1. Electricity Supply
2. Water source
and supply
Storage UG Sumps – 6 nos
- Raw Water – 2 nos – 65000 litres
-Filter Water Sump 2 nos – 100000 litre capacity
- Metro water Sump – 2 nos – 98000 litre capacity
Distribution HNS system – 2 sets of systems are installed
System - First Set serves Block A, E & F and consists of (3 pumps – I for
metro, II for domestic, III for flush water)
- Second Set serves Block B, C, D and consists of (3 pumps – I for
metro, II for domestic, III for flush water)
Source Borewell - 2 nos, open well – 1
WTP The treatment system is being planned by the consultant and is likely to be
installed before 30th June
Tanker Water - Most of the residential associations in the nearby vicinity have
Supply dwelled on tanker water supply because of no reliability on ground
water.
- The 2 nos of raw water sumps of 65,000 litre capacity at the site can
be used to store the tanker water supply
Metro water - The area is being fulfilled with metro water infrastructure in certain
parts.
- The representation from BBCL will facilitate the connection when
the infrastructure reaches this locality.
- Necessary metro sumps of 98000 litre capacity is constructed to
cater to the metro water source
6. Land extent - The profile of the site is compounded as per the site configuration
configuration shown in the sanctioned approval drawing and is not diluted nor
deviated from the land extent as calculated for UDS
- The demarcated portion is proposed to be developed as a
commercial development which will serve as a facility to the
community.
7. Fitouts - primary - It is the responsibility of the apartment owners to deposit the waste
guidelines, generated from the interior fit out works in the garbage yard
responsibility of created outside the eastern site of the site.
cleaning - Leaving the leftover ply materials in the corridor is to be strictly
prohibited
8. Cleaning of - The corridors and common areas will be continuously cleaned for
common spaces the next 6 to 8 weeks. Post handing over of the dwellings, periodical
cleaning will be as a part of maintenance
9. Corpus fund Corpus fund will be handed over on the Establishment of the Association
11 Snagging and - The flats can be taken over immediately for A, B, C, D & E blocks
handing over of - Once the complete list of snags are shared from the customer after
apartments their inspection, works will be attended and handed over in specific
period time
12 House warming - A notice is to be sent to CRM team on the date and time of the
& occupancy House warming. The CRM will inform the site team to keep the flat
clean and tidy with electricity and sanitary operational.
13 Final coat of The final coat of external painting be executed after the external works are
painting completed in July
14 Site team,
maintenance - Site Team – Mr. Killivallavan (9884686165)
team - primary - Maintenance Team -
contacts
15 Final settlement - The keys can be sought from the CRM team after the final payments
- handing over are cleared by the customer.
and NOC - The no due certificate will be issued by the accounts post the
settlement