Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
28
S.No. Item No. Rate page no Quantity Amount
1 1.1.1 112.8 25.74 2903.472
15 25.74
2 3.1.2 2051 6.46 13249.46
15 1.29
24 5.17
3 7.18+7.5.1 2546.85 12.79 32574.212
15 0.64
29 12.15
4 9.6 2355.95 4.83 11379.239
15 4.83
5 9.11.2 53.9 28.48 1535.072
16 28.48
6 9.13.3 344.05 49.2 16927.26
16 49.2
7 9.10 60.7 18.88 1146.016
16 18.88
8 2.1.16 163.8 2.09 342.342
16 2.09
9 3.2.3 3240.95 1.36 4407.692
17 0.28
18 1.08
10 7.9.2 283.7 68.85 19532.745
17 47.03
26 21.82
11 2.1.1 73.8 11.08 817.704
17 1.3
31 9.78
12 2.1.6 183.5 0.72 132.12
18 0.72
13 3.4.2 3290.9 4.58 15072.322
18 0.05
22 3.52
31 1.01
14 2.1.9 136.75 5.76 787.68
19 5.76
15 2.1.8 147.35 31.52 4644.472
20 31.52
16 3.14.1 46.8 408.24 19105.632
30 408.24
17 3.18 32.7 13.5 441.45
22 13.5
18 1.18 316.75 7.83 2480.1525
23 7.83
19 9.3.1 65.85 319.41 21033.149
26 319.41
20 7.18 2325.2 4.96 11532.992
27 4.96
21 1.17 38.15 3.93 149.9295
27 3.93
22 11.3.1+11.5 128.35 31.52 4045.592
27 31.52
23 6.24 289.55 59.06 17100.823
29 45.68
33 13.38
24 11.3.4 79.2 3.96 313.632
31 3.96
25 12.42.2 2460.45 67.03 164923.96
32 61.19
33 0.53
35 5.31
26 12.41.2 2403.6 22.75 54681.9
33 3.18
34 19.57
27 12.40 76.25 134.7 10270.875
34 134.7
28 12.10 913.7 271.09 247694.93
38 271.09
29 19.5.2 129.7 13.55 1757.435
39 13.55
30 19.5.4 204.8 20.85 4270.08
40 20.85
31 19.42 5.35 2500 13375
0 40 2500
32 12.6 532.35 131.13 69807.056
42 131.13
33 14.9+14.10 59.3 1182.46 70119.878
mb 2929 50 417.54
52 303.2
55 461.72
Name of work - Renovation of NC qtr for AE OFFICE at 33/11kv s/s Dantewada, Under O
Slab beam
H beam1x2 4 35.30
V beam 4 30.90
Deduction for beam corner
L shape junction -22 0.20
T shape junction -42 0.20
2.1.7 Suspended floors, roofs, access
platform, balconies (plain surfaces)
and shelves (cast in situ)
sqm 23.90
sqm 0.78
sqm 4.86
sqm 0.72
sqm 1.87
sqm 1.08
sqm 4.59
sqm 10.53
sqm 0.90
sqm 11.90
sqm 1.08
sqm 0.20
sqm 0.54
sqm 0.48
kg 87.12
kg 76.26
kg 4.00
0.76 kg 133.89
0.11 kg 1119.20
0.11 kg -241.96
0.11 kg -39.20
0.11 kg 6.44
sqm 23.90
sqm 0.78
sqm 4.86
sqm 0.72
sqm 1.87
sqm 1.08
sqm 4.59
sqm 10.53
sqm 0.90
sqm 11.90
sqm 1.08
sqm 1.08
sqm 4.76
sqm 3.64
42.80 34.00 1455.20
m 23.80
m 19.00
4.20 3263.00 13704.60
sqm 23.90
sqm 0.78
sqm 4.86
sqm 0.72
sqm 1.87
sqm 1.08
sqm 4.59
sqm 10.53
sqm 0.90
sqm 11.90
sqm 1.08
sqm 1.08
sqm 4.76
sqm 3.64
275.13 107.00 29438.51
subtotal 348.32
sqm 1.87
sqm 1.08
sqm 71.68
sqm 261.24
sqm 26.11
sqm 20.60
mtr 1.00
mtr 4.20
mtr 2.70
mtr 12.60
mtr 2.40
mtr 12.60
168.29 67.50 11359.71
kg 1.57
kg 4.24
kg 3.77
kg 11.30
kg 15.07
kg 4.40
kg 7.54
kg 9.89
kg 5.65
kg 43.39
kg 16.27
kg 32.54
kg 12.66
Estimation of Roofing Sheet with post
S.No. Item No. Item Descreption N L(in m) B(in m) H(in m) Unit
1 1.1 Excavation for all types
and sizes of foundations,
trenches and drains or
for any other purpose
including disposal of
excavated stuff upto 1.5 m
lift and lead upto 50m (at
least 5m away from the
excavated area), including
dressing and leveling of
pits.
1.58
0.23
3.12
1.35 2970.00 4009.50
1.35
20.80 858.00 17846.40
20.80