TITLE OF PROJECT CONTACT PERSON/S PLACE VISITED OBSERVATIONS AND REMARKS

 The team conducted site validation of proposed Farm-to-


Market road at Sitio Turbina, Brgy. Libato, San, Juan,
Batangas. The proposed road has a total length of 1.1km
with 6m width. The road will be serves for the FBT,
vegetables, and rice production with total service area of
100 ha to the nearest public market. RECOMMENDED
FOR FUNDING.

 The team conducted site validation of proposed Farm-to-


Gilberto F. Mercado Market road at Brgy Escribano to Brgy. Sapangan, San,
Validation of requested Juan, Batangas. The proposed road has a total length of
Municipal Engineer San Juan, Batangas
Farm-to-Market Road 1.5km with 4m width. The road will be served for the
(09985905113)
FBT, vegetables, and rice production with total service
area of 200 ha to the nearest public market.
RECOMMENDED FOR FUNDING.

 The team conducted site validation of proposed Farm-to-


Market road at Brgy. Coloconto, San, Juan, Batangas. The
proposed road has a total length of 0.6km with 6m width.
The road will be served for the FBT, vegetables, and rice
farmers with total service area of 50 ha to the nearest
public market. RECOMMENDED FOR FUNDING
TITLE OF PROJECT CONTACT PERSON/S PLACE VISITED OBSERVATIONS AND REMARKS

 The team conducted site validation of proposed Farm-


to-Market road at Sitio Labac, Brgy. Sico 1, San, Juan,
Gilberto F. Mercado Batangas. The proposed road has a total length of
Validation of requested
Municipal Engineer San Juan, Batangas 0.87km with 6m width. However, the proposed FMR is
Farm-to-Market Road
(09985905113) NOT FEASIBLE because the existing roads that are
connected in between the proposed road is too long
(approximate length of 1 km).

The team conducted topographic survey of proposed SPIS at


Fernando Labara Sitio Bagbag, Brgy. Prenza and Sitio Bagbag, Brgy. Bungahan,
Topographic survey of Brgy. Captain/Farmers Lian, Batangas. The source of water on both sites is ground
Lian, Batangas
validated SPIS sites Federation President water therefore, geo-resistivity test is highly recommended for
(09360968040) drilling purposes. Moreover, all necessary information and
issues were raised upon interview.

Prepared By: Submitted By: Noted By:

Paul John O. Dinglasa Romelo Reyes Marcos Aves Sr


RAED STAFF Section Chief (PDS) OIC-RAED Chief

Jesus D. Duque
RAED STAFF

Romel A. Caballero
RAED STAFF

Alexander Nicole L. Tan


RAED STAFF
Photo Documentation