aR, force ipa nduies nc. «+1 281 847 2087
on, 190377038 howor@avepips con
FUTURE PIPE INDUSTRIES Und Soe of Arte vrlaesipe com/
Short Term Burst Test Report
Date: Test: 10/16/09
‘Snortterm burst pressure (with Fiberglass connection) test report per ASTM D159 &
API 15HR
Sample ID & description:
Pipe: YB-API 10” x 750 psi; pipe number 625 Pin x box L = 30 feet
Sample with nipple and end connections:
(One end fitted steel xbox end cap, other end fitted with steel x pin end cap. End
connections are free.
Procedure:
Sand bags were fitted at both ends of the test piece but, not touching the tested
piece. High pressure pump was fitted to steel end cap along with a calibrated pressure
gauge accurate to +/- 50 psi. The pump was started and the pressure increased at a
rate of about 500 psi every 30 seconds wih a 15 second pause to check for leaks.
Test was terminated when the body of the pipe ruptured, a joint fallure ocourred, or pressure
was not sustained due to body weepage. All these failures were indicated by a rapd
pressure drop onthe gauge.
Results:
QL pene
Body Weep at 2629 psi QC Department CL DP
et
AMERICAS | MEA GCC ASIA