NOTES:

1. The licenced premises shall be used only for the purpose and facilities it is licensed for.
TO FARRUKNAGAR

2. CNG shall be dispensed only into those cylinders of motor vehicles, which are approved
by the Chief Controller and have passed the periodic statutory tests under thes rules conducted
by testing station recognised by the Chief Controller.
3. THE CNG cascades, dispensers, compressor, piping, and other fittings shall be of a design

TO KHEDKI
suitable for CNG in conformity to OISD Standard 179
SHAKTI
4. THE storage of the cascade of cylinders shall be made in a wall-ventilated shed having
DHARM KANTA a light roof or canopy with at least one side open. An area of at least 1 meter around the
PROPOSED cascade shall be provided and the shall be demarcated either by raised
SITE
platform or by curb wall
5. No cylinder shall be filled with CNG in excess of the design working pressure.
6. The dispenser for dispensing CNG shall be of a type approved by the PESO.
PWD OPEN GREEN BELT 7. The vehicle to be filled, shall have approved type of CNG kit fitted in accordance with guidelines of
TO SEC-106, 109 ministry of road transport and highway, Govt. of India.
C/L OF THE 15.24M WIDE METALLED ROAD
8. No motor vehicle shall be fuelled , while the engine is running and/ or while any passenger remains
NALA

3.05M WIDE CENTRAL VERGE in the vehicle.


TO SEC-99, 99A C/L OF THE 15.24M WIDE METALLED ROAD 9. Warning signs with the words "STOP VEHICLE", "NO SMOKING", "NO OPEN FLAME PERMITTED",
"PLAMMABLE GAS", shall be displayed at dispensing station and compressor areas prominently.
10. ALL electrical fitting and equipment such as compressors, motors, switches, starters, etc., installed

TO GURGAON SEC-4
TO GURGAON - BASAI ROAD

PWD OPEN GREEN BELT


in the premises used for compressing and filling of CNG shall be of flameproof construction
conforming to IS :2148 or such other specification as approved by the Chief Controller of
Explosive.
11. No alterations or additions shall be carried out to the premises without prior approval of

TO SEC-102
the licensing authority.
12. Smoking, naked lights, lamps,source of fire, mobile phones or any other implements capable of
BUILDING igniting flammable vapour or gas shall not be allowed inside the premises.
UNDER CONSTRUCTION 13. Every person managing or employed on or in connection with the licensedpremises shall abstain
from any act whatsoever whish tends to cause fire or explosion and which is not reasonably
necessary and to the best of his ability, shall prevent any other person from doing such act.
14. It is certified that other relevant Rules/Clauses of Gas Cylinder rules 2016/OISD-179 shall be
complied with.
SITE PLAN OF ACCESS AND FUEL STATION 15. There is no sewerage line within the site.
C ANOPY P WD BOU NDARY
50 MM TH . BITU MINOUS C AR PET
C NG E .POLE C .L . OF R OA D 15.24 M.W.
W.B .M. 1 0 0 MM TH. (2LAYERS )
B OUN DAR Y WALL P UMP COMP EC TE D EARTH OVE RL AY (P.C.C.+ DB M + BC)
OFFICE L EV EL - 0.340 (7 5 MM.,1 0 0 MM ,50MM) 3 .0 5M WID E C.VERGE
DRIVEWAY TOP S LOPE 2 % L EVEL + 0
E AR TH FIL LING D RAIN E AR TH FIL LING
WE T MIX MA C A D A M (WMM200 MM)
C EMEN T TR EA TE D AGGR EC ATE BA SE (CTAB 150MM)
U PP ER GRA NU LA R SU B BA SE (UGSB150 MM)
L OWE R U PPE R GRAN ULA R S UB BAS E (LGS B 1 50)
Legend
S UBGRADE
R.C.C. SLAB AS/STR. DESIGN
NUT BOLT Canopy Columm
RCC. COVER CAP
BRICK WALL A FUEL STATION AHEAD D GIVE WAY G COMPULSORY DIRECTION CONTROL
AT 1KM & 500M 1km.
CNG Dispenser
COARSE SAND 10 mm. B FUEL STATION E ONE WAY H NO RIGH TURN
FINE GRAVEL 2-4 mm.
COARSE GRAVEL 4-10 mm.
C FUEL STATION AHEAD
AHD.
F NO ENTRY I NO LEFT TURN
DCP 10 Kg.
PEBBLE
100 THK. P.C.C. 1:2:4 XY
I FUEL STATION BOARD
HORRIZONTAL PIPE (SLOTTED) DCP 75 Kg.
200 TH. W.B.M.
SLOTTED PIPE FOR RAIN WATER
DCP 4.5 Kg.
6 mm. J HONSON SCREEN 10 mm.
Street Light Pole
CULVERT DETAIL 5 mm. BLANK PIPE WITH DAIL PLUG
25MM TH. SEMI DENSE BITUMINOUS
CONCRETE (SDBC)
1. CNG Compressor:1 Nos.
50MM TH. BITUMINOUS MACADAM (BM)
75MM TH. WATER BOUND MACADAM (WBM) RAIN WATER HARVESTING 2. C.N.G. Dispensers (Daul Arm): 6 Nos.

CA 2M)
75MM TH. WATER BOUND MACADAM (WBM)

( 4X
3. Storage Cascades (3000 WL):

SC
75MM TH. WATER BOUND MACADAM (WBM)

AD
3
" & 21 " Size (SS316L)

E
150MM TH. GRANULAR SUB BASE (GSB) OR
SS
RE H)
CHAIN LINK FENCING 4. SS Tubing: 4
EARTH FILLING M P CM M 2000 HIGH
CO 00 S X 3.0
( 12 E 5.6 M
ELECTRIC POLE
S IZ 1 .5 E
W IDTE
ELECTRIC POLE 1. 10 KG DCP Type: 19 Nos.
S GA
CEMENT CONCRET WITH INTERLICKING
PAVER BLOCK APPROCH MARK 75MM THICK
LE
SA OM 2. 75 KG DCP Type: 2 No.
I. RO 3M
TO E
I.
3X
M
WID
3 .0 TE
3. 4.5 KG CO2 Type: 6 Nos.
TO
SAND BED 40MM THICK GA 0.23M THK. AND2.0M HIGH
PCC 1:4:8 BM. BOUNDARY WALL
ELECTRIC POLE
WBM 2 LAYAR OF 75MM THICK
CONSOLIDATED W.B.M WATER HARVESTING SYSTEM
(THREE SIDES)
PROPOSED C.N.G. FILLING STATION
WBM 100MM THICK
CONSOLIDATED W.B.M
WELL CONSOLIDATED SUBGRADE
ELECTRIC POLE SITE DETAILS.:
ELECTRIC POLE KHEWAT NO. 204, KHATONI NO.
Situation of the premises where
CNG DIS PE NS ER CNG DIS PE NS ER 214, RECT NO. 55, KILA NO. 1/2/1
1M WIDE SPAN SLAB CULVERT 1M WIDE SPAN SLAB CULVERT compressed gas to be stored/filled
MIN, NORTH WEST (2-1)
WITH IRON GRATING (IRC-13) WITH IRON GRATING (IRC-13)
State Haryana

SLOPE 2%

SLOPE 2%

SLOPE 2%

SLOPE 2%

SLOPE 2%

SLOPE 2%
ELECTRIC POLE
PWD BOUNDARY LINE PWD BOUNDARY LINE District Gurgaon
ROW ROW ROW ROW MH 1M WIDE CULVERT MH
BUFFER STRIP
OPEN DRAIN MH 1M WIDE CULVERT MH ROW ROW ROW ROW Town / Village DHANKOT
Survey No & Name of Road SEC 99, 99A - 106, 109, GURGAON
Nearest Police Station SECTOR-10A

SLOPE 2%

SLOPE 2%

SLOPE 2%

SLOPE 2%
EGRESS
INGRESS
Nearest Railway Station GURGAON
KACHA BERM
PIN CODE NO. 127505
PWD OPEN GREEN BELT
2.25M WID E EAR
THA N SHOULDER
OULDER
COMPANY NAME:
HAN SH
ID E EA RT
2.2 5M W 5.5M WIDE SER
HARYANA CITY GAS DISTRIBUTION LTD.
ICE ROAD VICE ROAD
DE SERV
5.5 M WI TITLE:
2.5M WIDE HARD SHOUNDER PROPOSED LAYOUT PLAN OF C.N.G. RETAIL
OUT-LET STATION AT VILLAGE-DHANKOT,
TO SEC-106, 109
DISTRICT-GURGAON (HARYANA)
DRAWING NAME: SITE LAYOUT PLAN
C/L OF THE 15.24M WIDE METALLED ROAD
SCALE: N.T.S.
DRG. NO. CCOE/HCG/DHANKOT REV.: DATE: 25.02.2019
PREPARED BY: CHECKED BY: APPROVED BY:
3.05M WIDE CENTRAL VERGE
OFFICE ADDRESS: HARYANA CITY GAS DISTRIBUTION LTD.
A-149 SUSHANT LOK, PHASE-I, GURGAON.
GURGAON-122001 (HARYANA)
Ph. No.- 0124-23888888
C/L OF THE 15.24M WIDE METALLED ROAD
TO SEC-99, 99A
LAYOUT PLAN OF ACCESS AND FUEL STATION

Potrebbero piacerti anche