Team:

Incharge Date Status


1.0 Pre-Work
1.0 Send to Contractor NPC Approved Drawing:
1.1 Transformer Pad
JR
1.2 Equipment Layout
1.3 Takeoff Stracture
2.0 Location of Takeoff Stracture Nick & JR
3.0 BOQ Material & Delivery Wency & Mae
4.0 Tools ( To be determined) Hualy & Wency
5.0 Courrier, Uncrating & Positioning Mae & Nick
6.0 Budget coordination Mae

2.0 Test & Inspection: Physical Electrical


Transformer Serial number:
Warehouse / Incoming Quality Control
Warehouse / Incoming Quality Control

3.0 Site preparation: Nick


3.1 Transformer Pad Construction
3.2 SteelPole Erection
3.3 Cables & Piping Layout
3.4 Transformer Positioning

4.0 Transformer Set-up Nick


4.1 Transformer Wiring Set-up
Steel Pole Accessories' Dressing,CO Fuse and LA Installation
Secondary Cable Pulling
Primary Cable Pulling
Secondary Cable Termination
Primary Cable Termination
4.2 Transformer Final Set-up

5.0 Test & Commissioning


Plant Site

6.0 Acceptance
Items RAP Delivery Date Status

Transformer 200 kVA 1 ordered


1/0 AWG ACSR Power Conductor 34 ordered

14C-Instrumentation Cable 44 ordered


3C-Instrumentation Cable 44 ordered
50mm2, terminal lugs 3 ordered

Ground connector, 50mm2 8

Fuse Cut-out 15kV 3

Fuse Link 10A 3

Lightning Arrester 3
Hotline Clamp 3
PVC solvent 6
Steel Pole 25 ft. 1 ordered
Cross Arms 3 1/2" x 4 1/2" x 8' 1
Metal flat brace 28" 2
Transformer Pad 1
Anchor Bolts 4
Grounding Rod 1
1/2" x 6" Machine Bolt - 2 with square nut and 5
lock
5/8" washer
x 12" Machine Bolt - 2 with square nut and 5
lock washer
Double Arming Bolt 5/8" x 22" with square nut 3 delivered
and lock washer
1 3/8" diameter 9/16" Hole Round Washer -1 10
2 1/4" x 2 1/4" x 11/16" Square Washer - 1 10
Pole Clamp 3
Cable tie 1 delivered
PVC Electrical Tape Red 2
PVC Electrical Tape Blue 2
PVC Electrical Tape Yellow 2
PVC Electrical Tape Black 2
Rubber Tape 2
50mm2, Bare Copper (Grounding) 39
Hualy Nick Status revision
1) To set-up Transformer Pad ( variation)
ok

2) Transformer Set-up - to monitor Delivery Date to plant site: C/o Wency


ok

3) Control Cables- from Gen Set to control room ( as per site inspection
consolidated with Jomalig & Patnanungan, delivery to Minuyan) ok

4) Installation of Power Cable from Load sideof GCPP to Primary side


Transformer ok

5) ACSR 117M ( 34Jomalig,34Polilio, 49Patnanungan)


ok

6) note: to check sunwest steelpole completion c/o -JR


ok
7) Dispatch Date: ____________

8) Testing & Commissioning ok


WORK INS
TRANSFORME
ARGENT VENTURES INC.

Scope of Work:
1) To set-up Transformer Pad ( variation)
Nick

2) Transformer Set-up - to monitor Delivery Date to plant site:


C/o Wency Nick

3) Control Cables- from Gen Set to control room ( as per site


inspection consolidated with Jomalig & Patnanungan, delivery
to Minuyan) Nick

4) Installation of Power Cable from Load sideof GCPP to Primary


side Transformer
Nick

5) ACSR 117M ( 34Jomalig,34Polilio, 49Patnanungan)


Nick

6) note: to check sunwest steelpole completion c/o -JR


Nick

7) Dispatch Date: ____________


PM
8) Testing & Commissioning
Hualy

9) Budget Coordination
Mae

Materials: Qnty
Transformer 200 kVA 1
1/0 AWG ACSR Power Conductor 34
14C-Instrumentation Cable 44
3C-Instrumentation Cable 44
50mm2, terminal lugs 3
Ground connector, 50mm2 8
Fuse Cut-out 15kV 3
Fuse Link 10A 3
Lightning Arrester 3
Hotline Clamp 3
PVC solvent 6
Steel Pole 25 ft. 1
Cross Arms 3 1/2" x 4 1/2" x 8' 1
Metal flat brace 28" 2
Transformer Pad 1
Anchor Bolts 4
Grounding Rod 1
1/2" x 6" Machine Bolt - 2 with square nut and lock washer 5

5/8" x 12" Machine Bolt - 2 with square nut and lock washer 5

Double Arming Bolt 5/8" x 22" with square nut and lock washer 3
1 3/8" diameter 9/16" Hole Round Washer -1 10
2 1/4" x 2 1/4" x 11/16" Square Washer - 1 10
Prepared by:(Project Engr:)_________________Date:______ Checked by:(Project Ma
________________

FOR ARGENT VENTURES INTERNAL USE ONLY


WORK INSTRUCTION
TRANSFORMER -RAPU RAPU

LAYOUT ( c/o JR - initial pending approval)


Materials: Qnty
Pole Clamp 3
Cable tie 1
PVC Electrical Tape Red 2
PVC Electrical Tape Blue 2
PVC Electrical Tape Yellow 2
PVC Electrical Tape Black 2
Rubber Tape 2
50mm2, Bare Copper (Grounding) 39
___________Date:______ Checked by:(Project Manager: Arch Joseph)_________________Date:_______
__________________Date:__________

SE ONLY
ng approval)
_Date:________ Approved by: (CTO: Joseph):