CEA-PS-12-14(12)/1/2018-PSPA-II Division
I/1928/2018

भारत सरकार
Government of India
िव युत मंत्रालय
Ministry of Power
के द्री य िव यु त प्रा िध क र ण
Central Electricity Authority
िव यु त प्र णा ली यो ज ना ए वं मू यां क न प्र भा ग - I I
Power System Planning & Appraisal Division-II

सेवा मे / To,
संलग्न सूची के अनस ु ार
As per list enclosed

िवषय: ट्रांसिमशन पर दिक्षणी क्षेत्र थायी सिमित (एसआरएससीटी) की पहली बैठक की


कायर्सूची ।
Subject: Agenda for 1st meeting of Southern Region Standing Committee on
Transmission (SRSCT)

महोदय(Sir)/महोदया(Madam),

ट्रांसिमशन पर दिक्षणी क्षेत्र थायी सिमित (एसआरएससीटी) की पहली बैठक 07 िसतंबर,


2018 को चे नई, तिमलनाडु म आयोिजत की जायेगी । बैठक की कायर्सच
ू ी संलग्न है । कृपया
बैठक म सि मिलत होकर अनग्र
ु हीत कर ।
1st meeting of Southern Region Standing Committee on Transmission (SRSCT)
will be held at on 7th September , 2018 at Chennai, Tamilnadu. Agenda for the meeting
is enclosed.
Kindly make it convenient to attend the meeting.

भवदीय/Yours faithfully,

(बी.एस.बैरवा/B.S. Bairwa)
िनदे शक/ Director

सेवा भवन, आर. के . परु म-I, नई िद ली-110066 टे लीफोन : 011-26198092 ईमेल: cea-pspa2@gov.in वेबसाइट: www.cea.nic.in
Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telephone: 011-26198092 Email:cea-pspa2@gov.in Website: www.cea.nic.in
Address List:

1. The Member Secretary, 2. Chief Operating Officer,


Southern Regional Power Committee, Central Transmission Utility (CTU),
29, Race Course Cross Road, Power Grid Corporation of India
Bangalore 560 009. “Saudamini” Plot No. 2, Sector-29,
FAX : 080-22259343 Gurugram-122001
Tel. No. 0124-2571816
Fax No.0124-2571932
3. Director (System Operations), POSOCO 4. Managing Director
B-9, Qutub Institutional Area, Karnataka State Power Trans. Corp.Ltd.,
Katwaria Sarai, New Delhi-110016 Cauvery Bhawan,
Tel. No. 26852843 Bangalore - 560 009.
Fax No. 2626524525, 26536901 FAX : 080 -22228367

5.Chairman and Managing Director 6. Chairman-cum-Managing Director


Transmission Corp. of Andhra Pradesh Ltd., Transmission Corp. of Telangana Ltd.,
(APTRANSCO) (TSTRANSCO)
Gunadala, Eluru Rd, Vidyut Soudha, Khairatabad
Hyderabad – 500 082.
Vijayawada,
Andhra Pradesh
7. Chairman-cum-Managing Director 8. Managing Director
Kerala State Electricity Board, Tamil Nadu Transmission Corporation Ltd
Vidyuthi Bhawanam, (TANTRANSCO),
Pattom, 6th Floor, Eastern Wing, 800 Anna Salai,
Thiruvananthapuram - 695 004. Chennai - 600002.
FAX : 0471-2444738 FAX : 044-28516362
9. The Superintending Engineer –I, 10. Executive Engineer
First Floor, Electricity Department, Divisional Office
Gingy Salai, Lakshadweep Electricity Department
Puducherry – 605 001. Kavaratti Island
FAX : 0413-2334277/2331556 UT of Lakshadweep
Agenda for 1st meeting of SRSCT (07.09.2018)

Agenda for 1st meeting of Southern Region Standing Committee on


Transmission (SRSCT)
Date: 7th September, 2018 Time: 10:00 hrs
Venue: Chennai, Tamilnadu

1.0 Minutes of 42nd meeting of the Standing Committee


1.1 The Minutes of 42nd meeting of the Standing Committee on Power System Planning of
Southern Region (SCPSPSR) held on 27th April 2018 were issued vide CEA’s letter
No. 1/1221/2018 dated 15th June 2018. No comments have been received on the
minutes.

Follow up issues of previous meetings of SCPSPSR


2.0 Proposal of erection of 125 MVAR Bus Reactor at other end instead of 400 kV GIS
Srisailam Left Bank Hydro Electric Station (SLBHES)
2.1 In the 39th Standing committee meeting, installation of the 400kV, 1x125MVAR, Bus
reactor at Srisailam Left Bank Hydro Electric Station(SLBHES) 400kV GIS substation
was approved. Representative of TSTRANSCO stated that during the 31st TCC&
32nd SRPC meetings held on 21/22.08.2017, it was informed that erection of Bus
reactor was not feasible due to space constraint at SLBHES.
2.2 In the 41st SCPSPSR it was decided to study and examine the installation of Bus
reactors at other end of the substations connecting SLBHES GIS substation in joint
meeting.
2.3 In the meeting held in CEA on 06.02.2018, it was observed that the effect of one 400kV,
125MVAr bus reactor planned at Dindi substation is not adequate to bring down the
overvoltage within limit at SLBHES bus. However, the voltage is observed to be within
limit by installation of additional bus reactors of 125 MVAr (400kV) capacity at Dindi
i.e. installation of 400kV, 2x125MVAR bus reactor (including one reactor already
planned at Dindi substation). Accordingly, it was decided that a team comprising
officers from CEA, CTU and TSTRANSCO would visit SLBHES switchyard to
explore the feasibility to accommodate the reactor (125 MVAr).
2.4 In response of the above a team comprising of officers of CEA, CTU and TSTRANSCO
visited SLBHES on 08.08.2018. After visiting the site and discussion with the project
authorities, the team was of view that there is no possibility of locating the 125MVAr,
400kV bus reactor at SLBHES without compromising the safety and security of the
plant. Site visit report is enclosed at Annexure-I.
Members may deliberate.

1
Agenda for 1st meeting of SRSCT (07.09.2018)

3.0 High voltage system studies and proposal for reactive compensation in SR
3.1 In the 42nd Standing committee meeting of Southern Region CTU had presented detailed
reactive compensation studies considering the present & future scenario and had
proposed 24 reactors at various substations of ISTS and Intra-state system. In the
meeting TSTRANSCO stated that they will check the requirement of the reactors in
their control area.
3.2 In the meeting, following reactor were proposed at substations of Telangana
Voltage Existing / UC BUS Bus Reactor
Sl. No. Bus Name
(in kV) Reactor (MVAr) proposed (MVAr)
1 SURYPET 400 - 125
2 RAIDURG 400 - 2x125
3 KAMALAPURAM 400 - 125
4 NARSAPUR 400 - 125
5 MAHESHWARAM-TS 400 - 125
6 TIPPAPUR 400 - 125
7 MANIKONDA 400 - 125
8 JANAGAON 400 - 125
9 CHOUTTUPPAL 400 - 125
10 YELLAMPALLI 400 - 125

3.3 TSTRANSCO informed that 125MVAR bus reactor each at Tippapur ,Kamalapuram,
Manikonda and Yellampalli substation are sufficient to keep the bus voltage under
control under off-peak condition for time frame 2021-22 (study enclosed at Annexure-
II)
Members may deliberate.
4.0 Providing additional feed to 3x500 MVA, 400/220kV substation at Mylasandra
(Electronic City) and Establishment of 2x500 MVA, 400/220 kV Sub-station at
Dommasandra in Bengaluru
4.1 In the 42nd meeting of SCPSPSR, KPTCL proposed to construct LILO of one circuit
of proposed Dharmapuri- Somanahalli 400kV D/c line (PGCIL line) at 400 kV
Mylasandra sub-station. With above proposals, 400kV system at proposed 400/220kV
Mylasandra substation would be as under:
i. 3x500MVA, 400/220kV ICTs
ii. LILO of single circuit of Dharmapuri-Somanahalli 400kV D/C line (quad
Moose ACSR conductor) at Mylasyandra
iii. LILO of single circuit of Kolar-Somanahalli 400kV S/C line (Twin Moose) at
Mylasyandra
4.2 Further, KPTCL had proposed for establishment of 400/220 kV sub-station at
Dommasandra (with 400/220kV, 2x500MVA ICTs) in Bengaluru city to relieve

2
Agenda for 1st meeting of SRSCT (07.09.2018)

400kV Mylasyandra sub-station by reducing the loading on 220 kV lines and to meet
the future load growth in the vicinity with following details:
i. 2 X 500 MVA, 400/220 kV GIS substation at Domasendra
ii. LILO of Kolar – Mylasandra 400kV S/C line (with Twin Moose ACSR
conductor) at proposed Dommasandra substation.
iii. Somanahalli - Dommasndra 400kV S/C line (with Twin Moose ACSR
conductor)
iv. LILO of Somanahalli - Malur 220 kV D/C line at EXORA sub-station (With
this line arrangement, there will be 220kV D/C connectivity between
Dommasandra & EXORA, 220 kV S/C connectivity from Dommasandra, each
to Sarjapura and Malur).
v. 220 kV, 1000sqmm UG cable link between 220 kV VT Park substation and
220kV EXORA sub-station (proposed).
4.3 In the 42nd meeting of SCPSPSR, it was decided that the strengthening of upstream
lines to Mylasandra sub-station and the proposal of LILO of Dharmapuri-Somanahalli
400kV D/C line at Mylasandra will be studied in detail along with proposal of
establishment of a 400kV substation at Dommasandra after joint study of system
carried by CEA, CTU, POSOCO and KPTCL.
4.4 Accordingly, the issue was discussed in a joint study meeting held on 10th/11th May
2018, wherein representative of CTU stated that KPTCL had already planned LILO of
Kolar - Somanahalli 400 kV S/C line at Mylasyandra 400/220kV substation. Again
making LILO of Kolar – Mylasyandra section at proposed Dommasandra 400/220kV
substation would reduce reliability of the system. Minutes of the joint study meeting
is enclosed at Annexure –III.
4.5 To meet out the rising demand of Bengaluru city along with reliability, following
alternatives were discussed:

Alternative 1:
i) LILO of Kolar – Somanahallli 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)
ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad ACSR
Conductor) line at Mylasandara 400/220 kV substation
iii) Mylasandra – Dommasandra 400kV D/C line (twin Moose)
Alternative 2:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).

3
Agenda for 1st meeting of SRSCT (07.09.2018)

ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad moose
ACSR conductor) line at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line (with twin Moose ACSR conductor)
Alternative 3:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C (Quad) line at
proposed 400/220 kV substation at Dommsandra.
iii) LILO of LILO section of Somanahalli – Dommasandra (formed after LILO of
single circuit of Dharampuri – Somanhalli 400kV D/C (Quad) line at
Dommasandra) at Mylasandra.
4.6 Regarding alternative-1, KPTCL stated that proposed 400/220kV substation at
Mylasandra is GIS and space is not available for 06 nos of 400kV line bays. Therefore,
Alternative-1 can be ruled out.
4.7 Load flow studies were carried out for both Alternative-2 and Alternative-3 (power
flow plot enclosed as Exhibit-2). The studies show that both Alternative-2 and
Alternative-3 are acceptable, but Alternative-2 is more reliable than Alternative-3.
4.8 KPTCL stated that in case of both Alternative-2 and Alternative-3, multi circuit towers
are need to be used for construction of lones constructed between Mylasandra and
Dommasandra. However, KPTCL requested to consider Alternative-2 over
Alternative-3 considering higher reliability.
4.9 Accordingly, Alternative-2 was agreed for supplying reliable power to Bengaluru city.
The transmission system of Mylasandra and Dommasandra 400kV S/S will be as
follows:
Connectivity at Mylasandra 400/220kV substation:
i) 3x500MVA, 400/220kV ICTs
ii) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)
iii) Mylasandra – Dommasandra 400kV S/C line (twin Moose)
400/220kV substation at Dommasandra :
i) 2x500MVA, 400/220kV ICTs
ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C line (with Quad
moose ACSR Conductor) at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line ((with twin moose ACSR Conductor)
on D/C towers

4
Agenda for 1st meeting of SRSCT (07.09.2018)

4.10 KPTCL stated that they would plan to utilize RoW of Kolar – Somanahalli 400kV S/C
line for LILO of Dharampuri – Somanhalli 400kV D/C line (with Quad moose ACSR
conductor) at Dommsandra. It was also clarified that modalities may be finalized at
the time of implementation.
Members may concur.
5.0 Evacuation of power from RE sources in Southern Region (Proposed Wind
Energy Zone by MNRE)
5.1 In the 42nd meeting of SCPSPSR held on 27.04.2018, it was informed that based on
various inputs like district wise NIWE potential, SNA developable potential, pooling
station wise wind capacity sanctioned by STU, RE applications received in ISTS by
CTU and detailed discussion with MNRE & wind IPPs/developers, projected capacity
in each Wind Energy Zone (WEZ) were identified and prioritized for implementation
in 2021-22-time frame in wind resource rich states. In the meeting held in MNRE,
Koppal (2500 MW) in Karnataka, Kurnool (3000 MW) in Andhra Pradesh and Karur
(2500 MW) in Tamil Nadu were identified as prioritized Wind Energy zones for which
transmission infrastructure needs to be developed/made available under ISTS Intrastate
transmission system. Further, it was indicated that Tirunelvelli/ Tuticorin district in TN
is also a high wind potential complex and 2500 MW of wind energy potentials
considered for development of transmission infrastructure under ISTS/Intra-state
transmission system.
5.2 In the meeting it was decided that comprehensive study would be carried out with
Southern Region constituents for accessing the transmission system requirement in the
region as a whole.
5.3 A joint system study was held in SRPC, Bengaluru on 10&11, May 2018. In the
meeting, LGB was finalized considering peak wind scenario and peak and off peak
demand scenario (2021-22). Minutes of the joint study meeting is enclosed at Annexure
–III. After analyzing study results following Transmission system were agreed:

A. Tirunelveli and Tuticorin Wind Energy Zone (Tamil Nadu):

i. Addition of 2x500 MVA, 400/230kV ICTs (4th & 5th) at Tuticorin-II GIS sub-
station.

ii. Operation of Tuticorin-II GIS – Dharmapuri (Salem) 765 D/C line (presently
operating at 400kV) at its rated voltage. (i.e 765kV) would be reviewed for
dispersal of more than 2000MW RE generation

B. Karur / Tiruppur Wind Energy Zone (Tamil Nadu):

i. Establishment of 5x500 MVA, 400/230 kV Karur Pooling Station (at a


location in between Karur Wind zone and Tiruppur wind zone)

5
Agenda for 1st meeting of SRSCT (07.09.2018)

ii. LILO of both circuits of Pugalur – Pugalur (HVDC) 400 kV D/c line ( with
Quad Moose ACSR Conductor) at Karur PS
iii. 9 Nos. of 230kV line bays for interconnection of wind projects
iv. 2x125 MVAr, 400kV Bus reactors at Karur PS

C. Koppal Wind Energy Zone (Karnataka)

The following transmission system mentioned was agreed for connectivity of RE


generators at proposed Munirabad/Koppal PS.

i. Establishment of 5x500 MVA, 400/220kV pooling station near Munirabad


/suitable location in Koppal distt.
ii. Pooling station (near Munirabad /suitable location in Koppal distt.) -
Munirabad 400 kV D/c Line (with Quad Moose ACSR conductor)
iii. Pooling station (near Munirabad /suitable location in Koppal distt.) -
Narendra (New) 400 kV D/c Line (with Quad Moose ACSR conductor)
iv. 9 Nos of 220kV line bays for interconnection of wind projects
v. 2x125 MVAr,400kV bus reactor at Pooling station (near Munirabad
/suitable location in Koppal distt.)
vi. Adequate space provision for future expansion.

It was also agreed that for transfer of power from the above pooling station would
require system strengthening in Western Region. Accordingly, it was suggested that
issue of strengthening of WR system need to be discussed/taken up with WR
constituents.

D. Kurnool Wind Energy Zone (AP):

Considering on the land availability for pooling station and the applications of RE
developers for connectivity with ISTS a pooling station at common location in
between Kurnool & Ananthapur distt. has been proposed with following details:
i. Establishment of 765/400/220kV Pooling station (at suitable location in
Kurnool substation Distt) at Kurnool-III (e.g. near Adoni) with 3x1500 MVA,
765/400kV; 6x500 MVA, 400/220kV transformation capacity
ii. Kurnool-III Pooling station - Kurnool(new) 765 kV D/c Line
iii. 10 nos of 220kV line bays for interconnection of wind projects
iv. 1x240 MVAr (765kV) & 1x125MVAr (400kV) bus reactors at Kurnool-III
Pooling station.
v. Adequate space provision for future expansion.

Members may discuss.

6.0 Intra- state transmission projects proposed for Green Energy Corridor Ph-II in
Karnataka
6.1 In the 42nd SCPSPCR, KPTCL proposed following Intra-State transmission projects

6
Agenda for 1st meeting of SRSCT (07.09.2018)

for evacuation of large scale RE generation

Sl No Project Description

Establishing 2X500 MVA, 400/220/110kV substation at Yalwar in


1
B.Bagewadi Taluk, Bijapur district.
Establishing 2X500 MVA, 400/220kV substation at Lokapur in Bagalkot
2
district.
Providing additional 400kV link with proposed 400/220 kV Doni sub-station
3 by LILO of existing Narendra- Davanagere 400 kV D/C line (with twin
moose ACSR conductor) at Dhoni sub-station.

4 Establishing 2X100MVA, 220/110 kV substation at Ron in Gadag district.


Establishing 2X100MVA, 220/110 kV substation at Savalgi in Bagalkot
5
district.
Establishing 2X100MVA, 220/66 kV substation at P.D.Kote in Chitradurga
6
district.
Establishment of 2x100 MVA, 220/66 kV sub-station at Hanagal (New),
7
Chitradurga District

LILO of 2nd circuit of the existing Mahalingpura - Kudachi 220 kV D/C


8
line at Athani.
Conversion of existing Bidnal-Saundatti 220 kV S/C line and Saundatti -
9
Mahalingpura 220kV S/C to 220 kV D/C line

Strengthening of Lingapura-Ittagi 220kV S/C line, Ittagi –Neelagunda


10 220kV S/C, Neelagunda –Guttur 220kV S/C line by replacing line with 220
kV D/C line (Twin Drake conductor).

6.2 In the meeting, it was decided that due to large scale integration of renewable
generation in SR, detailed study considering the proposals of renewable rich states of
SR and CTU need to be carried out.
6.3 In the joint system study held on 10th and 11th May 2018, the proposed transmission
system was studied in detail and deliberations are as follows:
A. Establishment of 2x500 MVA, 400/220 kV sub-station at Yalwar, Bijapur
District with following elements:
400 kV System:
i. Narendra (New) Kudgi-Yalwar 400 kV D/C line (with Quad Moose ACSR
Conductor)
ii. Gulbarga- Yalwar 400 kV D/C line (with Quad Moose ACSR Conductor).

7
Agenda for 1st meeting of SRSCT (07.09.2018)

iii. 2 X 500 MVA, 400/220 kV ICTs at Yalwar.


iv. 2 X 125 Mvar bus reactors.
220 kV System:
i. LILO of both circuits of existing B.Bagewadi – Lingasugur 220 kV D/C line
at Yalwar.
ii. LILO of both circuits of Bijapur- Sindagi 220 kV D/C line sub-station at
Yalwar.
iii. B.Bagewadi -Yalwar 220 kV D/C line.
System study shows that power flows from proposed Yalwar sub-station toward
Narendra. In case of outage of the proposed Yalwar –Narendra (New) 400kV D/C
line, all the power will absorb in state network.
After deliberations, the proposed 400/220 KV substation at Yalwar and associated
transmission lines for evacuation of wind generation in Yalwar was agreed except
Yalwar - Nagendera (New) 400kV D/C line.
B. Establishment of 2x500 MVA, 400/220 kV sub-station at Lokapur, Bagalkot
400 kV System:
i. LILO of both circuits of Narendra (New) –Narendra (PGCIL) 400 kV D/C
line (with Quad Moose ACSR Conductor) at Lokapur
ii. 2 X 500 MVA 400/220 kV ICTs.
iii. 2 X 125 Mvar bus reactors.
220 kV System:
i. LILO of both circuits of existing Gadag-Bagalkot 220 kV D/C line at
Lokapur.
ii. LILO of both circuits of Mahalingpura-Soundatti 220 kV D/C line at
Lokapur.
iii. Mughalkod.- Lokapur/Bagalkot 220 kV D/c Line.

The study result shows that power flows from Narendra (New) dispersed towards
Kolhpur (PG). The congestion /transmission constraint observed in the system
beyond Kolhapur (MSETCL) and Kolhapur (MSETCL) – Karad 400kV D/c line
gets overloaded. Accordingly, it was decided to review the transmission system for
Lokapur Wind Energy zone along with Koppal Wind Energy Zone seeking
connectivity at ISTS.
C. Providing additional feed to 400/220 kV Dhoni sub-station by LILO of
existing Narendra – Davanagere 400 kV Twin Moose D/C line at Dhoni.

8
Agenda for 1st meeting of SRSCT (07.09.2018)

The system study shows that additional feed to 400/220 kV Dhoni sub-station by
LILO of existing Narendra – Davanagere 400 kV D/C line (with twin moose ACSR
conductor) at Dhoni does not provide any additional benefit and hence, LILO of
above line at Dhoni was not agreed.
D. Establishment of 2x100 MVA, 220/110 kV sub-station at Ron (New), Gadag
District
220 kV System:
i. Doni- Ron 220kV D/C line.
ii. 2 X 100 MVA, 220/110 kV ICTs.
110 kV System:
i. LILO of both circuits of existing Ron-Gajendragad 110 kV D/C line at Ron
(New).
ii. 110 kV LILO of DC line between Gadag and 110 kV Ron to proposed 220
kV Ron. (Existing SC line via Naregal and proposed ongoing 2nd circuit
directly to 110 kV Ron).
E. Establishment of 2x100 MVA, 220/110 kV sub-station at Savalgi, Bagalkot
District
220 kV System:
i. LILO of both circuits of Kudgi-Vajramatti 220 kV D/C line at Savalgi.
ii. 2x100 MVA, 220/110 kV transformers.
110 kV System:
i. LILO of existing Todalbagi-Mamadapura 110 kV S/C line at Savalgi.
ii. LILO of existing Bableshwar-Mamadapura110 kV S/C line at Savalgi.
F. Establishment of 2x100 MVA, 220/66 kV sub-station at Hanagal (New),
Chitradurga District
220 kV Transmission scheme:
i. Jagalur - Hanagal 220 kV D/C line.
ii. 2 X 100 MVA, 220/66 kV ICT’s.
66 kV System:
i. LILO of existing Gudikote-Hangal 66 kV S/C line at Hangal (New).
ii. LILO of both circuits of Hangal -Rampura 66 kV D/C line at Hangal (New).
iii. Hangal - Konasagara 66 kV S/C line on D/c towers.

9
Agenda for 1st meeting of SRSCT (07.09.2018)

G. Establishment of 2x100 MVA, 220/66 kV sub-station at PD Kote (New),


Chitradurga District
220 kV System:
i. LILO of both circuits of Hiriyur-Gowribidanur 220 kV D/C line at P.D.Kote
(New).
ii. 2 X 100 MVA, 220/66 kV ICT’s.
66 kV System:
i. LILO of both circuits of Hariyabbe-P.Kote 66 kV D/C line at P. D Kote
(New).
ii. LILO of Hiriyur-Kalmaranahalli 66 kV S/C line at P. D Kote (New).
H. LILO of 2nd circuit of the existing Mahalingpura - Kudachi 220 kV D/C line
at Athani.
I. Conversion of existing Bidnal-Saundatti 220 kV S/C line and Saundatti -
Mahalingpura 220kV S/C to 220 kV D/C line
J. Strengthening of Lingapura-Ittagi 220kV S/C line, Ittagi –Neelagunda 220kV
S/C, Neelagunda –Guttur 220kV S/C line by replacing line with 220 kV D/C
line (Twin Drake conductor).
The transmission system proposals of KPTCL mentioned at D to J found to be in order
and agreed.
Members may concur.

Transmission planning proposals by Karnataka


7.0 Establishment of 1x500 MVA, 400/220 kV Substation at Arasapadavu
7.1 KPTCL vide their email dated 23.08.2018 informed that they are planning 1x500 MVA,
400/220 kV at Arasapadavu, Dakshina Kannada district with double LILO arrangement
of 400 kV UPCL-Shantigrama D/C Quad Moose line with LILO distance of about
11km.
7.2 Further, it is proposed to extend connectivity to proposed EHT load of M/s MRPL to
an extent of 400 MVA (ultimate load). The proposed 400 kV Arasapadavu sub-station
is intended to take loads of 220 kV MSEZ and Kavoor sub-stations, resulting in
reduction of load on 2X315MVA, 400/220kV UPCL transformers and 220 kV UPCL-
Kemar line. Also, there will be considerable reduction in system loss.
7.3 KPTCL has been carried out Load flow studies enclosed at Annexure-IV and proposed
following transmission scheme:

10
Agenda for 1st meeting of SRSCT (07.09.2018)

i. LILO of both circuits of 400 kV UPCL-Shantigrama D/C line at 400/220kV


Arasapadavu sub-station.
ii. 1 X 500 MVA, 400/220 kV transformers with provision for additional 500
MVA transformer in future.
iii. LILO of both circuits of MSEZ – Kemar 220kV D/C line at proposed
Arasapadavu .
Members may discuss.

Transmission planning proposals by Tamil Nadu


8.0 Establishment of 400/230kV substation at Vadamadurai
8.1 TANTRANSCO has informed that Vadamadurai 400/230kV S/S has been envisaged
to avoid overloading of Sembatty-Checkanurani 230kV feeder and also to reduce the
overloading of auto transformers at Renganathapuram 230 kV Substation and
overloading of ICTs at Checkanurani 400/230 kV Substation. This Substation cater the
loads of the existing Sembatty 230 kV SS and the proposed Thummakundu 230 kV SS,
Vedasandur SS & Palani 230 kV SS in Madurai Region.
8.2 In view of the above TANTRANSCO proposed following schemes:
i. Establishment of Vadamadurai 400/230kV SS with 2x500 MVA 400/230 kV
ICT
ii. 2x125 MVAr Bus Reactors
400 kV Connectivity:
i. LILO of Karaikudi-Pugalur 400 kV D/C line at Vadamadurai
ii. LILO of Thappagundu – Anaikadavu 400 kV D/C line at Vadamadurai
8.3 The system studies conducted by TANTRANSCO is enclosed at Annexure-V
Members may discuss.

9.0 Establishment of 400/110 kV substation at Vishwanathapuram


9.1 TANTRANSCO has informed that Vishwanathapuram 400/110kV SS has been
envisaged for reducing the overloading of auto transformers of the existing Hosur 230
kV SS and the upcoming Uddanapally 230 kV SS and also to reduce the loading of
certain 110 kV lines in that area. The proposed 400/110 kV SS will be an alternate
source for the associated 110 kV SSs in the Hosur & Krishnagiri area which is an
industrial area and further industrial expansion is expected by way of proposed
establishment of SEZ in future. Ensuring reliability of source in this area will reduce

11
Agenda for 1st meeting of SRSCT (07.09.2018)

power interruption and avoid major revenue loss. TANTRANSCO requested for
Provision of additional 1x 500 MVA, 400/230 kV ICT at Thiruvalam 400/230 kV SS.
9.2 In view of the above TANTRANSCO proposed following schemes:
i. Establishment of Vishwanathapuram 400/110kV S/S with 3x200 MVA 400/110 kV
ICT
ii. 1x125 MVAr Bus reactor
iii. 1x80 MVAr line reactor at Viswanathpuram the 400kV Vishwanathapuram –
Thiruvalam line.

400 kV Connectivity:
iii. LILO of Thiruvalam-Palavady 400 kV S/C line at Vishwanathapuram (quad
moose)
iv. PGCIL Hosur(Shoolagiri)- Vishwanathapuram 400kV S/C line
9.3 The system studies conducted by TANTRANSCO is enclosed at Annexure-VI
Members may discuss.

10.0 Modification in approved 400/230-110 kV substation at Sholingur


10.1 TANTRANSCO has informed that Sholingur has been already approved in the 37th
meeting of the Standing Committee on Power System Planning of Southern Region
held on 31st July 2014 in New Delhi, with the following scheme:
2x315 MVA 400/230 kV ICTs and 2x200MVA 400/110 kV ICTs
400 kV Connectivity:
LILO of Sriperumbudur – Tiruvalam 400 kV S/C line at Sholingur
10.2 TANTRANSCO has proposed following revision:
ICT
i) 400/230 kV, 2x500 MVA
ii) 400/110kV,3x200 MVA

iii) 2x125 MVAr Bus reactor


400kV connectivity:
LILO of Thiruvalam –Alamathy at Sholingur

10.3 The system studies conducted by TANTRANSCO is enclosed at Annexure-VII

12
Agenda for 1st meeting of SRSCT (07.09.2018)

Members may discuss.


11.0 Revised Scheme for power evacuation scheme proposed for Udangudi TPP stage
-1 2x660 MW
11.1 TANTRANSCO vide their letter dated 22.07.2018 informed that the power evacuation
system for the proposed state owned Udangudi power project (Stage -I)- 2X660 MW
was approved in the 37th Standing meeting on Power System Planning of Southern
Region held on 31.07.2017 with associated transmission schemes as detailed
below:
ATS-for the proposed thermal power plant at Udangudi (2x660 MW )
i. 400kV D/C line (with Quad Moose ACSR) to the Kayathar 400kV S/S.
ii. 400kV D/C line to the proposed Samugarengapuram 400/230-110 kV S/S.
iii. 400kV D/C line (with Quad Moose ACSR)to the proposed Ottapidaram
400/230-110kV S/S.
11.2 Rising trend of capacity addition of solar power over and above the already proposed
wind generation in Kayathar-Tirunélveli area necessitated to revisit the associated
transmission schemes of Udangudi MW power project. Hence TANTRANSCO carried
out load flow study considering following scenario (enclosed at Annexure-VIII).
a) Network condition for the year 2022-23. (Probable year of commissioning of
Udangudi (Stage-I) project.
b) LTA quantum of wind generation considered in the PGCIL Substations:
i) Trichy(Alundur) -80 MW
ii) Pugalur - 240+170 =410 MW
iii) Tirunelveli Pooling Station (Tuticorin-ll)- 800 MW
c) The solar/wind plants considered in this study are as follows:
i) Thennampatty 400/230-110 kV SS: 1200 MW (Solar - 500 MW + Wind -700
MW)
ii) Kanarpatty 400/230-110 W SS: 950MW (Solar-350 MW +Wind-600MW)
iii) Kayathar 400/230-110 kV SS: 1118 MW (Solar- 50 MW + Wind -1068 MW)
iv) Samugarengapuram 400/230-110 kV SS: Wind generation of 1200 MW
v) Kamuthi 400/230-110 kV SS: solar generation of 1000 MW
vi) Tiruchuzhi 230/110 W SS: solar generation of 500 MW

d) Generation from SEPC(1x525 MW) & Ind Bharath at Ottapidaram 400 kV SS.
e) The existing/sanctioned 400 kV connectivity of Kayathar SS in base case:
i) 400kV D/C line to Thennampatty 400 kV SS
ii) 400kV D/C line to Kanarpatty 400 kV-SS
iii) 400kV D/C line to Karaikudi 400 kV SS

13
Agenda for 1st meeting of SRSCT (07.09.2018)

iv) LILO of one circuit of Kayathar – Karaikudi 400kV D/C line at


Konthagai
v) 400kV D/C line to Virudhunagar 765/400 kV SS
vi) 400kV D/C line from Udangudi switchyard (2x660MW)

11.3 Load flow study has been conducted with the following cases in Full Wind and Full
solar condition for the year condition 2022-23.
BASECASE: Udangudi 2x660 MW plant connected to Kayathar 400 kV SS
CASE-1: Udangudi MVV plant connected to Virudhunagar 765/400 kV SS instead
of connectivity at Kayathar 400 kV SS
11.4 In base case, due to pooling of thermal as well as renewable Energy generation at
Kayathar 400 kV SS, Kayathar-Kanarpatty 400 kV D/C line and Kanarpatty-
Tirunelveli(Abhisekapatty) 400 kV lines are found to be overloaded. To mitigate this,
in case 1, the Udangudi power plant is connected to Virudhunagar 765/400 V SS instead
of Kayathar 400 kV SS. This will reduce the loading of Kayathar-Kanarpatty and
Kanarpatty-Abhishekapatty 400 kV D/C lines to permissible limits. However, to assess
the adequacy of the transmission system, contingency analysis has been done for the
following contingency conditions in case 1:
Outage 1: one circuit of 400 kV Kayathar — Kanarpatty D/C line (with Twin Moose
ACSR conductor).
Outage 2: one circuit of 400 kV Kanarpattÿ —TirunelveIi(Abhisekapa ) D/C line
(with Quad Moose ACSR conductor).

11.5 From the study results it is observed that even in Case1 also, during outage condition
of one circuit of Kayathar — Kanarpatty 400kV D/C line, the other line is found to be
loaded to 1000 MW. Similarly, during outage condition of one circuit of Kanarpatty —
Abhisekapatty 400kV D/C line, the other line is found to be loaded to 1787 MW.
To avoid these overloadings, the generation pooled at Kayathar needs to be reduced so
that the outflow from Kayathar 400 kV SS to Kanarpatty an further to Abhishekapatty
SS will get reduced. In this scenario, it is 'inevitable to reduce the generation from M/S.
SEPC and M/S. Ind Bharath in order to contain the said overloading in the event of the
above said contingencies during peak wind season and also to facilitate evacuation of
RE power in this area without constraints.

Study Observations :
Sl.No. 400 kV Lines Base case Case1
(Flow in (Flow in
MW)  MW)
1 Udangudi to Kayathar D/C line (with  Quad  Moose  2x712
ACSR conductor).

2 Kayathar - Kanarpatty D/C line (with Twin 2x710 2x584

14
Agenda for 1st meeting of SRSCT (07.09.2018)

Moose ACSR conductor)

3 Kanarpatty —Abhisekapatty D/C line (with Quad 2x1105 2x991


Moose ACSR conductor).
4 Karaikudi-Alundur S/C line (with Twin Moose ACSR 1x586 1x589
conductor).
5 Udangudi to Virudhunagar D/C line (with Quad - 2x531
Moose ACSR conductor).
6 Kayathar —Virudhunagar D/C line (with Quad Moose 2x303 --
ACSR conductor).

FAULT LEVEL:

Three phase Fault level of Kayathar 400 kV SS:

Basecase - 50.257 kA (When Udangudi 2x660 MW connected to Kayathar)


Case l - 40.412 kA (When Udangudi 2x660 MW is not connected to Kayathar)
11.6 In view of the above, TANTRANSCO requested to change the connectivity of
Udangudi Power Project(Stage-I)-2x660 MW from Kayathar 400 kV SS to
Virudhunagar 765/400 kV SS.

11.7 The revised ATS for the proposed thermal power plant at Udangudi (2x 660 MW)
StageI is given below:
i) 400kV D/C line(with Quad Moose ACSR conductor).to the Virudhunagar
765/440kV SS.
ii) 400kV D/C line (with Quad Moose ACSR conductor).to the proposed
Samugarengapuram 400/230 -110 kV SS.
iii) 400kV D/C line (with Quad Moose ACSR conductor).to the proposed
Ottapidaram 400/230-110kV SS.
Members may discuss

12.0 Enhancement of 400/230 kV ICT capacity from 3 X 315 MVA to 3 X 500 MVA at
the existing Sriperumbudur 400/230-110kV SS
12.1 TANTRANSCO vide their letter dated 23.08.2018 informed that combined
Interconnecting transformer capacity at Sriperumbudur 400/230-110 kV SS is 1345
MVA with 400/230 kV, 3x315 MVA ICTs and 400/110 kV, 2x200 MVA ICTs.
12.2 Further, The peak reached in the ICTs at Sriperumbudur 400/230-110 kV SS are as
follows.
315 MVA, 400/230 kV ICT - 1 - 282 MVA
315 MVA, 400/230 kV ICT - 2 - 282 MVA
315 MVA, 400/230 kV ICT - 3 - 282 MVA
200 MVA, 400/110 kV ICT - 4 - 179 MVA

15
Agenda for 1st meeting of SRSCT (07.09.2018)

200 MVA, 400/110 kV ICT - 5 - 179 MVA


12.3 The sustained peak value of 3 nos. 315 MVA ICT is 756 MVA which is 80 % of its full
load capacity. The ICT – 1 could not be loaded upto its full capacity due to internal
technical problem. Hence ICT-1 and ICT 2 & 3 are in service with split bus
arrangement. However, the sustained load in each ICTs is 250 MVA and are loaded
upto 80% each at present.
12.4 TANTRANSCO has been carried out load flow studies and results are enclosed at
Annexure IX.
12.5 In order to accommodate all the existing & future load demands, it is essential to
enhance transformation capoacity from 3x315MVA(400/220kV) to 3x500MVA
(400/230kV) at Sriperumbudur 400/230-110 kV SS. The space for erection of 400/230
kV, 500 MVA ICT is also available at Sriperumbudur 400/230-110 kV SS.
Member may discuss.

13.0 Provision of 400 kV power evacuation scheme – Contingency arrangement for


power evacuation of NCTPS Stage – III (1 X 800 MW)
13.1 TANTRANSCO vide their letter dated 23.08.2018 informed that The erection works of
North Chennai Stage – III (1 X 800 MW) Super Critical Thermal Power Project
(NCTPS) are under progress and will be ready for commissioning by August 2019. For
evacuation of power from NCTPS Stage –III, the erection works for the following
schemes are under progress :
i. North Chennai 765/400 kV pooling station.
ii. Ariyalur 765/400 kV substation.
iii. North Chennai Pooling station - Ariyalur , 765 D/C line
iv. NCTPS Stage III - North Chennai 765 kV 765 D/C line .
13.2 If the commissioning of Ariyalur 765/400 kV SS and 765 kV DC line from North
Chennai 765/400 kV Pooling station to Ariyalur 765/400 kV SS is delayed, it is
proposed to evacuate the power from North Chennai Stage – III (1 X 800 MW) Super
Critical Thermal Power Station as a contingency measure by making LILO of Manali
– Alamathy 400 kV line at North Chennai 765/400 kV Pooling station. This LILO
arrangement can be made by utilizing a portion of 765 kV DC line from North Chennai
765 kV pooling station to Ariyalur 765 kV SS.
13.3 TANTRANSCO has been carried out load flow studies and results are enclosed at
Annexure X.
13.4 TANTRANSCO requested for approval of the above contigency arrangment.
Members may discuss.

16
Agenda for 1st meeting of SRSCT (07.09.2018)

14.0 Proposal for the establishment of 400 kV Substation at Cuddalore instead of at


Neyveli
14.1 Establishment of Neyveli 400/230 kV Substation by upgradation of the Neyveli
(TNEB) 230 kV SS was approved in the 41st meeting of the Standing Committee on
Power System Planning for Southern Region. The approved connectivity for the
establishment of Neyveli 400/230 kV substation is as follows.

400 kV Connectivity
i) New Neyveli Thermal power station- Neyveli (TNEB) 400 kV D/C Link.
ii) Manalmedu- Neyveli (TNEB) 400 kV D/C Link.
(b) ICT and Bus reactors:
i) 2 x 500 MVA, 400/230 kV ICTs
ii) 2x 125 MVAr bus Reactors
14.2 In the 42nd meeting of Standing Committee on Power System Planning for Southern
Region, certain re-arrangement in the existing transmission system was agreed , so as
to control high short circuit fault level in Neyveli Generation complex. Due to this
rearrangement, the already approved 400kV connectivity for Neyveli 400/230kV SS
was modified as below.
“ Modification in Neyveli(TNEB) – NNTPS 400 kV D/C line (agreed in 41st
SCPSPSR) as Neyveli(TNEB) – Neyveli TS-II 400 kV D/C line with high capacity
conductors (to be constructed by TANTRANSCO) “
14.3 However, due to constraint in acquiring the land for the establishment of 400kV SS at
Neyveli, it is proposed to establish the 400 kV substation at Cuddalore which is nearby
the already proposed location at Neyveli.
14.4 Based on the above modification as mentioned in para 14.2, TANTRANSCO has
carried out load flow study for the establishment of Cuddalore 400/230-110 kV
substation by upgradation of the existing Cuddalore 230 kV substation ( results
enclosed at Annexure-XI) and the following connectivity is proposed.
400 kV Connectivity
i) Neyveli TS-II – Cuddalore 400 kV D/C Link.
ii) Manalmedu- Cuddalore 400 kV D/C Link.
ICT and Bus reactors:
i) 2 x500 MVA, 400/230 kV ICTs
ii) 2x200 MVA, 400/110 kV ICTs
iii) 2x125 MVAr, 400kV bus Reactors

17
Agenda for 1st meeting of SRSCT (07.09.2018)

14.5 TANTRANSCO requested for establishment of Cuddalore 400/230-110 kV substation


by upgradation of the existing Cuddalore 230 /110 kV substation instead of the already
approved Neyveli 400/230 kV substation.

Transmission planning proposals by Andhra Pradesh


15.0 Proposal for erection of 220/33 kV Substation at Chinturu (V), Chinturu (M) in
East Godavari district
15.1 APTRANSCO vide their letter dated 26.06.2018 proposed erection of 220/33 kV
Chinturu SS with a connectivity of 220 kV LILO (5 KM approx.) of existing 220 kV
KTS - Lower Sileru —Il line to proposed 220/33 kV Chinturu SS by considering a load
growth of 9.86%.
15.2 Presently, area is being fed from existing 132/33kV substation at Yetapaka, (Telangana
state control).

Sl. Name of the 33 kV No. of the Name of % Voltage Regulation


No. feeder 33/11kV 33/11kV SS
SS Base Year Horizon
Year

1. Etapaka- 5 Purusothapatnam, 15.54 24.86


Kunavaram Nellipaka,
Kunavaram,
Sarivela,
Chnturu.

The voltage regulations of 22kV Etapaka-Kunavaram feeder is beyond-permissible


limits both at Base and Horizon years.
15.3 To improve the voltage regulation of the above 33kV feeder, the One No: New 33kV
from 132/33 kV Yetapaka substation to the nearest cut point of Chinturu substation
duly taking the loads of 33/11 kV Chinturu, Sarivela & Kunavaram substations.

Sl. No. Name of the 33kV No. of Name of the % Voltage


feeder Regulation
33/11kV S/S 33/11kV S/S
Base Horizon
Year Year
1. Yetapaka Chinturu 3 Kunavaram, 5.48 8.77
(New) Sarivela,
Chinturu.

18
Agenda for 1st meeting of SRSCT (07.09.2018)

2. Purusothapatnam,
Yetapaka -
2 5.06 8.10
Kunavaram Nellipaka.

15.4 With the above improvements the voltage regulation of all the 33 kV feeders in the
scheme area are within permissible limits up to horizon ear as follows.
15.5 As per the load flow studies erection of 220/33 kV SS at Chïnturu ,technically is not
justified. Kunavaram and Nellipaka Mandals are declared as submerged mandals under
Polavaram Project and the loads of the said two mandals will be shifted to Chinuturu
Mandal due to relocation of villages, when the Polavaram Project is completed.
15.6 The Chinturu subdivision is covering an area of 520 KM radius, Ghat roads, Godavari
River and 03 Nos. State borders (Orissa, Chattisghar and Telangana) were surrounded
to this subdivision. Every year due to flooding of Sabari, Seeleru, Godavari Rivers and
other local streams, the area is totally submerged under flood condition. The existing
33kV line is also submerged in flood water certain times. Due to this, Chinturu,
Kunavaram, VR. Puram and Nellipaka mandals will be without power supply till
receding of flood water and restoration of supply. There are no 33 kV interlinking lines
for extending supply to this alternate feeding lines to this area.
15.7 The Chinturu Sub-division was newly formed with Chinturu, Kunavaram, VR. Puram
and Nellipaka 04 Nos. mandals duly amalgamated from TSNPDCL to APEPDCL in
Andhra Pradesh state bifurcation. At present, the 33 kV loads ofùinttxu-are being fed
from existing 132/33 kV Substation at Yetapaka, which is under Telangana a€aÄistance
of 90 KM from Chinturu village resulting in voltage drop at Chinturu end due to long
length of line. During rainy season there are heavy gales and rains which causes
frequent break downs on existing 33kV feeder which is situated in reserve forest. Much
difficult is being experienced by operation wing of APEPDCL for rectification due to
the major length of line passing through forest area.
15.8 After Polavaram project completion alternate accommodation for the merged villages
in 04 mandals public will be in and around Chinturu and the 33kV feeders from 132/33
kV SS Yetapaka will submerge in the back waters of Polavaram Project. There is no
other alternative supply available for 05 No's 33/11kV substations in this situation. To

19
Agenda for 1st meeting of SRSCT (07.09.2018)

arrange alternative supply to these submerged 5 Nos. 33/11 kV substations, erection of


220733 kV sub-station at Chinturu is essentially required.
15.9 In view of the circumstances explained above, APTRANSCO has requested approval
for erection 220/33 kV Chinturu SS with a connectivity of 220 kV LILO (5 KM
approx.) of existing 220 kV KTS - Lower Sileru —Il line to proposed 220/33 kV
Chinturu SS as this is the only line passes near to Chinturu village i.e. 5 KM approx.

Members may discuss.


16.0 Proposal for Revival of abandoned 220kV D/C line from Lower Sileru-Bommuru
in East Godavari District.
16.1 APTRANSCO their vide letter informed that Lower Sileru Hydro Electric Scheme
(LSPH, USPH & DCPH), is producing power by utilizing the water of Sileru river,
which is available almost throughout the year and meeting the energy requirements of
Andhra Pradesh State.Total Power being produced from Lower Sileru Power House is
460 MW (4x115 MW). The following feeders are connected with Lower Siler Power
House for evacuating power
i) Lower Sileru -Bommuru 220kV S/C Line
ii) Lower Siler- Donkaraya 220 kV S/C Line.
iii) 220 kV Lower Sileru — Kothagudem 1&2 Lines under the ownership of
APTRANSCO & TSTRANSCO
iv) 220 kV Lower Sileru -Barsoor 1&2 Lines under the ownership of APTRANSCO
& CSPTCL (Chattisgarh).
Barsoor I & Il feeders between Andhra Pradesh and Chattisgarh are not being used
since long time

16.2 Total Power being produced from Upper Sileru Power House is 240 MW (4x60 MW).
The following feeders are connected with Upper Sileru Power House.
i) Upper Sileru - Donkaraya 220kV S/C Line
ii) Upper Sileru Pendurthy 220kV S/C Line.
iii) Upper Sileru -Balimela 220kV S/C Line under the ownership of APTRANSCO
and OPTCL (Odisha).
iv) Upper Sileru - Balimela 220kV feeder is under standby mode.
16.3 Total Power being produced from Donkaraya Canal Power House is 25 (1x25 MW)
The following feeders are connected with Donkaraya anal Power House,
i) Donkaraya - Upper Sileru 220kV S/ C Line.

20
Agenda for 1st meeting of SRSCT (07.09.2018)

ii) Donkaraya Lower Sileru 220kV S/C Line.


16.4 Presently, the Power generated in the LSHES is being evacuated mainly through
220kV Lower Sileru - Bommuru (S/C line), 220kV Lower Sileru Kothagudem I &II
and 220kV Upper_Sileru –Pendurthy(S/C) line. The maximum Power evacuation
capability of each line is around 180 M W.
16.5 Further,220kv Lower Sileru –Kothagudem I&II line maintance is to be attended by
APRTRANSCO and TSTRANSCO based on the state bounderies. Due to involvement
of two agencies and line passing through deep forest, the restoration of the faults in the
feeders are taking more time. Also, KTPS being a strong generating source, evacuating
power over KTPS is becoming difficult, espaceally during peak hours, Power from
KTPS being flown to Bommuru and Pendurthy feeders and making the lines
overloaded. 220kV Lower Sileru-Bommuru S/C line is getting overloaded when the
generation at Sileru basin exceeds 450 to 500 MW. Dur to which full potential
generation (730 MW) has not been utilized. Hence the proposal for replacement of
220kV lower-Bommuru (S/C line) conductor with equivalent HTLS conductor is also
under consideration.
16.6 There is a proposal for erection of two more new generating units of capacity 2x115
MW at Lowe Sileru. System studies were carried out by APTRANSCO for evacuation
of power from Lower Sileru Power house including 2 more units (2x115 MW) and
considering export of 142 MW to KTS. The loadings are as follows:

Sl. No. Feeder Full Generation AT Lower


Sileru Power Complex

1 Lower Sileru Bommur S/C line 479 MW

2 Upper Sileru Pendurthy S/C line 270 MW

3 Lower Sileru Donkaraya S/C line 24 MW

4 Upper Sileru Donkaraya S/C line -46 MW

16.7 The loading on 220 kV Lower Sileru – Bommuru and 220 kV Upper Sileru – Pendurthy
is very much high if total power is to be evacuated from Lower Sileru Hydro Electric

21
Agenda for 1st meeting of SRSCT (07.09.2018)

project. Hence revival of abandoned 220 k DC Line from Lower Sileru to Bommuru is
very much required for evacuating total power.

16.8 APTRANSCO has been carried out System studies including 220kV DC line from
Lower Sileru to Bommuru for the same case and the loadings are as follows:

Sl. No. Feeder Full Generation AT


Lower Sileru Power
Complex

1 Lower Sileru Bommur 209 MW


2 Upper Sileru Pendurthy 141 MW
3 Lower Sileru Donkaraya -105 MW
4 Upper Sileru Donkaraya 83 MW
5 Lower Sileru Rampachodavaram 214 MW
6 Lower Sileru Bavojipeta 185 MW

From the above, it can be observed that the overloadings got decreased. Hence revival
of abandoned lines from Lower Sileru-Bommuru is very much essential.

16.9 In view of the above APTRANSCO requested for revival of abandoned 220 k V DC
Line from Lower Sileru- Bommuru.
Members may discuss.
17.0 Erection of 220 kV features in the 400 kV GVK Power Plant and 220 kV Features
at 400 kV Polavaram HEP in East Godavari district to extend power supply to the
proposed 220/132/33 kV Ramachandrapuram SS.
17.1 APGENCO is setting up 12 x 80 MW (960 MW) Polavaram Hydro Electric Project in
East Godavari district. Accordingly, APTRANSCO has proposed the following
dedicated Transmission Scheme for evacuation of 960 MW (12 x 80 MW) power from
Polavaram Hydro Electric Project of APGENCO in East Godavari district. The same
was approved in the 42nd Standing Committee Meeting held on 27.04.2018 at
Ernakulam
i. 400 kV Quad Moose D/C line (79 KM) from 400 kV KV Kota to proposed
Polavaram Hydro Electric Project.
ii. 2 x 125 MVAR bus Reactor at Polavaram Hydro Electric Project.

22
Agenda for 1st meeting of SRSCT (07.09.2018)

17.2 APTRANSCO vide their letter 27.08.2018 informed that they have proposed approved
the following dedicated Transmission System for 220 kV downstream evacuation
system from 400 k V Polavaram Hydro Electric project by providing 2x 500 MVA ICTs
and for providing 2 Nos. 220 kV features with 2 x 500 MVA 400 kV GYK-2 Power
Plant to overcome the overloading conditions in and around Ramachandra Puram area.
i. 220 kV features at 400 kV Polavaram SS with 2 x 500 MVA ICTs.
ii. Polavaram- Pattiseema 220kV D/C line (Twin Moose ,16 KM approx.)
iii. LILO of both circuits of Polavaram - Pattiseema 220kV D/C line at
Purushothapatnam SS (I KM approx.).
iv. LILO of the both existing circuits of the Yemagiri - Samalkot 220 kV D/C line
at Jegurupadu S/S (1 KM approx.)
v. 220 kV Features at 400 kV GYK-2 Power Plant with 2 x 500 MVA PTRs.
vi. Erection of 220/132 kV Ramachandrapuram S/S with 2 x 100 MVA PTRs.
vii. 220 kV Single Moose DC line (25 KM approx.) from proposed 400/220 kV GYK-
2 Power plant to proposed 220/132 kV Ramachandrapuram SS.
viii. Making one circuit 132 kV LILO (0 .5 KM approx ) of existing 132 kV RC
Puram- Kakinada at proposed 220/132 kV SS at RC Puram.
ix. Making 132 kV LILO (1 KM approx.) of existing 132 kV RC Puram - Editha at
proposed 220/132 kV SS at RC Puram.
x. Making 132 kV LILO (6 KM approx.) of existing 132 kV RC Puram - Kothapeta
at proposed 220/132 kV SS at RC Puram.
xi. Erection of 132 kV DC line (18 KM approx.) from 132 kV Gollapalem SS to
proposed 220/132 kV SS at RC Puram.

17.3 APTRANSCO has been carried out load flow study and results are enclosed at
Annexure –XII
Member may discuss.
18.0 Augmentation of ICT capacity from 2 x 315 MVA to 2 x 315 MVA + 1 x 500 MVA
ICTs at Maradam (Garividi) 400/230kV S/S.
18.1 APTRANSCO has proposed for Augmentation of ICT capacity from 2 x 315 MVA to
2 x 315 MV A + 1x 500 MVA ICTs at 400/220 kV Maradam (Garividi) SS to meet the
load demand and reliability at the scheme area.
Member may discuss.

23
Agenda for 1st meeting of SRSCT (07.09.2018)

Transmission planning proposals in Telangana

19.0 400/220kV Khammam (PGCIL) S/S- Augmentation of Power Transformer


capacity from 2x315 MVA+1x500MVA
19.1 TSTRANSCO vide their letter informed that in the 33rd Standing Committee meeting
on Power System Planning in Southern Region held on 20th October, 2011, the
augmentation of Power Transformer at 400/220kV Khammam (PGCIL) SS with 1 No.
additional 500 MVA PTR was approved.
19.2 The present loadings on 400/220kV are less than 50% of existing transformer capacity.
19.3 In view of the above, it requested to re-examine the necessity of augmentation with 1
No. additional 500 MVA PTR at 400/220kV Khammam (PGCIL) SS
Members may discuss.

20.0 Extension of HT supply at 220kV level to Central Power Research Institute,


Hyderabad (CPRI)
20.1 Extension of HT supply at 220kV level to CPRI, Hyderabad was approved with LILO
of one circuit Ghanapur - Hayathnagar 220kV line to M/s. CPRI for online.
20.2 TANTRANSCO vide their letter dated 23.08.2018 proposed to revise the proposal as
220kV radial DC line from Ghanapur to M/s CPRI with 9KM instead of LILO of one
circuit Ghanapur - Hayathnagar 220kV line to M/s. CPRI.
Member may discuss
21.0 Construction of 400/220/132kV Substation at KTPP switchyard
21.1 TSTRANSCO vide their letter dated 23.08.2018 proposed 400/220/132 kV S/S at
KTPP switchyard with following connectivity:
a) 400/220kV 2X500MVA ICTs & 220/132kV 2x160MVA PTRs.
b) LILO of existing 220kV Pulukurthy - Bhimghanapur line to proposed
400/220/132kV KTPP SS at Ramappa Point with Twin Moose DC line - 25kM .
c) LILO of existing 220kV Salivagu- Bhimghanapur line to proposed 4001220/ 132kV
KTPP S/S at Ramappa Point with Twin Moose DC line - 25kM.
d) 220kV Single Moose DC line from proposed 4001220/132kV KTPP SS to 220/
132kV Manthani SS - 34kM.
e) 132kV Single Moose DC line from proposed 400/220/132kV KTPP SS to
132/33kV Chelpur SS - 2kM.
f) Upgradation of existing 220kV Nagaram - Warangalline with HTLS conductor .
g) 220kV Single Moose DC line from upcoming 400/220kV Jangaon SS to 220/11 kV
Devannapet Ll 55 - 55kM.

24
Agenda for 1st meeting of SRSCT (07.09.2018)

Further following connectivity may be dropped after above proposed connectivity:

a. 220/ 132kV Venkatapur S/S and 220kV S/C line on D/C tower (with ACSR

Single Moose)from 400/220kV Oglapur (Warangal PGCIL) SS to 220/ 132kV


Venkatapur SS (42 KM) in Jayashanker Bhupalapally District (which was
approved in 42nd Standing Committee meeting on Power System Planning of
Southern Region)
b. 220 kV D/C line (with Single Moose ACSR conductor from 400/220KV
Oglapur (Warangal PGCIL) 55 to 220/11kV Devannapet L1 55- 30KM (which
was approved in 41st Standing Committee meeting on Power System Planning
of Southern Region).
22.0 Ratification for already charged LILO of both circuits 400kV Gajwel-
Shankarpalli line 400kV Narasapur S/S
22.1 TSTRANSCO vide their informed that 23.08.2018 that LILO of one circuit 400kV
Gajwel-Shankarpalli line 400kV Narasapur S/S was charged on dated 01.03.2017and
LILO of second circuit 400kV Gajwel-Shankarpalli line 400kV Narasapur S/S was
charged on dated 01.03.2017.
22.2 However, the 400kV Narsapur S/S was approved in the 35th SCPSPSR. later the
connectivity to 400kV Narsapur S/S was changed during the study of proposal for
connectivity of Telangana STPP (2x800 MW).
Members may discuss.
23.0 Ratifications of ICT Capacities in earlier approved 400kV Substation
23.1 TSTRANSCO vide their letter dated 23.08.2018 informed that following 400kV
Substation were approved with 220kV down Stream connectivities without mentioning
ICT capacity
S. Name of the SC ICT Remark
No. Substation PSP capacity in
SR MVA

1. 400/220kV Nirmal 38th 3x315 Charged with SRLDC permission


subject to ratification in SCM
2. 400/220/11kV 41st 4x315
Yellampalli

25
Agenda for 1st meeting of SRSCT (07.09.2018)

3. 400/220kV 41st 2x500 400kV S/S were approved with


220kV down Stream connectivity
Ramadugu S/S without mentioning ICT capacity

4. 400/220kV 41st 2x500


Rayadurg

5. 400/220kVMalkara 41st 4x315 Augmentation of Power


Transformer at existing
m 400/220/132kV with 400/220kV
500MVA transformer (4th ICT) was
approved in the 40th Standing
committee. Whereas erection of
315 MVA instead of earlier
approved 500MVA is under
progress

Member may discuss

Proposals of CTU
24.0 Connectivity Transmission system agreed in earlier Connectivity/LTA meetings
of SR
24.1 The following dedicated transmission system was agreed and granted for various IPPs
in earlier Connectivity/LTA meetings of Southern Region.

Table-1
Connectivit
Start Date
y
Sl. Applicant Location as per Connectivity transmission system
granted(MW
application
)
Samalkot East
Samalkot – Vemagiri-II (PG) 400
power Godavari,
1. 2214 Feb, 2017 kV D/c Quad line along with bays
Limited – Andhra
at both ends
Gas Pradesh
Regen
Wind Regen PS – Pugalur 230 kV D/c
Dindigul, 14th March
2. Farm 600 (Twin Moose) line along with bays
Tamil Nadu 2016
(Vagarai) at both ends
Pvt. Ltd
Renew Renew Power Ventures Pvt. Ltd–
Karur,
Power 31st March Pugalur 230kV D/c line along with
3. Tamil 400
Ventures 2018 bays at Pugalur & generation
Nadu,
Pvt. Ltd. switchyard

26
Agenda for 1st meeting of SRSCT (07.09.2018)

Upon notification of the Detailed Procedure for Grant of connectivity to projects based
on renewable sources to ISTS on 15.05.2018 in the Petition No. 145/MP/2017 by
CERC, the IPPs from Sl.No. 2-4 are deemed Stage-II grantees.
24.2 Further, the following dedicated transmission system for grant of Stage-II connectivity
was agreed in the 24th Connectivity / LTA meeting of SR held on 11.07.2018.

Sl.N Appli Applicant Location Date Quantum Stage-II Start Proposed Dedicated Tr. System
o catio of of Stage-I Connect Date of location for
n No. Appli Sought / ivity Stage-II Grant of
catio Granted Sought connecti Stage-II
n (MW) (MW) vity Connectivity
Connectivity applications near Tirunelveli
Orange Orange Sironj –
1200 Sironj Tuticori Tuticorin-II 230kV S/c
25.05 10.02.
1. 0012 Wind n, Tamil 200 200 line along with terminal
.2018 2019
74 Power Nadu bays at Tuticorin-II GIS
Pvt. Ltd. & generation switchyard
Green Infra Renewable
Green
1200 – Tuticorin-II 230kV
Infra Tuticori
0013 04.06 31.07. S/c line along with
2. Renewabl n, Tamil 249.9 249.9
66 .2018 2018 Tuticorin-II terminal bays at
e Energy Nadu
GIS PS Tuticorin-II GIS &
Limited
(erstwhile generation switchyard
Betam Tirunelveli
1200 Wind Tuticori GIS PS)
12.06 31.07.
3. 0014 Energy n, Tamil 50.2
.2018 2019 Betam Wind Energy –
18 Private Nadu
Tuticorin-II 230kV S/c
Limited
250.2 line along with terminal
Betam
bays at Tuticorin-II &
1200 Wind Tuticori
12.06 31.07. generation switchyard
4. 0014 Energy n, Tamil 200
.2018 2019
35 Private Nadu
Limited
Connectivity applications near Palakkad
Mytrah Coim Mytrah Energy –
Energy batore Palakkad 220kV S/c line
12000 19.06. 31.03. Palakkad
5. (India) , 300 300 along with terminal bays
01447 2018 2020 (Existing)
Private Tamil at Palakkad &
Limited Nadu generation switchyard
Connectivity applications near Pugalur
Sprng Sprng Renewable –
Renewabl Tirupur, Pugalur 230kV S/c line
12000 15.06. 31.10. Pugalur
6. e Energy Tamil 300 300 along with terminal bays
01434 2018 2019 (Existing)
Private Nadu at Pugalur & generation
Limited switchyard

24.3 The details of LTA granted in 24th Connectivity / LTA meeting of SR held on
11.07.2018 are given below.

27
Agenda for 1st meeting of SRSCT (07.09.2018)

LTA
Applicant quantum Beneficiaries (MW) Date of start of LTA
Sl.
(MW)
1. Orange Sironj Wind NR-50 MW + ER-100 MW,
200 22.02.2019
Power Pvt. Ltd. SR-50 MW
2. Mytrah Energy ER-100 MW + NER-50 MW 50 MW – 30.09.2018
175
India Pvt. Ltd. + NR-25 MW 125 MW – 01.12.2018
3. Green Infra
NR-149.9 MW + ER-100
Renewable Energy 249.9 31.10.2018
MW
Ltd.

24.4 The details of Stage-I connectivity granted to various IPPs in the 23rd & 24th
Connectivity/LTA meetings of Southern Region are given at Annexure-XIII

Operational Feedback from POSOCO

25.0 Following transmission constraints have been informed by POSOCO for SR


25.1 Transmission Line Constraints

Season/ Has the


Antece constraint
S.
Corridor dent Description of the constraints occurred
No
Conditi in earlier
ons quarter?
With Full Generation at SEPL (600
MW), MEPL (300 MW) SGPL
(2x660 MW) & SEIL (2x660 MW),
the 400kV NPS- Nellore D/C flow is
usually more than 1800 MW and it
has reached more than 2000 MW in
few occasions. With further
400kV Nellore
commissioning of Units at MEPL
Pooling Station Whole (stage-2-2x350MW), the problem
1 Yes
- Nellore DC Year will aggravate. In the 42nd SCM the
line re-arrangement to bypass 400kV
Nellore PS – Nellore D/C at Nellore
(PG) for making 400kV Nellore PS
– Thiruvallam D/C to control line
loading has been approved. The
same maybe commissioned at the
earliest as it would relieve the line-
loading problem.

28
Agenda for 1st meeting of SRSCT (07.09.2018)

Season/ Has the


Antece constraint
S.
Corridor dent Description of the constraints occurred
No
Conditi in earlier
ons quarter?
With increase of SR Import to 8750
400kV Gooty- MW (ATC) and increase of Drawl
by Karnataka & due to non-
Nelamangala
commissioning of Yelhanka and
line & 400kV Whole Tumkur downstream, the flow on
2 Yes
Gooty- Year 400kV Gooty-Nelamangala &
Somanahalli 400kV Gooty-Somanahalli line is
high. Loading on these lines have
line
been partially relieved after 400kV
Tumkur-Bidadi D/C line.
Kerala drawl is mainly through
400kV
400kV Udumalpet-Palakkad D/C
Udumalpet- Whole line. Present loading on these lines
3 Yes
Palakkad DC year is in the range of 420-500 MW. At
line present this is the limiting constraint
for the Import of Kerala.
With Full generation at Jindal TPS,
Bellary TPS, Yeramarus TPS, Less
generation at UPCL and high wind
generation, the flow on 400kV
Hiriyur-Nelamangala D/C line is
400kV
severly high and also with increase
Hiriyur- Whole in pavagada Solar Generation the
4 Yes
Nelamangala year situation would aggravate. The
DC line 400kV CN Halli – Mysore D/C
would relive the line loading of
400kV Hiriyur – Nelamangala D/C.
The same maybe commissioned at
the earliest as it would relieve the
line-loading problem.
Most of the 220 kV network in
Bengaluru is radialised during peak
220 kV
Whole season to prevent overloading of
5 Bangalore lines. The radialisation of lines Yes
Year
Metro Network decreases the reliability of supply &
thus resulting in Low Voltage
situation.

29
Agenda for 1st meeting of SRSCT (07.09.2018)

Season/ Has the


Antece constraint
S.
Corridor dent Description of the constraints occurred
No
Conditi in earlier
ons quarter?

Somanahalli, Yerrandahalli and


Hosur are Industrial areas. 220kV
Overloading of Yerandahalli is split and load is
220 kV partly fed from Hosur (TN) and
partly met from Somanahalli side.
Shoolagiri-
Whole Entire load cannot be met from
6 Hosur(TN)- either side (Somanahalli or Hosur) Yes
Year
Yerrandahalli- due to high loading on upstream
lines. The line flow on this line is
Somanahalli
also causing high flows on
SC line Shoolagiri-Hosur 230 kV S/C line.
2nd circuit of 230kV Soolagiri-
Hosur line yet to be commissioned.

The 220kV Nagjheri – Ambewadi


DC, 220kV Ambewadi – Narendra
Constraints in
Whole DC, 220kV Kaiga – Kodasally SC &
7 Nagjheri PH 220kV Kadra – Kodasally SC lines Yes
Year
evacuation are severely over-loaded. Re-
conducturing of the above lines to
HTLS is suggested.

230kV Oragadam – SV Chatram,


Constraints in 230kV Sriperumbduur – Tharamani
Whole line, 230kV Kalavindapattu-
8 Chennai Yes
Year S.PKoil, 230kV Kalavindapattu-
230kV System Siruseri, 230kV NCTPS-ETPS line
are severely loaded.

The following lines are heavily


Overloaded loaded in Southern Tamil Nadu
Whole 230kV Madurai - Sembatty S/c,
9 220kV Lines in Yes
Year 230kV Madurai - Theni S/c , 230kV
Tamil Nadu Pugalur - Mywadi S/c, 230kV
Pudanchandai-Pugalur line

30
Agenda for 1st meeting of SRSCT (07.09.2018)

Season/ Has the


Antece constraint
S.
Corridor dent Description of the constraints occurred
No
Conditi in earlier
ons quarter?
220kV Shankarpally – Gachibowli
D/C & 220kV Malkaram –
Shapuranagar D/C are heavily
220 kV
Whole loaded without N-1 security and
10 Hyderabad 220kV Mamidapalli- Yes
Year
Metro Network Chandrayangutta, 220kV
Mamidapalli-HIAL D/C, 220kV
Mamaidapalli – Sivarampalli, etc
getting heavily loaded

25.2 ICT Constraints

Has the
constraint
Season/
S. Description of the occurred in
ICT Antecedent
No constraints earlier
Conditions
quarter?
Details.
400/220kV
N-1 condition not satisfied in
1 2x315MVA ICTs at Whole Year Yes
few occasions
Gazuwaka SS
400/220kV
N-1 condition not satisfied in
2 3x315MVA ICTs at Whole Year Yes
few occasions
Vemagiri SS
400/220 kV 3X500
N-1 condition not satisfied in
3 MVA ICTs at Whole Year Yes
few occasions
Nelamangala
400/220kV 3X500
N-1 condition not satisfied in
4 MVA ICTs at Whole Year Yes
few occasions
Somanahalli

31
Agenda for 1st meeting of SRSCT (07.09.2018)

Has the
constraint
Season/
S. Description of the occurred in
ICT Antecedent
No constraints earlier
Conditions
quarter?
Details.
400/220kV 3X500 N-1 condition not satisfied in
5 Whole Year Yes
MVA ICTs at Hoody few occasions.
400/220kV 2X315 N-1 condition not satisfied in
6 Whole Year Yes
MVA ICTs at Guttur few occasions
400/220kV 2X315 N-1 condition not satisfied in
7 Whole Year Yes
MVA ICTs at Hiriyur few occasions
400/220 kV 2X315 N-1 condition not satisfied in
8 Whole Year Yes
MVA ICTs at UPCL few occasions
400/230kV
N-1 condition not satisfied in
9 2X315MVA ICTs at Whole Year Yes
few occasions
Thiruvallam
400/220 kV 3X315
During peak N-1 condition not satisfied in
10 MVA ICTs at No
summer few occasions
Shankarpally

Members may discuss.

32
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-I/1

SITE VISIT OF CEA, CTU AND TSTRANSCO OFFICERS TO SRISAILAM LEFT BANK
HYDRO ELECTRIC STATION (SLBHES) IN CONNECTION WITH LOCATION OF
125MVAR BUS REACTOR IN POWER PLANT ON gTH AND gTH AUGUST 2018

Following were present:

CEA CTU TSTRANSCO TSGENCO


Sanjay Srivastava, A.R.K. Reddy, A. Sreenivasa D. Srir.~ivasa Rao,
Chief Engineer DGM Reddy, SE SE/O&M
B.S. Bairwa, P. Srinivasu, K. Venkteswar Reddy,
Director ADE DE/EM
K.Poornachandar Raju
ADE/EMII
The background and terms of reference assign, to the team is enumerated
hereunder:
In the 39th meeting of Standing Committee on Power System Planning in Southern ·
Region (SCPSPSR), installation of 125MVAR bus reactor at Srisailam Left Bank
Hydro Electric Station (SLBHES) was agreed. During 31 51 TCC and 32nd SRPC
meetings held on 21.12. 2017 TSTRANSCO informed that erection of bus reactor
was not feasible due to space constraints in 400 kV GIS. Thereafter, a meeting was
held in CEA on 6.2.2018 wherein it was decided that a team comprising officers from
CEA, CTU and TSTRANSCO would visit SLBHES switchyard to explore the
feasibility to accommodate the bus reactor.·
In response to above, a team comprising of officers of CEA, CTU and TSTRANSCO
visited SLBHES, which is a underground HEP having 6x150MW reversible turbines,
to assess the feasibility of locating 125MVAr bus reactor. Team also held
discussions with the project authorities (TSGENCO) on the issue. The outcome of
the visit is summarized hereunder: ~/ _ - ·

1. The team found three possible alternatives with respect to location of bus
reactor in the power plant complex.

a. Keeping both 400kV switchgear(GIS) and Bus Reactor within the


underground transformer cavern of power plant.
b. Keeping 400kV switchgear on the GIS floor and tak+ng out inter-
I
connection through 400kV XLPE cables to pothead yard from main
access tunnel (MAT) and connection to bus reactor located in the
pothead yard area.

c. Extending the bus through 400kV XLPE cables to pothead yard and
locating both switchgear and reactor in the open pothead yard area.
2. Hitachi make GIS has been installed (SLD enclosed as Annex-1) and there
exist a possibility of extending the bus on the service bay side. Prima-facie a
spa?e of about 7 - 9 meters could be created by shifting the some of the
(' I' '1. ~ ,((:. ~J:~I)t::l. -
33
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-I/2

. existing temporary structures. Similarly, space of about 9 meters is available


on the service bay side (sketch enclosed as Annex-2), but this would make
the area very congested and constraints may be encountered during major
maintenance of transformers or GIS and there would be vulnerability in the
event of fire etc. Further, the transportation of three phase unit of 125 MVAR
bus reactor (size-8m x 4m, weight-130MT) may not be possible due to space
constraints in MAT and turning radius in transformer cavern. The alternative
of single phas,e units would require larger spac.e due to fire walls in between,
emulsifier system etc. and it shall not be possible to accommodate all this in
available area in transformer cavern. As such the team found this alternative
as not been feasible.
3. The second option of locating switchgear inside the cavern and bus reactor in
pothead yard and connections between these two through 400kV XLPE
cables. As indicated at para-2 above, placing of GIS bay is possible and
similarly apace is also available at pothead yard to keep bus reactor(Annex-
3). However, the existing five outgoing feeders of 1OOOsq mm single phase
400kV XLPE cable coming out from right side of MAT (about 1Km) has almost
occupied all the space of wall and there is hardly any space for routing the
bus reactor cabling. As there is no alternate route for these XLPE cables for
coming out from MAT, this possibility is also not found to be feasible by the
visiting team.
4. The third possibility also require routing of 400kV XLPE cabling (bus) up to
the pothead yard. As already indicated, there is no available space for routing
XLPE cable in MAT, this possibility is also rb.lled out. Further extension of bus
is not advisable as it may result in bus fault in any eventuality.
After visiting the site and discussions with the project authorities, the team is of
view that there is no possibility of locating the 125MVAr Reactor on SLBHES Bus
without compromising the safety & security of the plant.

S,S~~~
.CJ I /5:') 2-o1 !'., ~~~'1> ~
ql& Its
SanJay Snvastava, A. Sree~vasa a Rao.l.
Chief Engineer Reddy, SE SE/O&M
CEA TSTRANSCO TSGENCO

l'rL . _/'
f·0'~\ll"
~?~-
B.~. Bairwa,
Director
P. Srinivasu,
ADE
~e~kt~~
Reddy, DE/EM
K.Poornachandar Raju
ADE/EMII
CEA TSTRANSCO TSGENCO TSGENCO

34
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/1

With 125 MVAR Reactor at 400kV Tippapur,Kamalapuram,Manikonda & Yellampally Sub-stations

ZONE TOTALS
IN MW/MVAR
FROM ------AT ZONE BUSES------- TO -NET INTERCHANGE-
GENE- FROM IND TO IND TO TO BUS GNE BUS TO LINE FROM TO TO TIE TO TIES
X-- ZONE --X RATION GENERATN MOTORS LOAD SHUNT DEVICES SHUNT CHARGING LOSSES LINES + LOADS

51 6246.0 0.0 0.0 7847.1 0.0 0.0 0.0 0.0 135.8 -1736.9 -1736.9
TELANGANA -2822.6 0.0 0.0 2573.2 3779.5 0.0 3376.0 14548.3 1666.5 330.4 330.4

COLUMN 6246.0 0.0 0.0 7847.1 0.0 0.0 0.0 0.0 135.8 -1736.9 -1736.9
TOTALS -2822.6 0.0 0.0 2573.2 3779.5 0.0 3376.0 14548.3 1666.5 330.4 330.4

RATING %MVA FOR TRANSFORMERS


SET A % I FOR NON-TRANSFORMER BRANCHES

BUS 514060 SURYPET4 400.00 CKT MW MVAR MVA % 1.0258PU -2.98 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514060
410.32KV MW MVAR 5 SOUTH 51 TELANGANA
TO 504030 VIJAYA TP-IV400.00 1 45.6 29.3 54.2 10 0.15 1.58 5 SOUTH 50 ANDHRA
TO 504030 VIJAYA TP-IV400.00 2 45.6 29.3 54.2 10 0.15 1.58 5 SOUTH 50 ANDHRA
TO 504111 KV KOTA 400.00 1 -143.6 -25.7 145.9 21 0.34 5.86 5 SOUTH 50 ANDHRA
TO 504111 KV KOTA 400.00 2 -143.6 -25.7 145.9 21 0.34 5.86 5 SOUTH 50 ANDHRA
TO 512049 SURYAPET2 220.00 1 106.8 55.4 120.3 38 1.0000LK 0.00 4.37 5 SOUTH 51 TELANGANA
TO 512049 SURYAPET2 220.00 2 106.8 55.4 120.3 38 1.0000LK 0.00 4.37 5 SOUTH 51 TELANGANA
TO 514052 MALKARM4 400.00 1 76.4 11.7 77.3 14 0.20 2.17 5 SOUTH 51 TELANGANA
TO 514052 MALKARM4 400.00 2 76.4 11.7 77.3 14 0.20 2.17 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 1 -154.7 19.1 155.9 22 0.29 5.09 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 2 -154.7 19.1 155.9 22 0.29 5.09 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 1 69.5 -89.8 113.6 16 0.09 1.56 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 2 69.5 -89.8 113.6 16 0.09 1.56 5 SOUTH 51 TELANGANA

BUS 514068 RAIDURG 400.00 CKT MW MVAR MVA % 1.0290PU -5.04 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514068
411.58KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512118 RAIDURG 220.00 1 101.1 -20.7 103.2 21 1.0000LK 0.00 2.01 5 SOUTH 51 TELANGANA
TO 512118 RAIDURG 220.00 2 101.1 -20.7 103.2 21 1.0000LK 0.00 2.01 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 1 -101.1 20.7 103.2 15 0.00 0.05 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 2 -101.1 20.7 103.2 15 0.00 0.05 5 SOUTH 51 TELANGANA

35
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/2

BUS 514071 KAMALAPURAM 400.00 CKT MW MVAR MVA % 1.0121PU -1.31 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514071
404.84KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 115.8 115.8
TO 512200 KAMALAPURAM 220.00 1 0.0 -2.4 2.4 1 1.0000LK 0.00 0.00 5 SOUTH 51 TELANGANA
TO 512200 KAMALAPURAM 220.00 2 0.0 -2.4 2.4 1 1.0000LK 0.00 0.00 5 SOUTH 51 TELANGANA
TO 512200 KAMALAPURAM 220.00 3 0.0 -2.4 2.4 1 1.0000LK 0.00 0.00 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 1 -0.0 -54.2 54.2 10 0.01 0.14 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 2 -0.0 -54.2 54.2 10 0.01 0.14 5 SOUTH 51 TELANGANA

BUS 514100 NARSAPUR 400.00 CKT MW MVAR MVA % 1.0199PU -3.01 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514100
407.95KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512078 NARSAPUR2 220.00 1 143.0 41.3 148.9 47 1.0000LK 0.00 6.77 5 SOUTH 51 TELANGANA
TO 512078 NARSAPUR2 220.00 2 143.0 41.3 148.9 47 1.0000LK 0.00 6.77 5 SOUTH 51 TELANGANA
TO 514022 GAJWEL4 400.00 1 -23.3 19.9 30.6 5 0.02 0.23 5 SOUTH 51 TELANGANA
TO 514022 GAJWEL4 400.00 2 -23.3 19.9 30.6 5 0.02 0.23 5 SOUTH 51 TELANGANA
TO 514036 TEL_STPP(NTP400.00 1 -182.2 -19.1 183.2 26 0.53 9.12 5 SOUTH 51 TELANGANA
TO 514036 TEL_STPP(NTP400.00 2 -182.2 -19.1 183.2 26 0.53 9.12 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 1 166.7 -41.4 171.7 31 0.29 3.14 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 2 166.7 -41.4 171.7 31 0.29 3.14 5 SOUTH 51 TELANGANA
TO 514174 TUKKAPUR 400.00 1 -104.3 -0.7 104.3 15 0.07 1.23 5 SOUTH 51 TELANGANA
TO 514174 TUKKAPUR 400.00 2 -104.3 -0.7 104.3 15 0.07 1.23 5 SOUTH 51 TELANGANA

BUS 514104 MAHESH-TS 400.00 CKT MW MVAR MVA % 1.0207PU -3.82 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514104
408.28KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512082 MAHESH-TS2 220.00 1 139.5 46.3 147.0 29 1.0000LK 0.00 4.15 5 SOUTH 51 TELANGANA
TO 512082 MAHESH-TS2 220.00 2 139.5 46.3 147.0 29 1.0000LK 0.00 4.15 5 SOUTH 51 TELANGANA
TO 514012 HYDERABAD-TS400.00 1 85.0 83.9 119.4 23 0.07 0.74 5 SOUTH 51 TELANGANA
TO 514012 HYDERABAD-TS400.00 2 85.0 83.9 119.4 23 0.07 0.74 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 1 27.2 -31.2 41.4 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 2 27.2 -31.2 41.4 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 1 -95.1 -99.0 137.2 24 0.01 0.05 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 2 -95.1 -99.0 137.2 24 0.01 0.05 5 SOUTH 51 TELANGANA
TO 514152 DINDI 400.00 1 20.8 17.4 27.1 5 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514152 DINDI 400.00 2 20.8 17.4 27.1 5 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -235.6 46.9 240.2 35 0.91 15.71 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -235.6 46.9 240.2 35 0.91 15.71 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 1 58.2 -64.3 86.7 12 0.04 0.68 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 2 58.2 -64.3 86.7 12 0.04 0.68 5 SOUTH 51 TELANGANA

36
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/3

BUS 514106 TIPPAPUR 400.00 CKT MW MVAR MVA % 1.0183PU -1.78 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514106
407.30KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 117.2 117.2
TO 514105 RAMADAGU 400.00 1 -188.1 -4.2 188.2 27 0.06 1.08 5 SOUTH 51 TELANGANA
TO 514105 RAMADAGU 400.00 2 -188.1 -4.2 188.2 27 0.06 1.08 5 SOUTH 51 TELANGANA
TO 514107 CHANDULAPUR 400.00 1 135.0 -14.7 135.8 20 0.03 0.58 5 SOUTH 51 TELANGANA
TO 514107 CHANDULAPUR 400.00 2 135.0 -14.8 135.8 20 0.03 0.58 5 SOUTH 51 TELANGANA
TO 514165 JANAGAON 400.00 1 53.1 -39.7 66.3 10 0.02 0.32 5 SOUTH 51 TELANGANA
TO 514165 JANAGAON 400.00 2 53.1 -39.7 66.3 10 0.02 0.32 5 SOUTH 51 TELANGANA

BUS 514131 MANIKONDA 400.00 CKT MW MVAR MVA % 1.0242PU -4.56 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514131
409.69KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 118.5 118.5
TO 512100 KETHIREDDYPA220.00 1 70.4 34.5 78.4 25 1.0000LK 0.00 1.86 5 SOUTH 51 TELANGANA
TO 512100 KETHIREDDYPA220.00 2 70.4 34.5 78.4 25 1.0000LK 0.00 1.86 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 1 -129.2 43.9 136.5 20 0.08 1.28 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 2 -129.2 43.9 136.5 20 0.08 1.28 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 1 101.2 -83.3 131.1 19 0.12 1.12 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 2 101.2 -83.3 131.1 19 0.12 1.12 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 1 -42.4 -54.4 69.0 10 0.02 0.29 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 2 -42.4 -54.4 69.0 10 0.02 0.29 5 SOUTH 51 TELANGANA

BUS 514165 JANAGAON 400.00 CKT MW MVAR MVA % 1.0194PU -2.11 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514165
407.74KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512148 JANGAON 220.00 1 139.5 30.8 142.9 29 1.0000LK 0.00 3.93 5 SOUTH 51 TELANGANA
TO 512148 JANGAON 220.00 2 139.5 30.8 142.9 29 1.0000LK 0.00 3.93 5 SOUTH 51 TELANGANA
TO 512148 JANGAON 220.00 3 139.5 30.8 142.9 29 1.0000LK 0.00 3.93 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 1 -44.0 -61.8 75.9 11 0.04 0.65 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 2 -44.0 -61.8 75.9 11 0.04 0.65 5 SOUTH 51 TELANGANA
TO 514106 TIPPAPUR 400.00 1 -53.1 -13.3 54.7 8 0.02 0.32 5 SOUTH 51 TELANGANA
TO 514106 TIPPAPUR 400.00 2 -53.1 -13.3 54.7 8 0.02 0.32 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -112.2 28.8 115.8 17 0.28 4.79 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -112.2 28.8 115.8 17 0.28 4.79 5 SOUTH 51 TELANGANA

BUS 514170 CHOUTTUPPAL 400.00 CKT MW MVAR MVA % 1.0077PU -3.02 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514170
403.07KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512153 CHOUTTUPPAL 220.00 1 123.2 6.1 123.4 25 1.0000LK 0.00 3.00 5 SOUTH 51 TELANGANA
TO 512153 CHOUTTUPPAL 220.00 2 123.2 6.1 123.4 25 1.0000LK 0.00 3.00 5 SOUTH 51 TELANGANA
TO 512153 CHOUTTUPPAL 220.00 3 123.2 6.1 123.4 25 1.0000LK 0.00 3.00 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -184.8 -9.1 185.0 27 0.49 8.49 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -184.8 -9.1 185.0 27 0.49 8.49 5 SOUTH 51 TELANGANA

37
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/4

BUS 514193 YELLAMPALLI 400.00 CKT MW MVAR MVA % 1.0200PU -0.07 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514193
408.00KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 117.6 117.6
TO 512179 YELLAMPALLI 220.00 1 0.0 -12.4 12.4 2 1.0000LK 0.00 0.03 5 SOUTH 51 TELANGANA
TO 512179 YELLAMPALLI 220.00 2 0.0 -12.4 12.4 2 1.0000LK 0.00 0.03 5 SOUTH 51 TELANGANA
TO 512179 YELLAMPALLI 220.00 3 0.0 -12.4 12.4 2 1.0000LK 0.00 0.03 5 SOUTH 51 TELANGANA
TO 514031 SINGARENI 400.00 1 -122.6 57.9 135.6 20 0.05 0.84 5 SOUTH 51 TELANGANA
TO 514031 SINGARENI 400.00 2 -122.6 57.9 135.6 20 0.05 0.84 5 SOUTH 51 TELANGANA
TO 514062 NIRMAL 400.00 1 122.6 -98.1 157.0 23 0.19 3.36 5 SOUTH 51 TELANGANA
TO 514062 NIRMAL 400.00 2 122.6 -98.1 157.0 23 0.19 3.36 5 SOUTH 51 TELANGANA

PTI INTERACTIVE POWER SYSTEM SIMULATOR--PSS(R)E MON, JUL 16 2018 16:20


RATING %MVA FOR TRANSFORMERS
SET A % I FOR NON-TRANSFORMER BRANCHES

BUS 514023 MAHABUB4 400.00 CKT MW MVAR MVA % 1.0218PU -5.01 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514023
408.71KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 118.0 118.0
TO 504133 URAVAKONDA 400.00 1 64.3 -96.4 115.9 17 0.08 1.37 5 SOUTH 50 ANDHRA
TO 512018 VELTOOR 220.00 1 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 512018 VELTOOR 220.00 2 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 512018 VELTOOR 220.00 3 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 512018 VELTOOR 220.00 4 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 514003 NSAGAR 400.00 1 -50.3 -31.7 59.4 11 0.10 1.10 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 1 -113.6 -15.1 114.6 20 0.22 2.40 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 2 -113.6 -15.1 114.6 20 0.22 2.40 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 1 -85.1 -39.3 93.7 13 0.05 0.87 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 2 -85.1 -39.3 93.7 13 0.05 0.87 5 SOUTH 51 TELANGANA
TO 524003 RAIC 400.00 1 105.7 11.2 106.3 20 0.16 1.80 5 SOUTH 52 KARNATKA

BUS 514051 MAILARM4 400.00 CKT MW MVAR MVA % 1.0209PU -4.08 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514051
408.34KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 117.8 117.8
TO 512029 SHANKARPALLY220.00 1 105.2 35.9 111.2 35 1.0000LK 0.00 3.77 5 SOUTH 51 TELANGANA
TO 512029 SHANKARPALLY220.00 2 105.2 35.9 111.2 35 1.0000LK 0.00 3.77 5 SOUTH 51 TELANGANA
TO 512029 SHANKARPALLY220.00 3 105.2 35.9 111.2 35 1.0000LK 0.00 3.77 5 SOUTH 51 TELANGANA
TO 512029 SHANKARPALLY220.00 4 167.1 57.1 176.5 35 1.0000LK 0.00 5.98 5 SOUTH 51 TELANGANA
TO 514061 NIZAMABAD 400.00 1 -177.1 -49.0 183.7 33 0.75 8.05 5 SOUTH 51 TELANGANA
TO 514061 NIZAMABAD 400.00 2 -177.1 -49.0 183.7 33 0.75 8.05 5 SOUTH 51 TELANGANA
TO 514100 NARSAPUR 400.00 1 -166.4 6.9 166.5 30 0.29 3.14 5 SOUTH 51 TELANGANA
TO 514100 NARSAPUR 400.00 2 -166.4 6.9 166.5 30 0.29 3.14 5 SOUTH 51 TELANGANA

38
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/5

TO 514104 MAHESH-TS 400.00 1 -27.2 -24.5 36.6 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514104 MAHESH-TS 400.00 2 -27.2 -24.5 36.6 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514131 MANIKONDA 400.00 1 129.3 -74.8 149.4 21 0.08 1.28 5 SOUTH 51 TELANGANA
TO 514131 MANIKONDA 400.00 2 129.3 -74.8 149.4 21 0.08 1.28 5 SOUTH 51 TELANGANA

BUS 514052 MALKARM4 400.00 CKT MW MVAR MVA % 1.0104PU -4.00 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514052
404.15KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 115.4 115.4
TO 512030 MALKARAM 220.00 1 94.1 21.4 96.5 31 1.0000LK 0.00 2.90 5 SOUTH 51 TELANGANA
TO 512030 MALKARAM 220.00 2 94.1 21.4 96.5 31 1.0000LK 0.00 2.90 5 SOUTH 51 TELANGANA
TO 512030 MALKARAM 220.00 3 94.1 21.4 96.5 31 1.0000LK 0.00 2.90 5 SOUTH 51 TELANGANA
TO 512030 MALKARAM 220.00 4 149.4 34.0 153.2 31 1.0000LK 0.00 4.60 5 SOUTH 51 TELANGANA
TO 514001 RAMGUNDM STP400.00 1 -233.7 3.4 233.7 44 2.05 22.88 5 SOUTH 51 TELANGANA
TO 514002 HYDERABAD 400.00 1 -45.5 -29.5 54.2 10 0.02 0.25 5 SOUTH 51 TELANGANA
TO 514060 SURYPET4 400.00 1 -76.2 -93.8 120.9 22 0.20 2.17 5 SOUTH 51 TELANGANA
TO 514060 SURYPET4 400.00 2 -76.2 -93.8 120.9 22 0.20 2.17 5 SOUTH 51 TELANGANA

BUS 514135 ASUPAKA 400.00 CKT MW MVAR MVA % 1.0034PU -1.27 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514135
401.36KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 72.5 72.5
TO 504016 VIZAGPOOL 400.00 1 -158.0 4.0 158.0 29 1.23 13.11 5 SOUTH 50 ANDHRA
TO 512102 ASUPAKA 220.00 1 30.6 4.4 30.9 10 1.0000LK 0.00 0.30 5 SOUTH 51 TELANGANA
TO 512102 ASUPAKA 220.00 2 30.6 4.4 30.9 10 1.0000LK 0.00 0.30 5 SOUTH 51 TELANGANA
TO 514004 KHAMMAM 400.00 1 96.8 -85.4 129.1 23 0.27 2.87 5 SOUTH 51 TELANGANA

BUS 514152 DINDI 400.00 CKT MW MVAR MVA % 1.0166PU -3.93 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514152
406.63KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512131 DINDI 220.00 1 168.5 29.8 171.1 34 1.0000LK 0.00 5.67 5 SOUTH 51 TELANGANA
TO 512131 DINDI 220.00 2 168.5 29.8 171.1 34 1.0000LK 0.00 5.67 5 SOUTH 51 TELANGANA
TO 512131 DINDI 220.00 3 168.5 29.8 171.1 34 1.0000LK 0.00 5.67 5 SOUTH 51 TELANGANA
TO 514011 SSLBPH4 400.00 1 37.5 -37.0 52.6 10 0.02 0.22 5 SOUTH 51 TELANGANA
TO 514011 SSLBPH4 400.00 2 37.5 -37.0 52.6 10 0.02 0.22 5 SOUTH 51 TELANGANA
TO 514104 MAHESH-TS 400.00 1 -20.8 -53.7 57.6 11 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514104 MAHESH-TS 400.00 2 -20.8 -53.7 57.6 11 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -269.4 46.0 273.3 39 1.02 17.66 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -269.4 46.0 273.3 39 1.02 17.66 5 SOUTH 51 TELANGANA

39
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/1

40
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/2
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

List of addressee:

1. The Member Secretary, 2. COO, CTU


Southern Regional Power Committee, Power Grid Corp. of India Ltd.
29, Race Course Cross Road, “Saudamini”, Plot No.2, Sector-29,
Bangalore 560 009. Gurgaon 122 001, Haryana.
FAX : 080‐22259343 FAX: 95124-2571932

3. CEO, POSOCO, 4. GM, SRLDC,


B-9, Qutub Institutional Area, 29, Race Course Cross Road,
Katwaria Sarai, Bangalore 560 009
New Delhi-110016           FAX – 080‐22268725

5. The Director (Transmission), 6. The Director (Transmission)


Karnataka State Power Trans. Corp.Ltd., TANTRANSCO,
Cauvery Bhawan, 144, Anna Salai,
Bangalore - 560 009. Chennai - 600002.
FAX: 080 -22228367 FAX: 044-28516362

7. The Director (Transmission), 8. The Director (Trans & System op.),


Transmission Corp. of Andhra Pradesh Ltd., Kerala State Electricity Board Ltd,
(APTRANSCO) Vidyuthi Bhawanam, Pattom,
Vidyut Soudha, P.B. No. 1028,
Hyderabad – 500 082. Thiruvananthapuram - 695 004.
FAX : 040-66665137 FAX: 0471-2444738

9. The Director
(Grid Transmission and Management),
Transmission Corp. of Telangana Ltd.,
(TSTRANSCO)
Vidyut Soudha, Khairatabad
Hyderabad – 500 082.
FAX: 040-23321751


 
41
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/3
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

Minutes of joint study meeting of Southern Region held on 10th & 11th May
2018 at SRPC, Bengaluru

In the 42nd meeting of the Standing Committee on Power System Planning of Southern
Region (SCPSPSR), held on 27th April, 2018 in Ernakulam (Kerala), it was decided
that a joint system study will be carried out by CEA, CTU and STUs for Southern
Region(SR). Accordingly, the joint system study meeting was held at SRPC,
Bengaluru. The Member Secretary, SRPC welcomes the participants from CEA, CTU
and STUs of SR. Director, CEA thanked Member Secretary, SRPC, for extending all
support for the meeting. He also stated that as per the decision of SCPSPSR, the
transmission system evolved in this joint study meeting will be put up for discussion in
next meeting of SCPSPSR.

List of participants is enclosed at Annexure-I.

In the meeting following issues were discussed:

1.0 Evacuation of power from RE sources in Southern Region (Proposed Wind


Energy Zone by MNRE)

1.1 In the 42nd meeting of SCPSPSR held on 27.04.2018, it was informed that based
on various inputs like district wise NIWE potential, SNA developable potential,
pooling station wise wind capacity sanctioned by STU, RE applications received
in ISTS by CTU and detailed discussion with MNRE & wind IPPs/developers,
projected capacity in each Wind Energy Zone (WEZ) were identified and
prioritized for implementation in 2021-22 time frame in wind resource rich states.
In the meeting held in MNRE, Koppal (2500 MW) in Karnataka, Kurnool (3000
MW) in Andhra Pradesh and Karur (2500 MW) in Tamil Nadu were identified as
prioritized Wind Energy zones for which transmission infrastructure needs to be
developed/made available under ISTS Intrastate transmission system. Further, it
was indicated that Tirunelvelli/ Tuticorin district in TN is also a high wind potential
complex and 2500 MW of wind energy potentials considered for development of
transmission infrastructure under ISTS/Intra-state transmission system.

1.2 Director, CEA stated that in the SCM, it was decided that comprehensive study
would be carried out with Southern Region constituents for accessing the
transmission system requirement in the region as a whole. He stated that to carry
out comprehensive study, intra state RE generation and transmission projects
proposed by STUs need to be considered.

1.3 CTU stated that large nos. of applications have been received by them for
connectivity with ISTS in these Wind Energy Zones. Details of which are
tabulated below.


 
42
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/4
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

Infrastructure to be
Quantum(MW) for
S. developed for RE
Wind Energy Zone which connectivity
No. Quantum (MW) (as per
application received
MNRE meeting)
1 Tirunelveli & Tuticorin 8000 2500
(TN)
2 Karur / Tiruppur (TN) 4000 2500
3 Koppal (Karnataka) 3000 2500
4 Kurnool & Ananthpur (AP) 6000 3000

1.4 For successful evacuation of RE power from proposed Wind Energy Zones and
to review the transmission system proposed by STUs & CTUs under Green
Energy Corridors, it was agreed that detailed system study would be carried out
for 2021-22 time frame for the peak wind scenario (Monsoon season).
Incidentally, this scenario coincides with low load demand period/season (off
peak period) for Southern Region.

1.5 Based on historical pattern, representative of SRLDC suggested that 80% of the
EPS peak load for SR states may be considered for study & analysis for the off
peak scenario, which was agreed.

1.6 It was suggested that dispatches from RE wind power plants (existing & future)
may be taken as 80% of the installed capacity and same was agreed. However it
was decided that based on the Load generation balance (LGB) prepared by the
STUs, RE dispatches of the states shall be reviewed depending on the surplus
scenario of states.

1.7 Based on the information provided by STUs, existing installed capacity of RE


generation (wind/solar) and planned augmentation / addition by time frame of
2021-22 is summarised below:

Installed Capacity (Existing + Addition by 2021-22)


RE Thermal Hydro Gas Small Gen. +
SI CoGen
STU
No Existing Addition Existin Addition byExistin Addition Existin Addition Existing Addition
by 2021-g 2021-22 g by 2021-g by 2021- by 2021-
22 22 22 22
W : 4656; W : 2800;
1 Karnataka 7680 360 3195 0 0 0 2983 0
S : 4885 S : 700
Andhra W : 3947; W : 2500;
2 6050 1600 1798 0 2576 0 433 0
Pradesh S : 2147 S : 2000
Tamil W : 8152; W : 2000;
3 5620 7080 2308 500 528 0 1761 0
Nadu S : 2048 S : 2000


 
43
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/5
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

1.8 Further, the generation and dispatch provided by Tamil Nadu, Karnataka &
Andhra Pradesh for Load Generation Balance (LGB) is tabulated as below.
Detailed Load Generation balance report is also enclosed at Annexure-II.

Generation Dispatch Load +


SI No STU
RE Hydro Thermal Gas LTA/LTOA CGS Allocation Losses
W : 4473;
1 Karnataka 431 2180 0 0 2535 11417
S : 2234
Andhra W : 4513;
2 424 2349 175 0 1448 9474
Pradesh S : 1659
W : 5076;
3 Tamil Nadu 825 4471 0 0 3942 16685
S : 2024
4 Telangana* 9266 2334 11600
5 Kerala* 2515 1695 4210
* Since the representatives of Telangana & Kerala were not present in the
meeting, LGB had been set in consultation with CEA, CTU & POSOCO.

1.9 Considering RE Generation Capacity addition and Load Generations Scenarios


projected by state of SR, it was decided that dispatch of generation from Thermal
(coal & gas) /hydro plants are to be reduce to the technical minimum level during
off peak period to accommodate must run generation. The dispatch of the some
of the coal based generations reduce to 50-60% of their installed capacity or
generation has to be closed/back down and some ISGS allocations were
surrendered by states to achieve load generation balance.

1.10 After, finalizing the LGB, studies were carried out for peak wind scenario and
peak demand scenario (2021-22) with reduced RE dispatch and Study results
and analysis in respect to Wind Energy Zones is summarized as under:

A. Tirunelveli and Tuticorin Wind Energy Zone (Tamil Nadu):

i) For successful evacuation of wind generation from Tirunelveli and Tuticorin


complexes, a 400/230kV, 2X500 MVA GIS Substation Tuticorin – II (erstwhile
Tirunelveli Pooling station) along with its interconnection with Tuticorin Pooling
station through 2 nos. of 400kV D/c lines (with Quad Moose Conductor) is under
advance stage of commissioning as part of “Green Energy Corridor”. Further,
augmentation of 1X500 MVA, 400/230kV ICT at Tuticorin – II GIS has been
agreed in 42nd meeting of SCPSPSR.

ii) CTU informed that SECI / MNRE has indicated high wind potential of the order
of 2500MW in Tirunelveli and Tuticorin Wind Energy Zone. CTU has also
received applications for about 8000MW for connectivity to ISTS in these areas.

iii) Generation from CEPL with (IC-2x660MW and LTA-558 MW), Tuticorin JV
(2X500MW), Kudankulam NPP (2X1000MW) are pooled  at 765/400 kV
Tuticorin Pooling Station (PS) and RE generation at Tuticorin & Tirunelveli


 
44
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/6
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

areas are being planned to pooled through Tuticorin-II at 765/400 kV Tuticorin


Pooling Station (PS). Further it will dispersed through Tuticorin Pool – Madurai
400kV D/C line (with Quad) & Tuticorin PS – Dharmapuri 765kV D/c line (initially
to be charged at 400kV).

iv) Kudankulam Nuclear Power Plant (KKNPP) is connected to Tuticorin PS and


existing Tirunelveli substation through 3 nos. of 400kV D/C lines (with Quad
moose conductor). Generally, Kudankulam – Tuticorin PS 400kV D/C line (with
Quad moose ACSR conductor) is lightly loaded and large quantum of power
flow towards Tirunelveli from Kudankulam nuclear power plant through
Kudankulam – Tirunelveli 400kV D/c (Quad) line. under worst scenario like
outage of Tirunelveli bus or outage of Kudankulam – Tirunelveli 400kV D/c lines,
Kudankulam -Tuticorin Pool D/c line is expected to loaded upto 2000 MW (total
generation of Kundankulam APP). This been considered as pre condition and
accordingly, requirement of additional transmission system for evacuation of RE
generation from Tirunelveli area has been studied.

v) As per the LGB provided by Tamilnadu, scheduling of power from CEPL


(2x660MW) & Tuticorin JV TPS (TN – 5x210 MW) Thermal power station would
be reduced to either lowest technically feasible level or zero under high RE
generation.

vi) Study has been carried out considering dispatch from Intra state renewables
generation (both wind and solar) 50% as provided by
TANTRANSCO/TANGEDCO to achieve Long generation balance for the
studied scenario. Further thermal generations (state/IPP) have been backed
down technically possible level (as data provided by states).

vii) Dispatch of RES generation, Coastal Energy, Tuticorin JV and Tuticorin TPS
have been considered subject to successful evacuation of 2000MW power
from RE generation pooled at Tirunelveli Pool even under outage Kudankulam
– Tirunelveli 400kV D/c (Quad) line comes under outage.

viii) The existing / under construction transmission system have been considered
to evaluate requirement of additional transmission system for evacuation of
wind generation in Tirunelveli area including 558 MW LTA of CEPL and Tuticorin
JV (2X500MW).

ix) The study results (enclosed at Exhibit-1) indicates that the existing Tuticorin –
II adequate for evacuation of 2000 MW of wind generation.

x) Further, for successful evacuation of 2000MW wind generation , (pooled at


230kV level of 400/230kV Tuticorin-II GIS sub-station) transformation capacity
of 5x500 MVA, 400/230kV is required under N-1 contingency criteria. Since,
transformation capacity of 2x500 MVA, 400/230 kV is under erection and 1x500
MVA has been approved in 42nd meeting of SCPSPSR; additional

 
45
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/7
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

transformation capacity of 2x500MVA, 400/230kV ICTs would be required at


Tuticorin-II GIS sub-station.

xi) For dispersal of more than 2000MW of RE generation from Tuticorin-II GIS sub-
station, Tuticorin-II GIS – Dharmapuri (Salem) 765 D/C line(presently operating
at 400kV) needs to be operated at its rated voltage.(i.e 765kV)

xii) After detailed deliberation, requirement of followings transmission system was


agreed for transfer of 2000 MW power from wind energy in Tirunelveli /Tuticorin
area:

a) Addition of 2x500 MVA, 400/230kV ICTs (4th & 5th) at Tuticorin-II GIS sub-
station.

b) Operation of Tuticorin-II GIS – Dharmapuri (Salem) 765 D/C line (presently


operating at 400kV) at its rated voltage. (i.e 765kV) would be reviewed for
dispersal of more than 2000MW RE generation

B. Karur / Tiruppur Wind Energy Zone (Tamil Nadu):

i) Representative of CTU informed that MNRE/SECI has identified wind potential of


2500MW in Karur / Tiruppur wind zones of Tamil Nadu, with and applications for
connectivity for about 4000MW with ISTS has been received .

ii) To address the connectivity with ISTS for generators from Karur and Tiruppur wind
zones, a new substation (ISTS) was proposed at common location with following
details:

a) Establishment of 5x500 MVA, 400/230 kV Karur Pooling Station (at a location


in between Karur Wind zone and Tiruppur wind zone)
b) LILO of both circuits of Pugalur – Pugalur (HVDC) 400 kV D/c line ( with Quad
Moose ACSR Conductor) at Karur PS
c) 9 Nos. of 230kV line bays for interconnection of wind projects
d) 2x125 MVAr, 400kV Bus reactors at Karur PS

iii) System Studies were carried out for successful evacuation of 2000MW of RE
generation (80% of the expected capacity of 2500MW) from Karur PS. Dispatch of
2000MW was considered on Raigarh – Pugalur HVDC and Pugalur – Trichur (VSC
based HVDC) to meet out demand in Kerala. The study results (enclosed at
Exhibit-1), shows that proposed transmission system is adequte for transfer of
power/generation from Karur and Tiruppur wind zones.

iv) Accordingly, the above transmission system proposed at S.No. B(ii) for transfer of
power from Karur and Tiruppur wind zones was agreed. It was also agreed that
adequate space provision in substation would be kept for future expansion.

 

 
46
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/8
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

C. Koppal Wind Energy Zone (Karnataka):

i) Representative of CTU informed that MNRE/SECI had estimated wind energy


potential of 2500MW in Koppal wind zone of Karnataka and applications for
connectivity with ISTS have been received for 3000MW.

ii) To address the connectivity with ISTS from RE developers from Koppal wind zone,
a 400/220kV ISTS substation has been proposed in Koppal area with following
details:

a) Establishment of 5x500 MVA, 400/220kV pooling station near Munirabad


/suitable location in Koppal distt.
b) Pooling station (near Munirabad /suitable location in Koppal distt.) - Munirabad
400 kV D/c Line (with Quad Moose ACSR conductor)
c) Pooling station (near Munirabad /suitable location in Koppal distt.) - Narendra
(New) 400 kV D/c Line (with Quad Moose ACSR conductor)
d) 9 Nos of 220kV line bays for interconnection of wind projects
e) 2x125 MVAr,400kV bus reactor at Pooling station (near Munirabad /suitable
location in Koppal distt.)
f) Adequate space provision for future expansion.

iii) System Studies were carried out for successful evacuation of 2000MW of RE (i.e.
80% of the expected capacity:2500MW ) from pooling station in Munirabad (Study
results are enclosed at Exhibit-1).

iv) The study result shows that power from Narendra (New) is dispersed towards
Kolhapur PG and congestion /transmission constraint is in the system observed in
the system beyond Kolhapur (MSETCL), and Kolhapur (MSETCL) – Karad 400kv
D/c line gests overloaded.

v) After deliberations, the above proposed transmission system mentioned at c(ii) was
agreed for connectivity of RE generators at proposed Munirabad/Koppal PS. It was
also agreed that for transfer of power from the above pooling station would require
system strengthening in Western Region. Accordingly, it was suggested that issue
of strengthening of WR system need to be taken up with WR constituents.

D. Kurnool Wind Energy Zone (AP):

i) Representative of CTU informed that in a meeting at MNRE, it was decided that


Kurnool distt. (with about 3000 MW) would be the priority Wind Energy Zones
(WEZ) with AP due to availability of lot of waste land and High Wind Power density
(WPD) (as per assessment connectivity of NIWE potential). CTU had received
applications for connectivity with ISTS for about 6000 MW.


 
47
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/9
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

ii) Considering on the land availability for pooling station and the applications of RE
developers for connectivity with ISTS a pooling station at common location in
between Kurnool & Ananthapur distt. has been proposed with following details:

a) Establishment of 765/400/220kV Pooling station (at suitable location in Kurnool


substation Distt) at Kurnool-III (e.g. near Adoni) with 3x1500 MVA, 765/400kV;
6x500 MVA, 400/220kV transformation capacity
b) Kurnool-III Pooling station - Kurnool(new) 765 kV D/c Line
c) 10 nos of 220kV line bays for interconnection of wind projects
d) 1x240 MVAr (765kV) & 1x125MVAr (400kV) bus reactors at Kurnool-III Pooling
station.
e) Adequate space provision for future expansion.

iii) Studies were carried out for successful evacuation of 2400MW of RE generation
i.e. (80% of the expected capacity, 3000 MW) from Kurnool-III Pooling station (near
Adoni PS/suitable location in Kurnool distt.) (study results, enclosed at Exhibit-1).

iv) The study result shows that above transmission system is adequate for transfer of
power from RE generation. Accordingly, the above transmission system [mentioned
at Sl. No. D(ii)] was agreed for evacuation of 3000 MW RE generation from Kurnool
and Ananthapur wind zones.

2.0 Intra- state transmission projects proposed for Green Energy Corridor Ph-II
in Karnataka

Representative of KPTCL proposed for strengthening of Intrastate transmission


system for evacuation of RE generation. The proposed transmission system was
studied in detail and deliberations are as follows:

2.1 Establishment of 2x500 MVA, 400/220 kV sub-station at Yalwar, Bijapur


District with following elements:

400 kV System:
a. Narendra (New) Kudgi-Yalwar 400 kV D/C line (with Quad Moose ACSR
Conductor)
b. Gulbarga- Yalwar 400 kV D/C line (with Quad Moose ACSR Conductor).
c. 2 X 500 MVA, 400/220 kV ICTs at Yalwar.
d. 2 X 125 Mvar bus reactors.
220 kV System:
a. LILO of both circuits of existing B.Bagewadi – Lingasugur 220 kV D/C
line at Yalwar.
b. LILO of both circuits of Bijapur- Sindagi 220 kV D/C line sub-station at
Yalwar.


 
48
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/10
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

c. B.Bagewadi -Yalwar 220 kV D/C line.

2.1.1 System study shows that power flows from proposed Yalwar sub-station
toward Narendra. In case of outage of the proposed Yalwar –Narendra (New)
400kV D/C line, all the power will absorb in state network.

2.1.2 After deliberations, the proposed 400/220 KV substation at Yalwar and


associated transmission lines for evacuation of wind generation in Yalwar
was agreed except Yalwar - Nagendera (New) 400kV D/C line.

2.2 Establishment of 2x500 MVA, 400/220 kV sub-station at Lokapur, Bagalkot

400 kV System:
a. LILO of both circuits of Narendra (New) –Narendra (PGCIL) 400 kV D/C line
(with Quad Moose ACSR Conductor) at Lokapur
b. 2 X 500 MVA 400/220 kV ICTs.
c. 2 X 125 Mvar bus reactors.
220 kV System:
a. LILO of both circuits of existing Gadag-Bagalkot 220 kV D/C line at Lokapur.
b. LILO of both circuits of Mahalingpura-Soundatti 220 kV D/C line at Lokapur.
c. Mughalkod.- Lokapur/Bagalkot 220 kV D/c Line.

2.2.1 The study result shows that power flows from Narendra (New) dispersed
towards Kolhapur (PG). The congestion /transmission constraint observed in
the system beyond Kolhapur (MSETCL) and Kolhapur (MSETCL) – Karad
400kV D/c line gets overloaded. Accordingly, it was decided to review the
transmission system for Lokapur Wind Energy zone along with Koppal Wind
Energy Zone seeking connectivity at ISTS.

2.3 Providing additional feed to 400/220 kV Dhoni sub-station by LILO of existing


Narendra – Davanagere 400 kV Twin Moose D/C line at Dhoni.

2.3.1 The system study shows that additional feed to 400/220 kV Dhoni sub-station
by LILO of existing Narendra – Davanagere 400 kV D/C line (with twin moose
ACSR conductor) at Dhoni does not provide any additional benefit and hence,
LILO of above line at Dhoni was not agreed.

2.4 Establishment of 2x100 MVA, 220/110 kV sub-station at Ron (New), Gadag


District

220 kV System:

10 
 
49
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/11
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

a. Doni- Ron 220kV D/C line.


b. 2 X 100 MVA, 220/110 kV ICTs.
110 kV System:
a. LILO of both circuits of existing Ron-Gajendragad 110 kV D/C line
at Ron (New).
b. 110 kV LILO of DC line between Gadag and 110 kV Ron to
proposed 220 kV Ron. (Existing SC line via Naregal and proposed
ongoing 2nd circuit directly to 110 kV Ron).

2.5 Establishment of 2x100 MVA, 220/110 kV sub-station at Savalgi, Bagalkot


District

220 kV System:
a. LILO of both circuits of Kudgi-Vajramatti 220 kV D/C line at Savalgi.
b. 2x100 MVA, 220/110 kV transformers.
110 kV System:
a. LILO of existing Todalbagi-Mamadapura 110 kV S/C line at Savalgi.
b. LILO of existing Bableshwar-Mamadapura110 kV S/C line at Savalgi.
2.6 Establishment of 2x100 MVA, 220/66 kV sub-station at Hanagal (New),
Chitradurga District

220 kV Transmission scheme:


a. Jagalur - Hanagal 220 kV D/C line.
b. 2 X 100 MVA, 220/66 kV ICT’s.
66 kV System:
a. LILO of existing Gudikote-Hangal 66 kV S/C line at Hangal (New).
b. LILO of both circuits of Hangal -Rampura 66 kV D/C line at Hangal
(New).
c. Hangal - Konasagara 66 kV S/C line on D/c towers.

2.7 Establishment of 2x100 MVA, 220/66 kV sub-station at PD Kote (New),


Chitradurga District

220 kV System:
a. LILO of both circuits of Hiriyur-Gowribidanur 220 kV D/C line at
P.D.Kote (New).
b. 2 X 100 MVA, 220/66 kV ICT’s.

11 
 
50
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/12
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

66 kV System:
a. LILO of both circuits of Hariyabbe-P.Kote 66 kV D/C line at P. D Kote
(New).
b. LILO of Hiriyur-Kalmaranahalli 66 kV S/C line at P. D Kote (New).
2.8 LILO of 2nd circuit of the existing Mahalingpura - Kudachi 220 kV D/C line at
Athani.

2.9 Conversion of existing Bidnal-Saundatti 220 kV S/C line and Saundatti -


Mahalingpura 220kV S/C to 220 kV D/C line

2.10 Strengthening of Lingapura-Ittagi 220kV S/C line, Ittagi –Neelagunda 220kV


S/C, Neelagunda –Guttur 220kV S/C line by replacing line with 220 kV D/C line
(Twin Drake conductor).

2.11 The transmission system proposals of KPTCL mentioned at 2.4 to 2.10 found to
be in order and agreed.

3.0 High Flow on 400kV KKNPP – Tirunelveli D/C line after commissioning of of
400kV KKNPP – Tuticorin PS D/C line

3.1 Representative of POSOCO stated that power flow on 400kV lines connected to
KKNPP is quite uneven. KKNPP – Tuticorin PS 400kV D/C lightly loaded whereas
most of power from KKNP is dispersed through KKNPP – Tirunelveli 400kV D/c
line.

3.2 It was observed from system studies that although line loadings are uneven, there
is no issue regarding power evacuation from KKNPP even under contingency
conditions, as per planning criteria.

3.3 Accordingly, it was agreed that uneven loading of lines connected to Unit 1 & 2
would be studied while planning evacuation system for Unit 3 & 4.

4.0 Providing additional feed to 3x500 MVA, 400/220kV substation at Mylasandra


(Electronic City) and Establishment of 2x500 MVA, 400/220 kV Sub-station at
Dommasandra in Bengaluru

4.1 Director, CEA stated that in the 27th meeting of SCPSPSR, establishment of
400/220 kV sub-station (3 x 500 MVA) at Mylasandra (Electronic City) in Bangalore
was approved with LILO of Somanahalli-Kolar 400 kV S/C line (Twin Moose ACSR
conductor) at Mylasandra. In the 41st SCPSPSR, KPTCL had requested for
reconductoring of Somanahalli-Kolar 400kV D/C line LILO at Mylasandra
(Electronic city) with Quad Moose ACSR conductor (replacing existing Twin Moose
ACSR conductor) for providing additional feed to Mylasandra. In view of difficulty in
getting long shut down of Somanahalli-Kolar 400kV line, it was decided that CEA,

12 
 
51
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/13
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

CTU, POSOCO and KPTCL may carry out System Studies jointly and explore
various alternate options.

4.2 In the 42nd meeting of SCPSPSR, KPTCL proposed to construct LILO of one circuit
of proposed Dharmapuri- Somanahalli 400kV D/c line (PGCIL line) at 400 kV
Mylasandra sub-station. With above proposals 400kV system at proposed
400/220kV Mylasandra substation would be as under:

i) 3x500MVA, 400/220kV ICTs


ii) LILO of single circuit of Dharmapuri-Somanahalli 400kV D/C line (quad Moose
ACSR conductor) at Mylasyandra
iii) LILO of single circuit of Kolar-Somanahalli 400kV S/C line (Twin Moose) at
Mylasyandra

4.3 In the 42nd meeting of SCPSPSR, KPTCL had proposed for establishment of
400/220 kV sub-station at Dommasandra (400/220kV, 2x500MVA ICTs) in
Bengaluru city to relieve loading 400kV Mylasandra sub-station, to reduce the
loading of 220 kV lines and to meet the future load growth in the vicinity with
following details:

i) 2 X 500 MVA, 400/220 kV GIS substation at Domasendra


ii) LILO of Kolar – Mylasandra 400kV S/C line (with Twin Moose ACSR
conductor) at proposed Dommasandra substation.
iii) Somanahalli - Dommasndra 400kV S/C line (with Twin Moose ACSR
conductor)
iv) LILO of Somanahalli - Malur 220 kV D/C line between proposed 220kV
EXORA and Malur sub-station (With this line arrangement, there will be
220kV DC connectivity between Dommasandra & EXORA, 220 kV SC
connectivity from Dommasandra, each to Sarjapura and Malur).
v) 220 kV, 1000sqmm UG cable link between 220 kV VT Park substation and
220kV EXORA sub-station (proposed).

4.4 Representative of CTU stated that KPTCL had already planned LILO of Kolar -
Somanahalli 400 kV S/C line at Mylasyandra 400/220kV substation. Again making
LILO of Kolar – Mylasyandra section at proposed Dommasandra 400/220kV
substation would reduce reliability of the system.

4.5 To meet out the rising demand of Bengaluru city along with reliability, following
alternatives were discussed:

Alternative 1:
i) LILO of Kolar – Somanahallli 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)

13 
 
52
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/14
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad ACSR
Conductor) line at Mylasandara 400/220 kV substation
iii) Mylasandra – Dommasandra 400kV D/C line (twin Moose)

Alternative 2:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad moose
ACSR conductor) line at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line (with twin Moose ACSR
conductor)

Alternative 3:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C (Quad) line at
proposed 400/220 kV substation at Dommsandra.
iii) LILO of LILO section of Somanahalli – Dommasandra (formed after LILO of
single circuit of Dharampuri – Somanhalli 400kV D/C (Quad) line at
Dommasandra) at Mylasandra.

4.6 Regarding alternative-1, KPTCL stated that proposed 400/220kV substation at


Mylasandra is GIS and space is not available for 06 nos of 400kV line bays.
Therefore, Alternative-1 can be ruled out.

4.7 Load flow studies were carried out for both Alternative-2 and Alternative-3 (power
flow plot enclosed as Exhibit-2). The studies show that both Alternative-2 and
Alternative-3 are acceptable, but Alternative-2 is more reliable than Alternative-3.

4.8 KPTCL stated that in case of both Alternative-2 and Alternative-3, multi circuit
towers are need to be used for construction of lones constructed between
Mylasandra and Dommasandra. However, KPTCL requested to consider
Alternative-2 over Alternative-3 considering higher reliability.

4.9 Accordingly, Alternative-2 was agreed for supplying reliable power to Bengaluru city.
The transmission system of Mylasandra and Dommasandra 400kV S/S will be as
follows:

Connectivity at Mylasandra 400/220kV substation:

i) 3x500MVA, 400/220kV ICTs


ii) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)
iii) Mylasandra – Dommasandra 400kV S/C line (twin Moose)

400/220kV substation at Dommasandra :


14 
 
53
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/15
Minutes of Joint Study Meeting of SR (10th & 11th May 2018) 

i) 2x500MVA, 400/220kV ICTs


ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C line (with Quad
moose ACSR Conductor) at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line ((with twin moose ACSR
Conductor) on D/C towers

4.10 KPTCL stated that they would plan to utilize RoW of Kolar – Somanahalli 400kV
S/C line for LILO of Dharampuri – Somanhalli 400kV D/C line (with Quad moose
ACSR conductor) at Dommsandra.

4.11 It was also clarified that modalities may be finalized at the time of
implementation.

15 
 
54
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/16

Annexure-I
List of participants in Joint System Study Meeting held on 10th & 11th
May, 2018 at SRPC, Bengaluru

Sl. No. Name Designation


Central Electricity Authority
1 B.S. Bairwa Director (PSPA-II)
2 Kanchan Chauhan Assistant Director

SRPC
1. S R Bhatt Member Secretary
2. R. M. Rangarajan SE
3. Anil Thomas Executive Engineer

POWERGRID
1. Mukesh Khanna GM (CTU-Plg.), PGCIL
2. Kashish Bhambani CM(SG) PGCIL
3. Ajay Dahiya Dy. Mgr(CTU-Plg)
4. Narendra Sathrik Sr. Engr(CTU-Plg)
,POWERGRID

POSOCO/SRLDC
1. Abraham Varghese DGM
2. Madhukar G Manager
3. L. Sharath Chand Sr. Engr

APTRANSCO
1. T. V. Nageshwar Rao DE/System Studies
2. K Ramesh ADE/PS

TANTRANSCO/TANGEDCO
1. C Veeramani CE/reg
2. D. Ravichandran SE, System studies
3. T. Sumathi EE, System studies
4. V.Jayanthi AEE, System Studies
5. R. Kathiravan AEE/CERC
6. J. Kalaisetri AE/System Studies

55
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/17

Sl. No. Name Designation


KPTCL
1. D Chethan EE,PSS/KPTCK
2. Divya Prabha H AEE/PSS/KPTCL

56
Annexure-II
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/18

LOAD GENERATION BALANCE OF Tamilnadu for - 2021-22 Off Peak CONDITION

Mini. Technical
Power Plant Installed Capacity Total Units Despatch potential for
off peak running thermal
(MW) (MW) Considered power plant
Existing

Hydro
Kundah 3 X 60 + 2 X 50 +
5 X 20 + 5 X 35 +1x30 585 3 X 60 + 2 X 50 + 1 X 35 100
Pykara 3 X 6.65 + 1 X 11 + 2 X 14+2 60.95 3 X 6.65 + 1 X 11 + 2 X 14 30
Pykara ultimate (PUSHEP) 3X50 150 3X50 30
Moyar 3 X 12 36 3X12 18
Kadamparai 4 X 100 400 4 X 100 0
Aliyar 1 X 60 60 1 X 60 30
Periyar 4 X 35 140 4 X 35 100
Mettur Dam 4 X 12.5 50 4 X 12.5 25
Bhawani Barrage - II & III 2 x 15 + 2 x 15 60 2 x 15 + 2 x 15 30
Kodayar 1 X 60 + 1 X 40 100 1 X 60 + 1 X 40 50
Mettur Tunnel 4x50 200 4x50 150
Suruliyar 1x35 35 H 20
Servalar 1x20 20 H 14
Sarkarpathy 1x30 30 H 20
Sholayar 2x35+25 95 H 63
Papansam 4x8 32 H 22
Bhavani kattalai barage I,II, III 2x15+2x15+2x15 90 H 63
Lower mettur barage I,II ,III&IV 2x15+2x15+2x15+2X15 120 H 60
Micro Hydro 45 H 0
Subtotal Existing Hydro 2308.95 825

Thermal (Coal+Lignite)

Ennore (decommisioned) 2 X 60 + 3 X 110 450 2 X 110 0


Tuticorin 5 X 210 1050 4 X 210 0 577.5
Mettur 4 X 210 840 4 X 210 0 462
Mettur TPS St-III 1 x 600 600 1 x 600 330 330
Neyveli -I NLC 6x50 + 3X100 600 6x50 + 3X100 330
Neyveli Zero (STCMS) 1 X 250 250 1 X 250 0 137.5
North Chennai 3x210 + 2 x 600 1830 3x210 + 2 x 600 1006 1006.5

Subtotal Existing Thermal 5620 1336

Thermal (Gas)
PP Nallur 3 X 100 300 3 X 100 0
Basin Bridge 4 X 30 120 3 X 30 + 1 X 15 0
Kovil Kalapal 1x70+1x37.8 107.8 1x70+1x37.8 0

Subtotal Existing Gas 527.8 0

Small Thermal

Valathar Stg-I 1x60+1x35 95 T 0


Valathur Stg-II 1x60+1x32 92 T 0
Kuttalam Gas 1x64+1x37 101 T 0
GMR Power (Diesel) 4x49 196 T 0
Samalpatti 7x15.1 105.6 T 0
Madurai (Diesel) 106 106 T 0
Aban Power (Gas) 74.41+38.81 113.2 T 0
Arkey Energy (Gas) 1x38+2x6.8+1x.20 52.8 T 0
861.6
Subtotal Existing Mini Hydro +Small Thermal 861.6 0 0

RE

Tamil Nadu Wind 8152 4076


TN Solar 2048 1024

TN LGB sheet for off peak condition Page 1 joint study meeting at SRPC, Bengaluru
57
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/19

Other Renewables 900 0

Total RE 11100 5100

Total Existing 20418 7261

Additions upto 2021-22

Hydro
Kundah PSS 4 x 125 500 4 x 125 0
Mettur PSS 500
Vellimalai PSS 200
Kollimalai PSS 520

Subtotal - Hydro 500 0

Thermal

Ennore Expn TPS 1 x 660 660 1 x 660 363 363


Replacement of existing Ennore 1 x 660 660 1 x 660
TPS 0 363
North Chennai St-III (2015-16) 1 x 800 800 1 x 800 440 440
Ennore (SEZ) TPS at Kaltupalli 2 x 660 1320 2 x 660 726 726
Udangudi TPS (TNEB) 2 x 660 1320 2 x 660 726 726
Udangudi TPS St-II to be deleted
UPPUR 2 x 800 1600 2X800 880 880
OPGC 2x360 720 2x360 0
Subtotal - Thermal 7080 3135

Tamil Nadu Wind 2000 1000


TN Solar 2000 1000
Other Renewables 0 0

Total RE 4000 2000

Total Additions 11580 5135

Total Hydro 2809 825


Total Thermal 12700 4471
Total gas 1389.4 0
Total RE 15100 7100
TOTAL upto 2018-19 31998 12396

TN LGB sheet for off peak condition Page 2 joint study meeting at SRPC, Bengaluru
58
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/20

LOAD GENERATION BALANCE OF Andhra Pradesh for - 2021-22 Off Peak CONDITION
Peak Mini.
Power Plant Installed Capacity Total Units Despatch Technical
(MW) (MW) Considered (MW) potential of

Existing
Machkund 84 44
TB Dam 59 22
Donkarai 1x 25 25 1x25 25
Upper Sileru 4 X 60 240 4 X 60 133
Lower Sileru 4 X 115 460 4 X 115 200
Nagarjunasagar RT PH 3x30 90 3x30 0
Srisailam RBPH 7 X 110 770 7 X 110 0
Nagarjunasagar Tail Pond 2 x 25 50 0
Pennaahobhilam 2x10 20
Subtotal Existing Hydro 1798 424

Thermal (Coal)

Vijayawada 6 X 210 + 1x 500 1760 6 X 210+1 x 500 1144 1144


Muddanur 5 X 210 1050 4 X 210 685 682.5
Krishnapattanam Stage - I 2 x 800 1600 2 x 800 520 1040
Hinduja 2 x 520 1040 2 x 520 0 676
RTTP IV Stage 1 x600 600 0 390
Subtotal Existing Thermal 6050 2349

Thermal (Gas)

Vijjeswaram 2 X 33 + 1 X 34 + 1 X 112.5 + 1X59.5 272 2 X 33 + 1 X 36 + 1 X 172 175


GVK extension 1X145+1X75 220 0
Spectrum (Gas) Kakinada 1x46.8 + 2X46.1 +1x68.8 208 3 X 50 + 1 X 58 0
Kondaplli 2x112+1x128 350 0
Isolated Gas Well 27.04 27.04
Konaseema 445
Reliance Energy Limited 1X140+1x80 220
Gautami 2x145+1x174 464
Vemagiri Power Generation 1x233+1x137 370

Subtotal Existing Gas 2576.04 175

Mini Hydro 0

RE

Renewables (Wind) R 3947 0 2762.9


Renewables (Solar) R 2147 0 858.8
Renewables (Co-Gen) R 433 0 0

Total RE 6527 3621.7

Total Existing 16951 6569.7

Additions upto 2021-22

Hydro

Subtotal - Hydro 0 0

Thermal

Krishnapatnam TPP (JVP)


Stage II (1x800 MW) 1x800 800 0
Vijayawada TPS Stage V (1x800
MW) 1x800 800 0

Subtotal - Thermal 1600 0

RE

Renewables (Wind) R 2500 0 1750


Renewables (Solar) R 2000 0 800
Total RE 4500 2550

Total Additions 6100 2550

Total Hydro 1798 424


Total Thermal 7650 2349
Total Gas 2576.04 175

Total RE 11027 6171.7

TOTAL upto 2021-22 23051.04 9119.7

59
LGB sheet of AP Page 1 Joint study meeting at SRPC, Bengaluru
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/21

LOAD GENERATION BALANCE OF Karnataka for - 2021-22 Off Peak CONDITION

Despatch MW
Power Plant Installed Capacity Total Units
(MW) (MW) Considered Peak OffPeak
Existing

Hydro
Sharavathi 10 X 103.5 1035 10 X 103.5 507.15 207
Varahi 4 X 115 460 4 X 115 161 69
Kalinadi (Nagjheri) 6x150 900 1x135+5x150 525 0
Kodasalli 3 X 40 120 3 X 40 40 0
Kadra 3 X 50 150 3 X 50 50 0
Sharavati Tail Race 4 X 60 240 4 X 60 126 36
Almati Dam 1x15+5x55 290 1x15+5x55 0 33

Subtotal Existing Hydro 3195 1409.15 345

Thermal
Raichur 7 X 210 + 1 x 250 1720 3 X 210 + 1 x 250 1376 620
Bellary 2 x 500 +1x700 1700 2 x 500 + 0 X 700 1360 650
Yeramars TPS 2 x 800 1600 1 x 800 1280 520
UPCL 2 x 600 1200 1x 600 960 390
Torangalu (Jindal) 2 x 130 + 4 x 300 1460 2 x 130 + 4 x 300 0 0

Subtotal Existing thermal 7680 4976 2180

Gas

Subtotal Existing Gas 0

Small Hydro
Liganmakki 2x27.5 55 H 0 0
Jog 4x21.6+4x13.2 139.2 H 0 0
supa 2x50 100 H 0 0
Bhadra 1x7+2X12.1+1x2+6 39 H 0 0
Sivansamudram 6x3+4x6 42 H 0 0
Shimsa + Minirabad 2x8.6+(1x10+3x9) 45 H 0 0
TBDam Share(20%) 14 H 0 0
Ghataprabha 2x16 32 H 0 0
Mani Dam PH 2x4.5 9 H 0 0
Mini Hydro 4.5 H 0 0
Mallapur 2x4.5 9 H 0 0
Mini Hydro 702.66 859.56 H 515.736 85.956

Small Thermal (Diesel)


Yelahanka Diesel 6x21.32 0 T 0 0
Tata Electric Diesel 5x16.26 0 T 0 0
Rayalseema Alkalies 0 T 0 0
ITPL Diesel 0 T 0 0

Existing mini Hydro and thermal (not represented)


1348.26 1191.36 515.736 85.956
RE

Renewables(Wind) 4655.66 R 1396.698 2793.396


Renewables(Solar) 4884.56 R 3419.192 1953.824

LGB sheet of Karnataka 60 1 joint study meeting at SRPC, Bengaluru


Page
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/22

RE (Cogeneration) 1635 817.5 0

Total RE 11175.22 5633.39 4747.22

Total Existing 23398.5 12534.3 7358.18

Additions upto 2021-22

Hydro

Gundia HEP Ph-I & II 2 X 200


Shivasamudram ROR 345
Gangavali St-II 400
Kali St-III 300
Aghanashini HEP 600
Mahadayi HEP 320

Subtotal - Hydro 0

Thermal

Edlapur
Mangalore TPS
Chattisgam Pit Head (Th)
Bidadi Gas
YEramarus

YELAHANKA GAS 360 360 324 0


Subtotal - Thermal 360 324

RE

Renewables(Wind) 2800 R 840 1680


Renewables(Solar) 700 R 490 280
RE(Cogeneration) 0 0
Total RE 3500 1330 1960

Total Additions 3860 1654 1960

Total Hydro 4543.26 1409.15 430.956


Total Thermal 8040 5300 2180
Total Gas 0 0 0
Total RE 14675.2 6963.39 6707.22
TOTAL upto 2018-19 27258.5 13672.5 9318.18

LGB sheet of Karnataka 61 2 joint study meeting at SRPC, Bengaluru


Page
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/23

Power evacuation study for proposed Wind Energy Zone in SR


544095
TUTI-POOL
Exhibit : 1 (outage of Kudankulam - Tirunelvel 400kV D/c line + proposed RE generation in SR)
544114 342015 344002
CEPL XELDEM-NEW XELDEM4
544025
-0 0 TIRUNVLPOOL -121 121
1 522370 524047 344001
0 -26 -500 500 -20 24
KOPPAL NAREND-4 MAPUSA4
-0 0 24 -28 1000 -121 121
374050
0 -26 -500 500 2000 0 -20 24
KOLHAPURPG
544071 W 524022 374013 374004
398 24 -28 0H 211
TUTICORIN JV 1000 KOPPAL 568 -560 321 -320 99 -99 KOLHAPUR KARAD4
2000 374040
275 275 -275 -500 500 W 0 -1000 77 -15 -63 46 -108 26 827 -814
0H SOLAPUR-PG
1
19R 19 -56 24 -28 220 50 -80 160
321 -320 99 -99 -208 210
275 275 -275 -500 500 -1000 -63 46 -108 26 827 -814 -10 -83
2
19R 19 -56 24 -28 50 -175 -80 160
400 398 548003 524002 399
-54 -11 92 -92
SALE800 MNRB

-323
548095 400 387 388
-468 469 924 -915 -54 -26
TUTI-POL
544021 524015 378050
41 -60 531 -61 127

329
KUDAN4 NARDR-NW KOLHAPURPG
374101
1000 1000 -987 -468 469 -47 822
ALKUD
2
27R 27 98 41 -60 531 40 924 -915 -106 106 218 -217 -144
401 372129
1000 1000 -987 -47 176 -61 127 -59 22 -65 11 822
TALANDGE22
1
27R 27 98 765 -67 398 -144
53 -53
400 524098 765 400 378040
-528 -825 -14 16
MADHUGI4 SHOLAPUR-PG
18 836 36 53 -53 -822
544005 544113
-528 44 -825 -14 16 202
MADURAI4 DHARMPR
400 18 36
-1501 1521 740 -724 84 -83 -822
395 378045
307 -25 -39 98 -23 25 202
PUNE-PG-GIS
395 218
-1501 1521 740 -724 -252 254 836 -1788 1807
765 378043
307 -25 -39 98 -69 -175 44 89 168
AURANG-CHTPM
398
439 -252 254 815 -812
-58 134 -134 -69 -175 162 -235
544151 544097 763
439 -103 -37 -1275 1284
PALAVADI4 RASIPALA
524087 400
-58 -153 153 121 -120 150 -219
TUMKUR SP
403 -81 -60 -108 -49 800 -1275 1284
544012 S 524086 378049
-153 153 0H 150 -219
NAGAPTNM4 BELLARY-POOL PARLI NEW
542025 524013 787
-81 -60 0 -0 -274 275 -1842 477 -476
SALEM42 RAIC-NEW
-129 -6 -99 -67 -57 148 -338 191
528003
-21 0 -0 -274 275 RAIC800-1842 477 -476
408 -6 -99 -67 -57 148 -338 191
-129 871 -871 1856
544003 403 415 504008 775 781
-21 -101 101 209 56 15 -53
SALE GOOT
231 -45 -19 30
239 129 -208 190 -189 871 -871 1856
508099
-56 28 -175 175 -101 101 209 -86 21 -109 56 15 -53
CPETA800
239 129 -24 -14 -45 -19 30 -208 190 -189 -938 307 -977
-56 28 413 -86 21 -109 -120 -16 -202
-175 175
406 540506 524001 524084 522084 400
162 -24 -14 63 -938 307 -994
SALEM41 SMNH YELAHNKA YELAH220
-162 18 -431 433 256 -256 139 -139 55 -120 -16 -200
524077 522180 406 775 764
-5 198 -47 -9 87 -126 93 -86
BIDADI BIDADI
111 -66 133 -133 256 -256 139 -139
544007 504028
198 73 -67 87 -126 93 -86 KURL-NEW
HOSUR4
406 406 218 508028 518079
-197 -66 -85 85 133 -133 -63 522 KURL800 WARN800
406 508007
-4 -138 128 73 -67 -72 5 -522 979 -307
CUDP800
219 518051
-197 -85 85 -206 206 943 522 20 -25 -97
HYDR_800
522001
-4 -138 128 -123 59 -69 5 -522 996 -307 -614 615
SMNH
113 -113 173 -173 -206 206 943 402 20 -21 -97 63 -184
29 -72 94 -85 -123 59 -69 -614 615
405 63 -184
-11 173 -173 202 -201
522098 771
-24 94 -85 -94 -204 1170 -1165
MADHUGIR
-11 173 -173 -38 38 202 -201 -8 -61
504007 548087 508093
-24 94 -85 -63 64 -94 -204 1170 -1165
CUDP TIRUVLM NELL-POL
407 403 217 508048
-38 38 89 -89 368 -368 -776 780 237 -237 -8 -61
ADONI
-63 64 -48 -42 48 -36 -52 -316 -217 -101 772
-1197 1200 0
1
-38 38 89 -89 368 -368 -776 780 237 -237 72 -374 237
-63 64 -48 -42 48 -36 -52 -316 -217 -101 -1197 1200
504024 544087 2
222 411 782 765 72 -374
CHITOR TIRUVLM
548127
-585 586 -519 519 -1299 ARIYALUR7 -1200
502216 504048
CHINAKAMPALL 58 -58 110 -114 93 -67 144 1299 ADONI 255
504050 0
-2 2 12 NPKUNTA -95 -585 586 -519 519 -1299 333 2 0 1200 -1200
243 1
-40 41 -331 332 110 -114 93 -67 144 1299 108 -113 255
0 760
-3 3 -56 -5 161 333 1 0 1200
243 2
-64 65 -51 764 764 108 -113
-331 332
-56 -5 403 770 391
-2 2
544022
-40 41 -411 413 600 ALMATI4
S1 544002
220 -27 11 0H -122 122 MADR
504042
HINDPR40 -295 -39 -26 -161
504998
FSC-3 296 -5 -122 122 3

-225 225 -79 -295 113 -39 -26 247 -247


504999 0 401 504019
FSC-4 87 -100 296 -5 10 -78 NELLORE4 3
0 524011
402 -79 413
-225 225 KOLAR -127 128
87 -100 412 -49 -52
-113 60 -59
402 542127
-82 -9 TVALAM42 -76 -127 128
11 -160 160 -49 -52
410 -16 27 -17 403 404

11 -160 160
544016
-16 27 -17 PUGALUR-NEW
524005 233 544013
HOODI4 PUGALUR4
-256 256
-127 100
544086
-256 256 MALEKTT
544033
-127 100 -98 98 KARUR II
403 27 -95 -805 807 193 -193 -434
407 -163 173 -173 154 37
-98 98 -242 244
27 -95 -89 -158 -805 807 193 -193 -434
407 -163 173 -173 154 37
-238 -242 244
-82 -89 -158 404
2000
W
-238 0H
-82 401
544014 402
ARSUR4
314029
-328 329 RAIGARH_POOL
101 -133 16.00 16.79
-977 1002
-328 329 348 372
0.8500 0.8886
101 -133 16.00 16.79
-977 1002
401 534008
348 372
TCR-HVDC 0.8500 0.8886
16.00 13.26 544122
-953 1003 EDAMLYRM
391 375 206 -205
0.8905 0.8862
16.00 13.26 -179 143 400
-953 1003
391 375 206 -205
0.8905 0.8862
396 -179 143
402
397

62

1
Power flow plot for proposed Domasandra 400/220 kV S/s
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/24
Exhibit -2
Alternative -2
524171 523040
DOMSANDRA DOMSNDRA22
-202 190 -190
524001
-100 113 -100
SMNH
202 -250 190 -190
75 -209 113 -100
1
73
206
522001
SMNH 84

-219 219 1
386
-115 132
524035
-219 219 261 MYLSNDRA
-115 132 132 -73
524011
-219 219 -206 -99
KOLAR
-115 132 -197 -260 -411 413
1 522035
-142 -167 141
207 MYLSNDRA220
1
248 -248
393
1 136 -114
389
248 -248
136 -114
76
248 -248 1
20
136 -114
544113 1 1
DHARMPR 385 205
207 251
123 133

0
1
58
1
403 63

1
Power flow plot for proposed Domasandra 400/220 kV S/s Annex-III/25
Agenda for 1st meeting of SRSCT (07.09.2018)
Exhibit -2
Alternative -3
524171 523040
DOMSANDRA DOMSNDRA22
190 -190
524001
113 -100
SMNH
-263 190 -190
-213 113 -100
1
206
522001
-13
SMNH

-116
-219 219 270 1
386
-115 132 132
524035
-219 219 202

116
MYLSNDRA
-115 132 90 -270
524011
-219 219 -204 -148 -2
KOLAR
-115 132 -199 -201 -389 390
1 522035
-103 -154 126
207 MYLSNDRA220
1
248 -248
393
1 136 -114
389
248 -248
136 -114
76
248 -248 1
20
136 -114
544113 1 1
DHARMPR 386 205
205 264
124 139

0
1
58
1
403 64

1
Agenda for
LOAD FLOW STUDY: ESTABLISHING 1X500 MVA, 400/220 kV SUB-STATION AT ARASA PADAVU, 1st meeting
DAKSHINA of SRSCTDISTRICT.
KANNADA (07.09.2018) Annex-IV
CASE-2: WITH 400/220 kV ARASAPADAVU S/S AT SYSTEM PEAK LOAD CONDITION.

523031
HEGUNJE 522068
SHIM
522008 522075
UDUPI220 105.8 VARH
524008 522051 1
52.1 4 51.1 -50.8
UDUPI400 KEMR
146.4 -144.8 161.7
106.5 -105.8 -5.4 -5.3 1
81.5 -77.1 51.1 -50.8 84.7
2X315 MVA,400/220 kV 56.2 -52.1 522151
146.4 -144.8 0.9 -5.4 -5.3
200.9 MUTTIKOPPA
3
292.9 -292.9 81.5 -77.1 16.8 -16.8
58.8 -58.3
186.9 -162.9 -15.4 13.9
1

1
1.0 -2.1 -6.3 1.0
212.2 80.5 41.5 218.4
1 1
-6.5R 21.8
80.5 1.0
522247 2
-6.5R 218.2
KEMR-MHS
420.0 1.0 522030
1 18.6 18.6 -18.6 PUTTUR
-113.5R 1 65.9 220.0 -65.5
2.0H 2.0 -2.0
32.5 -35.4 143.0
0.9 1
420.0
2 205.1 65.9 -65.5 74.9
-113.5R
32.5 -35.4
522059
69.9 KAVOOR 0.9
1 522150
35.2 201.1
MSEZ
230.0
523073 106.7 -106.0 1
94.8
ARSPDV2 45.9 -46.4
106.7 -106.0
115.2 -114.7
45.9 -46.4
45.8 -45.9
534049 1.0
0.9 25.0
KSRGOD4 115.2 -114.7 1 210.7
524174 205.1
-143.1 143.9 10.0
ARSPADV4 45.8 -45.9
176.5 -250.8 1.0
230.4 -230.4
214.8
99.6 -91.7
1

-143.1 143.9
176.5 -250.8 1X500 MVA,400/220 kV 1.0
ARASA PADAVU S/S 524175 216.8
MRPLGIS4 523074
MRPL220
1.0 129.7 -129.6 190.0 -190.0
416.3 380.0 -380.0 380.0
43.9 -62.0 83.6 -85.9 1
171.9 -150.0 150.0
1

190.0 -190.0
129.7 -129.6 1.0 524166 524009 524097
83.6 -85.9 2X500 MVA,400/220 kV
43.9 -62.0 1.0 214.8 YETNHOLE HASSAN4 CNHALLI
-175.5 398.8 176.0
-271.2 271.5 -381.7 383.9
-71.4 -42.0
-175.5 176.0 8.3 -34.1 -37.5 16.3
-271.2 271.5 -381.7 383.9
-71.4 -42.0
8.3 -34.1 -37.5 16.3
1.0 1.0 1.0
399.0 523033 401.5 405.6
YETINAHOLE
95.2 -95.2
33.8 -31.2
1

1 190.4
1.0 1
95.2 -95.2
400.0 62.5
33.8 -31.2
1

65 1.0
401.7 1.0
219.1

1
541607
542202
541516
TNPL21

TNPL2

VEDASANTUR21
1
1
-21.8 21.8 3.2 4.3

1
1

542048
ALUNDR42
1.6 -1.1 83.2 -82.8

542099
VEDASANDUR2

1
1
-21.8 21.8 -49.0 49.2 3.2 4.3

1
1
1.6 -1.1 52.1 -55.0 83.2 -82.8
121.3R

1
80.0

1.0
1.0

109.4
108.3

542219
544093

KPUDUR2
TAPPAKUN4
-13.7 48.6
544094
ANIKADAV4

542052
542105
TRICHULI2

SEMBATY2
224.8 -215.6

1.0
1.0

228.7
227.4

1.0
527.2 -517.9

230.0
7.4 -0.6

540509
-50.6 59.6

SEMBTY21
-169.6 172.5 0.0H

W
31.4
150.0
95.5
1.0
544999
VIRUDHNAGA4

1
1
8.3 -87.8 88.0 7.4 -0.6 121.6

1
395.7

25.3 18.0 -13.1 -169.6 172.5 0.0

1.0
-333.3 335.8

229.2
-43.2 6.0

1
1
-3.2 -87.8 88.0

542248
544132

PALANI2
KAMUTHI4
-333.3 335.8
0.0 18.0 -13.1
1.0

-43.2 6.0
232.6

-48.0 0.0H

542030
MYVADY42
S
188.1 -185.2
0.0 500.0

1
1
1.0

-87.8 88.0
-20.5 29.4 2.7 -2.8
394.5

18.0 -13.1 520.1 -517.1


125.7 -125.1

1
66
124.9 -50.8 51.4

1
0.0 520.1 -517.1

1.0
110.0
-50.8 51.4

1.0
226.2
1.0

544017
KARAIK
400.0

1.0
-20.9 55.2

227.5
630.2 -621.0

542037
CHECKN42
-20.9 55.2
630.2 -621.0
Agenda for 1st meeting of SRSCT (07.09.2018)

1.0

227.9 -224.5
399.8

-19.0 32.2
FULL WIND FULL HYDRO FULL SOLAR

0.0
542094
PUGALR42

227.9 -224.5 71.7


544013
PUGALUR4

-19.0 32.2

1
-129.0 1 129.4
3.8 4.7 -50.1

541523
544063

VELALVDTHI41
VELALAVIDU

0.0
1
1

-129.0 129.4 1.7 1.1


1
1

3.8 4.7 0.0 124.9 -124.7

542036
542097
KARAI42

THENI2
-10.0 13.6 123.3
1.0

-6.6 16.6
1.0
230.0

149.6 -146.8
1
1

108.9 234.2 -233.7

1.0
-26.5 26.5 -624.5 630.6

229.6
-102.6 -43.1
-9.4 1.1 52.9 -68.5
101.3 -101.1
1
1
1.0

-102.7 102.8
11.7 -41.4
400.5
BASE CASE : WITHOUT THE PROPOSED VADAMADURAI 400 KV SUBSTATION

22.9 -20.9
-565.6 570.0
1
1

-102.7 102.8
Annex-V/1

22.9 -20.9
542203
VELALVDTHI42

1.0
1.0
1.0
1.0

227.1
229.1
397.3
397.9

-29.9 30.1
-5.5 -12.9
1.0
1.0

228.4
228.8
541607
542202
541516
TNPL21

TNPL2

VEDASANTUR21
1
1
-39.6 39.7 0.7 4.5

1
1

542048
ALUNDR42
7.4 -5.8 70.6 -70.3

542099
VEDASANDUR2

1
1
-39.6 39.7 67.9 -67.7 0.7 4.5

1
1
7.4 -5.8 -4.4 1.3 70.6 -70.3
-206.2R

1
80.0

1.0
1.0

111.0
109.6

542219
544093

KPUDUR2
TAPPAKUN4
-9.3 -2.8
544094
ANIKADAV4

542052
542105
TRICHULI2

SEMBATY2
74.5 -73.5

1.0
1.0

231.2
229.5

1.0
163.7 -162.8

230.0
-3.2 -5.7

540509
-57.1 -31.8

SEMBTY21
-43.9 44.1 0.0H

W
31.4
1.9
95.5
1.0
544999
VIRUDHNAGA4

1
1
8.3 -95.8 96.0 -3.2 -5.7 126.9

1
402.7

25.3 15.3 -9.8 -43.9 44.1 0.0

1.0
-213.6 214.7

231.8
-3.5 -52.5

1
1
-3.2 -95.8 96.0

542248
544132

PALANI2
KAMUTHI4
-213.6 214.7
0.0 15.3 -9.8
1.0

-3.5 -52.5
232.6

-49.1 0.0H

542030
MYVADY42
S
63.1 -62.8
0.0 16.0

1
1
1.0

-95.8 96.0
1.7 -7.8 33.2 -36.4
403.0

15.3 -9.8 -1.6 1.6


-36.5 36.6

1
67
126.0 -34.6 1.0

1
0.0 -1.6 1.6

1.0
111.3
-34.6 1.0

1.0
228.4
1.0

544017
KARAIK
402.4

1.0
-88.2 26.8

229.9
182.1 -181.3

542037
CHECKN42
-88.2 26.8
182.1 -181.3
Agenda for 1st meeting of SRSCT (07.09.2018)

NIL WIND FULL HYDRO NIL SOLAR

1.0

191.8 -189.5
401.6

-10.0 16.8
0.0
542094
PUGALR42

191.8 -189.5 74.6


544013
PUGALUR4

-10.0 16.8

1
-130.6 1 131.0
-2.4 10.8 -51.3

541523
544063

VELALVDTHI41
VELALAVIDU

0.0
1
1

-130.6 131.0 66.8 -56.7


1
1

-2.4 10.8 0.0 229.6 -229.1

542036
542097
KARAI42

THENI2
-2.5 7.7 127.7
1.0

3.0 7.1
1.0
230.0

161.4 -158.3
1
1

110.5 241.2 -240.7

1.0
-66.7 67.2 -88.7 88.8

233.3
-73.4 -75.0
-8.0 1.5 -61.6 -60.7
-132.4 132.7
1
1
1.0

-79.0 79.1
-44.7 -45.7
405.2
BASE CASE : WITHOUT THE PROPOSED VADAMADURAI 400 KV SUBSTATION

16.8 -15.6
-287.7 288.8
1
1

-79.0 79.1
Annex-V/2

16.8 -15.6
542203
VELALVDTHI42

1.0
1.0
1.0
1.0

229.5
233.0
404.3
405.8

-39.4 39.7
-7.5 -10.9
1.0
1.0

231.6
232.9
VEDASANTUR21
541607
TNPL21
541516

1
1
-57.8 58.1 5.2 -0.6

1
1
10.0 -6.5 65.7 -65.5

542249

542099
542202

VADAMADURA42
TNPL2

VEDASANDUR2

1
1
-57.8 58.1 5.2 -0.6

1
1
10.0 -6.5 65.7 -65.5
-119.2 119.7
12.7 -13.3
-14.4 10.4

1.0
1.0
109.3 -107.6
542030
MYVADY42

110.3
108.6
-119.2 119.7
12.7 -13.3

542052
SEMBATY2
1.0
1.0

229.5
228.7
81.5 -81.1

542248
PALANI2
-14.9 11.4

540509
SEMBTY21
-14.4 4.6
18.5 -20.9
66.3 -65.7
-14.4 4.6 73.1 -72.9
66.3 -65.7

1
1
8.3 -99.9 100.2

542219

544094
544171
KPUDUR2

ANIKADAV4
VADAMADURAI4
27.8 17.6 -11.4
1.0
1.0

229.5

1
1
-3.2 -99.9 100.2 -5.6 7.6 10.7 -3.0
227.9

-298.3 299.5 43.1 -26.3

1
1
0.0 17.6 -11.4 105.1 -105.0 -174.3 177.4
-24.7 -63.7 -190.1 195.4
-48.5
10.7 -3.0

1.0

1
1
0.0 -99.9 100.2 -5.6 7.6

399.9
-174.3 177.4

1
1
17.6 -11.4 105.1 -105.0 31.4

1
1.0
105.0

68
1.0

229.9
229.7
124.8
544017

544093
KARAIK
542105

TAPPAKUN4
TRICHULI2

1.0
8.4 -53.0
0.0
1.0

110.6
-460.1 462.3
232.9

0.0

1
123.4

150.0
542097
KARAI42

542037
CHECKN42
W
-80.6 25.9
0.0H
426.3 -424.0 374.4 -373.0
0.0
-80.8 22.2
72.3
Agenda for 1st meeting of SRSCT (07.09.2018)

192.8 -190.3
542094
PUGALR42

544013
PUGALUR4

-20.2 27.6
FULL WIND FULL HYDRO FULL SOLAR

1.0
1.0
-2.3 8.1

397.4
399.7
1
1

192.8 -190.3 179.2 -178.9


50.8 -26.2
-20.2 27.6

1
1
-126.5 126.9
1
1

367.5 -366.3
1.3 6.8 -50.5

VELALVDTHI41
541523
544063
VELALAVIDU

1
1
-126.5 126.9 0.0
1.0

1.3 6.8 0.0

542036
THENI2
228.7

-14.9 15.5 124.3

1.0
135.0 -132.8 -101.7 -46.5

109.2

1.0
-32.8 32.9 79.4 -79.3
1.0
CASE1 : WITH THE PROPOSED VADAMADURAI 400 KV SUBSTATION

230.8
229.5

-3.6 -4.7
1
1

-93.5 93.6
2.3 -44.9
20.9 -19.3
-520.3 524.0
1
1

-93.5 93.6
1.0
1.0

401.9
399.5

20.9 -19.3
VELALVDTHI42
542203
Annex-V/3

1.0
1.0
1.0

229.3
230.0
398.8

1.0
230.0
VEDASANTUR21
541607
TNPL21
541516

1
1
-68.6 68.9 1.5 3.0

1
1
11.0 -6.3 65.1 -64.9

542249

542099
542202

VADAMADURA42
TNPL2

VEDASANDUR2

1
1
-68.6 68.9 1.5 3.0

1
1
11.0 -6.3 65.1 -64.9
-85.9 86.1
5.3 -7.4
1.2 -12.3

1.0
1.0
58.9 -58.4
542030
MYVADY42

111.7
109.7
-85.9 86.1
5.3 -7.4

542052
SEMBATY2
1.0
1.0

232.6
229.9
-17.0 17.0

542248
PALANI2
-6.2 0.2

540509
SEMBTY21
-3.3 -8.0
39.9 -43.4
53.2 -52.8
-3.3 -8.0 3.0 -3.0
53.2 -52.8

1
1
8.3 -96.1 96.4

542219

544094
544171
KPUDUR2

ANIKADAV4
VADAMADURAI4
25.3 14.0 -8.5
1.0
1.0

231.0

1
1
-3.3 -96.1 96.4 -2.7 6.8 -2.1 -7.2
228.8

-120.1 120.3 6.3 -18.1

1
1
0.0 14.0 -8.5 153.2 -153.0 -38.4 38.6
-68.2 -40.7 -48.5 48.8
-49.4
-2.1 -7.2

1.0

1
1
0.0 -96.1 96.4 -2.7 6.8

403.5
-38.4 38.6

1
1
14.0 -8.5 153.2 -153.0 31.4

1
1.0
95.5

69
1.0

233.0
232.4
128.4
544017

544093
KARAIK
542105

TAPPAKUN4
TRICHULI2

1.0
-30.9 -48.0
0.0
1.0

111.6
-197.9 198.3
232.9

0.0

1
127.5

1.9
542097
KARAI42

542037
CHECKN42
W
-29.8 -49.7
0.0H
158.6 -158.3 -70.6 70.6
0.0
-74.3 -21.5
NIL WIND FULL HYDRO NIL SOLAR

74.6
Agenda for 1st meeting of SRSCT (07.09.2018)

164.2 -162.5
542094
PUGALR42

544013
PUGALUR4

-14.3 17.5

1.0
1.0
0.4 8.2

404.0
405.4
1
1

164.2 -162.5 221.4 -221.0


64.6 -57.8
-14.3 17.5

1
1
-128.6 129.1
1
1

185.7 -185.4
-2.7 10.9 -51.3

VELALVDTHI41
541523
544063
VELALAVIDU

1
1
-128.6 129.1 0.0
1.0

-2.7 10.9 0.0

542036
THENI2
230.0

-3.0 6.6 127.7

1.0
153.9 -151.1 -73.2 -75.4

110.4

1.0
-77.1 77.7 -126.9 127.2
1.0
CASE1 : WITH THE PROPOSED VADAMADURAI 400 KV SUBSTATION

233.6
233.0

-9.6 3.7
1
1

-75.5 75.5
-44.7 -46.3
16.8 -15.7
-282.3 283.4
1
1

-75.5 75.5
1.0
1.0

405.1
405.7

16.8 -15.7
VELALVDTHI42
542203
Annex-V/4

1.0
1.0
1.0

230.0
232.9
404.2

1.0
232.5
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/1

ESTABLISHMENT OF VISHWANATHAPURAM 400 / 110 kV SS

BASE CASE :FULL WIND FULL HYDRO FULL SOLAR


541557
541172 NPURAM1
BAGALUR1
541610
SEVUGANAPAL1
57.0
544087 21.0 1
544151 540681 1 18.0
TIRUVLM4 7.0
PALAVADI4 541086 HOSUR21 -17.6 17.7
HOSUR1 541171
260.6 -259.2 0.0 -4.5 4.5 2.2 -3.0
ZUZUVAD1
1
-118.5 -11.5 72.1 67.2 -67.0 1.2 -1.9 -18.5 18.6
260.6 -259.2 29.4 -29.0 2.4 -3.1
12.1 -12.1 12.1 16.6 -16.5
-118.5 -11.5 1 541556
4.0 -2.4 2.3 50.4 7.7 -8.2
MNAGAR1
1
21.3 25.5 -25.4
1.0 524011
393.5 KOLAR 14.8 -15.2
0.9
0.0 -170.4 170.8 542076 0.9 0.9
1 102.8
-750.0 -16.2 -63.9 HOSUR42 104.1 0.9 102.8
1.0 57.6 -57.5
103.4 32.0
398.9 25.1 -25.0 1
544007 542023
541170 10.2
HOSUR4 HOSUR2
0.0 KEMPATY1 0.9 23.9
-68.5 68.8 58.9 -58.8 1
-1962.2 228.8 -228.4 12.0 -12.0 103.9 7.8
95.1 -130.3 50.7 -50.5 14.0 -9.9 72.5

1
541339
108.7 -100.8 22.8 -23.1 1
1

14.3 -18.9 23.8 UDANPLY1


540803
-68.5 68.8 HSIPCTII -60.5 60.7
58.9 -58.8
95.1 -130.3 SW 99.9 -99.5 -0.7 -1.8 26.4
14.0 1 -9.9 1

1
-0.0 31.0 -31.8 0.9 8.7
1.0 103.5
542227 541611
400.0 1.0 ERNDHLY2 27.5 -27.4 541615 VENKRAFT_EHT 12.5 -12.4
393.8 VENK_TOFF
58.9 -58.8 25.0 -25.1 -1.2 541501 -0.7
20.8 6.6 -6.5 4.5 GURUPAR21
14.0 -9.9 1 4.6 -4.5 1 -32.8 33.0
1

48.8 -48.8 48.9 8.8 16.3 -16.5 1.5


1 0.9 1.4 -1.5 0.1 -0.5 24.2 -23.8
16.0 -16.0 12.9 103.4 2.0
541504 -1.2 -0.5
1.0 15.2
1.0 221.0 UDDANAPLY21 0.9
219.6 0.9 103.1
67.1 -66.8
103.2 24.2 -23.8
542193
6.2 -5.7
UDDANAPLY 2 0.9 -1.2 -0.5
17.6 -17.6
103.7
0.9 541558 0.9
47.9 -49.2
104.1 KDODDY1 103.1
-2.0
5.6 -5.5
54.5 -54.4 -15.3
12.8 -17.8 540457
16.4 -13.0 SOLAGIRI
1

15.9 -13.9 13.9


1
5.2 10.1 -10.3
1.0
223.2 0.9
54.5 -54.4
48.4 103.0 -47.9 34.0
16.4 -13.0 1
1

4.3 -4.1 14.4


1.0 0.9
222.0 -8.5 102.9 8.5
0.9 -2.2

0.9
104.5
0.9
104.3

70

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/2

ESTABLISHMENT OF VISHWANATHAPURAM 400 / 110 kV SS

BASE CASE :NIL WIND FULL HYDRO NIL SOLAR


541557
541172 NPURAM1
BAGALUR1
541610
SEVUGANAPAL1
57.0
544087 21.0 1
544151 540681 1 18.0
TIRUVLM4 7.0
PALAVADI4 541086 HOSUR21 -16.9 16.9
HOSUR1 541171
-70.4 70.5 0.0 -4.0 4.0 2.1 -2.9
ZUZUVAD1
1
-90.4 -65.0 72.8 67.8 -67.5 1.1 -1.7 -17.7 17.8
-70.4 70.5 29.2 -28.8 2.2 -3.0
12.1 -12.1 12.1 17.1 -17.0
-90.4 -65.0 1 541556
4.0 -2.3 2.3 50.4 7.5 -8.1
MNAGAR1
1
21.3 26.6 -26.4
1.0 524011
398.6 KOLAR 14.5 -14.9
0.9
0.0 -312.9 314.2 542076 1.0 0.9
1 104.1
-750.0 -23.9 -42.5 HOSUR42 105.3 1.0 104.1
1.0 58.6 -58.6
104.7 32.0
401.0 24.8 -24.7 1
544007 542023
541170 10.2
HOSUR4 HOSUR2
0.0 KEMPATY1 1.0 23.9
133.7 -133.5 61.1 -61.0 1
-1838.6 332.2 -331.5 15.2 -15.1 105.1 7.8
32.5 -67.5 63.6 -63.3 13.2 -8.9 72.5

1
541339
81.6 -67.2 22.5 -22.8 1
1

10.6 -15.0 23.8 UDANPLY1


540803
133.7 -133.5 HSIPCTII -57.4 57.5
61.1 -61.0
32.5 -67.5 SW 125.0 -124.4 -1.1 -1.7 26.4
13.2 1 -8.9 1

1
-0.0 23.7 -23.6 1.0 8.7
1.0 104.7
542227 541611
400.0 1.0 ERNDHLY2 29.3 -29.2 541615 VENKRAFT_EHT 12.0 -11.9
396.4 VENK_TOFF
61.1 -61.0 24.7 -24.7 -1.2 541501 -0.9
20.8 8.4 -8.3 4.5 GURUPAR21
13.2 -8.9 1 4.6 -4.5 1 -32.6 32.8
1

48.8 -48.8 48.9 8.8 15.9 -16.2 1.5


1 1.0 1.4 -1.5 0.3 -0.8 23.6 -23.3
16.0 -16.0 12.8 104.7 3.8
541504 -1.3 -0.6
1.0 14.8
1.0 223.4 UDDANAPLY21 0.9
222.0 0.9 104.4
63.6 -63.3
104.4 23.6 -23.3
542193
6.5 -6.1
UDDANAPLY 2 1.0 -1.3 -0.6
71.8 -71.7
104.9
1.0 541558 0.9
32.5 -33.5
105.4 KDODDY1 104.4
-3.8
22.7 -22.6
58.2 -58.1 -14.9
8.0 -12.9 540457
16.0 -12.3 SOLAGIRI
1

15.9 -12.1 12.1


1
5.2 9.7 -10.0
1.0
225.4 0.9
58.2 -58.1
46.6 104.3 -46.1 34.0
16.0 -12.3 1
1

4.5 -4.4 14.4


1.0 0.9
224.3 -9.2 104.2 9.2
1.2 -2.5

1.0
105.7
1.0
105.5

71

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/3

ESTABLISHMENT OF VISHWANATHAPURAM 400 / 110 kV SS


541557
NPURAM1
CASE 1: FULL WIND FULL HYDRO FULL SOLAR
541612
VISHWANAT41
541614
HOSUR_SEZ 35.2 -35.2
7.9 -8.0
69.0 35.2 -35.2
1
21.3 -69.0 69.8 7.9 -8.0
-21.3 22.5 541172
1.0 BAGALUR1
541613
104.7 VISHWNATHAP1
37.0 -36.9 57.0
10.0 1
1 6.6 -6.8 18.0
3.0 -10.0 10.0 541610
524011 544087 SEVUGANAPAL1
KOLAR TIRUVLM4 544151 -3.0 2.4 0.0
PALAVADI4 1 -11.0 11.1
-5.9
1.0 32.0 -31.8 21.0 -2.0 1.1
0.0 544170 106.4 1
1 VISHWANATH4 4.3 -4.7 7.0 -11.6 11.6
72.1 -262.2 263.6 -2.5 2.5
-2.1 1.2
-2.1 -126.3 117.6 -117.2 0.6 541171 -1.3
ZUZUVAD1
483.1 -480.4 24.5 -18.5 13.4 -13.3 540681
1

1
-135.7 135.9 HOSUR21
-50.6 11.8 -2.9 2.3
-17.6 -64.7 1.0 1.0
13.8 392.2 -13.7 117.6 -117.2 -37.1 105.9 37.2
50.4
0.0 57.4 -118.8 24.5 -18.5 1 -23.6 541556 23.6
1

1 1 1.0 21.3 MNAGAR1


-750.0 105.9 32.0 23.9
1.0 1 1
1.0 544007 105.8 10.2 -12.7 12.7 7.8
398.8 HOSUR4 19.4 -19.3
-119.6 120.0 117.6 -117.2 -11.8 11.8
-2.7 1.6
105.4 -138.9 24.5 -18.5
1

-141.3 141.4 34.5 1.0 -34.3


106.2
-119.6 120.0 70.1 -86.7 -5.8 540803 5.5
HSIPCTII
105.4 -138.9 SW 0.0 30.9 -30.8
0.0 1 7.1 -7.1
-0.0 120.3 1.7 -2.1
-1984.1 -15.7 541611 15.4
1.0 541615 VENKRAFT_EHT
393.5 VENK_TOFF 541501
1.0 2.8 -2.8 4.6 -4.5 1.0 GURUPAR21
392.4 20.8 4.5 106.3
1 9.0 -9.3 1.4 -1.5 1 5.8 -5.8
8.8 1.5 541558
1.0 KDODDY1 1.7 -4.2
1.0 1.0 -1.7 105.9 1.7
400.0 106.1 5.8 -5.8
7.9 -8.0 15.9 540457
1 1.7 -4.2
47.5 1.0 -47.2 5.2 SOLAGIRI
105.9
10.5 541504 -10.4 29.7 -29.6
UDDANAPLY21
13.2 -13.4
1.0 34.0
4.4 105.8 -4.4 1
14.4
-0.0 -1.0
541339
UDANPLY1 1.0
26.4 105.3
1
8.7 -12.1 12.2
26.6 -26.5 -4.7 2.6
3.4 -3.7 -12.1 1.0 12.1
106.3
-1.1 0.2

1.0
1.0 -2.7 105.2 2.7
106.6
-0.3 -1.1
1.0
105.5

1.0
105.5

72

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/4

ESTABLISHMENT OF VISHWANATHAPURAM 400 / 110 kV SS


541557
NPURAM1
CASE 1: NIL WIND NIL SOLAR
541612
VISHWANAT41
541614
HOSUR_SEZ 41.1 -41.0
4.9 -5.0
69.0 41.1 -41.0
1
21.3 -69.0 69.8 4.9 -5.0
-21.3 22.4 541172
1.0 BAGALUR1
541613
106.8 VISHWNATHAP1
39.0 -38.8 57.0
10.0 1
1 5.6 -5.8 18.0
3.0 -10.0 10.0 541610
524011 544087 SEVUGANAPAL1
KOLAR TIRUVLM4 544151 -3.0 2.4 0.0
PALAVADI4 1 -10.5 10.5
-6.1
1.0 34.2 -34.0 21.0 -2.3 1.4
0.0 544170 108.5 1
1 VISHWANATH4 3.5 -3.8 7.0 -11.0 11.0
76.7 -3.2 3.3
-2.4 1.5
129.8 -129.3 0.7 541171 -1.3
228.4 -227.8 ZUZUVAD1
20.5 -13.6 16.3 -16.2 540681
1

1
-281.9 283.1 -34.1 -44.5 HOSUR21
-3.9 3.2
-155.0 85.1 1.0 1.0
400.6 129.8 -129.3 -34.2 108.0 34.2
225.6 -224.6 50.4
0.0 20.5 -13.6 1 -24.5 541556 24.4
1

1 102.7 -149.2 1 1.0 21.3 MNAGAR1


-750.0 108.0 32.0 23.9
1.0 1 1
1.0 544007 107.9 10.2 -9.7 9.7 7.8
411.4 HOSUR4 22.5 -22.3
101.4 -101.3 129.8 -129.3 -12.9 12.8
-3.8 2.7
-7.9 -28.8 20.5 -13.6
1

-63.1 63.2 40.7 1.0 -40.5


108.2
101.4 -101.3 -25.6 7.5 -7.9 540803 7.7
HSIPCTII
-7.9 -28.8 SW 0.0 35.3 -35.1
0.0 1 10.9 -10.9
-0.0 124.5 0.4 -0.7
-1290.8 -17.2 541611 16.9
1.0 541615 VENKRAFT_EHT
398.9 VENK_TOFF 541501
1.0 3.3 -3.3 4.6 -4.5 1.0 GURUPAR21
399.2 20.8 4.5 108.3
1 9.0 -9.3 1.3 -1.5 1 10.2 -10.1
8.8 1.5 541558
1.0 KDODDY1 -1.0 -1.6
1.0 1.0 -1.2 107.9 1.2
400.0 108.1 10.2 -10.1
8.0 -8.1 15.9 540457
1 -1.0 -1.6
54.4 1.0 -54.1 5.2 SOLAGIRI
107.9
8.5 541504 -8.3 37.0 -36.9
UDDANAPLY21
11.1 -11.3
1.0 34.0
-2.9 107.9 2.9 1
14.4
2.1 -3.1
541339
UDANPLY1 1.0
26.4 107.4
1
8.7 -16.1 16.2
17.6 -17.5 -3.3 1.2
3.2 -3.5 -9.8 1.0 9.9
108.3
-4.6 3.6

1.0
1.0 -3.1 107.3 3.1
108.7
-3.0 1.5
1.0
107.4

1.0
107.7

73

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/1

ANNEXURE -1

BASE CASE: WITHOUT PROPOSED 400 kV /230 kV -110 kV SHOLINGHUR SUBSTATION

FULL WIND-FULL HYDRO -FULL SOLAR

540756
MOSUR21
542093
542024 MOSUR2
542127 TVALAM2 540388 540389
544087 TVALAM42 31.8 -31.8 SOLINGR MVPURAM1
TIRUVLM4 3.5 -2.4 51.9 -33.2 33.3

1
544002 110.8 -109.7 1 18.5 540982
179.2 -178.7 144.2 -144.0 31.8 -31.8 17.0 -16.5 16.2 1
SPBUDUR4 -2.1 -1.2 6.1 AJPET1
29.6 -29.5 1.0
-307.8 309.0 15.6 -4.9 -30.0 30.1 3.5 -2.4
1

1
540539 31.8 -31.8 2.1 -2.6 113.0
22.6 -98.9 144.2 -144.0 TVALAM1 10.8 -10.8 19.1
358.4 -357.3 3.5 -2.4 1

1
1.1 -30.0 30.1 5.8 -6.7 7.1
420.7 31.3 -9.9 58.1 -57.9 31.8 -31.8
1

1.0
112.1 541332
-7.7 11.7 3.5 -2.4
1

1
THAKOLM1 1.0
544022 9.0 -9.0 541564
179.2 -178.7 58.1 -57.9 15.6 111.6
ALMATI4 1.0 10.5 -11.4 PUNNAI1
1 540965 -2.4 2.4
15.6 -4.9 -7.7 11.7 5.1 236.4
1

SIPCOTTV 1.0 7.7 -8.8


-354.4 357.0
58.1 -57.9 47.0 -46.8 112.6 22.2
540922
-3.5 -39.7 11.4 1
-7.7 11.7 32.1 -32.0 KAVRIPKM 7.1
-354.4 357.0 1
1

540924
1.0 3.7
-3.5 -39.7 1.0 TIMIRI 1.0
115.0 42.0
238.6 1 -18.9 19.0 112.0
542166 1.0
13.0 25.0
KANCHI2 6.6 -7.8 111.6
1
1.0 9.1
416.1 116.5 -115.8 4.8 -4.7 30.0
1.0 1
417.5 7.7 -9.3 19.0 -19.9 10.0 1.0
1.0 112.8 540923
1.0 113.7 DAMAL
238.5 1.0
-6.4 6.4 16.8
236.6 1
7.1 -7.9 5.5

1.0
112.7 1.0
112.5

74

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/2

ANNEXURE -1

BASE CASE: WITHOUT PROPOSED 400 kV /230 kV -110 kV SHOLINGHUR SUBSTATION

NIL WIND-FULL HYDRO -NIL SOLAR

540756
MOSUR21
542093
542024 MOSUR2
542127 TVALAM2 3.4 -2.1 540388 540389
544087 TVALAM42 SOLINGR MVPURAM1
TIRUVLM4 34.1 -34.1
-13.5 13.6

1
17.0
544002 63.7 -63.3 1 18.5 540982
-28.3 27.9
51.9
SPBUDUR4
9.7 0.7 -11.2 10.9 3.4 -2.1 1 AJPET1
5.4 -12.2 -6.2 6.0 6.1
176.4 -175.9 112.3 -112.2 34.1 -34.1 1.0
-179.1 179.5
1

1
540539 3.4 -2.1 44.6 -44.4 112.5
-9.2 -77.7 -11.2 10.9 TVALAM1 34.1 -34.1 6.0 -6.0 19.1
1

1
19.5 1.5
1.0 112.3 -112.2
8.9 -9.8 7.1
416.4 352.7 -351.7
1

-9.9 14.3 3.4 -2.1


1.0
60.5 -60.3 34.1 -34.1 111.5 541332
1

1
THAKOLM1 1.0
544022 14.6 -14.6 541564
9.7 0.7 -9.9 14.3
15.6 111.0
ALMATI4 1.0 5.8 -6.7 PUNNAI1
1 540965 3.2 -3.2
176.4 -175.9 60.5 -60.3
5.1 235.0
1

SIPCOTTV 1.0 2.9 -4.0


-216.4 217.4 -9.9 14.3
41.4 -41.1 112.0 22.2
540922
-32.3 -27.9 11.4 1
60.5 -60.3
33.5 -33.5 KAVRIPKM 7.1
-216.4 217.4 1
1

540924
1.0 3.7
-32.3 -27.9 1.0 TIMIRI 1.0
114.7 42.0
237.2 1 -11.5 11.6 111.4
542166 1.0
13.0 25.0
KANCHI2 1.7 -3.2 111.2
1
1.0 9.1
412.5 55.9 -55.7
20.5 -21.4
30.0
1.0 1
414.6 7.5 -11.9
-0.9 1.0
10.0 1.0
1.0 112.6 540923
1.0 113.4 DAMAL
237.3 1.0
-19.4 19.5 16.8
236.0 1
13.4 -14.0 5.5

1.0
112.4 1.0
112.2

75

1
CASE 1 : WITH PROPOSED 400 kV /230 kV -110 kV SHOLINGHUR SUBSTATION
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/3
FULL WIND-FULL HYDRO -FULL SOLAR

542127
544087 TVALAM42
TIRUVLM4 542024
11.8 0.9 TVALAM2
-29.6 29.2
273.2 -272.6

1
5.9 0.5 91.9 -91.8
136.6 -136.3 540756

1
-29.6 29.2
MOSUR21
5.9 0.5 91.9 -91.8
542244 542093
136.6 -136.3 KATPADI2 MOSUR2

1
542166 79.9 -79.6 2.6 -2.1
KANCHI2 -3.6 1.2 21.3 -21.3

1
76.7 -7.9 5.2
1 0.0 -94.6 95.1 542228 2.6 -2.1
SHOLINGHUR42
1.0 21.3 -21.3
-65.6 65.9 41.7 -41.6

1
235.8
-6.2 0.9 -6.8 1.1
-9.5 1.0 2.5 2.6 -2.1
1.0 235.3
544002 234.2 544168 6.6 -6.6 21.3 -21.3

1
SPBUDUR4 SOLINGHUR4
628.6 -627.6
71.0 -75.9 -6.4 9.2 1.0 2.6 -2.1
-263.7 264.6 236.0
126.4 -126.2 21.3 -21.3
628.6 -627.6
1

1
-3.0 3.1
19.3 -97.4
71.0 -75.9
138.2 -137.3

-6.4 9.2
1.0 1.0 1.0
414.8 411.5 126.4 -126.2 234.1
1

131.0 1.0
2 235.6
0.0 540388
541590 SOLINGR
131.0 SHOLINGHUR41
544022 1 0.0
-0.7 1.0
71.7 -71.0
ALMATI4 64.9 -64.6
-16.2 17.1
-0.7 1.0 1.0
-346.2 347.2
-2.4 7.4
57.5 111.6
131.0 64.9 -64.6
-7.2 -45.2 18.0
102.7 -102.5
1
1

0.0 540982
AJPET1
1.0
-346.2 347.2 -2.4 7.4 1.3 112.1 -1.8
19.1
-7.2 -45.2
7.1
102.7 -102.5 42.2 -41.8
1

1.0
409.5 541564
-2.4 7.4 PUNNAI1
-0.1 -0.3
102.7 -102.5 1.0
22.2
1

44.3 -43.7 111.2


540922 7.1 540923
KAVRIPKM DAMAL
1.0
24.9 -24.8 16.8
111.2
1.0 -1.8 0.8 -3.1 2.6 5.5
409.6
32.6 -32.3
540965 30.0
13.0 SIPCOTTV -1.8 0.8 10.0
42.0 -25.5 25.9 32.6 -32.3 1.0
16.9 -18.6 111.5
1.0
1.0 112.6 76
113.4 1.0
111.7
1
CASE 1 : WITH PROPOSED 400 kV /230 kV -110 kV SHOLINGHUR SUBSTATION
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/4
NIL WIND-FULL HYDRO -NIL SOLAR

542127
544087 TVALAM42
TIRUVLM4 542024
1.9 10.5 TVALAM2
-15.0 14.3
270.2 -269.5

1
1.0 5.3 67.2 -67.2
135.1 -134.8 540756

1
-15.0 14.3
MOSUR21
1.0 5.3 67.2 -67.2
542244 542093
135.1 -134.8 KATPADI2 MOSUR2

1
542166 82.2 -82.0 1.6 -0.9
KANCHI2 -7.5 5.1 25.4 -25.4

1
76.6 -7.6 2.8
1 0.0 -41.0 41.0 542228 1.6 -0.9
SHOLINGHUR42
1.0 25.4 -25.4
-47.5 47.6 67.9 -67.6

1
236.0
-2.3 -3.9 -11.7 7.1
-10.3 1.0 3.6 1.6 -0.9
1.0 235.7
544002 235.2 544168 25.6 -25.5 25.4 -25.4

1
SPBUDUR4 SOLINGHUR4
456.2 -455.7
45.0 -57.9 -10.4 12.8 1.0 1.6 -0.9
-143.2 143.4 236.1
117.9 -117.8 25.4 -25.4
456.2 -455.7
1

1
0.3 -3.1
1.0 -88.6
45.0 -57.9
94.4 -94.0

-10.4 12.8
1.0 1.0 1.0
414.0 411.2 117.9 -117.8 234.7
1

131.2 1.0
2 235.9
0.0 540388
541590 SOLINGR
131.2 SHOLINGHUR41
544022 1 0.0
-9.4 9.8
42.0 -41.8
ALMATI4 69.0 -68.7
-1.3 1.1
-9.4 9.8 1.0
-182.5 182.7
-7.4 12.5
57.5 112.0
131.5 69.0 -68.7
-12.5 -51.7 18.0
103.4 -103.1
1
1

0.0 540982
AJPET1
1.0
-182.5 182.7 -7.4 12.5 4.2 112.6 -5.0
19.1
-12.5 -51.7
7.1
103.4 -103.1 34.9 -34.6
1

1.0
410.3 541564
PUNNAI1
1.1 -1.7
1.0
22.2
-7.4 12.5
39.1 -38.7 111.6
7.1
103.4 -103.1
1

540922 540923
KAVRIPKM DAMAL
1.0
17.4 -17.3 16.8
111.6
1.0 -2.9 2.0 -1.2 0.5 5.5
409.8
33.8 -33.5
540965 30.0
13.0 SIPCOTTV -2.9 2.0 10.0
42.0 -29.1 29.6 33.8 -33.5 1.0
16.7 -18.2 111.9
1.0
1.0 113.0 77
113.6 1.0
112.1
1
548127
548999
544999
544093

ARIYALUR7
VIRUDHNAGA4
TAPPAKUN4

VIRUDHNAGAR
325.5 -323.1
-2.3 -37.0

544006
UDMP4
150.0

W
-1332.3 1332.3
325.5 -323.1 0.0H

1
1
-171.0 247.5
-2.3 -37.0 SW

548128
544132

COIMBTR7
KAMUTHI4
-0.0

0.0 -514.7 517.8

544027
KAYATHAR4

1
-896.0 902.0 -1372.6 1384.9
954.0 48.6 -48.4
-40.2 -204.7 27.7 4.7 -514.7 517.8
0.0 513.7 -504.8

1
48.6 -48.4
-1372.6 1384.9 125.3 -49.4 52.4
-896.0 902.0
27.7 4.7 0.0 500.0

544017
KARAIK

2
S
-40.2 -204.7
125.3 0.0H
1.0

544004
ALUNDUR4
0.0
396.1

1
470.3 701.6 -692.5

1.0
1.0
-59.6 106.3

762.6
757.2
0.0

548004
544094
ANIKADAV4

UPPUR
1
648.5
720.0 -718.8
720.0 402.5 -400.1 SW

2
-4.6 -243.5
235.4R -37.3 19.8 -0.0

1.0
720.0 0.0

400.5

1
1
515.7 -506.8
235.4R 720.0 -718.8 72.1
402.5 -400.1 -57.4 61.0
0.0 -4.6 -243.5

1
-37.3 19.8
240.0

1.0
1.0
0.0

758.3
400.0

2
-627.0 636.4
240.0
64.7 -28.8

1.0
1.0

502.4 -496.8

765.0
397.3

-48.7 -6.6

541305
KAYATR41
1.0

1
1
88.6 -88.4 -627.0 636.4
395.3

544009
THENAMPATTY
-0.6 3.7 64.7 -28.8

1
1.0

78
542148
KANARP42
398.9

1
1
88.6 -88.4

544026
KANAPATT
-0.6 3.7

1
1
105.7 -105.6 -595.1 597.4

1
1
88.6 -88.4

544165
544167

OTTAPIDARA4
SEPC

-24.7 26.8 39.9 -51.7


-0.6 3.7 -237.2 237.5

1
1
105.7 -105.6 81.3 -81.2
-5.6 -33.1 475.0 0.0

1.0
1
1

-24.7 26.8 -595.1 597.4 -13.7 -4.3

110.3
-66.1R 124.9
39.9 -51.7 81.3 -81.2 -237.2 237.5

1.0
230.5
-13.7 -4.3 -5.6 -33.1

1.0
1.0
Agenda for 1st meeting of SRSCT (07.09.2018)

-706.2 708.5

400.0
400.0

544018
544072

TIRUNEL4
UDNGDI4
160.4 -148.1 -749.1 753.8 510.4 -508.2
-706.2 708.5 63.1 -44.2 -41.6 21.6
600.0

542090
ABISEK42
2
160.4 -148.1
-50.0L
-290.1 290.9 510.4 -508.2
-749.1 753.8 600.0
544166
SAMUGARANGAP

1
1
1
28.6 -13.6 -41.6 21.6
63.1 -44.2 -50.0L
1.0
399.9

259.2 -258.7

1.0
1.0
-1099.0 1101.6 -33.7 -11.0

232.2
400.5
241.6 -215.6

541412
KANRPT41
-144.9 145.4 259.2 -258.7
( BOTH TENNAMPATTY & UDANGUDI CONNECTED TO KAYATHAR 400KV SS)

1
1
14.2 -5.9 -33.7 -11.0
-144.9 145.4 500.0
1.0

-413.1 413.8
W1

1
1
-1099.0 1101.6 14.2 -5.9 0.0H
400.0

-28.6 12.7
241.6 -215.6 -144.9 145.4

1
1
14.2 -5.9 -413.1 413.8
-144.9 145.4
Annex-VIII/1

-28.6 12.7

1
1
14.2 -5.9
0.0

1
1

1.0 113.2

1.0
1.0
1.0
1.0

110.6

404.2
402.3
400.3
401.5
BASECASE(FWFS) : WITH UDANGUDI (2X660 MW) GENERATION+ WITH 400KV FEEDERS AS PER APPROVAL
548127
548999
544999
544093

ARIYALUR7
VIRUDHNAGA4
TAPPAKUN4

VIRUDHNAGAR
358.2 -355.3
2.1 -35.6

544006
UDMP4
150.0

W
-1453.1 1453.1
358.2 -355.3 0.0H

1
1
-178.9 270.0
2.1 -35.6 SW

548128
544132

COIMBTR7
KAMUTHI4
-0.0

0.0 -415.9 417.8

1
-920.1 926.4 -1431.8 1445.3
952.6 33.3 -44.7
-30.6 -205.7 36.8 19.6 -415.9 417.8
544.4 -534.5
33.3 -44.7
-1431.8 1445.3 -49.6 65.1
-920.1 926.4
36.8 19.6 500.0 500.0

544027
544017

KAYATHAR4
KARAIK

1
S
-30.6 -205.7 0.0

1
300.7R 0.0H
1.0

125.6

544004
ALUNDUR4
0.0
396.2

1
468.9 704.7 -695.5

1.0
1.0
0.0

2
-59.9 107.4

762.0
756.1
0.0 125.6

548004
UPPUR
1
647.6
720.0 -718.8
720.0 -574.0 SW

2
6.3 -254.0
246.3R 9.4 -0.0

1.0
720.0 -574.0 0.0

400.6

1
1
246.3R 720.0 -718.8 9.4 72.1

0.0 6.3 -254.0

1
240.0

1.0
1.0
0.0

757.8
400.0

2
-655.0 665.3
240.0 422.0 -418.0
72.5 -26.8

1.0
-53.6 -26.7

765.0
541305
KAYATR41
1.0

-655.0 665.3
394.9

1
1
90.8 -90.6

544009
THENAMPATTY
72.5 -26.8

1
-1.8 5.1

1.0

79
542148
KANARP42
500.0

398.9

1
1
90.8 -90.6

544026
KANAPATT
-48.0R
-1.8 5.1

1
1
105.7 -105.6

1
1
90.8 -90.6 -776.9 780.8

544165
544167

OTTAPIDARA4
SEPC

-28.5 30.7
-1.8 5.1 73.2 -57.1 -237.2 237.5
-102.2 102.2
-5.6 -33.1

1
1
105.7 -105.6 475.0 0.0

1.0
1
1

-776.9 780.8 -3.0 -14.9

110.3
-28.5 30.7 -66.1R 125.0
73.2 -57.1 -102.2 102.2 -237.2 237.5

1.0
230.6
-3.0 -14.9 -5.6 -33.1

1.0
1.0
Agenda for 1st meeting of SRSCT (07.09.2018)

-557.0 558.4

400.0
400.0

544018
544072

TIRUNEL4
UDNGDI4
147.2 -144.3 453.4 -451.6
-557.0 558.4 -41.9 14.9
579.4 600.0

542090
ABISEK42
2
147.2 -144.3
-45.2 -50.0L 200.0
1

-328.5 329.4 453.4 -451.6


579.4 600.0 -202.1R
544166
SAMUGARANGAP

1
1
1
40.1 -20.8 -41.9 14.9
-45.2 -50.0L
1.0
399.9

396.0 -394.7

1.0
-959.9 961.9 -29.0 -4.4

232.1
4
228.3 -211.5

541412
KANRPT41
-149.7 150.2 396.0 -394.7

1
1
16.8 -7.9 -29.0 -4.4

3
500.0

1.0
1.0

-149.7 150.2 -375.4 376.0


W1

-959.9 961.9 0.0H

400.9
400.0

1
1
16.8 -7.9 -32.5 14.7
228.3 -211.5 -149.7 150.2

1
1
16.8 -7.9 -375.4 376.0
Annex-VIII/2

-149.7 150.2 -32.5 14.7

1
1
16.8 -7.9 0.0

1
1

1.0 113.4

1.0
1.0
1.0
1.0

110.6

404.7
402.8
400.7
401.9
CASE1 : REVISED CONNECTIVITY -UDANGUDI TO VIRUDHUNAGAR & THENNAMPATTY TO KAYATHAR 400KV SS
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-IX/1

BASE CASE : PROVISION OF 1 NO. 500 MVA, 400/230 KV ICT AT SRIPERUMBUDUR 400/230-110 KV SS

NETWORK YEAR CONDITION : 2019-20

514024 1.0 514019 1.0


CHITOR 400.1 NELLORE4 407.1

4.7

4.7
107.8
-11.0

242.0
-47.1

242.0
-47.1

517.5
-16.3
517.5
-16.3

491.3

491.3
544090 1.0
SVCHTRM 398.2
-241.9

-241.9

-511.5

-511.5
-41.1

-41.1
33.6

33.6

544087 1.0

-193.9
13.4

284.9
47.7
TIRUVLM 400.5
64.4
-20.1

1
-107.6

-483.0

-483.0
-39.2

-18.3

-18.3

194.0
1
-64.3
-65.1

-21.9
544002 1.0
MADR 398.2

-284.1
-32.6
542117 1.0
364.3
56.9

193.2
35.3

193.2
35.3

193.2
35.3

SVCATRM2 226.7

-132.1132.5
9.4

72.2
10.7

79.4
12.4
1

1 1 1

-9.2
542064 1.0
1 3 X 315 MVA, 400/230 KV ICT ORAGADM2 225.8
-362.6

1 1 1
-29.5

540510 1.0
-29.4
3.4

SPBUDR41 108.1
-192.5

-192.5

-192.5
-21.3

-21.3

-21.3

29.5
-6.1

542050 1.0
SPBUDUR2 225.8
35.0
10.2

60.7
15.8

188.1
0.3

-22.7
6.8

-14.5
-11.7

126.1
33.1
126.1
33.1

58.5
20.6
-13.5

-72.2
-13.0

-63.7
-11.9
126.5
-125.6

-125.6
-32.9

-32.9

542016 1.0
KADAPEI2 223.8
-72.2
-11.3
63.8
10.4
-60.5
-19.4

542065 1.0
14.5

542007 1.0 542014 1.0


1.7

MAMSIPC2 226.4
TARMANI2 223.8 NCTPS2 227.1
51.3
27.4

-58.4
-23.7

542017 1.0
-187.2

KORATUR2 223.9
31.4
-79.4

-12.8

542015 1.0
-51.2
-28.4

KOYMBDU2 223.9 542175 1.0


PORUR2 223.1
-35.0
-10.9

-79.3
-13.2
72.3
12.2

542043 1.0 542092 1.0


-38.4
-5.5

HYNDAI2 225.7 NOKIA2 226.3


-125.0
13.6
-36.1
-15.6

542224 1.0
12.9
22.8

542047 1.0 VEMBAKKAM2 224.8


35.0
10.9

GPOODI2 224.9
38.4

1 542121 1.0
5.3

GUINDY2 223.2

80

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-IX/2

CASE 1 : BASE CASE + ENHANCEMENT OF 400/230 kV ICT CAPACITY FROM 3 X 315 MVA TO 3 X 500 MVA AT SRIPERUMBUDUR 400/230-110 KV SS

NETWORK YEAR CONDITION : 2019-20

514024 1.0 514019 1.0


CHITOR 400.1 NELLORE4 407.0

9.0

9.0
-6.5

-48.6

-48.6

-17.0

-17.0
136.0

231.0

231.0

515.4

515.4

504.1

504.1
544090 1.0
SVCHTRM 398.2
-230.9

-230.9

-509.4

-509.4
-41.2

-41.2
34.8

34.8

544087 1.0

-48.3
30.1

233.2
36.9
TIRUVLM 400.5
93.1
-15.2

1
-135.7

-495.3

-495.3

1
-42.2

-17.4

-17.4
-92.9
-68.9

-39.9
48.3

544002 1.0
MADR 397.7

-232.6
-26.7
542117 1.0
330.9
51.5

280.0
44.8

280.0
44.8

280.0
44.8

SVCATRM2 227.1

-128.6 129.0
9.1

50.8
8.3

52.8
9.3
1

1 1 1

-9.1
1 3 X 500 MVA, 400/230 KV ICT 542064 1.0
ORAGADM2 226.2
-329.5

1 1 1
-28.8

540510 1.0
53.6 -53.5
1.0

SPBUDR41 108.0
-279.2

-279.2

-279.2
-30.1

-30.1

-30.1

-3.4

542050 1.0
SPBUDUR2 226.5
35.0
10.2

80.9
18.2

234.5
2.3

-10.3
7.7

-4.0
-10.4

151.4
35.8
151.4
35.8

79.0
23.2

-9.3

-8.8
-11.0

-38.8

-35.6
140.6
-150.7

-150.7
-34.5

-34.5

542016 1.0
KADAPEI2 224.3
-50.8
35.6

-9.0
-80.5
-21.0

6.9

542065 1.0
542007 1.0 542014 1.0
4.0
0.3

MAMSIPC2 226.9
TARMANI2 224.1 NCTPS2 227.4
62.1
28.5

-78.7
-25.5

542017 1.0
-233.1

KORATUR2 224.3
30.3
-80.1

-10.9

542015 1.0
-62.1
-29.3

KOYMBDU2 224.4 542175 1.0


PORUR2 223.6
-35.0
-10.9

-52.8
-10.3
38.8
8.2

542043 1.0 542092 1.0


-29.0
-4.5

HYNDAI2 226.4 NOKIA2 226.8


-138.8
12.9
-35.0
-16.7

11.0
10.4

542047 1.0 542224 1.0


35.0
10.9

VEMBAKKAM2 225.1
GPOODI2 225.2
29.0

1 542121 1.0
4.3

GUINDY2 223.6

81

1
ALMATI4
544022
544000
CHENN-EX
540204
NCTPSANG1
540.0

544040
MANALI4
250.0H
-538.2 540.0

1
1
-213.9 250.0
0.0

1
-426.6 428.0
123.5
-86.9 80.5

397.6
540207
21.7 NCTPSANG2
-538.2 540.0
540.0

1
1
1

-213.9 250.0
250.0H
21.7

-359.3 360.0
-33.7 25.1

1
82
544088
VALLUR TPS

-180.5 180.5

SVCHTRM
544090
143.8 -144.8
-323.8 324.7
-32.5 17.3 -180.5 180.5
Agenda for 1st meeting of SRSCT (07.09.2018)

47.5 -47.4 143.8 -144.8


-19.0 -25.0 450.0
1

-112.0L
-323.8 324.7
-32.5 17.3
Base Case : 2019-20 Year Network condition -NCTPS Stage III (1X 800 MW)

450.0
2

-112.0L

399.7
-277.9 278.4
450.0
3

401.7

-23.7 7.8
-112.0L
-277.9 278.4
Annex-X/1

-23.7 7.8
401.5

400.2
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-X/2

Case 1: Base case + NCTPS Stage III (1 X 800 MW) Contingency arrangement of making LILO of Alamathy - Manali 400 kV # at 765/400 kV North Chennai Pooling Station

1 1 2 3
1
250.0H

-112.0L

-112.0L

-112.0L
540.0

250.0H

450.0

450.0

450.0
540204
540.0

544088
184.3R

NCTPSANG1 21.8 540207


VALLUR TPS 404.1
720.0

NCTPSANG2 21.8
548013
NCTPS-STG3 765.0
540.0
250.0

146.3
-141.8

146.3
-141.8

261.1
5.5

261.1
5.5
540.0
250.0
720.0
184.3

1
1

1 1
1
-538.2
-214.3

-538.2
-214.3

-146.3

-146.3
140.7

140.7
-719.9
-194.0

544000
249.8

548008 CHENN-EX 404.3


0.0

NORTH CHN PS 764.7


21.9

12.8
338.9

388.3
99.7

12.8
253.5

388.3
719.9
-55.8

1
-719.9
77.6

544130
NORTH CHEN P 401.0
160.1
-90.7

559.9
63.4

-387.1
-24.4
-387.1
-24.4

544090
SVCHTRM 402.3
-253.0
-115.9
-559.3
-62.4

544040
MANALI4 400.0
-90.9
-22.2
0.0
125.0
-159.9

-260.6

-260.6
-338.3

-21.4

-22.5

-22.5
73.5

91.0
-31.8

544022
ALMATI4 1 402.9

83

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XI/1

ESTABLISHMENT OF 400/230-110 kV CUDDALORE SS

BASE CASE : WITHOUT PROPOSED 400 / 230-110 kV CUDDALORE SS

FULL WIND FULL HYDRO FULL SOLAR

544127 1.0
ARIYALUR4 402.9
92.9
-89.5

92.9
-89.5

-18.5
-97.6
-18.5
-97.6
544046 1.0

18.6
35.8
18.6
35.8
NNTPS4 409.1

228.9
101.1

-27.6
28.3
1

-82.3
544003 1.0

27.8
SALEM4 397.8
-92.6

-92.6

545001 1.0 1
-6.5

-6.5

MANALMEDU4 407.7
-228.4
-90.3

542184 1.0

-272.8
2.4
NNTPS2 230.8

275.3
114.5
10.2

114.5
10.2

-29.3
544001 1.0
NLCTPS_II 402.5

542056 1.0
CUDALRE2 230.2
72.8
4.5

72.8
4.5

72.8
4.5
27.2
-16.9

-175.7
30.1
35.5
-21.9

35.5
-21.9

-108.0
17.0

-33.0
-0.1

1 1 1
-114.4

-114.4
177.5
-25.7

-11.8

-11.8

542011 1.0
NEYVELI2 230.5 1 1 1
109.0
-19.3

542073 1.0
NEYZERO2 230.3
117.7
3.0

117.7
3.0

117.7
3.0

-72.6

-72.6

-72.6

540712 1.0
1.7

1.7

1.7

CUDALU21 109.6
-35.2

-35.2

542063 1.0
-0.9

-0.9

1 1 1
5.5
31.8
10.3

8.1
-12.1

38.7
7.2
70.1
18.4

-16.7 16.7

52.4
13.2
VEERPRM2 231.6

541190 1.0
-5.5

1 1 1 CAPERHIL 109.6
-27.1

542006 1.0
8.2

-69.4
-17.5

VILUPRM2 231.1 540886 1.0


CHITARSR 108.0
16.7
5.5
-117.3

-117.3

-117.3

540497 1.0 1
5.3

5.3

5.3

NLCTNEB21 109.9
82.7
-17.9

82.7
-17.9

-73.7
18.0

3.3
10.2

-52.2
-13.1

1 541093 21.0 1.0


1 1
7.0
KULNCVDI 108.8
84.6
-25.0

1
-31.7
-10.4

1 1
-11.5
-7.2

540700 1.0
NATAPATU 109.3
-82.3

-82.3

540517 1.0
26.4

26.4

VILPRM21 112.9
-38.6

540701 1.0
11.5
-7.4

6.9
31.7
10.4

1 SEMNKUPM 109.0
-23.2

542139 1.0
74.2

33.1
-9.1

ULUNDR2 230.3
-11.9
-13.5

1
39.0
14.0

541182 1.0
18.0
5.6

PANRUT_URBAN 109.3
61.4
4.6

61.4
4.6

540657 1.0 1
11.3

12.0
12.5
-8.0

1 1
-18.0
-5.6

BMUTLUR 110.0

1 1
-82.7

21.5
7.1

-25.4
-30.9

540747 1.0
28.1

18.0
5.4

PANRUTI1 109.4
-61.3

-61.3

541375 1.0
-1.0

-1.0

ULUNDR21 109.7
1
37.5
12.3

540939 1.0
25.6
30.6

CHIDAMB1 111.4
1
9.3
28.3

84

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XI/2

ESTABLISHMENT OF 400/230-110 kV CUDDALORE SS

BASE CASE : WITHOUT PROPOSED 400 / 230-110 kV CUDDALORE SS

NIL WIND FULL HYDRO NIL SOLAR

544127 1.0
ARIYALUR4 404.5
-77.7

-77.7

19.4
-95.0
19.4
-95.0
180.7

180.7

-19.3

-19.3
544046 1.0

32.7

32.7
NNTPS4 410.1

289.7
103.0

121.4
1.7
1

-120.8
-52.4
544003 1.0
-179.6

-179.6

SALEM4 401.0
-10.4

-10.4

545001 1.0 1
MANALMEDU4 407.0
-288.9
-86.8

542184 1.0

-279.4
7.5
NNTPS2 231.3

282.0
141.4
10.4

141.4
10.4

-34.3
544001 1.0
NLCTPS_II 405.1

542056 1.0
CUDALRE2 230.4
91.6
9.0

91.6
9.0

91.6
9.0
14.1
-19.2

-146.6
20.2
-8.4
-18.4

-8.4
-18.4

-97.2
12.4

-28.3
-3.5

1 1 1
-141.3

-141.3
147.8
-18.8

-11.8

-11.8

542011 1.0
NEYVELI2 231.0 1 1 1
-15.8

542073 1.0
98.0

NEYZERO2 230.7
154.1
5.2

154.1
5.2

154.1
5.2

-91.3

-91.3

-91.3

540712 1.0
1.0

1.0

1.0

CUDALU21 109.3

542063 1.0
-6.4

-6.4

1 1 1
8.4

8.4

5.5
31.8
10.3

38.3
-10.3

50.2
8.0
76.6
17.2

-16.7 16.7

60.3
13.8
VEERPRM2 232.9

541190 1.0
-5.5

1 1 1 CAPERHIL 109.3
-14.1

542006 1.0
10.2

-75.8
-16.0

VILUPRM2 231.9 540886 1.0


CHITARSR 107.7
16.7
5.5
-153.3

-153.3

-153.3

540497 1.0 1
9.0

9.0

9.0

NLCTNEB21 110.1
87.7
-18.8

87.7
-18.8

-52.5
15.7

3.3
10.2

-60.0
-13.5

1 541093 21.0 1.0


1 1
7.0
KULNCVDI 108.5
63.8
-21.0

1
-31.7
-10.4

1 1
-3.7
-6.8

540700 1.0
NATAPATU 109.0
-87.2
-87.2

540517 1.0
28.3
28.3

VILPRM21 113.4
-49.9

540701 1.0
-7.9

3.7
6.5
31.7
10.4

1 SEMNKUPM 108.6
-22.1

542139 1.0
52.8

28.4
-5.9

ULUNDR2 230.9
7.2
-12.6

1
39.0
14.0

541182 1.0
18.0
5.6

PANRUT_URBAN 109.6
68.6
4.3

68.6
4.3

-38.1

540657 1.0 1
10.1

11.6
-7.2

1 1
-18.0
-5.6

BMUTLUR 109.1

1 1
-62.7

21.5
7.1

23.8
-28.7

540747 1.0
22.2

18.0
5.4

PANRUTI1 109.8
-68.5

-68.5

541375 1.0
1.1

1.1

ULUNDR21 110.1
1
37.5
12.3

-23.6

540939 1.0
28.4

CHIDAMB1 109.7
1
9.3
28.3

85

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XI/3

ESTABLISHMENT OF 400/230-110 kV CUDDALORE SS

CASE 1: WITH PROPOSED 400kV CUDDALORE SS WITH SOURCE AS 400kV DC LINE TO MANALMEDU SS & 400 kV DC LINE TO NLCTSII SS

NIL WIND FULL HYDRO NIL SOLAR

544127 1.0
ARIYALUR4 404.7

97.3
-69.5

97.3
-69.5

17.9
-94.0
17.9
-94.0
-17.8

-17.8
544046 1.0

31.6

31.6
NNTPS4 410.2

153.9
-0.5
-153.1
-47.1
544003 1.0
SALEM4 401.3
-97.0
-26.9

-97.0
-26.9

545001 1.0
MANALMEDU4 406.5

-177.7
-36.5 -7.5
178.7
544001 1.0
-96.7
27.6

-96.7
27.6

NLCTPS_II 404.9
382.6
7.1

382.6
7.1
2 1
-382.0

-382.0
127.3
127.3

-89.7

-89.7

-31.6

-31.6
545002 1.0
96.8

96.8
0.0
0.0

CUDDALORE4 403.7

542073 1.0
130.9
-8.5

130.9
-8.5

154.2
2.5

154.2
2.5
NEYZERO2 231.0

1 1 1 1
-13.6
-14.1

1 1 1 1
-153.7

-153.7

540712 1.0
-130.7

-130.7

6.8

6.8
542056 1.0
13.6

11.5

11.5

CUDALU21 110.7
6.3

CUDALRE2 232.3
70.1
21.3

16.7
5.5

31.8
10.3

62.7
-18.6

59.4
4.9

66.7
11.7
31.8
-20.4

31.8
-20.4

96.0
-15.9

57.7
18.1

30.7
9.3

-16.7

541190 1.0
-5.5

CAPERHIL 110.7
-30.6
-14.2

542011 1.0
-95.2

542006 1.0
11.5

NEYVELI2 231.1
-69.4
-20.3

VILUPRM2 231.9 540886 1.0


CHITARSR 109.0
16.7
5.5

1
140.6
-0.2

140.6
-0.2

140.6
-0.2
92.3
-24.2

92.3
-24.2

40.4
-38.5

10.2
3.3

-66.3
-11.2
1 1 1 541093 21.0 1.0
7.0
1 1 1 KULNCVDI 109.8
-31.5

-31.5

542063 1.0
-3.2

-3.2

VEERPRM2 233.3
1
1 1
-31.7
-10.4

2.6
-9.0

1 1 1 540700 1.0
-91.8

-91.8

540517 1.0
35.0

35.0

NATAPATU 110.4
VILPRM21 114.1
-140.0

-140.0

-140.0

540497 1.0
12.1

12.1

12.1

-59.0

NLCTNEB21 110.4 540701 1.0


-4.6

-2.6
8.7
31.7
10.4

1 SEMNKUPM 109.9
-46.6

-57.3
-25.7
0.0
-51.7

542139 1.0
38.8

ULUNDR2 228.1
64.8
-25.0

22.6
-18.1

39.0
14.0

541182 1.0 1
18.0
5.6

1 PANRUT_URBAN 110.2
95.9
72.8

95.9
72.8

-62.0

-22.4

540657 1.0 1
19.4

17.4

0.9 0.9
-18.0
-5.6

BMUTLUR 110.4

1 1
-63.6

21.5
7.1

63.0

540747 1.0
-43.8
26.4

18.0
5.4

PANRUTI1 110.4
-95.6
-61.3

-95.6
-61.3

541375 1.0
ULUNDR21 114.3
1
37.5
12.3

-62.2

540939 1.0
44.9

CHIDAMB1 111.0
1
28.3
9.3

86

1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XII/1

01235123

1 

 
3 1
7 7 
  838

  
  27 713  
   
3 1
7      
    

  


  
     
  27 713 

     53
      

 
 
  097 1 1 1  
      
    
 81
         


1 1 1       
     
97 ! 1   
       
    53 
1 1 1    
77    
 
 

      


   53 
  
 

 
 
 
  
   
    
  8  "3
! !1 !  1 
097 1 ! 1181   
 
  0 ! !  
  
     
 
113   

       
  71 1 ! 9  3 1! 1    
  
        
       
1887233 1   
        3 7891
     
    

 
   ! 1 
 
 


 
    

   
    
! !298911    
  
  
 
   7291 1 1
 
   
    
      6789
1218 3 1
7 7

   3988 12 72272232 6
  



87
Annex-XII/2

WITH PROPOSED RAMACHANDRAPURAM 220KV SS


511006
AMLP
512017
VEMAGIRI2
511552
KOTPET
-47.0
-30.1
122.0 511003 50.0
70.0 -47.0 SIRIPALLE 1
43.0 1 -26.3 25.0
514017 35.0 -30.1 47.3 26.5
VEMAGIR4 -16.2
1.0 30.3 15.6
1250.0 178.7 -178.7 512201 134.1 -23.7
1.0000 1.0000 1.0000

0.9909 0.9909 0.9909

SIRIPALLE220 47.3
-156.0L 45.2 -31.9 -8.8
-120.7 30.3
178.7 -178.7 1.0
-47.9 55.3 -55.3 134.3

1.0000 1.0000

1.1250 1.1250
1 175.5 511126
45.2 -31.9
512114 44.2 -38.8 RCPE
178.7 -178.7 -4.3 BHIMAVARAM
Agenda for 1st meeting of SRSCT (07.09.2018)

55.3 -55.3 -10.4


514111 2
45.2 -31.9
KVKOTA40 -9.9 10.1 44.2 -38.8 1.3
211.8 163.4
514054 -211.3 22.4 -40.6 1.0
POLAVARAM -22.0 71.9 135.6
-6.2 512098 1.0
900.0 -211.3 211.8 163.4 DUVVA220 210.7
HI 511022 10.4
512099 -53.6R 226.5 -226.1 -6.2 -22.0 71.9 43.2 -174.3 85.9 -85.6 RCPE21
POLAVARAM22 514044 -2.5
1.0000 1.0000

223.5 -87.9 35.9 1.0 3.8 4.2 -16.9 12.4 23.9


1.0000 1.0000

GVK-II
-223.5 403.0 -32.5
61.1 226.5 -226.1 -163.4 -66.0 134.2 1.0 512091 7.4
-47.7 214.9 RCPE220 -14.2
223.5 -87.9 35.9 -75.2 -9.3 25.1 32.6
-223.5 -77.7 77.7 -77.7 -15.0

1.0000 1.0000

1.1250 1.1250
61.1 -163.4 -66.0 134.2 1.0 14.1
-47.7 1.0 214.7 -57.7 57.7 -47.8 -6.8
1.0 -75.2 -9.3 25.1 15.0 511060 1
402.4 512043 -77.7 77.7 -77.7
400.0 KDA
263.4 1.0 JEGURUPADU2 6.2
216.3 -57.7 57.7 -47.8

88
200.0 61.2 66.1 78.0 3.8 -3.8
270.5 512032 512248 T1 1.0 -2.4 75.0
BHIMADOLU PALLANTLA -28.0L 263.4 8.0 54.4 214.1 4.6 -6.1 1
00
58.1 00 2.4 1.1 38.0
61.2 1. 66.1 78.0
-46.9 47.1 9 35.6 -3.0 -35.5
1.0 90 8.0 54.4
00 .9
0.6 -9.1 402.5 00 0 15.4 511087 -15.5
1. -263.4 GOLLAPALEM13 103.0
176.4 -46.9 47.1 09 512113 1
99 -43.1 PEDDAPURAM 19.1 -19.1 -8.9 8.9 25.8
37.2 0.6 -9.1
512061 0.
NIDADAVOLU -263.4 512034 10.1 -10.8 -1.8 0.5
1.0 1.0 1.0
512116 BOMMURU
217.0 214.7 -0.5 0.5 -43.1 19.1 -19.1 135.8
PATTISEEMA22
-43.1 1.0
64.1 -63.9 0.9 -8.2 -82.6 82.9 114.6 10.1 -10.8 135.7 511517
-6.8 EDITHA
-5.2 -0.5 -0.5 0.5 -24.0 22.3 -16.2 1.0
-134.1 135.3
-176.0 64.1 -63.9 0.9 -8.2 114.6 -114.0 6.3
-25.1
-37.2 -5.2 -0.5 1.0 -16.2 12.2 27.8
-134.1 -6.2
1.0 214.8 180.0 106.5 -114.0 1.0
215.3 G1 -25.1 136.3 -28.5
132.0 512010 45.0H 16.5 12.2
1 512027 KORUKONDA220 -106.3 29.2
66.0 -84.2 PURUSHOTHAPA 1.0 56.4 -56.2 1
1.1 216.5 -16.8 14.6
-18.4 40.0 -13.3 9.6
1 -12.3 -1.1 1.0
1.0 20.0 1.0 134.6
215.8 1.1 6.9 216.0
-270.2 57.0 -56.8 512028
-12.3 KRISHNAVARAM -1.1
-56.2 1.7 -6.4
25.0 -25.0 6.9
57.0 -56.8
6.5 -12.5 1.0
1.7 -6.4 216.0 WITH GAS AT VEMAGIRI
25.0 -25.0 50.0
84.3 1 EHT TRANSMISSION LOSSES: 451.340 MW
6.5 -12.5 25.0
16.8
1.0
72.0 215.0
1
36.0
1.0
1.0 215.6
216.2
Annex-XII/3

WITH PROPOSED RAMACHANDRAPURAM 220KV SS


511006
AMLP
512017
VEMAGIRI2
511552
KOTPET
-47.0
-30.1
122.2 511003 50.0
70.0 -47.0 SIRIPALLE 1
43.1 1 -26.3 25.0
514017 35.0 -30.1 47.3 26.5
VEMAGIR4 -16.2
1.0 30.3 15.6
1250.0 178.3 -178.3 512201 134.1 -23.7
1.0000 1.0000 1.0000

0.9909 0.9909 0.9909

SIRIPALLE220 47.3
-156.0L 45.1 -31.8 -8.8
-120.8 30.3
178.3 -178.3 1.0
-47.9 55.3 -55.3 134.3

1.0000 1.0000

1.1250 1.1250
1 176.0 511126
45.1 -31.8
512114 44.2 -38.8 RCPE
178.3 -178.3 -4.3 BHIMAVARAM
Agenda for 1st meeting of SRSCT (07.09.2018)

55.3 -55.3 -10.4


514111 2
45.1 -31.8
KVKOTA40 -10.1 10.2 44.2 -38.8 1.3
212.5 162.9
514054 -212.0 22.4 -40.6 1.0
POLAVARAM -21.9 71.8 135.6
-6.3 512098 1.0
900.0 -212.0 212.5 162.9 DUVVA220 210.7
HI 511022 10.5
512099 -53.2R 225.5 -225.1 -6.3 -21.9 71.8 42.7 -174.7 86.3 -85.9 RCPE21
POLAVARAM22 514044 -2.5
1.0000 1.0000

224.5 -88.0 35.9 1.0 3.8 4.1 -16.9 12.4 23.9


1.0000 1.0000

GVK-II
-224.5 403.0 -32.5
61.3 225.5 -225.1 -162.9 -65.6 132.7 1.0 512091 7.4
-47.8 214.9 RCPE220 -14.3
224.5 -88.0 35.9 -75.0 -9.2 24.9 32.6
-224.5 -77.7 77.7 -77.7 -15.0

1.0000 1.0000

1.1250 1.1250
61.3 -162.9 -65.6 132.7 1.0 14.1
-47.8 1.0 214.7 -57.7 57.7 -47.9 -6.9
1.0 -75.0 -9.2 24.9 15.1 511060 1
224.5 402.4 512043 -77.7 77.7 -77.7
400.0 KDA
262.9 1.0 JEGURUPADU2 6.2
47.8 216.3 -57.7 57.7 -47.9

89
200.0 61.0 65.6 78.0 3.8 -3.8
224.5 512032 512248 T1 1.0 -2.4 75.0
BHIMADOLU PALLANTLA -28.0L 262.9 7.9 54.4 214.2 4.6 -6.1 1
00
47.8 00 2.4 1.2 38.0
61.0 1. 65.6 78.0
-45.9 46.1 09 35.6 -3.0 -35.5
1.0 9 7.9 54.4
00 0.9
0.6 -9.2 402.5 00 15.4 511087 -15.5
1. -262.9 GOLLAPALEM13 103.0
-45.9 46.1 09 512113 1
99 -43.0 PEDDAPURAM 19.1 -19.1 -8.9 8.9 25.8
0.6 -9.2
512061 0.
NIDADAVOLU -262.9 512034 10.1 -10.8 -1.8 0.5
1.0 1.0 1.0
512116 BOMMURU
217.0 214.7 -2.2 2.2 -43.0 19.1 -19.1 135.8
PATTISEEMA22
-42.6 1.0
61.5 -61.3 0.7 -8.1 -83.6 83.9 114.6 10.1 -10.8 135.7 511517
-6.7 EDITHA
-5.5 -0.3 -2.2 2.2 -24.0 22.4 -16.2 1.0
-132.6 135.3
61.5 -61.3 0.7 -8.1 114.6 -114.0 6.3
-24.8
-5.5 -0.3 1.0 -16.2 12.2 27.8
-132.6 -6.2
-127.5 1.0 214.8 180.0 105.5 -114.0 1.0
215.2 G1 -24.8 136.3 -28.4
132.0 -27.5 512010 45.0H 16.3 12.2
1 512027 KORUKONDA220 -105.3 29.2
66.0 -127.5 PURUSHOTHAPA 1.0 56.6 -56.4 1
4.8 216.5 -16.6 14.6
-27.5 -224.3 40.0 -13.3 9.6
1 -11.7 -4.8 1.0
1.0 -46.9 20.0 1.0 134.6
215.7 4.8 6.3 216.0
-224.3 60.7 -60.5 512028
-11.7 KRISHNAVARAM -4.8
-46.9 2.4 -7.0
25.0 -25.0 6.3
127.6 60.7 -60.5
6.5 -12.5 1.0
26.5 2.4 -7.0 216.0 WITH GAS AT VEMAGIRI
25.0 -25.0 50.0
127.6 1 EHT TRANSMISSION LOSSES: 451.320 MW
6.5 -12.5 25.0
26.5
1.0
72.0 215.1
1
36.0
1.0
1.0 215.7
216.3
LOAD FLOWS WITH & WITHOUT PROPOSED 220kV FEATURES AT 400 KV GVK POWER PLANT TO EXTEND
POWER SUPPLY TO PROPOSED 220/132/33 KV RAMACHANDRAPURAM SS
Annex-XII/4

Base Case (MW) With proposed 220 kV With proposed 220 kV


features at 400 kV GVK features at 400 kV GVK
Power Plant and to extend Power Plant and to extend
power supply to proposed power supply to proposed
220/132 kV RC Puram SS 220/132 kV RC Puram SS
Sl. No. Description along with 220kV features along with 220kV features at
at Polavaram HEP with Polavaram HEP with DC
one circuit LILO with LILO with Twin Moose at
Twin Moose at 220 kV 220 kV Purushothapatnam
Purushothapatnam (MW) (MW)
1 ICT Loadings at 400/220 kV Vemagir SS 3 x 332.9 3 x 178.7 3 x 178.3
2 ICT Loadings at 400/220 kV GVK SS - 2 x 263.4 2 x 262.9
3 PTR Loadings at 220/132 kV RC Puram - 2 x 77.7 2 x 77.7
4 220 kV RC Puram - Jegurupadu - 2 X -77.7 2 X -77.7
5 220 kV Bommur - Jegurupadu -84.9 -106.5 -105.3
6 PTR Loadings at 220/132 kV Siripalle 2 x 68.7 2 x 55.3 2 x 55.3
7 220 kV Vemagiri - Siripalli 120.4 122 122.2
8 220 kV Undi - Siripalli 18.9 -9.9 -10.1
9 ICT Loadings at 400/220 kV Polavaram SS - 2 x 223.5 2 x 224.5
10 400/220 kV Polavaram - Pattiseema - 176.4 -
11 400/220 kV Polavaram - Purushothapatnam - 270.5 2 x 224.5
Agenda for 1st meeting of SRSCT (07.09.2018)

12 400/220 kV Pattiseema - Purushothapatnam - -84.2 2 x -127.5


13 220 kV Undi - Duvva -35.2 -85.6 -85.9
14 220 kV Vemagiri - Duvva 130 175.5 176
15 220 kV Vemagiri - SSS 2 x 94.2 - -
16 220 kV Vemagiri - Jegurupadu - 2 x -66.0 2 x -65.6
17 220 kV SSS - Jegurupadu - 2 x -114.2 2 x -114.0

90
18 220/132 kV Siripalli - Amalapuram 2 x 35.5 2 x 47.3 2 x 47.3
19 220/132 kV Siripalli - Kothapeta 44.7 26.5 26.5
20 220/132 kV Siripalli - Ramachandrapuram 21.7 -10.4 -10.4
21 132 kV Ramachandrapuram - Kothapeta 5.7 - -
22 132 kV Ramachandrapuram - Kakinada 2 x -18.3 -2.4 -2.4
23 132 kV Ramachandrapuram - Editha -22.6 - -
24 132 kV Gollapalem - Kakinada -47 -8.9 -8.9
25 220/132 kV RC Puram - Kothapeta - 23.9 23.9
26 220/132 kV RC Puram - Editha - 6.3 6.3
1 x 32.6+ 1 x 15.0 + 1 x 1 x 32.6 + 1 x 15.1 + 1 x
27 220/132 kV RC Puram - RC Puram -
35.6 35.6
28 220/132 kV RC Puram - Kakinada - 3.8 3.8
29 220/132 kV RC Puram - Gollaplem - 2 x 19.1 2 x 19.1
EHT Transmission Losses 463.430 451.340 451.320
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/1

Annexure – 1

1. List of applicants granted Stage-I Connectivity in 23rd Connectivity / LTA meeting of SR held on 07.06.2018.

Sl. Applicatio Applicant Location Date of Connectivity Nature Primary location for Dedicated Tr. Alternative location Dedicated Tr.
No. n No. Application Quantum of Connectivity / Tr. System for Connectivity / Tr. System for
(MW) Applican System under ISTS System under ISTS alternative
t connectivity
Connectivity applications near Munirabad
Koppal / Ostro Dakshin – Munirabad-III (new)
Koppal, Ostro Dakshin –
12000004 Ostro Dakshin Munirabad-II Koppal /  Establishment of
1. Karnataka 21.06.2016 300 Wind Munirabad-III
05 Power Pvt. Ltd. (new) Munirabad-II Munirabad-III
220kV S/c line
 Establishment of 220kV S/c line 400/220kV S/s at
Gadag & Koppal / Clean Wind – suitable location
Clean Wind –
12000006 Clean Wind Power Koppal, Munirabad-II Koppal / near Munirabad
2. 13.01.2017 300 Wind Munirabad-III
16 Tuticorin Pvt. Ltd. Karnataka 400/220kV S/s at Munirabad-II along with 1x500
220kV S/c line
suitable location 220kV S/c line MVA, 400/220kV
Mytrah Energy Koppal near Mytrah Energy – ICT
Mytrah Energy –
12000006 (India) Pvt. Ltd. Dist., Koppal/Muniraba Koppal /  Munirabad-III –
3. 22.02.2017 200 Wind Munirabad-III
50 (Kyadiguppa Wind Karnataka d along with Munirabad-II Munirabad-II or
220kV S/c line
Farm) 1x500 MVA, 220kV S/c line Munirabad
400/220kV ICT IMPEL (existing) 400kV
 Koppal/Muniraba Renewable – Quad/HTLS D/c
300
d-II – Munirabad Koppal / line with carrying
(enhanced IMPEL
Koppal, (existing) 400kV Munirabad-II capacity of 2000
12000007 IMPEL Renewable from 250 Renewable –
4. Karnataka 09.05.2017 Wind Quad/HTLS D/c 220kV S/c line MW at nominal
22 Power Pvt. Ltd. MW as per Munirabad-III
line with carrying
applicant 220kV S/c line
capacity of 2000
request)
MW at nominal
voltage
Connectivity applications near Gooty/Kurnool

Devarabanda Kurnool, Kurnool / Gooty-II Devarabanda – Gooty-III (new) Devarabanda –


12000006 Andhra Wind Kurnool / Gooty-
5. Renewable Energy 07.02.2017 200 (new)  Establishment of Gooty-III 220kV
28 Pradesh II 220kV S/c line
Pvt. Ltd.  Establishment of Gooty-III S/c line

91
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/2
CTU Agenda for 1st SRSCT

Tuljapur Dhone, Kurnool / Gooty- Tuljapur – 400/220kV S/s at


12000006 Andhra II 400/220kV S/s Kurnool / Gooty- suitable location Tuljapur – Gooty-
6. Windfarms Pvt. 08.02.2017 150 Wind
32 Pradesh at suitable II 220kV S/c line near Gooty along III 220kV S/c line
Ltd.
location near with 1x500 MVA,
Dhone, Kurnool / Gooty Kutch renewable 400/220kV ICT Kutch renewable
12000006 Kutch Renewable Andhra (with provision to – Kurnool /  Gooty-III – Gooty-
7. 13.02.2017 200 Wind – Gooty-III
33 Pvt. Ltd. Pradesh upgrade to Gooty-II 220kV II or Gooty 220kV S/c line
765kV level in S/c line (existing) 400kV
Mytrah Energy Kurnool, future) along with Quad/HTLS D/c
Mytrah Energy – Mytrah Energy –
12000006 (India) Pvt. Ltd. Andhra 1x500 MVA, line with carrying
8. 22.02.2017 250 Wind Kurnool/Gooty-II Gooty-III 220kV
47 (Veldurthi Wind Pradesh 400/220kV ICT capacity of 2000
220kV S/c line S/c line
Farm)  Kurnool/Gooty-II MW at nominal
Mytrah Energy Anantapur, – Gooty(existing) voltage
Mytrah Energy – Mytrah Energy –
12000006 (India) Pvt. Ltd. Andhra 400kV
9. 22.02.2017 250 Wind Kurnool/Gooty-II Gooty-III 220kV
52 (Karadikonda Wind Pradesh Quad/HTLS D/c 220kV S/c line S/c line
Farm) line with carrying
Kurnool, capacity of 2000 Poovani Wind – Poovani Wind –
12000006 Poovani Wind Farms Andhra MW at nominal
10. 27.02.2017 100 Wind Kurnool/Gooty-II Gooty-III 220kV
66 Pvt. Ltd. Pradesh voltage 220kV S/c line S/c line
Kurnool, Powerica – Powerica –
12000006 Powerica Ltd. Andhra
11. 20.03.2017 150 Wind Kurnool/Gooty-II Gooty-III 220kV
06 (Yerukalacheruvu) Pradesh 220kV S/c line S/c line
Kurnool, Sreeja –
12000007 Sreeja Infrastructure Andhra Sreeja – Gooty-
12. 06.05.2017 350 Wind Kurnool/Gooty-II
21 Pvt. Ltd. Pradesh III 220kV D/c line
220kV D/c line
Kurnool, Ecoren Energy – Ecoren Energy –
12000007 Ecoren Energy India Andhra
13. 25.05.2017 250 Wind Kurnool/Gooty-II Gooty-III 220kV
32 Pvt. Ltd. Pradesh 220kV S/c line S/c line

Anemoi Energy Kurnool, Anemoi Energy – Anemoi Energy –


12000007 Andhra 300
14. Pvt. Ltd. 19.06.2017 Wind Kurnool/Gooty-II Gooty-III 220kV
76 Pradesh 220kV S/c line S/c line
12000007 Kurnool, 300 Soganur – Soganur –
15. Soganur Pvt. Ltd. 19.06.2017 Wind
74 Andhra Kurnool/Gooty-II Gooty-III 220kV

92
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/3
CTU Agenda for 1st SRSCT

Pradesh 220kV S/c line S/c line

Anemoi Energy Kurnool, Anemoi Energy – Anemoi Energy –


12000007 Andhra 300
16. Pvt. Ltd. 19.06.2017 Wind Kurnool/Gooty-II Gooty-III 220kV
77 Pradesh 220kV S/c line S/c line
Kurnool, Anemoi Energy – Anemoi Energy –
12000007 Anemoi Energy Andhra 300
17. 19.06.2017 Wind Kurnool/Gooty-II Gooty-III 220kV
73 Pvt. Ltd. Pradesh 220kV S/c line S/c line

Clean Wind Power Kurnool, Clean Wind – Clean Wind –


12000007 Andhra 300
18. (Kurnool) Pvt. Ltd. 20.06.2017 Wind Kurnool/Gooty-II Gooty-III 220kV
79 Pradesh 220kV S/c line S/c line
Greenko Energies Kurnool, Greenko Greenko
12000008 Pvt. Ltd. (Brahman Andhra Energies – Energies –
19. 02.09.2017 1000 Solar
48 Palle / Kurnool Pradesh Kurnool/Gooty-II Gooty-III 400kV
Solar Park) 400kV D/c line D/c line
Connectivity applications near Tuticorin/Tirunelveli
Tuticorin-III

 Establishment of
Tuticorin-III(new)
400/230kV S/s at
suitable location
near Tuticorin
*Mytrah Energy Tirunelveli, Tuticorin-II GIS Mytrah Energy – along with 1x500
MVA, 400/230kV Mytrah Energy –
12000006 (India) Private Ltd Tamil PS (erstwhile Tuticorin-II
20. 04.01.2017 200 Wind ICT Tuticorin-III
13 (Maniyachi Wind Nadu Tirunelveli GIS 230kV D/c line
230kV S/c line
Farm) PS) (existing)  Tuticorin-III(new)
– Tuticorin-
II(existing) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage

93
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/4
CTU Agenda for 1st SRSCT

*Note: M/s Mytrah Energy (India) Private Ltd requested that they intend to utilize the existing 230 kV D/c line implemented as a part of already granted connectivity for 300 MW
wind farms of MEIPL at Tirunelveli and connectivity may be allowed on the same transmission system, the same was agreed subject to MEIPL fulfills the criteria stipulated in the
Detailed Procedure.
Praptha Tuticorin-III
Renewable Energy Thoothukd Praptha – Praptha –
12000006 i,Tamil  Establishment of
21. Pvt. Ltd. 30.01.2017 250 Wind Tuticorin-II Tuticorin-III
10 Nadu Tuticorin-III(new)
(Thoothukudi Wind 230kV S/c line 230kV S/c line
Farm) 400/230kV S/s at
Tuticorin, suitable location
Green Infra Green Infra – near Tuticorin Green Infra –
12000006 Tamil
22. Renewable Energy 02.03.2017 250 Wind Tuticorin-II along with 1x500 Tuticorin-III
75 Nadu
Ltd. 230kV S/c line MVA, 400/230kV 230kV S/c line
Madathupt Ecoren Anemoi – ICT Ecoren Anemoi –
12000007 Ecoren Anemoi ti, Tamil  Tuticorin-III(new)
23. 27.05.2017 250 Wind Tuticorin-II Tuticorin-III
48 Winds Pvt. Ltd. Nadu – Tuticorin-
230kV S/c line 230kV S/c line
II(existing) 400kV
Tuticorin, Tuticorin-II GIS Quad/HTLS D/c
Green Infra – Green Infra –
12000007 Green Infra Wind Tamil PS (erstwhile line with carrying
24. 31.05.2017 250 Wind Tuticorin-II Tuticorin-III
64 Energy Ltd. Nadu Tirunelveli GIS capacity of 2000
230kV S/c line 230kV S/c line
PS) MW at nominal
Sitac Starcap Tuticorin, Sitac Starcap – voltage Sitac Starcap –
12000007 Tamil
25. buildwell Private 14.06.2017 600 Wind Tuticorin-II Tuticorin-III
70 Nadu
Ltd. 230kV D/c line 230kV D/c line
Tuticorin, Clean Wind – Clean Wind –
12000007 Clean Wind Power Tamil
26. 20.06.2017 300 Wind Tuticorin-II Tuticorin-III
91 (Tuticorin) Pvt. Ltd Nadu 230kV S/c line 230kV S/c line
Orange Ashok
North Wind Power Thoothuku Orange Ashok – Orange Ashok –
12000008 di, Tamil 30.10.2017
27. Pvt. Ltd. 300 Wind Tuticorin-II Tuticorin-III
84 Nadu
(Thalavaipuram 230kV S/c line 230kV S/c line
Wind Farm)
Connectivity applications at Narendra
Narendra(Existing) Wind World – Narendra-III(new) Wind World –
12000005 Wind World (India) Dharwad
28. 28.11.2016 500 Wind  Establishment of Narendra 220kV Narendra-III
54 Ltd. Dist,  Establishment of
400kV Narendra D/c line 220kV D/c line

94
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/5
CTU Agenda for 1st SRSCT

Karnataka along with 1x500 Narendra-III


MVA, 400/220kV 400/220kV S/s at
ICT on adjacent suitable location
Mytrah Energy Dharwad land/new location near Narendra
 Inter connection Mytrah Energy – along with 1x500 Mytrah Energy –
12000006 (India) Pvt. Ltd. Dist,
29. 23.02.2017 200 Wind with existing Narendra 220kV MVA, 400/220kV Narendra-III
61 (Guledakoppa Karnataka
400kV Narendra S/c line ICT 220kV S/c line
Wind Farm)
Belgaum through 400kV  Narendra-III –
Clean Wind Power bus Clean Wind – Narendra(New) Clean Wind –
12000007 Dist,
30. (Tuticorin) Pvt. 20.06.2017 300 Wind extension/Naren Narendra 220kV 400kV Narendra-III
88 Karnataka
Ltd. dra(existing) to S/c line Quad/HTLS D/c 220kV S/c line
Narendra, Narendra(New) line with carrying
Karnataka through 400kV capacity of 2000
Greenko Solar Quad/HTLS D/c Greenko Solar – MW at nominal Greenko Solar –
12000011
31. Energy Private 10.05.2018 1200 Solar line Narendra 400kV voltage Narendra-III
61
Limited  Establishment of D/c line 400kV D/c line
separate 220kV
GIS/AIS bus
Connectivity applications at Trichy
Viralipatti Karur, Trichy-II (new)
Viralipatti – Viralipatti –
32.
12000006 Renewable Pvt. Tamil 07.02.2017 200 Wind Trichy 230kV S/c  Establishment of Trichy-II 230kV
29 Ltd. (Viralipatti Nadu Trichy-II 400/230
line S/c line
Wind Farm) Tichy (Existing) kV S/s at suitable
location near Trichy
 Installation of along with 1x500
1x500 MVA, MVA, 400/230kV
400/230kV ICT at ICT
Saunshi Karur, Trichy S/s Saunshine –  Trichy-II – Trichy Saunshine –
12000007 Tamil  Establishment of Trichy 230kV S/c
33. Renewable Energy 29.05.2017 200 Wind (existing) 400kV Trichy-II 230kV
54 Nadu separate 230kV
Pvt. Ltd. line Quad/HTLS D/c S/c line
bus line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity applications at Pugalur
It was informed that total 8 nos. of connectivity applications are to be processed for grant of Stage-I connectivity in Pugalur Area. The Stage-I connectivity to these applications

95
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/6
CTU Agenda for 1st SRSCT

was proposed at Pugalur-II (New substation) in the agenda looking into the bay constraints at Pugalur(existing) substation. However, considering the number of applications
and the consideration of 220kV bays as GIS bays at Pugalur (existing) substation, it was agreed that the Stage-I connectivity may be granted to the applicants with
Pugalur(existing) as primary location and Pugalur-II(new)/Karur as alternate location.
Further establishment of Pugalur-II(new)/Karur substation by LILO of Pugalur-Pugalur (HVDC) 400kV Quad D/c line was agreed in place of earlier proposed Pugalur-II-
Dharmapuri 400 kV D/c line. Further Pugalur-II- Dharmapuri 400 kV D/c line shall be taken up as additional transmission scheme for power evacuation from Pugalur-
II(new)/karur.
Mytrah Energy
Karur, Mytrah Energy – Mytrah Energy –
12000006 (India) Pvt. Ltd. 23.02.201 Wind
34. Tamil 200 Pugalur 230kV Pugalur-II/Karur
58 (KParamathi Wind 7
Nadu S/c line 230kV S/c line
Farm)
Karur, Zalki Renewable Zalki Renewable
12000007 Zalki Renewable 29.05.201
35. Tamil 200 Wind – Pugalur 230kV –Pugalur-II/Karur
56 Pvt. Ltd. 7 Pugalur-II (new) /
Nadu S/c line 230kV S/c line
Umrani Karur Umrani
Karur,
12000007 Umrani Renewable 29.05.201 Renewable – Renewable –
36. Tamil 200 Wind  Establishment of
55 Pvt. Ltd. 7 Pugalur 230kV Pugalur-II/Karur
Nadu Karur / Pugalur-II
S/c line 230kV S/c line
400/230kV S/s at
Karur, Hertz Wind – suitable location Hertz Wind –
12000007 Hertz Wind Parks 02.06.201
37. Tamil 250 Wind Pugalur 230kV near Pugalur Pugalur-II/Karur
66 Pvt. Ltd. 7
Nadu Pugalur (existing) S/c line along with 1x500 230kV S/c line
Tripur, Clean Wind – MVA, 400/230kV Clean Wind –
12000007 Clean Wind Power 20.06.201
38. Tamil 300 Wind Pugalur 230kV ICT Pugalur-II/Karur
89 (Tuticorin) Pvt. Ltd. 7
Nadu S/c line  LILO of Pugalur- 230kV S/c line
Sprng Renewable Sprng Pugalur (HVDC) Sprng
Tirupur,
12000008 Energy Pvt. Ltd. 13.12.201 Renewable – 400kV Quad D/c Renewable –
39. Tamil 300 Wind
63 (Mulanur Wind 7 Pugalur 230kV line at Pugalur-II Pugalur-II/Karur
Nadu
Farm) S/c line (new)/ Karur 230kV S/c line
Pugalur, Sprng Vayu – Sprng Vayu –
12000011 Sprng Vayu Vidyut 02.05.201
40. Tamil 300 Wind Pugalur 230kV Pugalur-II/Karur
55 Private Limited 8
Nadu S/c line 230kV S/c line
Sprng Natural Pugalur, Sprng Natural – Sprng Natural –
12000011 02.05.201
41. Power Source Tamil 300 Wind Pugalur 230kV Pugalur-II/Karur
54 8
Private Limited Nadu S/c line 230kV S/c line
Connectivity application at Hyderabad

96
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/7
CTU Agenda for 1st SRSCT

Maheshwaram-II

 Establishment of
12000006 Maheshwaram-II
49 Maheshwaram 400/220kV S/s at
765/400kV suitable location
(Existing) near
Maheshwaram
Mytrah Energy  Establishment of Mytrah Energy – along with 1x500
Rangared Mytrah Energy –
(India) Pvt. Ltd. 22.02.201 separate 220kV MVA, 400/220kV
42. dy, 200 Wind Maheshwaram Maheshwaram-II
(Tapaspalle Wind 7 GIS bus with ICT
Telangana 220kV S/c line 220kV S/c line
Farm) 1x500 MVA,  Maheshwaram-II
400/220kV ICT at – Maheshwaram
Maheshwaram 400kV
765/400kV S/s Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity applications at Hiriyur
Mytrah Energy Mytrah Energy – Hiriyur-II (new) Mytrah Energy –
43.
12000006 (India) Pvt. Ltd. Hiriyur, 22.02.201
200 Wind Hiriyur 220kV S/c  Establishment of Hiriyur-II 220kV
51 (Lakkenahalli Wind Karnataka 7 line Hiriyur-II
S/c line
Farm) 400/220kV S/s at
300 suitable location
(enhanced near Hiriyur along
Chitradurg IMPEL Power – IMPEL Power –
12000007 IMPEL Power 09.05.201 from 250 with 1x500 MVA,
44. a, Wind Hiriyur 220kV S/c Hiriyur-II 220kV
23 Solutions Pvt. Ltd. 7 MW as per 400/220kV ICT
Karnataka Hiriyur (Existing) line S/c line
applicant  Hiriyur-II –
request) Hiriyur(existing)
INOX Wind Chitradurg Inox Wind – 400kV Inox Wind –
12000007 12.05.201
45. Infrastructure a, 500 Wind Hiriyur 220kV Quad/HTLS D/c Hiriyur-II 220kV
29 7
Service Ltd. Karnataka D/c line line with carrying D/c line
Clean Wind – capacity of 2000 Clean Wind –
12000007 Clean Wind Power Hiriyur, 20.06.201 300
46. Wind Hiriyur 220kV S/c MW at nominal Hiriyur-II 220kV
87 (Tuticorin) Pvt. Ltd. Karnataka 7
line S/c line

97
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/8
CTU Agenda for 1st SRSCT

*270 voltage
#Vempalli (enhanced Vempalli Vempalli
Davanger
12000009 Renewable Energy 22.11.201 from 170 Renewable – Renewable –
47. e, Wind
15 Pvt. Ltd. (Mustur 7 MW as per Hiriyur 220kV S/c Hiriyur-II 220kV
Karnataka
Wind Farm) applicant line S/c line
request)
#Note: M/s Vempalli Renewable Energy Pvt. Ltd.(VREPL) (Mustur Wind Farm) requested for enhancement of connectivity quantum to 270 MW. CTU stated that since the
change in connectivity quantum is less than 100 MW same may be allowed. It was agreed that a formal request shall be submitted by applicant by 23.06.2018 failing
which intimation for 170 MW shall be issued. Subsequently, VREPL has submitted formal request for enhancement in connectivity vide letter dated 07.06.2018.
Connectivity application at Udumalpet
Arasur-II (new)

 Establishment of
Arasur-II
400/230kV S/s at
suitable location
Mytrah Energy near Arasur along
12000006 Tiruppur, Mytrah Energy – with 1x500 MVA, Mytrah Energy –
(India) Pvt. Ltd. 23.02.201
48. 60 Tamil 200 Wind Arasur(Existing) Arasur 230kV 400/230kV ICT Arasur-II 230kV
(Devanallur Wind 7
Nadu S/c line S/c line
Farm)  Arasur-II – Arasur
(existing) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity application at Palakkad
Palakkad-II (new)
300  Establishment of
Mytrah Energy (enhanced Palakkad-II
12000006 Coimbator Mytrah Energy – Mytrah Energy –
(India) Pvt. Ltd. 23.02.201 from 200 as 400/220kV S/s at
49. 57 e, Tamil Wind Palakkad(Existing) Palakkad 220kV Palakkad-II
(Mettupalayam 7 per suitable location
Nadu S/c line 220kV S/c line
Wind Farm) applicant near Palakkad
request) along with 1x500
MVA, 400/220kV

98
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/9
CTU Agenda for 1st SRSCT

ICT
 Palakkad-II –
Palakkad
(existing) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity applications at Mahaboob Nagar/ Raichur
Mahaboob Induvasi Wind – Raichur-II Induvasi Wind –
12000006 Induvasi Wind farm 20.03.201
50. Nagar, 300 Wind Raichur 220kV Raichur-II 220kV
91 Pvt. Ltd. 7  Establishment of
Telangana S/c line S/c line
Raichur-II
Mahaboob Raichur Kondapalli Wind 400/220kV S/s at Kondapalli Wind
12000006 Kondapalli Wind 20.03.201 765/400kV
51. Nagar, 300 Wind – Raichur 220kV suitable location – Raichur-II
92 farm Pvt. Ltd. 7 (Existing)
Telangana S/c line near Raichur 220kV S/c line
Mahaboob Achyuta Power – along with 1x500 Achyuta Power –
12000006 Achyuta Power 27.03.201  Establishment of
52. Nagar, 250 Wind Raichur 220kV MVA, 400/220kV Raichur-II 220kV
97 Pvt. Ltd. 7 separate 220kV
Telangana S/c line ICT S/c line
GIS bus with
 Raichur-II –
1x500 MVA,
Raichur(Existing)
400/220kV ICT at
Clean Wind Power 400kV
Raichur Clean Wind – Clean Wind –
12000007 (Tuticorin) Pvt. Ltd. Raichur, 19.06.201 Quad/HTLS D/c
53. 300 Wind 765/400kV S/s Raichur 220kV Raichur-II 220kV
90 (Sindhnur Wind Karnataka 7 line with carrying
S/c line S/c line
Farm) capacity of 2000
MW at nominal
voltage
Connectivity application at Khammam
Khammam Khammam-II (new)
(Existing)
 Establishment of
Mytrah Energy Mytrah Energy –
12000006 Krishna,  Installation of Khammam-II Mytrah Energy –
(India) Pvt. Ltd. 22.02.201 Khammam
54. 55 Andhra 200 Wind 1x500 MVA, 400/220kV S/s at Khammam-II
(Gowravaram Wind 7 220kV S/c line
Pradesh 400/220kV ICT at suitable location 220kV S/c line
Farm)
Khammam S/s near Gooty along
 Establishment of with 1x500 MVA,

99
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/10
CTU Agenda for 1st SRSCT

separate 230kV 400/220kV ICT


bus  Khammam-II –
Khammam(Existin
g) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity application at NP Kunta/Cudappah
300 NP Kunta-II (new)
(enhanced Impel Alternate –  Establishment of
Kadapa, Impel Alternate –
12000007 Impel Alternate 30.05.201 from 250 NP Kunta 220kV NP Kunta-II
55. Andhra Wind NP Kunta-II
59 Energy Pvt. Ltd. 7 MW as per S/c line 400/220kV S/s at
Pradesh 220kV S/c line
applicant suitable location
request) near NP Kunta
along with 1x500
Kadapa, Ecoren Energy – MVA, 400/220kV Ecoren Energy –
12000007 Ecoren Energy 25.05.201 NP Kunta
56. Andhra 250 Wind NP Kunta 220kV ICT NP Kunta-II
42 India Pvt. Ltd. 7 (Existing)
Pradesh S/c line  NP Kunta-II – NP 220kV S/c line
Kunta(Existing)
400kV
Azure Power India Ananthapu Azure Power – Quad/HTLS D/c Azure Power –
12000008 18.08.201 line with carrying
57. Pvt. Ltd.(NP Kunta r,Andhra 100 Solar NP Kunta 220kV NP Kunta-II
37 7 capacity of 2000
Solar Project) Pradesh S/c line 220kV S/c line
MW at nominal
voltage
Connectivity application at Pavagada
300 Pavagada-II (new)
(enhanced  Establishment of
from 250 Powerica – Pavagada-II
Anantapur, Tumkur Powerica –
12000007 Powerica Ltd. 13.04.201 MW & Pavagada 220kV 400/220kV S/s at
58. Andhra Wind (Pavagada) Pavagada-II
15 (Dharmavaram) 7 change of S/c line suitable location
Pradesh Existing 220kV S/c line
location to near Pavagada
Pavagada along with 1x500
as per

100
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/11
CTU Agenda for 1st SRSCT

applicant MVA, 400/220kV


request) ICT
 Pavagada-II –
Benigere Energy Ananthapu Benigere Energy Pavagada Benigere Energy
12000007 19.06.201 300 – Pavagada (Existing) 400kV
59. Pvt. Ltd. r, Andhra Wind – Pavagada-II
75 7 220kV S/c line Quad/HTLS D/c
Pradesh 220kV S/c line
line with carrying
300 capacity of 2000
Viridi Clean (enhanced MW at nominal
Viridi Clean – Viridi Clean –
12000008 Alternatives Pvt. Tumkur, 27.09.201 from 250 voltage
60. Wind Pavagada 220kV Pavagada-II
66 Ltd. (Pavagada Karnataka 7 MW as per
S/c line 220kV S/c line
Wind Farm) applicant
request)
Sprng Power Pvt. Anantpur, Sprng Power – Sprng Power –
12000008 25.10.201
61. Ltd. (Peruru Wind Andhra 250 Wind Pavagada 220kV Pavagada-II
62 7
Farm) Pradesh S/c line 220kV S/c line
Vespower
Anantapur Vespower Wind Vespower Wind
12000011 Windfarm Pvt. Ltd. 23.03.201
62. , Andhra 300 Wind – Pavagada – Pavagada-II
06 (M.Bandameedapa 8
Pradesh 220kV S/c line 220kV S/c line
lli Wind Farm)

2. List of applicants granted Stage-I Connectivity in 24th Connectivity / LTA meeting of SR held on 11.07.2018.
Sl. Application Applicant Location Date of Connec Nature of Proposed primary Dedicated Tr. Proposed Alternative Dedicated Tr.
No. No. Application tivity Applican location for System location for Connectivity / Tr. System for
Sought t Connectivity System under ISTS alternative
(MW) connectivity
Connectivity applications near Tirunelveli
Betam Wind Betam Wind – Tuticorin-III Betam Wind –
Tuticorin,
1. 1200001415 Energy Private 12.06.2018 250.2 Wind Tuticorin-II 230kV  Establishment of Tuticorin- Tuticorin-III
Tamil Nadu
Limited Tuticorin-II GIS PS S/c line III(new) 400/230kV S/s at 230kV S/c line
(erstwhile Viento suitable location near Viento
Viento
1200001448 Tirunelveli, Tirunelveli GIS PS) Renewables – Tuticorin along with 1x500 Renewables –
2. Renewables 15.06.2018 300 Wind
Tamil Nadu Tuticorin-II 230kV MVA, 400/230kV ICT Tuticorin-III
Private Limited
S/c line 230kV S/c line

101
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/12
CTU Agenda for 1st SRSCT

 Tuticorin-III(new) –
Anurudra Anurudra – Tuticorin-II(existing) 400kV Anurudra –
Thuthukudi,
3. 1200000974 Renewables Pvt 29.12.2017 300 Wind Tuticorin-II 230kV Quad/HTLS D/c line with Tuticorin-III
Tamil Nadu
Ltd S/c line carrying capacity of 2000 230kV S/c line
MW at nominal voltage
Connectivity applications near Munirabad
Axis Wind farm Koppal / Axis Wind – Axis wind –
Koppal,
4. 1200000604 (Anantapur) Pvt. 22.12.2016 300 Wind Munirabad-II(new) Koppal/Munirabad Munirabad-III
Karnataka Munirabad-III(new)
Ltd.  Establishment of -II 220kV S/c line 220kV S/c line
 Establishment of
Orange Ashok Koppal /
Orange Ashok – Munirabad-III 400/220kV Orange Ashok –
Wind Power Pvt. Gadag, Munirabad-II
5. 1200000883 31.10.2017 500 Wind Koppal/Munirabad S/s at suitable location Munirabad-III
Ltd. (Jakkali Karnataka 400/220kV S/s at
-II 220kV D/c line near Munirabad along with 220kV D/c line
Wind Farm) suitable location
1x500 MVA, 400/220kV
near Koppal /
Hungund Hungund – ICT Hungund –
Gadag, Munirabad along
6. 1200001102 Renewable 17.03.2018 300 Wind Koppal/Munirabad Munirabad-III
Karnataka with 1x500 MVA,
Energy Pvt Ltd -II 220kV S/c line 220kV S/c line
400/220kV ICT
Connectivity applications near Hiriyur
Hiriyur-II (new)
 Establishment of Hiriyur-II
400/220kV S/s at suitable
location near Hiriyur along
ReNew Power – with 1x500 MVA, 400/220kV ReNew Power –
ReNew Power Davangere,
7. 1200001464 22.06.2018 300 Wind Hiriyur (Existing) Hiriyur 220kV S/c ICT Hiriyur-II 220kV
Ltd. Karnataka
line  Hiriyur-II – Hiriyur (existing) S/c line
400kV Quad/HTLS D/c line
with carrying capacity of
2000 MW at nominal
voltage
Connectivity application at Pavagada

102
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/13
CTU Agenda for 1st SRSCT

Pavagada-II (new)
 Establishment of Pavagada-
II 400/220kV S/s at suitable
location near Pavagada
Cuddalore Cuddalore along with 1x500 MVA, Cuddalore
Bioenergy Pvt. Tumkur, Tumkur (Pavagada) Bioenergy – 400/220kV ICT Bioenergy –
8. 1200000876 18.10.2017 300 Wind
Ltd. (Pavagada Karnataka Existing Pavagada 220kV  Pavagada-II – Pavagada Pavagada-II
Wind Farm) S/c line (Existing) 400kV 220kV S/c line
Quad/HTLS D/c line with
carrying capacity of 2000
MW at nominal voltage

103