Sei sulla pagina 1di 1
5 Fone Pipe Industries ne. Tek +! 28) 847 2987 ‘4 18) 1 Proctor Rood Fane +1 281 847 103) 2003 77038 Ho howorharepipe con FUTURE PIPE INDUSTRIES ed Sees of Arse smeraldepipe.cem/wa Short Term Burst Test Report Date’ Test: 10/16/09 Short term burst pressure (wth Fiberglass connection) test report per ASTM D1599 & API 1SHR: Sample ID & description: Pipe: YB-API 10” x 750 psi; pipe number 503 Pin x box L = 30 feet Sample with nipple and end connections: (One end fitted steel xbox end cap, other end fitted with sieel x pin end cap. End connections are free. Procedure: Sand bags were fitted at both ends of the test piece but, not touching the tested piece. High pressure pump was fitted to steel end cap along with a calibrated pressure gauge accurate to +/- 50 psi. The pump was started and the pressure increased at a Tate of about 500 psi every 30 seconds with a 15 second pause tocheck for leaks ‘Test was terminated when the body of the pipe ruptured, a joint feilure occurred, or pressure: was not sustained due to body weepage Al these failures were indicated by a rarid pressure drop on the gauge. Results: pie Body Weep at 2462 psi QC Department Romy o: AMERICAS | EHEA GCC ASA

Potrebbero piacerti anche