CEA-PS-12-14(12)/1/2018-PSPA-II Division
I/1928/2018
भारत सरकार
Government of India
िव युत मंत्रालय
Ministry of Power
के द्री य िव यु त प्रा िध क र ण
Central Electricity Authority
िव यु त प्र णा ली यो ज ना ए वं मू यां क न प्र भा ग - I I
Power System Planning & Appraisal Division-II
सेवा मे / To,
संलग्न सूची के अनस ु ार
As per list enclosed
महोदय(Sir)/महोदया(Madam),
भवदीय/Yours faithfully,
(बी.एस.बैरवा/B.S. Bairwa)
िनदे शक/ Director
सेवा भवन, आर. के . परु म-I, नई िद ली-110066 टे लीफोन : 011-26198092 ईमेल: cea-pspa2@gov.in वेबसाइट: www.cea.nic.in
Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telephone: 011-26198092 Email:cea-pspa2@gov.in Website: www.cea.nic.in
Address List:
1
Agenda for 1st meeting of SRSCT (07.09.2018)
3.0 High voltage system studies and proposal for reactive compensation in SR
3.1 In the 42nd Standing committee meeting of Southern Region CTU had presented detailed
reactive compensation studies considering the present & future scenario and had
proposed 24 reactors at various substations of ISTS and Intra-state system. In the
meeting TSTRANSCO stated that they will check the requirement of the reactors in
their control area.
3.2 In the meeting, following reactor were proposed at substations of Telangana
Voltage Existing / UC BUS Bus Reactor
Sl. No. Bus Name
(in kV) Reactor (MVAr) proposed (MVAr)
1 SURYPET 400 - 125
2 RAIDURG 400 - 2x125
3 KAMALAPURAM 400 - 125
4 NARSAPUR 400 - 125
5 MAHESHWARAM-TS 400 - 125
6 TIPPAPUR 400 - 125
7 MANIKONDA 400 - 125
8 JANAGAON 400 - 125
9 CHOUTTUPPAL 400 - 125
10 YELLAMPALLI 400 - 125
3.3 TSTRANSCO informed that 125MVAR bus reactor each at Tippapur ,Kamalapuram,
Manikonda and Yellampalli substation are sufficient to keep the bus voltage under
control under off-peak condition for time frame 2021-22 (study enclosed at Annexure-
II)
Members may deliberate.
4.0 Providing additional feed to 3x500 MVA, 400/220kV substation at Mylasandra
(Electronic City) and Establishment of 2x500 MVA, 400/220 kV Sub-station at
Dommasandra in Bengaluru
4.1 In the 42nd meeting of SCPSPSR, KPTCL proposed to construct LILO of one circuit
of proposed Dharmapuri- Somanahalli 400kV D/c line (PGCIL line) at 400 kV
Mylasandra sub-station. With above proposals, 400kV system at proposed 400/220kV
Mylasandra substation would be as under:
i. 3x500MVA, 400/220kV ICTs
ii. LILO of single circuit of Dharmapuri-Somanahalli 400kV D/C line (quad
Moose ACSR conductor) at Mylasyandra
iii. LILO of single circuit of Kolar-Somanahalli 400kV S/C line (Twin Moose) at
Mylasyandra
4.2 Further, KPTCL had proposed for establishment of 400/220 kV sub-station at
Dommasandra (with 400/220kV, 2x500MVA ICTs) in Bengaluru city to relieve
2
Agenda for 1st meeting of SRSCT (07.09.2018)
400kV Mylasyandra sub-station by reducing the loading on 220 kV lines and to meet
the future load growth in the vicinity with following details:
i. 2 X 500 MVA, 400/220 kV GIS substation at Domasendra
ii. LILO of Kolar – Mylasandra 400kV S/C line (with Twin Moose ACSR
conductor) at proposed Dommasandra substation.
iii. Somanahalli - Dommasndra 400kV S/C line (with Twin Moose ACSR
conductor)
iv. LILO of Somanahalli - Malur 220 kV D/C line at EXORA sub-station (With
this line arrangement, there will be 220kV D/C connectivity between
Dommasandra & EXORA, 220 kV S/C connectivity from Dommasandra, each
to Sarjapura and Malur).
v. 220 kV, 1000sqmm UG cable link between 220 kV VT Park substation and
220kV EXORA sub-station (proposed).
4.3 In the 42nd meeting of SCPSPSR, it was decided that the strengthening of upstream
lines to Mylasandra sub-station and the proposal of LILO of Dharmapuri-Somanahalli
400kV D/C line at Mylasandra will be studied in detail along with proposal of
establishment of a 400kV substation at Dommasandra after joint study of system
carried by CEA, CTU, POSOCO and KPTCL.
4.4 Accordingly, the issue was discussed in a joint study meeting held on 10th/11th May
2018, wherein representative of CTU stated that KPTCL had already planned LILO of
Kolar - Somanahalli 400 kV S/C line at Mylasyandra 400/220kV substation. Again
making LILO of Kolar – Mylasyandra section at proposed Dommasandra 400/220kV
substation would reduce reliability of the system. Minutes of the joint study meeting
is enclosed at Annexure –III.
4.5 To meet out the rising demand of Bengaluru city along with reliability, following
alternatives were discussed:
Alternative 1:
i) LILO of Kolar – Somanahallli 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)
ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad ACSR
Conductor) line at Mylasandara 400/220 kV substation
iii) Mylasandra – Dommasandra 400kV D/C line (twin Moose)
Alternative 2:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
3
Agenda for 1st meeting of SRSCT (07.09.2018)
ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad moose
ACSR conductor) line at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line (with twin Moose ACSR conductor)
Alternative 3:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C (Quad) line at
proposed 400/220 kV substation at Dommsandra.
iii) LILO of LILO section of Somanahalli – Dommasandra (formed after LILO of
single circuit of Dharampuri – Somanhalli 400kV D/C (Quad) line at
Dommasandra) at Mylasandra.
4.6 Regarding alternative-1, KPTCL stated that proposed 400/220kV substation at
Mylasandra is GIS and space is not available for 06 nos of 400kV line bays. Therefore,
Alternative-1 can be ruled out.
4.7 Load flow studies were carried out for both Alternative-2 and Alternative-3 (power
flow plot enclosed as Exhibit-2). The studies show that both Alternative-2 and
Alternative-3 are acceptable, but Alternative-2 is more reliable than Alternative-3.
4.8 KPTCL stated that in case of both Alternative-2 and Alternative-3, multi circuit towers
are need to be used for construction of lones constructed between Mylasandra and
Dommasandra. However, KPTCL requested to consider Alternative-2 over
Alternative-3 considering higher reliability.
4.9 Accordingly, Alternative-2 was agreed for supplying reliable power to Bengaluru city.
The transmission system of Mylasandra and Dommasandra 400kV S/S will be as
follows:
Connectivity at Mylasandra 400/220kV substation:
i) 3x500MVA, 400/220kV ICTs
ii) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)
iii) Mylasandra – Dommasandra 400kV S/C line (twin Moose)
400/220kV substation at Dommasandra :
i) 2x500MVA, 400/220kV ICTs
ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C line (with Quad
moose ACSR Conductor) at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line ((with twin moose ACSR Conductor)
on D/C towers
4
Agenda for 1st meeting of SRSCT (07.09.2018)
4.10 KPTCL stated that they would plan to utilize RoW of Kolar – Somanahalli 400kV S/C
line for LILO of Dharampuri – Somanhalli 400kV D/C line (with Quad moose ACSR
conductor) at Dommsandra. It was also clarified that modalities may be finalized at
the time of implementation.
Members may concur.
5.0 Evacuation of power from RE sources in Southern Region (Proposed Wind
Energy Zone by MNRE)
5.1 In the 42nd meeting of SCPSPSR held on 27.04.2018, it was informed that based on
various inputs like district wise NIWE potential, SNA developable potential, pooling
station wise wind capacity sanctioned by STU, RE applications received in ISTS by
CTU and detailed discussion with MNRE & wind IPPs/developers, projected capacity
in each Wind Energy Zone (WEZ) were identified and prioritized for implementation
in 2021-22-time frame in wind resource rich states. In the meeting held in MNRE,
Koppal (2500 MW) in Karnataka, Kurnool (3000 MW) in Andhra Pradesh and Karur
(2500 MW) in Tamil Nadu were identified as prioritized Wind Energy zones for which
transmission infrastructure needs to be developed/made available under ISTS Intrastate
transmission system. Further, it was indicated that Tirunelvelli/ Tuticorin district in TN
is also a high wind potential complex and 2500 MW of wind energy potentials
considered for development of transmission infrastructure under ISTS/Intra-state
transmission system.
5.2 In the meeting it was decided that comprehensive study would be carried out with
Southern Region constituents for accessing the transmission system requirement in the
region as a whole.
5.3 A joint system study was held in SRPC, Bengaluru on 10&11, May 2018. In the
meeting, LGB was finalized considering peak wind scenario and peak and off peak
demand scenario (2021-22). Minutes of the joint study meeting is enclosed at Annexure
–III. After analyzing study results following Transmission system were agreed:
i. Addition of 2x500 MVA, 400/230kV ICTs (4th & 5th) at Tuticorin-II GIS sub-
station.
ii. Operation of Tuticorin-II GIS – Dharmapuri (Salem) 765 D/C line (presently
operating at 400kV) at its rated voltage. (i.e 765kV) would be reviewed for
dispersal of more than 2000MW RE generation
5
Agenda for 1st meeting of SRSCT (07.09.2018)
ii. LILO of both circuits of Pugalur – Pugalur (HVDC) 400 kV D/c line ( with
Quad Moose ACSR Conductor) at Karur PS
iii. 9 Nos. of 230kV line bays for interconnection of wind projects
iv. 2x125 MVAr, 400kV Bus reactors at Karur PS
It was also agreed that for transfer of power from the above pooling station would
require system strengthening in Western Region. Accordingly, it was suggested that
issue of strengthening of WR system need to be discussed/taken up with WR
constituents.
Considering on the land availability for pooling station and the applications of RE
developers for connectivity with ISTS a pooling station at common location in
between Kurnool & Ananthapur distt. has been proposed with following details:
i. Establishment of 765/400/220kV Pooling station (at suitable location in
Kurnool substation Distt) at Kurnool-III (e.g. near Adoni) with 3x1500 MVA,
765/400kV; 6x500 MVA, 400/220kV transformation capacity
ii. Kurnool-III Pooling station - Kurnool(new) 765 kV D/c Line
iii. 10 nos of 220kV line bays for interconnection of wind projects
iv. 1x240 MVAr (765kV) & 1x125MVAr (400kV) bus reactors at Kurnool-III
Pooling station.
v. Adequate space provision for future expansion.
6.0 Intra- state transmission projects proposed for Green Energy Corridor Ph-II in
Karnataka
6.1 In the 42nd SCPSPCR, KPTCL proposed following Intra-State transmission projects
6
Agenda for 1st meeting of SRSCT (07.09.2018)
Sl No Project Description
6.2 In the meeting, it was decided that due to large scale integration of renewable
generation in SR, detailed study considering the proposals of renewable rich states of
SR and CTU need to be carried out.
6.3 In the joint system study held on 10th and 11th May 2018, the proposed transmission
system was studied in detail and deliberations are as follows:
A. Establishment of 2x500 MVA, 400/220 kV sub-station at Yalwar, Bijapur
District with following elements:
400 kV System:
i. Narendra (New) Kudgi-Yalwar 400 kV D/C line (with Quad Moose ACSR
Conductor)
ii. Gulbarga- Yalwar 400 kV D/C line (with Quad Moose ACSR Conductor).
7
Agenda for 1st meeting of SRSCT (07.09.2018)
The study result shows that power flows from Narendra (New) dispersed towards
Kolhpur (PG). The congestion /transmission constraint observed in the system
beyond Kolhapur (MSETCL) and Kolhapur (MSETCL) – Karad 400kV D/c line
gets overloaded. Accordingly, it was decided to review the transmission system for
Lokapur Wind Energy zone along with Koppal Wind Energy Zone seeking
connectivity at ISTS.
C. Providing additional feed to 400/220 kV Dhoni sub-station by LILO of
existing Narendra – Davanagere 400 kV Twin Moose D/C line at Dhoni.
8
Agenda for 1st meeting of SRSCT (07.09.2018)
The system study shows that additional feed to 400/220 kV Dhoni sub-station by
LILO of existing Narendra – Davanagere 400 kV D/C line (with twin moose ACSR
conductor) at Dhoni does not provide any additional benefit and hence, LILO of
above line at Dhoni was not agreed.
D. Establishment of 2x100 MVA, 220/110 kV sub-station at Ron (New), Gadag
District
220 kV System:
i. Doni- Ron 220kV D/C line.
ii. 2 X 100 MVA, 220/110 kV ICTs.
110 kV System:
i. LILO of both circuits of existing Ron-Gajendragad 110 kV D/C line at Ron
(New).
ii. 110 kV LILO of DC line between Gadag and 110 kV Ron to proposed 220
kV Ron. (Existing SC line via Naregal and proposed ongoing 2nd circuit
directly to 110 kV Ron).
E. Establishment of 2x100 MVA, 220/110 kV sub-station at Savalgi, Bagalkot
District
220 kV System:
i. LILO of both circuits of Kudgi-Vajramatti 220 kV D/C line at Savalgi.
ii. 2x100 MVA, 220/110 kV transformers.
110 kV System:
i. LILO of existing Todalbagi-Mamadapura 110 kV S/C line at Savalgi.
ii. LILO of existing Bableshwar-Mamadapura110 kV S/C line at Savalgi.
F. Establishment of 2x100 MVA, 220/66 kV sub-station at Hanagal (New),
Chitradurga District
220 kV Transmission scheme:
i. Jagalur - Hanagal 220 kV D/C line.
ii. 2 X 100 MVA, 220/66 kV ICT’s.
66 kV System:
i. LILO of existing Gudikote-Hangal 66 kV S/C line at Hangal (New).
ii. LILO of both circuits of Hangal -Rampura 66 kV D/C line at Hangal (New).
iii. Hangal - Konasagara 66 kV S/C line on D/c towers.
9
Agenda for 1st meeting of SRSCT (07.09.2018)
10
Agenda for 1st meeting of SRSCT (07.09.2018)
11
Agenda for 1st meeting of SRSCT (07.09.2018)
power interruption and avoid major revenue loss. TANTRANSCO requested for
Provision of additional 1x 500 MVA, 400/230 kV ICT at Thiruvalam 400/230 kV SS.
9.2 In view of the above TANTRANSCO proposed following schemes:
i. Establishment of Vishwanathapuram 400/110kV S/S with 3x200 MVA 400/110 kV
ICT
ii. 1x125 MVAr Bus reactor
iii. 1x80 MVAr line reactor at Viswanathpuram the 400kV Vishwanathapuram –
Thiruvalam line.
400 kV Connectivity:
iii. LILO of Thiruvalam-Palavady 400 kV S/C line at Vishwanathapuram (quad
moose)
iv. PGCIL Hosur(Shoolagiri)- Vishwanathapuram 400kV S/C line
9.3 The system studies conducted by TANTRANSCO is enclosed at Annexure-VI
Members may discuss.
12
Agenda for 1st meeting of SRSCT (07.09.2018)
d) Generation from SEPC(1x525 MW) & Ind Bharath at Ottapidaram 400 kV SS.
e) The existing/sanctioned 400 kV connectivity of Kayathar SS in base case:
i) 400kV D/C line to Thennampatty 400 kV SS
ii) 400kV D/C line to Kanarpatty 400 kV-SS
iii) 400kV D/C line to Karaikudi 400 kV SS
13
Agenda for 1st meeting of SRSCT (07.09.2018)
11.3 Load flow study has been conducted with the following cases in Full Wind and Full
solar condition for the year condition 2022-23.
BASECASE: Udangudi 2x660 MW plant connected to Kayathar 400 kV SS
CASE-1: Udangudi MVV plant connected to Virudhunagar 765/400 kV SS instead
of connectivity at Kayathar 400 kV SS
11.4 In base case, due to pooling of thermal as well as renewable Energy generation at
Kayathar 400 kV SS, Kayathar-Kanarpatty 400 kV D/C line and Kanarpatty-
Tirunelveli(Abhisekapatty) 400 kV lines are found to be overloaded. To mitigate this,
in case 1, the Udangudi power plant is connected to Virudhunagar 765/400 V SS instead
of Kayathar 400 kV SS. This will reduce the loading of Kayathar-Kanarpatty and
Kanarpatty-Abhishekapatty 400 kV D/C lines to permissible limits. However, to assess
the adequacy of the transmission system, contingency analysis has been done for the
following contingency conditions in case 1:
Outage 1: one circuit of 400 kV Kayathar — Kanarpatty D/C line (with Twin Moose
ACSR conductor).
Outage 2: one circuit of 400 kV Kanarpattÿ —TirunelveIi(Abhisekapa ) D/C line
(with Quad Moose ACSR conductor).
11.5 From the study results it is observed that even in Case1 also, during outage condition
of one circuit of Kayathar — Kanarpatty 400kV D/C line, the other line is found to be
loaded to 1000 MW. Similarly, during outage condition of one circuit of Kanarpatty —
Abhisekapatty 400kV D/C line, the other line is found to be loaded to 1787 MW.
To avoid these overloadings, the generation pooled at Kayathar needs to be reduced so
that the outflow from Kayathar 400 kV SS to Kanarpatty an further to Abhishekapatty
SS will get reduced. In this scenario, it is 'inevitable to reduce the generation from M/S.
SEPC and M/S. Ind Bharath in order to contain the said overloading in the event of the
above said contingencies during peak wind season and also to facilitate evacuation of
RE power in this area without constraints.
Study Observations :
Sl.No. 400 kV Lines Base case Case1
(Flow in (Flow in
MW) MW)
1 Udangudi to Kayathar D/C line (with Quad Moose 2x712
ACSR conductor).
14
Agenda for 1st meeting of SRSCT (07.09.2018)
FAULT LEVEL:
11.7 The revised ATS for the proposed thermal power plant at Udangudi (2x 660 MW)
StageI is given below:
i) 400kV D/C line(with Quad Moose ACSR conductor).to the Virudhunagar
765/440kV SS.
ii) 400kV D/C line (with Quad Moose ACSR conductor).to the proposed
Samugarengapuram 400/230 -110 kV SS.
iii) 400kV D/C line (with Quad Moose ACSR conductor).to the proposed
Ottapidaram 400/230-110kV SS.
Members may discuss
12.0 Enhancement of 400/230 kV ICT capacity from 3 X 315 MVA to 3 X 500 MVA at
the existing Sriperumbudur 400/230-110kV SS
12.1 TANTRANSCO vide their letter dated 23.08.2018 informed that combined
Interconnecting transformer capacity at Sriperumbudur 400/230-110 kV SS is 1345
MVA with 400/230 kV, 3x315 MVA ICTs and 400/110 kV, 2x200 MVA ICTs.
12.2 Further, The peak reached in the ICTs at Sriperumbudur 400/230-110 kV SS are as
follows.
315 MVA, 400/230 kV ICT - 1 - 282 MVA
315 MVA, 400/230 kV ICT - 2 - 282 MVA
315 MVA, 400/230 kV ICT - 3 - 282 MVA
200 MVA, 400/110 kV ICT - 4 - 179 MVA
15
Agenda for 1st meeting of SRSCT (07.09.2018)
16
Agenda for 1st meeting of SRSCT (07.09.2018)
400 kV Connectivity
i) New Neyveli Thermal power station- Neyveli (TNEB) 400 kV D/C Link.
ii) Manalmedu- Neyveli (TNEB) 400 kV D/C Link.
(b) ICT and Bus reactors:
i) 2 x 500 MVA, 400/230 kV ICTs
ii) 2x 125 MVAr bus Reactors
14.2 In the 42nd meeting of Standing Committee on Power System Planning for Southern
Region, certain re-arrangement in the existing transmission system was agreed , so as
to control high short circuit fault level in Neyveli Generation complex. Due to this
rearrangement, the already approved 400kV connectivity for Neyveli 400/230kV SS
was modified as below.
“ Modification in Neyveli(TNEB) – NNTPS 400 kV D/C line (agreed in 41st
SCPSPSR) as Neyveli(TNEB) – Neyveli TS-II 400 kV D/C line with high capacity
conductors (to be constructed by TANTRANSCO) “
14.3 However, due to constraint in acquiring the land for the establishment of 400kV SS at
Neyveli, it is proposed to establish the 400 kV substation at Cuddalore which is nearby
the already proposed location at Neyveli.
14.4 Based on the above modification as mentioned in para 14.2, TANTRANSCO has
carried out load flow study for the establishment of Cuddalore 400/230-110 kV
substation by upgradation of the existing Cuddalore 230 kV substation ( results
enclosed at Annexure-XI) and the following connectivity is proposed.
400 kV Connectivity
i) Neyveli TS-II – Cuddalore 400 kV D/C Link.
ii) Manalmedu- Cuddalore 400 kV D/C Link.
ICT and Bus reactors:
i) 2 x500 MVA, 400/230 kV ICTs
ii) 2x200 MVA, 400/110 kV ICTs
iii) 2x125 MVAr, 400kV bus Reactors
17
Agenda for 1st meeting of SRSCT (07.09.2018)
18
Agenda for 1st meeting of SRSCT (07.09.2018)
2. Purusothapatnam,
Yetapaka -
2 5.06 8.10
Kunavaram Nellipaka.
15.4 With the above improvements the voltage regulation of all the 33 kV feeders in the
scheme area are within permissible limits up to horizon ear as follows.
15.5 As per the load flow studies erection of 220/33 kV SS at Chïnturu ,technically is not
justified. Kunavaram and Nellipaka Mandals are declared as submerged mandals under
Polavaram Project and the loads of the said two mandals will be shifted to Chinuturu
Mandal due to relocation of villages, when the Polavaram Project is completed.
15.6 The Chinturu subdivision is covering an area of 520 KM radius, Ghat roads, Godavari
River and 03 Nos. State borders (Orissa, Chattisghar and Telangana) were surrounded
to this subdivision. Every year due to flooding of Sabari, Seeleru, Godavari Rivers and
other local streams, the area is totally submerged under flood condition. The existing
33kV line is also submerged in flood water certain times. Due to this, Chinturu,
Kunavaram, VR. Puram and Nellipaka mandals will be without power supply till
receding of flood water and restoration of supply. There are no 33 kV interlinking lines
for extending supply to this alternate feeding lines to this area.
15.7 The Chinturu Sub-division was newly formed with Chinturu, Kunavaram, VR. Puram
and Nellipaka 04 Nos. mandals duly amalgamated from TSNPDCL to APEPDCL in
Andhra Pradesh state bifurcation. At present, the 33 kV loads ofùinttxu-are being fed
from existing 132/33 kV Substation at Yetapaka, which is under Telangana a€aÄistance
of 90 KM from Chinturu village resulting in voltage drop at Chinturu end due to long
length of line. During rainy season there are heavy gales and rains which causes
frequent break downs on existing 33kV feeder which is situated in reserve forest. Much
difficult is being experienced by operation wing of APEPDCL for rectification due to
the major length of line passing through forest area.
15.8 After Polavaram project completion alternate accommodation for the merged villages
in 04 mandals public will be in and around Chinturu and the 33kV feeders from 132/33
kV SS Yetapaka will submerge in the back waters of Polavaram Project. There is no
other alternative supply available for 05 No's 33/11kV substations in this situation. To
19
Agenda for 1st meeting of SRSCT (07.09.2018)
16.2 Total Power being produced from Upper Sileru Power House is 240 MW (4x60 MW).
The following feeders are connected with Upper Sileru Power House.
i) Upper Sileru - Donkaraya 220kV S/C Line
ii) Upper Sileru Pendurthy 220kV S/C Line.
iii) Upper Sileru -Balimela 220kV S/C Line under the ownership of APTRANSCO
and OPTCL (Odisha).
iv) Upper Sileru - Balimela 220kV feeder is under standby mode.
16.3 Total Power being produced from Donkaraya Canal Power House is 25 (1x25 MW)
The following feeders are connected with Donkaraya anal Power House,
i) Donkaraya - Upper Sileru 220kV S/ C Line.
20
Agenda for 1st meeting of SRSCT (07.09.2018)
16.7 The loading on 220 kV Lower Sileru – Bommuru and 220 kV Upper Sileru – Pendurthy
is very much high if total power is to be evacuated from Lower Sileru Hydro Electric
21
Agenda for 1st meeting of SRSCT (07.09.2018)
project. Hence revival of abandoned 220 k DC Line from Lower Sileru to Bommuru is
very much required for evacuating total power.
16.8 APTRANSCO has been carried out System studies including 220kV DC line from
Lower Sileru to Bommuru for the same case and the loadings are as follows:
From the above, it can be observed that the overloadings got decreased. Hence revival
of abandoned lines from Lower Sileru-Bommuru is very much essential.
16.9 In view of the above APTRANSCO requested for revival of abandoned 220 k V DC
Line from Lower Sileru- Bommuru.
Members may discuss.
17.0 Erection of 220 kV features in the 400 kV GVK Power Plant and 220 kV Features
at 400 kV Polavaram HEP in East Godavari district to extend power supply to the
proposed 220/132/33 kV Ramachandrapuram SS.
17.1 APGENCO is setting up 12 x 80 MW (960 MW) Polavaram Hydro Electric Project in
East Godavari district. Accordingly, APTRANSCO has proposed the following
dedicated Transmission Scheme for evacuation of 960 MW (12 x 80 MW) power from
Polavaram Hydro Electric Project of APGENCO in East Godavari district. The same
was approved in the 42nd Standing Committee Meeting held on 27.04.2018 at
Ernakulam
i. 400 kV Quad Moose D/C line (79 KM) from 400 kV KV Kota to proposed
Polavaram Hydro Electric Project.
ii. 2 x 125 MVAR bus Reactor at Polavaram Hydro Electric Project.
22
Agenda for 1st meeting of SRSCT (07.09.2018)
17.2 APTRANSCO vide their letter 27.08.2018 informed that they have proposed approved
the following dedicated Transmission System for 220 kV downstream evacuation
system from 400 k V Polavaram Hydro Electric project by providing 2x 500 MVA ICTs
and for providing 2 Nos. 220 kV features with 2 x 500 MVA 400 kV GYK-2 Power
Plant to overcome the overloading conditions in and around Ramachandra Puram area.
i. 220 kV features at 400 kV Polavaram SS with 2 x 500 MVA ICTs.
ii. Polavaram- Pattiseema 220kV D/C line (Twin Moose ,16 KM approx.)
iii. LILO of both circuits of Polavaram - Pattiseema 220kV D/C line at
Purushothapatnam SS (I KM approx.).
iv. LILO of the both existing circuits of the Yemagiri - Samalkot 220 kV D/C line
at Jegurupadu S/S (1 KM approx.)
v. 220 kV Features at 400 kV GYK-2 Power Plant with 2 x 500 MVA PTRs.
vi. Erection of 220/132 kV Ramachandrapuram S/S with 2 x 100 MVA PTRs.
vii. 220 kV Single Moose DC line (25 KM approx.) from proposed 400/220 kV GYK-
2 Power plant to proposed 220/132 kV Ramachandrapuram SS.
viii. Making one circuit 132 kV LILO (0 .5 KM approx ) of existing 132 kV RC
Puram- Kakinada at proposed 220/132 kV SS at RC Puram.
ix. Making 132 kV LILO (1 KM approx.) of existing 132 kV RC Puram - Editha at
proposed 220/132 kV SS at RC Puram.
x. Making 132 kV LILO (6 KM approx.) of existing 132 kV RC Puram - Kothapeta
at proposed 220/132 kV SS at RC Puram.
xi. Erection of 132 kV DC line (18 KM approx.) from 132 kV Gollapalem SS to
proposed 220/132 kV SS at RC Puram.
17.3 APTRANSCO has been carried out load flow study and results are enclosed at
Annexure –XII
Member may discuss.
18.0 Augmentation of ICT capacity from 2 x 315 MVA to 2 x 315 MVA + 1 x 500 MVA
ICTs at Maradam (Garividi) 400/230kV S/S.
18.1 APTRANSCO has proposed for Augmentation of ICT capacity from 2 x 315 MVA to
2 x 315 MV A + 1x 500 MVA ICTs at 400/220 kV Maradam (Garividi) SS to meet the
load demand and reliability at the scheme area.
Member may discuss.
23
Agenda for 1st meeting of SRSCT (07.09.2018)
24
Agenda for 1st meeting of SRSCT (07.09.2018)
a. 220/ 132kV Venkatapur S/S and 220kV S/C line on D/C tower (with ACSR
25
Agenda for 1st meeting of SRSCT (07.09.2018)
Proposals of CTU
24.0 Connectivity Transmission system agreed in earlier Connectivity/LTA meetings
of SR
24.1 The following dedicated transmission system was agreed and granted for various IPPs
in earlier Connectivity/LTA meetings of Southern Region.
Table-1
Connectivit
Start Date
y
Sl. Applicant Location as per Connectivity transmission system
granted(MW
application
)
Samalkot East
Samalkot – Vemagiri-II (PG) 400
power Godavari,
1. 2214 Feb, 2017 kV D/c Quad line along with bays
Limited – Andhra
at both ends
Gas Pradesh
Regen
Wind Regen PS – Pugalur 230 kV D/c
Dindigul, 14th March
2. Farm 600 (Twin Moose) line along with bays
Tamil Nadu 2016
(Vagarai) at both ends
Pvt. Ltd
Renew Renew Power Ventures Pvt. Ltd–
Karur,
Power 31st March Pugalur 230kV D/c line along with
3. Tamil 400
Ventures 2018 bays at Pugalur & generation
Nadu,
Pvt. Ltd. switchyard
26
Agenda for 1st meeting of SRSCT (07.09.2018)
Upon notification of the Detailed Procedure for Grant of connectivity to projects based
on renewable sources to ISTS on 15.05.2018 in the Petition No. 145/MP/2017 by
CERC, the IPPs from Sl.No. 2-4 are deemed Stage-II grantees.
24.2 Further, the following dedicated transmission system for grant of Stage-II connectivity
was agreed in the 24th Connectivity / LTA meeting of SR held on 11.07.2018.
Sl.N Appli Applicant Location Date Quantum Stage-II Start Proposed Dedicated Tr. System
o catio of of Stage-I Connect Date of location for
n No. Appli Sought / ivity Stage-II Grant of
catio Granted Sought connecti Stage-II
n (MW) (MW) vity Connectivity
Connectivity applications near Tirunelveli
Orange Orange Sironj –
1200 Sironj Tuticori Tuticorin-II 230kV S/c
25.05 10.02.
1. 0012 Wind n, Tamil 200 200 line along with terminal
.2018 2019
74 Power Nadu bays at Tuticorin-II GIS
Pvt. Ltd. & generation switchyard
Green Infra Renewable
Green
1200 – Tuticorin-II 230kV
Infra Tuticori
0013 04.06 31.07. S/c line along with
2. Renewabl n, Tamil 249.9 249.9
66 .2018 2018 Tuticorin-II terminal bays at
e Energy Nadu
GIS PS Tuticorin-II GIS &
Limited
(erstwhile generation switchyard
Betam Tirunelveli
1200 Wind Tuticori GIS PS)
12.06 31.07.
3. 0014 Energy n, Tamil 50.2
.2018 2019 Betam Wind Energy –
18 Private Nadu
Tuticorin-II 230kV S/c
Limited
250.2 line along with terminal
Betam
bays at Tuticorin-II &
1200 Wind Tuticori
12.06 31.07. generation switchyard
4. 0014 Energy n, Tamil 200
.2018 2019
35 Private Nadu
Limited
Connectivity applications near Palakkad
Mytrah Coim Mytrah Energy –
Energy batore Palakkad 220kV S/c line
12000 19.06. 31.03. Palakkad
5. (India) , 300 300 along with terminal bays
01447 2018 2020 (Existing)
Private Tamil at Palakkad &
Limited Nadu generation switchyard
Connectivity applications near Pugalur
Sprng Sprng Renewable –
Renewabl Tirupur, Pugalur 230kV S/c line
12000 15.06. 31.10. Pugalur
6. e Energy Tamil 300 300 along with terminal bays
01434 2018 2019 (Existing)
Private Nadu at Pugalur & generation
Limited switchyard
24.3 The details of LTA granted in 24th Connectivity / LTA meeting of SR held on
11.07.2018 are given below.
27
Agenda for 1st meeting of SRSCT (07.09.2018)
LTA
Applicant quantum Beneficiaries (MW) Date of start of LTA
Sl.
(MW)
1. Orange Sironj Wind NR-50 MW + ER-100 MW,
200 22.02.2019
Power Pvt. Ltd. SR-50 MW
2. Mytrah Energy ER-100 MW + NER-50 MW 50 MW – 30.09.2018
175
India Pvt. Ltd. + NR-25 MW 125 MW – 01.12.2018
3. Green Infra
NR-149.9 MW + ER-100
Renewable Energy 249.9 31.10.2018
MW
Ltd.
24.4 The details of Stage-I connectivity granted to various IPPs in the 23rd & 24th
Connectivity/LTA meetings of Southern Region are given at Annexure-XIII
28
Agenda for 1st meeting of SRSCT (07.09.2018)
29
Agenda for 1st meeting of SRSCT (07.09.2018)
30
Agenda for 1st meeting of SRSCT (07.09.2018)
Has the
constraint
Season/
S. Description of the occurred in
ICT Antecedent
No constraints earlier
Conditions
quarter?
Details.
400/220kV
N-1 condition not satisfied in
1 2x315MVA ICTs at Whole Year Yes
few occasions
Gazuwaka SS
400/220kV
N-1 condition not satisfied in
2 3x315MVA ICTs at Whole Year Yes
few occasions
Vemagiri SS
400/220 kV 3X500
N-1 condition not satisfied in
3 MVA ICTs at Whole Year Yes
few occasions
Nelamangala
400/220kV 3X500
N-1 condition not satisfied in
4 MVA ICTs at Whole Year Yes
few occasions
Somanahalli
31
Agenda for 1st meeting of SRSCT (07.09.2018)
Has the
constraint
Season/
S. Description of the occurred in
ICT Antecedent
No constraints earlier
Conditions
quarter?
Details.
400/220kV 3X500 N-1 condition not satisfied in
5 Whole Year Yes
MVA ICTs at Hoody few occasions.
400/220kV 2X315 N-1 condition not satisfied in
6 Whole Year Yes
MVA ICTs at Guttur few occasions
400/220kV 2X315 N-1 condition not satisfied in
7 Whole Year Yes
MVA ICTs at Hiriyur few occasions
400/220 kV 2X315 N-1 condition not satisfied in
8 Whole Year Yes
MVA ICTs at UPCL few occasions
400/230kV
N-1 condition not satisfied in
9 2X315MVA ICTs at Whole Year Yes
few occasions
Thiruvallam
400/220 kV 3X315
During peak N-1 condition not satisfied in
10 MVA ICTs at No
summer few occasions
Shankarpally
32
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-I/1
SITE VISIT OF CEA, CTU AND TSTRANSCO OFFICERS TO SRISAILAM LEFT BANK
HYDRO ELECTRIC STATION (SLBHES) IN CONNECTION WITH LOCATION OF
125MVAR BUS REACTOR IN POWER PLANT ON gTH AND gTH AUGUST 2018
1. The team found three possible alternatives with respect to location of bus
reactor in the power plant complex.
c. Extending the bus through 400kV XLPE cables to pothead yard and
locating both switchgear and reactor in the open pothead yard area.
2. Hitachi make GIS has been installed (SLD enclosed as Annex-1) and there
exist a possibility of extending the bus on the service bay side. Prima-facie a
spa?e of about 7 - 9 meters could be created by shifting the some of the
(' I' '1. ~ ,((:. ~J:~I)t::l. -
33
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-I/2
S,S~~~
.CJ I /5:') 2-o1 !'., ~~~'1> ~
ql& Its
SanJay Snvastava, A. Sree~vasa a Rao.l.
Chief Engineer Reddy, SE SE/O&M
CEA TSTRANSCO TSGENCO
l'rL . _/'
f·0'~\ll"
~?~-
B.~. Bairwa,
Director
P. Srinivasu,
ADE
~e~kt~~
Reddy, DE/EM
K.Poornachandar Raju
ADE/EMII
CEA TSTRANSCO TSGENCO TSGENCO
34
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/1
ZONE TOTALS
IN MW/MVAR
FROM ------AT ZONE BUSES------- TO -NET INTERCHANGE-
GENE- FROM IND TO IND TO TO BUS GNE BUS TO LINE FROM TO TO TIE TO TIES
X-- ZONE --X RATION GENERATN MOTORS LOAD SHUNT DEVICES SHUNT CHARGING LOSSES LINES + LOADS
51 6246.0 0.0 0.0 7847.1 0.0 0.0 0.0 0.0 135.8 -1736.9 -1736.9
TELANGANA -2822.6 0.0 0.0 2573.2 3779.5 0.0 3376.0 14548.3 1666.5 330.4 330.4
COLUMN 6246.0 0.0 0.0 7847.1 0.0 0.0 0.0 0.0 135.8 -1736.9 -1736.9
TOTALS -2822.6 0.0 0.0 2573.2 3779.5 0.0 3376.0 14548.3 1666.5 330.4 330.4
BUS 514060 SURYPET4 400.00 CKT MW MVAR MVA % 1.0258PU -2.98 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514060
410.32KV MW MVAR 5 SOUTH 51 TELANGANA
TO 504030 VIJAYA TP-IV400.00 1 45.6 29.3 54.2 10 0.15 1.58 5 SOUTH 50 ANDHRA
TO 504030 VIJAYA TP-IV400.00 2 45.6 29.3 54.2 10 0.15 1.58 5 SOUTH 50 ANDHRA
TO 504111 KV KOTA 400.00 1 -143.6 -25.7 145.9 21 0.34 5.86 5 SOUTH 50 ANDHRA
TO 504111 KV KOTA 400.00 2 -143.6 -25.7 145.9 21 0.34 5.86 5 SOUTH 50 ANDHRA
TO 512049 SURYAPET2 220.00 1 106.8 55.4 120.3 38 1.0000LK 0.00 4.37 5 SOUTH 51 TELANGANA
TO 512049 SURYAPET2 220.00 2 106.8 55.4 120.3 38 1.0000LK 0.00 4.37 5 SOUTH 51 TELANGANA
TO 514052 MALKARM4 400.00 1 76.4 11.7 77.3 14 0.20 2.17 5 SOUTH 51 TELANGANA
TO 514052 MALKARM4 400.00 2 76.4 11.7 77.3 14 0.20 2.17 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 1 -154.7 19.1 155.9 22 0.29 5.09 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 2 -154.7 19.1 155.9 22 0.29 5.09 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 1 69.5 -89.8 113.6 16 0.09 1.56 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 2 69.5 -89.8 113.6 16 0.09 1.56 5 SOUTH 51 TELANGANA
BUS 514068 RAIDURG 400.00 CKT MW MVAR MVA % 1.0290PU -5.04 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514068
411.58KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512118 RAIDURG 220.00 1 101.1 -20.7 103.2 21 1.0000LK 0.00 2.01 5 SOUTH 51 TELANGANA
TO 512118 RAIDURG 220.00 2 101.1 -20.7 103.2 21 1.0000LK 0.00 2.01 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 1 -101.1 20.7 103.2 15 0.00 0.05 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 2 -101.1 20.7 103.2 15 0.00 0.05 5 SOUTH 51 TELANGANA
35
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/2
BUS 514071 KAMALAPURAM 400.00 CKT MW MVAR MVA % 1.0121PU -1.31 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514071
404.84KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 115.8 115.8
TO 512200 KAMALAPURAM 220.00 1 0.0 -2.4 2.4 1 1.0000LK 0.00 0.00 5 SOUTH 51 TELANGANA
TO 512200 KAMALAPURAM 220.00 2 0.0 -2.4 2.4 1 1.0000LK 0.00 0.00 5 SOUTH 51 TELANGANA
TO 512200 KAMALAPURAM 220.00 3 0.0 -2.4 2.4 1 1.0000LK 0.00 0.00 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 1 -0.0 -54.2 54.2 10 0.01 0.14 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 2 -0.0 -54.2 54.2 10 0.01 0.14 5 SOUTH 51 TELANGANA
BUS 514100 NARSAPUR 400.00 CKT MW MVAR MVA % 1.0199PU -3.01 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514100
407.95KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512078 NARSAPUR2 220.00 1 143.0 41.3 148.9 47 1.0000LK 0.00 6.77 5 SOUTH 51 TELANGANA
TO 512078 NARSAPUR2 220.00 2 143.0 41.3 148.9 47 1.0000LK 0.00 6.77 5 SOUTH 51 TELANGANA
TO 514022 GAJWEL4 400.00 1 -23.3 19.9 30.6 5 0.02 0.23 5 SOUTH 51 TELANGANA
TO 514022 GAJWEL4 400.00 2 -23.3 19.9 30.6 5 0.02 0.23 5 SOUTH 51 TELANGANA
TO 514036 TEL_STPP(NTP400.00 1 -182.2 -19.1 183.2 26 0.53 9.12 5 SOUTH 51 TELANGANA
TO 514036 TEL_STPP(NTP400.00 2 -182.2 -19.1 183.2 26 0.53 9.12 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 1 166.7 -41.4 171.7 31 0.29 3.14 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 2 166.7 -41.4 171.7 31 0.29 3.14 5 SOUTH 51 TELANGANA
TO 514174 TUKKAPUR 400.00 1 -104.3 -0.7 104.3 15 0.07 1.23 5 SOUTH 51 TELANGANA
TO 514174 TUKKAPUR 400.00 2 -104.3 -0.7 104.3 15 0.07 1.23 5 SOUTH 51 TELANGANA
BUS 514104 MAHESH-TS 400.00 CKT MW MVAR MVA % 1.0207PU -3.82 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514104
408.28KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512082 MAHESH-TS2 220.00 1 139.5 46.3 147.0 29 1.0000LK 0.00 4.15 5 SOUTH 51 TELANGANA
TO 512082 MAHESH-TS2 220.00 2 139.5 46.3 147.0 29 1.0000LK 0.00 4.15 5 SOUTH 51 TELANGANA
TO 514012 HYDERABAD-TS400.00 1 85.0 83.9 119.4 23 0.07 0.74 5 SOUTH 51 TELANGANA
TO 514012 HYDERABAD-TS400.00 2 85.0 83.9 119.4 23 0.07 0.74 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 1 27.2 -31.2 41.4 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 2 27.2 -31.2 41.4 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 1 -95.1 -99.0 137.2 24 0.01 0.05 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 2 -95.1 -99.0 137.2 24 0.01 0.05 5 SOUTH 51 TELANGANA
TO 514152 DINDI 400.00 1 20.8 17.4 27.1 5 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514152 DINDI 400.00 2 20.8 17.4 27.1 5 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -235.6 46.9 240.2 35 0.91 15.71 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -235.6 46.9 240.2 35 0.91 15.71 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 1 58.2 -64.3 86.7 12 0.04 0.68 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 2 58.2 -64.3 86.7 12 0.04 0.68 5 SOUTH 51 TELANGANA
36
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/3
BUS 514106 TIPPAPUR 400.00 CKT MW MVAR MVA % 1.0183PU -1.78 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514106
407.30KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 117.2 117.2
TO 514105 RAMADAGU 400.00 1 -188.1 -4.2 188.2 27 0.06 1.08 5 SOUTH 51 TELANGANA
TO 514105 RAMADAGU 400.00 2 -188.1 -4.2 188.2 27 0.06 1.08 5 SOUTH 51 TELANGANA
TO 514107 CHANDULAPUR 400.00 1 135.0 -14.7 135.8 20 0.03 0.58 5 SOUTH 51 TELANGANA
TO 514107 CHANDULAPUR 400.00 2 135.0 -14.8 135.8 20 0.03 0.58 5 SOUTH 51 TELANGANA
TO 514165 JANAGAON 400.00 1 53.1 -39.7 66.3 10 0.02 0.32 5 SOUTH 51 TELANGANA
TO 514165 JANAGAON 400.00 2 53.1 -39.7 66.3 10 0.02 0.32 5 SOUTH 51 TELANGANA
BUS 514131 MANIKONDA 400.00 CKT MW MVAR MVA % 1.0242PU -4.56 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514131
409.69KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 118.5 118.5
TO 512100 KETHIREDDYPA220.00 1 70.4 34.5 78.4 25 1.0000LK 0.00 1.86 5 SOUTH 51 TELANGANA
TO 512100 KETHIREDDYPA220.00 2 70.4 34.5 78.4 25 1.0000LK 0.00 1.86 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 1 -129.2 43.9 136.5 20 0.08 1.28 5 SOUTH 51 TELANGANA
TO 514051 MAILARM4 400.00 2 -129.2 43.9 136.5 20 0.08 1.28 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 1 101.2 -83.3 131.1 19 0.12 1.12 5 SOUTH 51 TELANGANA
TO 514069 RAIDURG DUMY400.00 2 101.2 -83.3 131.1 19 0.12 1.12 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 1 -42.4 -54.4 69.0 10 0.02 0.29 5 SOUTH 51 TELANGANA
TO 514173 UDDANDAPUR 400.00 2 -42.4 -54.4 69.0 10 0.02 0.29 5 SOUTH 51 TELANGANA
BUS 514165 JANAGAON 400.00 CKT MW MVAR MVA % 1.0194PU -2.11 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514165
407.74KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512148 JANGAON 220.00 1 139.5 30.8 142.9 29 1.0000LK 0.00 3.93 5 SOUTH 51 TELANGANA
TO 512148 JANGAON 220.00 2 139.5 30.8 142.9 29 1.0000LK 0.00 3.93 5 SOUTH 51 TELANGANA
TO 512148 JANGAON 220.00 3 139.5 30.8 142.9 29 1.0000LK 0.00 3.93 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 1 -44.0 -61.8 75.9 11 0.04 0.65 5 SOUTH 51 TELANGANA
TO 514095 JULURUPADU 400.00 2 -44.0 -61.8 75.9 11 0.04 0.65 5 SOUTH 51 TELANGANA
TO 514106 TIPPAPUR 400.00 1 -53.1 -13.3 54.7 8 0.02 0.32 5 SOUTH 51 TELANGANA
TO 514106 TIPPAPUR 400.00 2 -53.1 -13.3 54.7 8 0.02 0.32 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -112.2 28.8 115.8 17 0.28 4.79 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -112.2 28.8 115.8 17 0.28 4.79 5 SOUTH 51 TELANGANA
BUS 514170 CHOUTTUPPAL 400.00 CKT MW MVAR MVA % 1.0077PU -3.02 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514170
403.07KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512153 CHOUTTUPPAL 220.00 1 123.2 6.1 123.4 25 1.0000LK 0.00 3.00 5 SOUTH 51 TELANGANA
TO 512153 CHOUTTUPPAL 220.00 2 123.2 6.1 123.4 25 1.0000LK 0.00 3.00 5 SOUTH 51 TELANGANA
TO 512153 CHOUTTUPPAL 220.00 3 123.2 6.1 123.4 25 1.0000LK 0.00 3.00 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -184.8 -9.1 185.0 27 0.49 8.49 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -184.8 -9.1 185.0 27 0.49 8.49 5 SOUTH 51 TELANGANA
37
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/4
BUS 514193 YELLAMPALLI 400.00 CKT MW MVAR MVA % 1.0200PU -0.07 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514193
408.00KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 117.6 117.6
TO 512179 YELLAMPALLI 220.00 1 0.0 -12.4 12.4 2 1.0000LK 0.00 0.03 5 SOUTH 51 TELANGANA
TO 512179 YELLAMPALLI 220.00 2 0.0 -12.4 12.4 2 1.0000LK 0.00 0.03 5 SOUTH 51 TELANGANA
TO 512179 YELLAMPALLI 220.00 3 0.0 -12.4 12.4 2 1.0000LK 0.00 0.03 5 SOUTH 51 TELANGANA
TO 514031 SINGARENI 400.00 1 -122.6 57.9 135.6 20 0.05 0.84 5 SOUTH 51 TELANGANA
TO 514031 SINGARENI 400.00 2 -122.6 57.9 135.6 20 0.05 0.84 5 SOUTH 51 TELANGANA
TO 514062 NIRMAL 400.00 1 122.6 -98.1 157.0 23 0.19 3.36 5 SOUTH 51 TELANGANA
TO 514062 NIRMAL 400.00 2 122.6 -98.1 157.0 23 0.19 3.36 5 SOUTH 51 TELANGANA
BUS 514023 MAHABUB4 400.00 CKT MW MVAR MVA % 1.0218PU -5.01 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514023
408.71KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 118.0 118.0
TO 504133 URAVAKONDA 400.00 1 64.3 -96.4 115.9 17 0.08 1.37 5 SOUTH 50 ANDHRA
TO 512018 VELTOOR 220.00 1 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 512018 VELTOOR 220.00 2 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 512018 VELTOOR 220.00 3 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 512018 VELTOOR 220.00 4 69.4 27.0 74.4 24 1.0000LK 0.00 1.69 5 SOUTH 51 TELANGANA
TO 514003 NSAGAR 400.00 1 -50.3 -31.7 59.4 11 0.10 1.10 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 1 -113.6 -15.1 114.6 20 0.22 2.40 5 SOUTH 51 TELANGANA
TO 514101 MAHESWRM 400.00 2 -113.6 -15.1 114.6 20 0.22 2.40 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 1 -85.1 -39.3 93.7 13 0.05 0.87 5 SOUTH 51 TELANGANA
TO 514171 YEDULA 400.00 2 -85.1 -39.3 93.7 13 0.05 0.87 5 SOUTH 51 TELANGANA
TO 524003 RAIC 400.00 1 105.7 11.2 106.3 20 0.16 1.80 5 SOUTH 52 KARNATKA
BUS 514051 MAILARM4 400.00 CKT MW MVAR MVA % 1.0209PU -4.08 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514051
408.34KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 117.8 117.8
TO 512029 SHANKARPALLY220.00 1 105.2 35.9 111.2 35 1.0000LK 0.00 3.77 5 SOUTH 51 TELANGANA
TO 512029 SHANKARPALLY220.00 2 105.2 35.9 111.2 35 1.0000LK 0.00 3.77 5 SOUTH 51 TELANGANA
TO 512029 SHANKARPALLY220.00 3 105.2 35.9 111.2 35 1.0000LK 0.00 3.77 5 SOUTH 51 TELANGANA
TO 512029 SHANKARPALLY220.00 4 167.1 57.1 176.5 35 1.0000LK 0.00 5.98 5 SOUTH 51 TELANGANA
TO 514061 NIZAMABAD 400.00 1 -177.1 -49.0 183.7 33 0.75 8.05 5 SOUTH 51 TELANGANA
TO 514061 NIZAMABAD 400.00 2 -177.1 -49.0 183.7 33 0.75 8.05 5 SOUTH 51 TELANGANA
TO 514100 NARSAPUR 400.00 1 -166.4 6.9 166.5 30 0.29 3.14 5 SOUTH 51 TELANGANA
TO 514100 NARSAPUR 400.00 2 -166.4 6.9 166.5 30 0.29 3.14 5 SOUTH 51 TELANGANA
38
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-II/5
TO 514104 MAHESH-TS 400.00 1 -27.2 -24.5 36.6 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514104 MAHESH-TS 400.00 2 -27.2 -24.5 36.6 7 0.01 0.12 5 SOUTH 51 TELANGANA
TO 514131 MANIKONDA 400.00 1 129.3 -74.8 149.4 21 0.08 1.28 5 SOUTH 51 TELANGANA
TO 514131 MANIKONDA 400.00 2 129.3 -74.8 149.4 21 0.08 1.28 5 SOUTH 51 TELANGANA
BUS 514052 MALKARM4 400.00 CKT MW MVAR MVA % 1.0104PU -4.00 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514052
404.15KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 115.4 115.4
TO 512030 MALKARAM 220.00 1 94.1 21.4 96.5 31 1.0000LK 0.00 2.90 5 SOUTH 51 TELANGANA
TO 512030 MALKARAM 220.00 2 94.1 21.4 96.5 31 1.0000LK 0.00 2.90 5 SOUTH 51 TELANGANA
TO 512030 MALKARAM 220.00 3 94.1 21.4 96.5 31 1.0000LK 0.00 2.90 5 SOUTH 51 TELANGANA
TO 512030 MALKARAM 220.00 4 149.4 34.0 153.2 31 1.0000LK 0.00 4.60 5 SOUTH 51 TELANGANA
TO 514001 RAMGUNDM STP400.00 1 -233.7 3.4 233.7 44 2.05 22.88 5 SOUTH 51 TELANGANA
TO 514002 HYDERABAD 400.00 1 -45.5 -29.5 54.2 10 0.02 0.25 5 SOUTH 51 TELANGANA
TO 514060 SURYPET4 400.00 1 -76.2 -93.8 120.9 22 0.20 2.17 5 SOUTH 51 TELANGANA
TO 514060 SURYPET4 400.00 2 -76.2 -93.8 120.9 22 0.20 2.17 5 SOUTH 51 TELANGANA
BUS 514135 ASUPAKA 400.00 CKT MW MVAR MVA % 1.0034PU -1.27 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514135
401.36KV MW MVAR 5 SOUTH 51 TELANGANA
TO SHUNT 0.0 72.5 72.5
TO 504016 VIZAGPOOL 400.00 1 -158.0 4.0 158.0 29 1.23 13.11 5 SOUTH 50 ANDHRA
TO 512102 ASUPAKA 220.00 1 30.6 4.4 30.9 10 1.0000LK 0.00 0.30 5 SOUTH 51 TELANGANA
TO 512102 ASUPAKA 220.00 2 30.6 4.4 30.9 10 1.0000LK 0.00 0.30 5 SOUTH 51 TELANGANA
TO 514004 KHAMMAM 400.00 1 96.8 -85.4 129.1 23 0.27 2.87 5 SOUTH 51 TELANGANA
BUS 514152 DINDI 400.00 CKT MW MVAR MVA % 1.0166PU -3.93 X--- LOSSES ---X X---- AREA -----X X---- ZONE -----X 514152
406.63KV MW MVAR 5 SOUTH 51 TELANGANA
TO 512131 DINDI 220.00 1 168.5 29.8 171.1 34 1.0000LK 0.00 5.67 5 SOUTH 51 TELANGANA
TO 512131 DINDI 220.00 2 168.5 29.8 171.1 34 1.0000LK 0.00 5.67 5 SOUTH 51 TELANGANA
TO 512131 DINDI 220.00 3 168.5 29.8 171.1 34 1.0000LK 0.00 5.67 5 SOUTH 51 TELANGANA
TO 514011 SSLBPH4 400.00 1 37.5 -37.0 52.6 10 0.02 0.22 5 SOUTH 51 TELANGANA
TO 514011 SSLBPH4 400.00 2 37.5 -37.0 52.6 10 0.02 0.22 5 SOUTH 51 TELANGANA
TO 514104 MAHESH-TS 400.00 1 -20.8 -53.7 57.6 11 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514104 MAHESH-TS 400.00 2 -20.8 -53.7 57.6 11 0.02 0.18 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 1 -269.4 46.0 273.3 39 1.02 17.66 5 SOUTH 51 TELANGANA
TO 514169 DAMARCHARLA 400.00 2 -269.4 46.0 273.3 39 1.02 17.66 5 SOUTH 51 TELANGANA
39
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/1
40
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/2
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
List of addressee:
9. The Director
(Grid Transmission and Management),
Transmission Corp. of Telangana Ltd.,
(TSTRANSCO)
Vidyut Soudha, Khairatabad
Hyderabad – 500 082.
FAX: 040-23321751
2
41
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/3
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
Minutes of joint study meeting of Southern Region held on 10th & 11th May
2018 at SRPC, Bengaluru
In the 42nd meeting of the Standing Committee on Power System Planning of Southern
Region (SCPSPSR), held on 27th April, 2018 in Ernakulam (Kerala), it was decided
that a joint system study will be carried out by CEA, CTU and STUs for Southern
Region(SR). Accordingly, the joint system study meeting was held at SRPC,
Bengaluru. The Member Secretary, SRPC welcomes the participants from CEA, CTU
and STUs of SR. Director, CEA thanked Member Secretary, SRPC, for extending all
support for the meeting. He also stated that as per the decision of SCPSPSR, the
transmission system evolved in this joint study meeting will be put up for discussion in
next meeting of SCPSPSR.
1.1 In the 42nd meeting of SCPSPSR held on 27.04.2018, it was informed that based
on various inputs like district wise NIWE potential, SNA developable potential,
pooling station wise wind capacity sanctioned by STU, RE applications received
in ISTS by CTU and detailed discussion with MNRE & wind IPPs/developers,
projected capacity in each Wind Energy Zone (WEZ) were identified and
prioritized for implementation in 2021-22 time frame in wind resource rich states.
In the meeting held in MNRE, Koppal (2500 MW) in Karnataka, Kurnool (3000
MW) in Andhra Pradesh and Karur (2500 MW) in Tamil Nadu were identified as
prioritized Wind Energy zones for which transmission infrastructure needs to be
developed/made available under ISTS Intrastate transmission system. Further, it
was indicated that Tirunelvelli/ Tuticorin district in TN is also a high wind potential
complex and 2500 MW of wind energy potentials considered for development of
transmission infrastructure under ISTS/Intra-state transmission system.
1.2 Director, CEA stated that in the SCM, it was decided that comprehensive study
would be carried out with Southern Region constituents for accessing the
transmission system requirement in the region as a whole. He stated that to carry
out comprehensive study, intra state RE generation and transmission projects
proposed by STUs need to be considered.
1.3 CTU stated that large nos. of applications have been received by them for
connectivity with ISTS in these Wind Energy Zones. Details of which are
tabulated below.
3
42
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/4
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
Infrastructure to be
Quantum(MW) for
S. developed for RE
Wind Energy Zone which connectivity
No. Quantum (MW) (as per
application received
MNRE meeting)
1 Tirunelveli & Tuticorin 8000 2500
(TN)
2 Karur / Tiruppur (TN) 4000 2500
3 Koppal (Karnataka) 3000 2500
4 Kurnool & Ananthpur (AP) 6000 3000
1.4 For successful evacuation of RE power from proposed Wind Energy Zones and
to review the transmission system proposed by STUs & CTUs under Green
Energy Corridors, it was agreed that detailed system study would be carried out
for 2021-22 time frame for the peak wind scenario (Monsoon season).
Incidentally, this scenario coincides with low load demand period/season (off
peak period) for Southern Region.
1.5 Based on historical pattern, representative of SRLDC suggested that 80% of the
EPS peak load for SR states may be considered for study & analysis for the off
peak scenario, which was agreed.
1.6 It was suggested that dispatches from RE wind power plants (existing & future)
may be taken as 80% of the installed capacity and same was agreed. However it
was decided that based on the Load generation balance (LGB) prepared by the
STUs, RE dispatches of the states shall be reviewed depending on the surplus
scenario of states.
4
43
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/5
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
1.8 Further, the generation and dispatch provided by Tamil Nadu, Karnataka &
Andhra Pradesh for Load Generation Balance (LGB) is tabulated as below.
Detailed Load Generation balance report is also enclosed at Annexure-II.
1.10 After, finalizing the LGB, studies were carried out for peak wind scenario and
peak demand scenario (2021-22) with reduced RE dispatch and Study results
and analysis in respect to Wind Energy Zones is summarized as under:
ii) CTU informed that SECI / MNRE has indicated high wind potential of the order
of 2500MW in Tirunelveli and Tuticorin Wind Energy Zone. CTU has also
received applications for about 8000MW for connectivity to ISTS in these areas.
iii) Generation from CEPL with (IC-2x660MW and LTA-558 MW), Tuticorin JV
(2X500MW), Kudankulam NPP (2X1000MW) are pooled at 765/400 kV
Tuticorin Pooling Station (PS) and RE generation at Tuticorin & Tirunelveli
5
44
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/6
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
vi) Study has been carried out considering dispatch from Intra state renewables
generation (both wind and solar) 50% as provided by
TANTRANSCO/TANGEDCO to achieve Long generation balance for the
studied scenario. Further thermal generations (state/IPP) have been backed
down technically possible level (as data provided by states).
vii) Dispatch of RES generation, Coastal Energy, Tuticorin JV and Tuticorin TPS
have been considered subject to successful evacuation of 2000MW power
from RE generation pooled at Tirunelveli Pool even under outage Kudankulam
– Tirunelveli 400kV D/c (Quad) line comes under outage.
viii) The existing / under construction transmission system have been considered
to evaluate requirement of additional transmission system for evacuation of
wind generation in Tirunelveli area including 558 MW LTA of CEPL and Tuticorin
JV (2X500MW).
ix) The study results (enclosed at Exhibit-1) indicates that the existing Tuticorin –
II adequate for evacuation of 2000 MW of wind generation.
xi) For dispersal of more than 2000MW of RE generation from Tuticorin-II GIS sub-
station, Tuticorin-II GIS – Dharmapuri (Salem) 765 D/C line(presently operating
at 400kV) needs to be operated at its rated voltage.(i.e 765kV)
a) Addition of 2x500 MVA, 400/230kV ICTs (4th & 5th) at Tuticorin-II GIS sub-
station.
ii) To address the connectivity with ISTS for generators from Karur and Tiruppur wind
zones, a new substation (ISTS) was proposed at common location with following
details:
iii) System Studies were carried out for successful evacuation of 2000MW of RE
generation (80% of the expected capacity of 2500MW) from Karur PS. Dispatch of
2000MW was considered on Raigarh – Pugalur HVDC and Pugalur – Trichur (VSC
based HVDC) to meet out demand in Kerala. The study results (enclosed at
Exhibit-1), shows that proposed transmission system is adequte for transfer of
power/generation from Karur and Tiruppur wind zones.
iv) Accordingly, the above transmission system proposed at S.No. B(ii) for transfer of
power from Karur and Tiruppur wind zones was agreed. It was also agreed that
adequate space provision in substation would be kept for future expansion.
7
46
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/8
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
ii) To address the connectivity with ISTS from RE developers from Koppal wind zone,
a 400/220kV ISTS substation has been proposed in Koppal area with following
details:
iii) System Studies were carried out for successful evacuation of 2000MW of RE (i.e.
80% of the expected capacity:2500MW ) from pooling station in Munirabad (Study
results are enclosed at Exhibit-1).
iv) The study result shows that power from Narendra (New) is dispersed towards
Kolhapur PG and congestion /transmission constraint is in the system observed in
the system beyond Kolhapur (MSETCL), and Kolhapur (MSETCL) – Karad 400kv
D/c line gests overloaded.
v) After deliberations, the above proposed transmission system mentioned at c(ii) was
agreed for connectivity of RE generators at proposed Munirabad/Koppal PS. It was
also agreed that for transfer of power from the above pooling station would require
system strengthening in Western Region. Accordingly, it was suggested that issue
of strengthening of WR system need to be taken up with WR constituents.
8
47
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/9
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
ii) Considering on the land availability for pooling station and the applications of RE
developers for connectivity with ISTS a pooling station at common location in
between Kurnool & Ananthapur distt. has been proposed with following details:
iii) Studies were carried out for successful evacuation of 2400MW of RE generation
i.e. (80% of the expected capacity, 3000 MW) from Kurnool-III Pooling station (near
Adoni PS/suitable location in Kurnool distt.) (study results, enclosed at Exhibit-1).
iv) The study result shows that above transmission system is adequate for transfer of
power from RE generation. Accordingly, the above transmission system [mentioned
at Sl. No. D(ii)] was agreed for evacuation of 3000 MW RE generation from Kurnool
and Ananthapur wind zones.
2.0 Intra- state transmission projects proposed for Green Energy Corridor Ph-II
in Karnataka
400 kV System:
a. Narendra (New) Kudgi-Yalwar 400 kV D/C line (with Quad Moose ACSR
Conductor)
b. Gulbarga- Yalwar 400 kV D/C line (with Quad Moose ACSR Conductor).
c. 2 X 500 MVA, 400/220 kV ICTs at Yalwar.
d. 2 X 125 Mvar bus reactors.
220 kV System:
a. LILO of both circuits of existing B.Bagewadi – Lingasugur 220 kV D/C
line at Yalwar.
b. LILO of both circuits of Bijapur- Sindagi 220 kV D/C line sub-station at
Yalwar.
9
48
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/10
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
2.1.1 System study shows that power flows from proposed Yalwar sub-station
toward Narendra. In case of outage of the proposed Yalwar –Narendra (New)
400kV D/C line, all the power will absorb in state network.
400 kV System:
a. LILO of both circuits of Narendra (New) –Narendra (PGCIL) 400 kV D/C line
(with Quad Moose ACSR Conductor) at Lokapur
b. 2 X 500 MVA 400/220 kV ICTs.
c. 2 X 125 Mvar bus reactors.
220 kV System:
a. LILO of both circuits of existing Gadag-Bagalkot 220 kV D/C line at Lokapur.
b. LILO of both circuits of Mahalingpura-Soundatti 220 kV D/C line at Lokapur.
c. Mughalkod.- Lokapur/Bagalkot 220 kV D/c Line.
2.2.1 The study result shows that power flows from Narendra (New) dispersed
towards Kolhapur (PG). The congestion /transmission constraint observed in
the system beyond Kolhapur (MSETCL) and Kolhapur (MSETCL) – Karad
400kV D/c line gets overloaded. Accordingly, it was decided to review the
transmission system for Lokapur Wind Energy zone along with Koppal Wind
Energy Zone seeking connectivity at ISTS.
2.3.1 The system study shows that additional feed to 400/220 kV Dhoni sub-station
by LILO of existing Narendra – Davanagere 400 kV D/C line (with twin moose
ACSR conductor) at Dhoni does not provide any additional benefit and hence,
LILO of above line at Dhoni was not agreed.
220 kV System:
10
49
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/11
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
220 kV System:
a. LILO of both circuits of Kudgi-Vajramatti 220 kV D/C line at Savalgi.
b. 2x100 MVA, 220/110 kV transformers.
110 kV System:
a. LILO of existing Todalbagi-Mamadapura 110 kV S/C line at Savalgi.
b. LILO of existing Bableshwar-Mamadapura110 kV S/C line at Savalgi.
2.6 Establishment of 2x100 MVA, 220/66 kV sub-station at Hanagal (New),
Chitradurga District
220 kV System:
a. LILO of both circuits of Hiriyur-Gowribidanur 220 kV D/C line at
P.D.Kote (New).
b. 2 X 100 MVA, 220/66 kV ICT’s.
11
50
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/12
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
66 kV System:
a. LILO of both circuits of Hariyabbe-P.Kote 66 kV D/C line at P. D Kote
(New).
b. LILO of Hiriyur-Kalmaranahalli 66 kV S/C line at P. D Kote (New).
2.8 LILO of 2nd circuit of the existing Mahalingpura - Kudachi 220 kV D/C line at
Athani.
2.11 The transmission system proposals of KPTCL mentioned at 2.4 to 2.10 found to
be in order and agreed.
3.0 High Flow on 400kV KKNPP – Tirunelveli D/C line after commissioning of of
400kV KKNPP – Tuticorin PS D/C line
3.1 Representative of POSOCO stated that power flow on 400kV lines connected to
KKNPP is quite uneven. KKNPP – Tuticorin PS 400kV D/C lightly loaded whereas
most of power from KKNP is dispersed through KKNPP – Tirunelveli 400kV D/c
line.
3.2 It was observed from system studies that although line loadings are uneven, there
is no issue regarding power evacuation from KKNPP even under contingency
conditions, as per planning criteria.
3.3 Accordingly, it was agreed that uneven loading of lines connected to Unit 1 & 2
would be studied while planning evacuation system for Unit 3 & 4.
4.1 Director, CEA stated that in the 27th meeting of SCPSPSR, establishment of
400/220 kV sub-station (3 x 500 MVA) at Mylasandra (Electronic City) in Bangalore
was approved with LILO of Somanahalli-Kolar 400 kV S/C line (Twin Moose ACSR
conductor) at Mylasandra. In the 41st SCPSPSR, KPTCL had requested for
reconductoring of Somanahalli-Kolar 400kV D/C line LILO at Mylasandra
(Electronic city) with Quad Moose ACSR conductor (replacing existing Twin Moose
ACSR conductor) for providing additional feed to Mylasandra. In view of difficulty in
getting long shut down of Somanahalli-Kolar 400kV line, it was decided that CEA,
12
51
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/13
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
CTU, POSOCO and KPTCL may carry out System Studies jointly and explore
various alternate options.
4.2 In the 42nd meeting of SCPSPSR, KPTCL proposed to construct LILO of one circuit
of proposed Dharmapuri- Somanahalli 400kV D/c line (PGCIL line) at 400 kV
Mylasandra sub-station. With above proposals 400kV system at proposed
400/220kV Mylasandra substation would be as under:
4.3 In the 42nd meeting of SCPSPSR, KPTCL had proposed for establishment of
400/220 kV sub-station at Dommasandra (400/220kV, 2x500MVA ICTs) in
Bengaluru city to relieve loading 400kV Mylasandra sub-station, to reduce the
loading of 220 kV lines and to meet the future load growth in the vicinity with
following details:
4.4 Representative of CTU stated that KPTCL had already planned LILO of Kolar -
Somanahalli 400 kV S/C line at Mylasyandra 400/220kV substation. Again making
LILO of Kolar – Mylasyandra section at proposed Dommasandra 400/220kV
substation would reduce reliability of the system.
4.5 To meet out the rising demand of Bengaluru city along with reliability, following
alternatives were discussed:
Alternative 1:
i) LILO of Kolar – Somanahallli 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed)
13
52
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/14
Minutes of Joint Study Meeting of SR (10th & 11th May 2018)
ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad ACSR
Conductor) line at Mylasandara 400/220 kV substation
iii) Mylasandra – Dommasandra 400kV D/C line (twin Moose)
Alternative 2:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
ii) LILO of one circuit of Dharampuri – Somanhalli 400kV D/C (with Quad moose
ACSR conductor) line at proposed 400/220 kV substation at Dommsandra.
iii) Mylasandra – Dommasandra 400kV S/C line (with twin Moose ACSR
conductor)
Alternative 3:
i) LILO of Kolar – Somanhally 400kV S/C line at Mylasandara 400/220 kV
substation (already agreed).
ii) LILO of one circuit of Dharampuri – Somanhally 400kV D/C (Quad) line at
proposed 400/220 kV substation at Dommsandra.
iii) LILO of LILO section of Somanahalli – Dommasandra (formed after LILO of
single circuit of Dharampuri – Somanhalli 400kV D/C (Quad) line at
Dommasandra) at Mylasandra.
4.7 Load flow studies were carried out for both Alternative-2 and Alternative-3 (power
flow plot enclosed as Exhibit-2). The studies show that both Alternative-2 and
Alternative-3 are acceptable, but Alternative-2 is more reliable than Alternative-3.
4.8 KPTCL stated that in case of both Alternative-2 and Alternative-3, multi circuit
towers are need to be used for construction of lones constructed between
Mylasandra and Dommasandra. However, KPTCL requested to consider
Alternative-2 over Alternative-3 considering higher reliability.
4.9 Accordingly, Alternative-2 was agreed for supplying reliable power to Bengaluru city.
The transmission system of Mylasandra and Dommasandra 400kV S/S will be as
follows:
4.10 KPTCL stated that they would plan to utilize RoW of Kolar – Somanahalli 400kV
S/C line for LILO of Dharampuri – Somanhalli 400kV D/C line (with Quad moose
ACSR conductor) at Dommsandra.
4.11 It was also clarified that modalities may be finalized at the time of
implementation.
15
54
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/16
Annexure-I
List of participants in Joint System Study Meeting held on 10th & 11th
May, 2018 at SRPC, Bengaluru
SRPC
1. S R Bhatt Member Secretary
2. R. M. Rangarajan SE
3. Anil Thomas Executive Engineer
POWERGRID
1. Mukesh Khanna GM (CTU-Plg.), PGCIL
2. Kashish Bhambani CM(SG) PGCIL
3. Ajay Dahiya Dy. Mgr(CTU-Plg)
4. Narendra Sathrik Sr. Engr(CTU-Plg)
,POWERGRID
POSOCO/SRLDC
1. Abraham Varghese DGM
2. Madhukar G Manager
3. L. Sharath Chand Sr. Engr
APTRANSCO
1. T. V. Nageshwar Rao DE/System Studies
2. K Ramesh ADE/PS
TANTRANSCO/TANGEDCO
1. C Veeramani CE/reg
2. D. Ravichandran SE, System studies
3. T. Sumathi EE, System studies
4. V.Jayanthi AEE, System Studies
5. R. Kathiravan AEE/CERC
6. J. Kalaisetri AE/System Studies
55
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/17
56
Annexure-II
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/18
Mini. Technical
Power Plant Installed Capacity Total Units Despatch potential for
off peak running thermal
(MW) (MW) Considered power plant
Existing
Hydro
Kundah 3 X 60 + 2 X 50 +
5 X 20 + 5 X 35 +1x30 585 3 X 60 + 2 X 50 + 1 X 35 100
Pykara 3 X 6.65 + 1 X 11 + 2 X 14+2 60.95 3 X 6.65 + 1 X 11 + 2 X 14 30
Pykara ultimate (PUSHEP) 3X50 150 3X50 30
Moyar 3 X 12 36 3X12 18
Kadamparai 4 X 100 400 4 X 100 0
Aliyar 1 X 60 60 1 X 60 30
Periyar 4 X 35 140 4 X 35 100
Mettur Dam 4 X 12.5 50 4 X 12.5 25
Bhawani Barrage - II & III 2 x 15 + 2 x 15 60 2 x 15 + 2 x 15 30
Kodayar 1 X 60 + 1 X 40 100 1 X 60 + 1 X 40 50
Mettur Tunnel 4x50 200 4x50 150
Suruliyar 1x35 35 H 20
Servalar 1x20 20 H 14
Sarkarpathy 1x30 30 H 20
Sholayar 2x35+25 95 H 63
Papansam 4x8 32 H 22
Bhavani kattalai barage I,II, III 2x15+2x15+2x15 90 H 63
Lower mettur barage I,II ,III&IV 2x15+2x15+2x15+2X15 120 H 60
Micro Hydro 45 H 0
Subtotal Existing Hydro 2308.95 825
Thermal (Coal+Lignite)
Thermal (Gas)
PP Nallur 3 X 100 300 3 X 100 0
Basin Bridge 4 X 30 120 3 X 30 + 1 X 15 0
Kovil Kalapal 1x70+1x37.8 107.8 1x70+1x37.8 0
Small Thermal
RE
TN LGB sheet for off peak condition Page 1 joint study meeting at SRPC, Bengaluru
57
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/19
Hydro
Kundah PSS 4 x 125 500 4 x 125 0
Mettur PSS 500
Vellimalai PSS 200
Kollimalai PSS 520
Thermal
TN LGB sheet for off peak condition Page 2 joint study meeting at SRPC, Bengaluru
58
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/20
LOAD GENERATION BALANCE OF Andhra Pradesh for - 2021-22 Off Peak CONDITION
Peak Mini.
Power Plant Installed Capacity Total Units Despatch Technical
(MW) (MW) Considered (MW) potential of
Existing
Machkund 84 44
TB Dam 59 22
Donkarai 1x 25 25 1x25 25
Upper Sileru 4 X 60 240 4 X 60 133
Lower Sileru 4 X 115 460 4 X 115 200
Nagarjunasagar RT PH 3x30 90 3x30 0
Srisailam RBPH 7 X 110 770 7 X 110 0
Nagarjunasagar Tail Pond 2 x 25 50 0
Pennaahobhilam 2x10 20
Subtotal Existing Hydro 1798 424
Thermal (Coal)
Thermal (Gas)
Mini Hydro 0
RE
Hydro
Subtotal - Hydro 0 0
Thermal
RE
59
LGB sheet of AP Page 1 Joint study meeting at SRPC, Bengaluru
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/21
Despatch MW
Power Plant Installed Capacity Total Units
(MW) (MW) Considered Peak OffPeak
Existing
Hydro
Sharavathi 10 X 103.5 1035 10 X 103.5 507.15 207
Varahi 4 X 115 460 4 X 115 161 69
Kalinadi (Nagjheri) 6x150 900 1x135+5x150 525 0
Kodasalli 3 X 40 120 3 X 40 40 0
Kadra 3 X 50 150 3 X 50 50 0
Sharavati Tail Race 4 X 60 240 4 X 60 126 36
Almati Dam 1x15+5x55 290 1x15+5x55 0 33
Thermal
Raichur 7 X 210 + 1 x 250 1720 3 X 210 + 1 x 250 1376 620
Bellary 2 x 500 +1x700 1700 2 x 500 + 0 X 700 1360 650
Yeramars TPS 2 x 800 1600 1 x 800 1280 520
UPCL 2 x 600 1200 1x 600 960 390
Torangalu (Jindal) 2 x 130 + 4 x 300 1460 2 x 130 + 4 x 300 0 0
Gas
Small Hydro
Liganmakki 2x27.5 55 H 0 0
Jog 4x21.6+4x13.2 139.2 H 0 0
supa 2x50 100 H 0 0
Bhadra 1x7+2X12.1+1x2+6 39 H 0 0
Sivansamudram 6x3+4x6 42 H 0 0
Shimsa + Minirabad 2x8.6+(1x10+3x9) 45 H 0 0
TBDam Share(20%) 14 H 0 0
Ghataprabha 2x16 32 H 0 0
Mani Dam PH 2x4.5 9 H 0 0
Mini Hydro 4.5 H 0 0
Mallapur 2x4.5 9 H 0 0
Mini Hydro 702.66 859.56 H 515.736 85.956
Hydro
Subtotal - Hydro 0
Thermal
Edlapur
Mangalore TPS
Chattisgam Pit Head (Th)
Bidadi Gas
YEramarus
RE
-323
548095 400 387 388
-468 469 924 -915 -54 -26
TUTI-POL
544021 524015 378050
41 -60 531 -61 127
329
KUDAN4 NARDR-NW KOLHAPURPG
374101
1000 1000 -987 -468 469 -47 822
ALKUD
2
27R 27 98 41 -60 531 40 924 -915 -106 106 218 -217 -144
401 372129
1000 1000 -987 -47 176 -61 127 -59 22 -65 11 822
TALANDGE22
1
27R 27 98 765 -67 398 -144
53 -53
400 524098 765 400 378040
-528 -825 -14 16
MADHUGI4 SHOLAPUR-PG
18 836 36 53 -53 -822
544005 544113
-528 44 -825 -14 16 202
MADURAI4 DHARMPR
400 18 36
-1501 1521 740 -724 84 -83 -822
395 378045
307 -25 -39 98 -23 25 202
PUNE-PG-GIS
395 218
-1501 1521 740 -724 -252 254 836 -1788 1807
765 378043
307 -25 -39 98 -69 -175 44 89 168
AURANG-CHTPM
398
439 -252 254 815 -812
-58 134 -134 -69 -175 162 -235
544151 544097 763
439 -103 -37 -1275 1284
PALAVADI4 RASIPALA
524087 400
-58 -153 153 121 -120 150 -219
TUMKUR SP
403 -81 -60 -108 -49 800 -1275 1284
544012 S 524086 378049
-153 153 0H 150 -219
NAGAPTNM4 BELLARY-POOL PARLI NEW
542025 524013 787
-81 -60 0 -0 -274 275 -1842 477 -476
SALEM42 RAIC-NEW
-129 -6 -99 -67 -57 148 -338 191
528003
-21 0 -0 -274 275 RAIC800-1842 477 -476
408 -6 -99 -67 -57 148 -338 191
-129 871 -871 1856
544003 403 415 504008 775 781
-21 -101 101 209 56 15 -53
SALE GOOT
231 -45 -19 30
239 129 -208 190 -189 871 -871 1856
508099
-56 28 -175 175 -101 101 209 -86 21 -109 56 15 -53
CPETA800
239 129 -24 -14 -45 -19 30 -208 190 -189 -938 307 -977
-56 28 413 -86 21 -109 -120 -16 -202
-175 175
406 540506 524001 524084 522084 400
162 -24 -14 63 -938 307 -994
SALEM41 SMNH YELAHNKA YELAH220
-162 18 -431 433 256 -256 139 -139 55 -120 -16 -200
524077 522180 406 775 764
-5 198 -47 -9 87 -126 93 -86
BIDADI BIDADI
111 -66 133 -133 256 -256 139 -139
544007 504028
198 73 -67 87 -126 93 -86 KURL-NEW
HOSUR4
406 406 218 508028 518079
-197 -66 -85 85 133 -133 -63 522 KURL800 WARN800
406 508007
-4 -138 128 73 -67 -72 5 -522 979 -307
CUDP800
219 518051
-197 -85 85 -206 206 943 522 20 -25 -97
HYDR_800
522001
-4 -138 128 -123 59 -69 5 -522 996 -307 -614 615
SMNH
113 -113 173 -173 -206 206 943 402 20 -21 -97 63 -184
29 -72 94 -85 -123 59 -69 -614 615
405 63 -184
-11 173 -173 202 -201
522098 771
-24 94 -85 -94 -204 1170 -1165
MADHUGIR
-11 173 -173 -38 38 202 -201 -8 -61
504007 548087 508093
-24 94 -85 -63 64 -94 -204 1170 -1165
CUDP TIRUVLM NELL-POL
407 403 217 508048
-38 38 89 -89 368 -368 -776 780 237 -237 -8 -61
ADONI
-63 64 -48 -42 48 -36 -52 -316 -217 -101 772
-1197 1200 0
1
-38 38 89 -89 368 -368 -776 780 237 -237 72 -374 237
-63 64 -48 -42 48 -36 -52 -316 -217 -101 -1197 1200
504024 544087 2
222 411 782 765 72 -374
CHITOR TIRUVLM
548127
-585 586 -519 519 -1299 ARIYALUR7 -1200
502216 504048
CHINAKAMPALL 58 -58 110 -114 93 -67 144 1299 ADONI 255
504050 0
-2 2 12 NPKUNTA -95 -585 586 -519 519 -1299 333 2 0 1200 -1200
243 1
-40 41 -331 332 110 -114 93 -67 144 1299 108 -113 255
0 760
-3 3 -56 -5 161 333 1 0 1200
243 2
-64 65 -51 764 764 108 -113
-331 332
-56 -5 403 770 391
-2 2
544022
-40 41 -411 413 600 ALMATI4
S1 544002
220 -27 11 0H -122 122 MADR
504042
HINDPR40 -295 -39 -26 -161
504998
FSC-3 296 -5 -122 122 3
11 -160 160
544016
-16 27 -17 PUGALUR-NEW
524005 233 544013
HOODI4 PUGALUR4
-256 256
-127 100
544086
-256 256 MALEKTT
544033
-127 100 -98 98 KARUR II
403 27 -95 -805 807 193 -193 -434
407 -163 173 -173 154 37
-98 98 -242 244
27 -95 -89 -158 -805 807 193 -193 -434
407 -163 173 -173 154 37
-238 -242 244
-82 -89 -158 404
2000
W
-238 0H
-82 401
544014 402
ARSUR4
314029
-328 329 RAIGARH_POOL
101 -133 16.00 16.79
-977 1002
-328 329 348 372
0.8500 0.8886
101 -133 16.00 16.79
-977 1002
401 534008
348 372
TCR-HVDC 0.8500 0.8886
16.00 13.26 544122
-953 1003 EDAMLYRM
391 375 206 -205
0.8905 0.8862
16.00 13.26 -179 143 400
-953 1003
391 375 206 -205
0.8905 0.8862
396 -179 143
402
397
62
1
Power flow plot for proposed Domasandra 400/220 kV S/s
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-III/24
Exhibit -2
Alternative -2
524171 523040
DOMSANDRA DOMSNDRA22
-202 190 -190
524001
-100 113 -100
SMNH
202 -250 190 -190
75 -209 113 -100
1
73
206
522001
SMNH 84
-219 219 1
386
-115 132
524035
-219 219 261 MYLSNDRA
-115 132 132 -73
524011
-219 219 -206 -99
KOLAR
-115 132 -197 -260 -411 413
1 522035
-142 -167 141
207 MYLSNDRA220
1
248 -248
393
1 136 -114
389
248 -248
136 -114
76
248 -248 1
20
136 -114
544113 1 1
DHARMPR 385 205
207 251
123 133
0
1
58
1
403 63
1
Power flow plot for proposed Domasandra 400/220 kV S/s Annex-III/25
Agenda for 1st meeting of SRSCT (07.09.2018)
Exhibit -2
Alternative -3
524171 523040
DOMSANDRA DOMSNDRA22
190 -190
524001
113 -100
SMNH
-263 190 -190
-213 113 -100
1
206
522001
-13
SMNH
-116
-219 219 270 1
386
-115 132 132
524035
-219 219 202
116
MYLSNDRA
-115 132 90 -270
524011
-219 219 -204 -148 -2
KOLAR
-115 132 -199 -201 -389 390
1 522035
-103 -154 126
207 MYLSNDRA220
1
248 -248
393
1 136 -114
389
248 -248
136 -114
76
248 -248 1
20
136 -114
544113 1 1
DHARMPR 386 205
205 264
124 139
0
1
58
1
403 64
1
Agenda for
LOAD FLOW STUDY: ESTABLISHING 1X500 MVA, 400/220 kV SUB-STATION AT ARASA PADAVU, 1st meeting
DAKSHINA of SRSCTDISTRICT.
KANNADA (07.09.2018) Annex-IV
CASE-2: WITH 400/220 kV ARASAPADAVU S/S AT SYSTEM PEAK LOAD CONDITION.
523031
HEGUNJE 522068
SHIM
522008 522075
UDUPI220 105.8 VARH
524008 522051 1
52.1 4 51.1 -50.8
UDUPI400 KEMR
146.4 -144.8 161.7
106.5 -105.8 -5.4 -5.3 1
81.5 -77.1 51.1 -50.8 84.7
2X315 MVA,400/220 kV 56.2 -52.1 522151
146.4 -144.8 0.9 -5.4 -5.3
200.9 MUTTIKOPPA
3
292.9 -292.9 81.5 -77.1 16.8 -16.8
58.8 -58.3
186.9 -162.9 -15.4 13.9
1
1
1.0 -2.1 -6.3 1.0
212.2 80.5 41.5 218.4
1 1
-6.5R 21.8
80.5 1.0
522247 2
-6.5R 218.2
KEMR-MHS
420.0 1.0 522030
1 18.6 18.6 -18.6 PUTTUR
-113.5R 1 65.9 220.0 -65.5
2.0H 2.0 -2.0
32.5 -35.4 143.0
0.9 1
420.0
2 205.1 65.9 -65.5 74.9
-113.5R
32.5 -35.4
522059
69.9 KAVOOR 0.9
1 522150
35.2 201.1
MSEZ
230.0
523073 106.7 -106.0 1
94.8
ARSPDV2 45.9 -46.4
106.7 -106.0
115.2 -114.7
45.9 -46.4
45.8 -45.9
534049 1.0
0.9 25.0
KSRGOD4 115.2 -114.7 1 210.7
524174 205.1
-143.1 143.9 10.0
ARSPADV4 45.8 -45.9
176.5 -250.8 1.0
230.4 -230.4
214.8
99.6 -91.7
1
-143.1 143.9
176.5 -250.8 1X500 MVA,400/220 kV 1.0
ARASA PADAVU S/S 524175 216.8
MRPLGIS4 523074
MRPL220
1.0 129.7 -129.6 190.0 -190.0
416.3 380.0 -380.0 380.0
43.9 -62.0 83.6 -85.9 1
171.9 -150.0 150.0
1
190.0 -190.0
129.7 -129.6 1.0 524166 524009 524097
83.6 -85.9 2X500 MVA,400/220 kV
43.9 -62.0 1.0 214.8 YETNHOLE HASSAN4 CNHALLI
-175.5 398.8 176.0
-271.2 271.5 -381.7 383.9
-71.4 -42.0
-175.5 176.0 8.3 -34.1 -37.5 16.3
-271.2 271.5 -381.7 383.9
-71.4 -42.0
8.3 -34.1 -37.5 16.3
1.0 1.0 1.0
399.0 523033 401.5 405.6
YETINAHOLE
95.2 -95.2
33.8 -31.2
1
1 190.4
1.0 1
95.2 -95.2
400.0 62.5
33.8 -31.2
1
65 1.0
401.7 1.0
219.1
1
541607
542202
541516
TNPL21
TNPL2
VEDASANTUR21
1
1
-21.8 21.8 3.2 4.3
1
1
542048
ALUNDR42
1.6 -1.1 83.2 -82.8
542099
VEDASANDUR2
1
1
-21.8 21.8 -49.0 49.2 3.2 4.3
1
1
1.6 -1.1 52.1 -55.0 83.2 -82.8
121.3R
1
80.0
1.0
1.0
109.4
108.3
542219
544093
KPUDUR2
TAPPAKUN4
-13.7 48.6
544094
ANIKADAV4
542052
542105
TRICHULI2
SEMBATY2
224.8 -215.6
1.0
1.0
228.7
227.4
1.0
527.2 -517.9
230.0
7.4 -0.6
540509
-50.6 59.6
SEMBTY21
-169.6 172.5 0.0H
W
31.4
150.0
95.5
1.0
544999
VIRUDHNAGA4
1
1
8.3 -87.8 88.0 7.4 -0.6 121.6
1
395.7
1.0
-333.3 335.8
229.2
-43.2 6.0
1
1
-3.2 -87.8 88.0
542248
544132
PALANI2
KAMUTHI4
-333.3 335.8
0.0 18.0 -13.1
1.0
-43.2 6.0
232.6
-48.0 0.0H
542030
MYVADY42
S
188.1 -185.2
0.0 500.0
1
1
1.0
-87.8 88.0
-20.5 29.4 2.7 -2.8
394.5
1
66
124.9 -50.8 51.4
1
0.0 520.1 -517.1
1.0
110.0
-50.8 51.4
1.0
226.2
1.0
544017
KARAIK
400.0
1.0
-20.9 55.2
227.5
630.2 -621.0
542037
CHECKN42
-20.9 55.2
630.2 -621.0
Agenda for 1st meeting of SRSCT (07.09.2018)
1.0
227.9 -224.5
399.8
-19.0 32.2
FULL WIND FULL HYDRO FULL SOLAR
0.0
542094
PUGALR42
-19.0 32.2
1
-129.0 1 129.4
3.8 4.7 -50.1
541523
544063
VELALVDTHI41
VELALAVIDU
0.0
1
1
542036
542097
KARAI42
THENI2
-10.0 13.6 123.3
1.0
-6.6 16.6
1.0
230.0
149.6 -146.8
1
1
1.0
-26.5 26.5 -624.5 630.6
229.6
-102.6 -43.1
-9.4 1.1 52.9 -68.5
101.3 -101.1
1
1
1.0
-102.7 102.8
11.7 -41.4
400.5
BASE CASE : WITHOUT THE PROPOSED VADAMADURAI 400 KV SUBSTATION
22.9 -20.9
-565.6 570.0
1
1
-102.7 102.8
Annex-V/1
22.9 -20.9
542203
VELALVDTHI42
1.0
1.0
1.0
1.0
227.1
229.1
397.3
397.9
-29.9 30.1
-5.5 -12.9
1.0
1.0
228.4
228.8
541607
542202
541516
TNPL21
TNPL2
VEDASANTUR21
1
1
-39.6 39.7 0.7 4.5
1
1
542048
ALUNDR42
7.4 -5.8 70.6 -70.3
542099
VEDASANDUR2
1
1
-39.6 39.7 67.9 -67.7 0.7 4.5
1
1
7.4 -5.8 -4.4 1.3 70.6 -70.3
-206.2R
1
80.0
1.0
1.0
111.0
109.6
542219
544093
KPUDUR2
TAPPAKUN4
-9.3 -2.8
544094
ANIKADAV4
542052
542105
TRICHULI2
SEMBATY2
74.5 -73.5
1.0
1.0
231.2
229.5
1.0
163.7 -162.8
230.0
-3.2 -5.7
540509
-57.1 -31.8
SEMBTY21
-43.9 44.1 0.0H
W
31.4
1.9
95.5
1.0
544999
VIRUDHNAGA4
1
1
8.3 -95.8 96.0 -3.2 -5.7 126.9
1
402.7
1.0
-213.6 214.7
231.8
-3.5 -52.5
1
1
-3.2 -95.8 96.0
542248
544132
PALANI2
KAMUTHI4
-213.6 214.7
0.0 15.3 -9.8
1.0
-3.5 -52.5
232.6
-49.1 0.0H
542030
MYVADY42
S
63.1 -62.8
0.0 16.0
1
1
1.0
-95.8 96.0
1.7 -7.8 33.2 -36.4
403.0
1
67
126.0 -34.6 1.0
1
0.0 -1.6 1.6
1.0
111.3
-34.6 1.0
1.0
228.4
1.0
544017
KARAIK
402.4
1.0
-88.2 26.8
229.9
182.1 -181.3
542037
CHECKN42
-88.2 26.8
182.1 -181.3
Agenda for 1st meeting of SRSCT (07.09.2018)
1.0
191.8 -189.5
401.6
-10.0 16.8
0.0
542094
PUGALR42
-10.0 16.8
1
-130.6 1 131.0
-2.4 10.8 -51.3
541523
544063
VELALVDTHI41
VELALAVIDU
0.0
1
1
542036
542097
KARAI42
THENI2
-2.5 7.7 127.7
1.0
3.0 7.1
1.0
230.0
161.4 -158.3
1
1
1.0
-66.7 67.2 -88.7 88.8
233.3
-73.4 -75.0
-8.0 1.5 -61.6 -60.7
-132.4 132.7
1
1
1.0
-79.0 79.1
-44.7 -45.7
405.2
BASE CASE : WITHOUT THE PROPOSED VADAMADURAI 400 KV SUBSTATION
16.8 -15.6
-287.7 288.8
1
1
-79.0 79.1
Annex-V/2
16.8 -15.6
542203
VELALVDTHI42
1.0
1.0
1.0
1.0
229.5
233.0
404.3
405.8
-39.4 39.7
-7.5 -10.9
1.0
1.0
231.6
232.9
VEDASANTUR21
541607
TNPL21
541516
1
1
-57.8 58.1 5.2 -0.6
1
1
10.0 -6.5 65.7 -65.5
542249
542099
542202
VADAMADURA42
TNPL2
VEDASANDUR2
1
1
-57.8 58.1 5.2 -0.6
1
1
10.0 -6.5 65.7 -65.5
-119.2 119.7
12.7 -13.3
-14.4 10.4
1.0
1.0
109.3 -107.6
542030
MYVADY42
110.3
108.6
-119.2 119.7
12.7 -13.3
542052
SEMBATY2
1.0
1.0
229.5
228.7
81.5 -81.1
542248
PALANI2
-14.9 11.4
540509
SEMBTY21
-14.4 4.6
18.5 -20.9
66.3 -65.7
-14.4 4.6 73.1 -72.9
66.3 -65.7
1
1
8.3 -99.9 100.2
542219
544094
544171
KPUDUR2
ANIKADAV4
VADAMADURAI4
27.8 17.6 -11.4
1.0
1.0
229.5
1
1
-3.2 -99.9 100.2 -5.6 7.6 10.7 -3.0
227.9
1
1
0.0 17.6 -11.4 105.1 -105.0 -174.3 177.4
-24.7 -63.7 -190.1 195.4
-48.5
10.7 -3.0
1.0
1
1
0.0 -99.9 100.2 -5.6 7.6
399.9
-174.3 177.4
1
1
17.6 -11.4 105.1 -105.0 31.4
1
1.0
105.0
68
1.0
229.9
229.7
124.8
544017
544093
KARAIK
542105
TAPPAKUN4
TRICHULI2
1.0
8.4 -53.0
0.0
1.0
110.6
-460.1 462.3
232.9
0.0
1
123.4
150.0
542097
KARAI42
542037
CHECKN42
W
-80.6 25.9
0.0H
426.3 -424.0 374.4 -373.0
0.0
-80.8 22.2
72.3
Agenda for 1st meeting of SRSCT (07.09.2018)
192.8 -190.3
542094
PUGALR42
544013
PUGALUR4
-20.2 27.6
FULL WIND FULL HYDRO FULL SOLAR
1.0
1.0
-2.3 8.1
397.4
399.7
1
1
1
1
-126.5 126.9
1
1
367.5 -366.3
1.3 6.8 -50.5
VELALVDTHI41
541523
544063
VELALAVIDU
1
1
-126.5 126.9 0.0
1.0
542036
THENI2
228.7
1.0
135.0 -132.8 -101.7 -46.5
109.2
1.0
-32.8 32.9 79.4 -79.3
1.0
CASE1 : WITH THE PROPOSED VADAMADURAI 400 KV SUBSTATION
230.8
229.5
-3.6 -4.7
1
1
-93.5 93.6
2.3 -44.9
20.9 -19.3
-520.3 524.0
1
1
-93.5 93.6
1.0
1.0
401.9
399.5
20.9 -19.3
VELALVDTHI42
542203
Annex-V/3
1.0
1.0
1.0
229.3
230.0
398.8
1.0
230.0
VEDASANTUR21
541607
TNPL21
541516
1
1
-68.6 68.9 1.5 3.0
1
1
11.0 -6.3 65.1 -64.9
542249
542099
542202
VADAMADURA42
TNPL2
VEDASANDUR2
1
1
-68.6 68.9 1.5 3.0
1
1
11.0 -6.3 65.1 -64.9
-85.9 86.1
5.3 -7.4
1.2 -12.3
1.0
1.0
58.9 -58.4
542030
MYVADY42
111.7
109.7
-85.9 86.1
5.3 -7.4
542052
SEMBATY2
1.0
1.0
232.6
229.9
-17.0 17.0
542248
PALANI2
-6.2 0.2
540509
SEMBTY21
-3.3 -8.0
39.9 -43.4
53.2 -52.8
-3.3 -8.0 3.0 -3.0
53.2 -52.8
1
1
8.3 -96.1 96.4
542219
544094
544171
KPUDUR2
ANIKADAV4
VADAMADURAI4
25.3 14.0 -8.5
1.0
1.0
231.0
1
1
-3.3 -96.1 96.4 -2.7 6.8 -2.1 -7.2
228.8
1
1
0.0 14.0 -8.5 153.2 -153.0 -38.4 38.6
-68.2 -40.7 -48.5 48.8
-49.4
-2.1 -7.2
1.0
1
1
0.0 -96.1 96.4 -2.7 6.8
403.5
-38.4 38.6
1
1
14.0 -8.5 153.2 -153.0 31.4
1
1.0
95.5
69
1.0
233.0
232.4
128.4
544017
544093
KARAIK
542105
TAPPAKUN4
TRICHULI2
1.0
-30.9 -48.0
0.0
1.0
111.6
-197.9 198.3
232.9
0.0
1
127.5
1.9
542097
KARAI42
542037
CHECKN42
W
-29.8 -49.7
0.0H
158.6 -158.3 -70.6 70.6
0.0
-74.3 -21.5
NIL WIND FULL HYDRO NIL SOLAR
74.6
Agenda for 1st meeting of SRSCT (07.09.2018)
164.2 -162.5
542094
PUGALR42
544013
PUGALUR4
-14.3 17.5
1.0
1.0
0.4 8.2
404.0
405.4
1
1
1
1
-128.6 129.1
1
1
185.7 -185.4
-2.7 10.9 -51.3
VELALVDTHI41
541523
544063
VELALAVIDU
1
1
-128.6 129.1 0.0
1.0
542036
THENI2
230.0
1.0
153.9 -151.1 -73.2 -75.4
110.4
1.0
-77.1 77.7 -126.9 127.2
1.0
CASE1 : WITH THE PROPOSED VADAMADURAI 400 KV SUBSTATION
233.6
233.0
-9.6 3.7
1
1
-75.5 75.5
-44.7 -46.3
16.8 -15.7
-282.3 283.4
1
1
-75.5 75.5
1.0
1.0
405.1
405.7
16.8 -15.7
VELALVDTHI42
542203
Annex-V/4
1.0
1.0
1.0
230.0
232.9
404.2
1.0
232.5
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/1
1
541339
108.7 -100.8 22.8 -23.1 1
1
1
-0.0 31.0 -31.8 0.9 8.7
1.0 103.5
542227 541611
400.0 1.0 ERNDHLY2 27.5 -27.4 541615 VENKRAFT_EHT 12.5 -12.4
393.8 VENK_TOFF
58.9 -58.8 25.0 -25.1 -1.2 541501 -0.7
20.8 6.6 -6.5 4.5 GURUPAR21
14.0 -9.9 1 4.6 -4.5 1 -32.8 33.0
1
0.9
104.5
0.9
104.3
70
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/2
1
541339
81.6 -67.2 22.5 -22.8 1
1
1
-0.0 23.7 -23.6 1.0 8.7
1.0 104.7
542227 541611
400.0 1.0 ERNDHLY2 29.3 -29.2 541615 VENKRAFT_EHT 12.0 -11.9
396.4 VENK_TOFF
61.1 -61.0 24.7 -24.7 -1.2 541501 -0.9
20.8 8.4 -8.3 4.5 GURUPAR21
13.2 -8.9 1 4.6 -4.5 1 -32.6 32.8
1
1.0
105.7
1.0
105.5
71
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/3
1
-135.7 135.9 HOSUR21
-50.6 11.8 -2.9 2.3
-17.6 -64.7 1.0 1.0
13.8 392.2 -13.7 117.6 -117.2 -37.1 105.9 37.2
50.4
0.0 57.4 -118.8 24.5 -18.5 1 -23.6 541556 23.6
1
1.0
1.0 -2.7 105.2 2.7
106.6
-0.3 -1.1
1.0
105.5
1.0
105.5
72
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VI/4
1
-281.9 283.1 -34.1 -44.5 HOSUR21
-3.9 3.2
-155.0 85.1 1.0 1.0
400.6 129.8 -129.3 -34.2 108.0 34.2
225.6 -224.6 50.4
0.0 20.5 -13.6 1 -24.5 541556 24.4
1
1.0
1.0 -3.1 107.3 3.1
108.7
-3.0 1.5
1.0
107.4
1.0
107.7
73
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/1
ANNEXURE -1
540756
MOSUR21
542093
542024 MOSUR2
542127 TVALAM2 540388 540389
544087 TVALAM42 31.8 -31.8 SOLINGR MVPURAM1
TIRUVLM4 3.5 -2.4 51.9 -33.2 33.3
1
544002 110.8 -109.7 1 18.5 540982
179.2 -178.7 144.2 -144.0 31.8 -31.8 17.0 -16.5 16.2 1
SPBUDUR4 -2.1 -1.2 6.1 AJPET1
29.6 -29.5 1.0
-307.8 309.0 15.6 -4.9 -30.0 30.1 3.5 -2.4
1
1
540539 31.8 -31.8 2.1 -2.6 113.0
22.6 -98.9 144.2 -144.0 TVALAM1 10.8 -10.8 19.1
358.4 -357.3 3.5 -2.4 1
1
1.1 -30.0 30.1 5.8 -6.7 7.1
420.7 31.3 -9.9 58.1 -57.9 31.8 -31.8
1
1.0
112.1 541332
-7.7 11.7 3.5 -2.4
1
1
THAKOLM1 1.0
544022 9.0 -9.0 541564
179.2 -178.7 58.1 -57.9 15.6 111.6
ALMATI4 1.0 10.5 -11.4 PUNNAI1
1 540965 -2.4 2.4
15.6 -4.9 -7.7 11.7 5.1 236.4
1
540924
1.0 3.7
-3.5 -39.7 1.0 TIMIRI 1.0
115.0 42.0
238.6 1 -18.9 19.0 112.0
542166 1.0
13.0 25.0
KANCHI2 6.6 -7.8 111.6
1
1.0 9.1
416.1 116.5 -115.8 4.8 -4.7 30.0
1.0 1
417.5 7.7 -9.3 19.0 -19.9 10.0 1.0
1.0 112.8 540923
1.0 113.7 DAMAL
238.5 1.0
-6.4 6.4 16.8
236.6 1
7.1 -7.9 5.5
1.0
112.7 1.0
112.5
74
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/2
ANNEXURE -1
540756
MOSUR21
542093
542024 MOSUR2
542127 TVALAM2 3.4 -2.1 540388 540389
544087 TVALAM42 SOLINGR MVPURAM1
TIRUVLM4 34.1 -34.1
-13.5 13.6
1
17.0
544002 63.7 -63.3 1 18.5 540982
-28.3 27.9
51.9
SPBUDUR4
9.7 0.7 -11.2 10.9 3.4 -2.1 1 AJPET1
5.4 -12.2 -6.2 6.0 6.1
176.4 -175.9 112.3 -112.2 34.1 -34.1 1.0
-179.1 179.5
1
1
540539 3.4 -2.1 44.6 -44.4 112.5
-9.2 -77.7 -11.2 10.9 TVALAM1 34.1 -34.1 6.0 -6.0 19.1
1
1
19.5 1.5
1.0 112.3 -112.2
8.9 -9.8 7.1
416.4 352.7 -351.7
1
1
THAKOLM1 1.0
544022 14.6 -14.6 541564
9.7 0.7 -9.9 14.3
15.6 111.0
ALMATI4 1.0 5.8 -6.7 PUNNAI1
1 540965 3.2 -3.2
176.4 -175.9 60.5 -60.3
5.1 235.0
1
540924
1.0 3.7
-32.3 -27.9 1.0 TIMIRI 1.0
114.7 42.0
237.2 1 -11.5 11.6 111.4
542166 1.0
13.0 25.0
KANCHI2 1.7 -3.2 111.2
1
1.0 9.1
412.5 55.9 -55.7
20.5 -21.4
30.0
1.0 1
414.6 7.5 -11.9
-0.9 1.0
10.0 1.0
1.0 112.6 540923
1.0 113.4 DAMAL
237.3 1.0
-19.4 19.5 16.8
236.0 1
13.4 -14.0 5.5
1.0
112.4 1.0
112.2
75
1
CASE 1 : WITH PROPOSED 400 kV /230 kV -110 kV SHOLINGHUR SUBSTATION
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-VII/3
FULL WIND-FULL HYDRO -FULL SOLAR
542127
544087 TVALAM42
TIRUVLM4 542024
11.8 0.9 TVALAM2
-29.6 29.2
273.2 -272.6
1
5.9 0.5 91.9 -91.8
136.6 -136.3 540756
1
-29.6 29.2
MOSUR21
5.9 0.5 91.9 -91.8
542244 542093
136.6 -136.3 KATPADI2 MOSUR2
1
542166 79.9 -79.6 2.6 -2.1
KANCHI2 -3.6 1.2 21.3 -21.3
1
76.7 -7.9 5.2
1 0.0 -94.6 95.1 542228 2.6 -2.1
SHOLINGHUR42
1.0 21.3 -21.3
-65.6 65.9 41.7 -41.6
1
235.8
-6.2 0.9 -6.8 1.1
-9.5 1.0 2.5 2.6 -2.1
1.0 235.3
544002 234.2 544168 6.6 -6.6 21.3 -21.3
1
SPBUDUR4 SOLINGHUR4
628.6 -627.6
71.0 -75.9 -6.4 9.2 1.0 2.6 -2.1
-263.7 264.6 236.0
126.4 -126.2 21.3 -21.3
628.6 -627.6
1
1
-3.0 3.1
19.3 -97.4
71.0 -75.9
138.2 -137.3
-6.4 9.2
1.0 1.0 1.0
414.8 411.5 126.4 -126.2 234.1
1
131.0 1.0
2 235.6
0.0 540388
541590 SOLINGR
131.0 SHOLINGHUR41
544022 1 0.0
-0.7 1.0
71.7 -71.0
ALMATI4 64.9 -64.6
-16.2 17.1
-0.7 1.0 1.0
-346.2 347.2
-2.4 7.4
57.5 111.6
131.0 64.9 -64.6
-7.2 -45.2 18.0
102.7 -102.5
1
1
0.0 540982
AJPET1
1.0
-346.2 347.2 -2.4 7.4 1.3 112.1 -1.8
19.1
-7.2 -45.2
7.1
102.7 -102.5 42.2 -41.8
1
1.0
409.5 541564
-2.4 7.4 PUNNAI1
-0.1 -0.3
102.7 -102.5 1.0
22.2
1
542127
544087 TVALAM42
TIRUVLM4 542024
1.9 10.5 TVALAM2
-15.0 14.3
270.2 -269.5
1
1.0 5.3 67.2 -67.2
135.1 -134.8 540756
1
-15.0 14.3
MOSUR21
1.0 5.3 67.2 -67.2
542244 542093
135.1 -134.8 KATPADI2 MOSUR2
1
542166 82.2 -82.0 1.6 -0.9
KANCHI2 -7.5 5.1 25.4 -25.4
1
76.6 -7.6 2.8
1 0.0 -41.0 41.0 542228 1.6 -0.9
SHOLINGHUR42
1.0 25.4 -25.4
-47.5 47.6 67.9 -67.6
1
236.0
-2.3 -3.9 -11.7 7.1
-10.3 1.0 3.6 1.6 -0.9
1.0 235.7
544002 235.2 544168 25.6 -25.5 25.4 -25.4
1
SPBUDUR4 SOLINGHUR4
456.2 -455.7
45.0 -57.9 -10.4 12.8 1.0 1.6 -0.9
-143.2 143.4 236.1
117.9 -117.8 25.4 -25.4
456.2 -455.7
1
1
0.3 -3.1
1.0 -88.6
45.0 -57.9
94.4 -94.0
-10.4 12.8
1.0 1.0 1.0
414.0 411.2 117.9 -117.8 234.7
1
131.2 1.0
2 235.9
0.0 540388
541590 SOLINGR
131.2 SHOLINGHUR41
544022 1 0.0
-9.4 9.8
42.0 -41.8
ALMATI4 69.0 -68.7
-1.3 1.1
-9.4 9.8 1.0
-182.5 182.7
-7.4 12.5
57.5 112.0
131.5 69.0 -68.7
-12.5 -51.7 18.0
103.4 -103.1
1
1
0.0 540982
AJPET1
1.0
-182.5 182.7 -7.4 12.5 4.2 112.6 -5.0
19.1
-12.5 -51.7
7.1
103.4 -103.1 34.9 -34.6
1
1.0
410.3 541564
PUNNAI1
1.1 -1.7
1.0
22.2
-7.4 12.5
39.1 -38.7 111.6
7.1
103.4 -103.1
1
540922 540923
KAVRIPKM DAMAL
1.0
17.4 -17.3 16.8
111.6
1.0 -2.9 2.0 -1.2 0.5 5.5
409.8
33.8 -33.5
540965 30.0
13.0 SIPCOTTV -2.9 2.0 10.0
42.0 -29.1 29.6 33.8 -33.5 1.0
16.7 -18.2 111.9
1.0
1.0 113.0 77
113.6 1.0
112.1
1
548127
548999
544999
544093
ARIYALUR7
VIRUDHNAGA4
TAPPAKUN4
VIRUDHNAGAR
325.5 -323.1
-2.3 -37.0
544006
UDMP4
150.0
W
-1332.3 1332.3
325.5 -323.1 0.0H
1
1
-171.0 247.5
-2.3 -37.0 SW
548128
544132
COIMBTR7
KAMUTHI4
-0.0
544027
KAYATHAR4
1
-896.0 902.0 -1372.6 1384.9
954.0 48.6 -48.4
-40.2 -204.7 27.7 4.7 -514.7 517.8
0.0 513.7 -504.8
1
48.6 -48.4
-1372.6 1384.9 125.3 -49.4 52.4
-896.0 902.0
27.7 4.7 0.0 500.0
544017
KARAIK
2
S
-40.2 -204.7
125.3 0.0H
1.0
544004
ALUNDUR4
0.0
396.1
1
470.3 701.6 -692.5
1.0
1.0
-59.6 106.3
762.6
757.2
0.0
548004
544094
ANIKADAV4
UPPUR
1
648.5
720.0 -718.8
720.0 402.5 -400.1 SW
2
-4.6 -243.5
235.4R -37.3 19.8 -0.0
1.0
720.0 0.0
400.5
1
1
515.7 -506.8
235.4R 720.0 -718.8 72.1
402.5 -400.1 -57.4 61.0
0.0 -4.6 -243.5
1
-37.3 19.8
240.0
1.0
1.0
0.0
758.3
400.0
2
-627.0 636.4
240.0
64.7 -28.8
1.0
1.0
502.4 -496.8
765.0
397.3
-48.7 -6.6
541305
KAYATR41
1.0
1
1
88.6 -88.4 -627.0 636.4
395.3
544009
THENAMPATTY
-0.6 3.7 64.7 -28.8
1
1.0
78
542148
KANARP42
398.9
1
1
88.6 -88.4
544026
KANAPATT
-0.6 3.7
1
1
105.7 -105.6 -595.1 597.4
1
1
88.6 -88.4
544165
544167
OTTAPIDARA4
SEPC
1
1
105.7 -105.6 81.3 -81.2
-5.6 -33.1 475.0 0.0
1.0
1
1
110.3
-66.1R 124.9
39.9 -51.7 81.3 -81.2 -237.2 237.5
1.0
230.5
-13.7 -4.3 -5.6 -33.1
1.0
1.0
Agenda for 1st meeting of SRSCT (07.09.2018)
-706.2 708.5
400.0
400.0
544018
544072
TIRUNEL4
UDNGDI4
160.4 -148.1 -749.1 753.8 510.4 -508.2
-706.2 708.5 63.1 -44.2 -41.6 21.6
600.0
542090
ABISEK42
2
160.4 -148.1
-50.0L
-290.1 290.9 510.4 -508.2
-749.1 753.8 600.0
544166
SAMUGARANGAP
1
1
1
28.6 -13.6 -41.6 21.6
63.1 -44.2 -50.0L
1.0
399.9
259.2 -258.7
1.0
1.0
-1099.0 1101.6 -33.7 -11.0
232.2
400.5
241.6 -215.6
541412
KANRPT41
-144.9 145.4 259.2 -258.7
( BOTH TENNAMPATTY & UDANGUDI CONNECTED TO KAYATHAR 400KV SS)
1
1
14.2 -5.9 -33.7 -11.0
-144.9 145.4 500.0
1.0
-413.1 413.8
W1
1
1
-1099.0 1101.6 14.2 -5.9 0.0H
400.0
-28.6 12.7
241.6 -215.6 -144.9 145.4
1
1
14.2 -5.9 -413.1 413.8
-144.9 145.4
Annex-VIII/1
-28.6 12.7
1
1
14.2 -5.9
0.0
1
1
1.0 113.2
1.0
1.0
1.0
1.0
110.6
404.2
402.3
400.3
401.5
BASECASE(FWFS) : WITH UDANGUDI (2X660 MW) GENERATION+ WITH 400KV FEEDERS AS PER APPROVAL
548127
548999
544999
544093
ARIYALUR7
VIRUDHNAGA4
TAPPAKUN4
VIRUDHNAGAR
358.2 -355.3
2.1 -35.6
544006
UDMP4
150.0
W
-1453.1 1453.1
358.2 -355.3 0.0H
1
1
-178.9 270.0
2.1 -35.6 SW
548128
544132
COIMBTR7
KAMUTHI4
-0.0
1
-920.1 926.4 -1431.8 1445.3
952.6 33.3 -44.7
-30.6 -205.7 36.8 19.6 -415.9 417.8
544.4 -534.5
33.3 -44.7
-1431.8 1445.3 -49.6 65.1
-920.1 926.4
36.8 19.6 500.0 500.0
544027
544017
KAYATHAR4
KARAIK
1
S
-30.6 -205.7 0.0
1
300.7R 0.0H
1.0
125.6
544004
ALUNDUR4
0.0
396.2
1
468.9 704.7 -695.5
1.0
1.0
0.0
2
-59.9 107.4
762.0
756.1
0.0 125.6
548004
UPPUR
1
647.6
720.0 -718.8
720.0 -574.0 SW
2
6.3 -254.0
246.3R 9.4 -0.0
1.0
720.0 -574.0 0.0
400.6
1
1
246.3R 720.0 -718.8 9.4 72.1
1
240.0
1.0
1.0
0.0
757.8
400.0
2
-655.0 665.3
240.0 422.0 -418.0
72.5 -26.8
1.0
-53.6 -26.7
765.0
541305
KAYATR41
1.0
-655.0 665.3
394.9
1
1
90.8 -90.6
544009
THENAMPATTY
72.5 -26.8
1
-1.8 5.1
1.0
79
542148
KANARP42
500.0
398.9
1
1
90.8 -90.6
544026
KANAPATT
-48.0R
-1.8 5.1
1
1
105.7 -105.6
1
1
90.8 -90.6 -776.9 780.8
544165
544167
OTTAPIDARA4
SEPC
-28.5 30.7
-1.8 5.1 73.2 -57.1 -237.2 237.5
-102.2 102.2
-5.6 -33.1
1
1
105.7 -105.6 475.0 0.0
1.0
1
1
110.3
-28.5 30.7 -66.1R 125.0
73.2 -57.1 -102.2 102.2 -237.2 237.5
1.0
230.6
-3.0 -14.9 -5.6 -33.1
1.0
1.0
Agenda for 1st meeting of SRSCT (07.09.2018)
-557.0 558.4
400.0
400.0
544018
544072
TIRUNEL4
UDNGDI4
147.2 -144.3 453.4 -451.6
-557.0 558.4 -41.9 14.9
579.4 600.0
542090
ABISEK42
2
147.2 -144.3
-45.2 -50.0L 200.0
1
1
1
1
40.1 -20.8 -41.9 14.9
-45.2 -50.0L
1.0
399.9
396.0 -394.7
1.0
-959.9 961.9 -29.0 -4.4
232.1
4
228.3 -211.5
541412
KANRPT41
-149.7 150.2 396.0 -394.7
1
1
16.8 -7.9 -29.0 -4.4
3
500.0
1.0
1.0
400.9
400.0
1
1
16.8 -7.9 -32.5 14.7
228.3 -211.5 -149.7 150.2
1
1
16.8 -7.9 -375.4 376.0
Annex-VIII/2
1
1
16.8 -7.9 0.0
1
1
1.0 113.4
1.0
1.0
1.0
1.0
110.6
404.7
402.8
400.7
401.9
CASE1 : REVISED CONNECTIVITY -UDANGUDI TO VIRUDHUNAGAR & THENNAMPATTY TO KAYATHAR 400KV SS
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-IX/1
BASE CASE : PROVISION OF 1 NO. 500 MVA, 400/230 KV ICT AT SRIPERUMBUDUR 400/230-110 KV SS
4.7
4.7
107.8
-11.0
242.0
-47.1
242.0
-47.1
517.5
-16.3
517.5
-16.3
491.3
491.3
544090 1.0
SVCHTRM 398.2
-241.9
-241.9
-511.5
-511.5
-41.1
-41.1
33.6
33.6
544087 1.0
-193.9
13.4
284.9
47.7
TIRUVLM 400.5
64.4
-20.1
1
-107.6
-483.0
-483.0
-39.2
-18.3
-18.3
194.0
1
-64.3
-65.1
-21.9
544002 1.0
MADR 398.2
-284.1
-32.6
542117 1.0
364.3
56.9
193.2
35.3
193.2
35.3
193.2
35.3
SVCATRM2 226.7
-132.1132.5
9.4
72.2
10.7
79.4
12.4
1
1 1 1
-9.2
542064 1.0
1 3 X 315 MVA, 400/230 KV ICT ORAGADM2 225.8
-362.6
1 1 1
-29.5
540510 1.0
-29.4
3.4
SPBUDR41 108.1
-192.5
-192.5
-192.5
-21.3
-21.3
-21.3
29.5
-6.1
542050 1.0
SPBUDUR2 225.8
35.0
10.2
60.7
15.8
188.1
0.3
-22.7
6.8
-14.5
-11.7
126.1
33.1
126.1
33.1
58.5
20.6
-13.5
-72.2
-13.0
-63.7
-11.9
126.5
-125.6
-125.6
-32.9
-32.9
542016 1.0
KADAPEI2 223.8
-72.2
-11.3
63.8
10.4
-60.5
-19.4
542065 1.0
14.5
MAMSIPC2 226.4
TARMANI2 223.8 NCTPS2 227.1
51.3
27.4
-58.4
-23.7
542017 1.0
-187.2
KORATUR2 223.9
31.4
-79.4
-12.8
542015 1.0
-51.2
-28.4
-79.3
-13.2
72.3
12.2
542224 1.0
12.9
22.8
GPOODI2 224.9
38.4
1 542121 1.0
5.3
GUINDY2 223.2
80
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-IX/2
CASE 1 : BASE CASE + ENHANCEMENT OF 400/230 kV ICT CAPACITY FROM 3 X 315 MVA TO 3 X 500 MVA AT SRIPERUMBUDUR 400/230-110 KV SS
9.0
9.0
-6.5
-48.6
-48.6
-17.0
-17.0
136.0
231.0
231.0
515.4
515.4
504.1
504.1
544090 1.0
SVCHTRM 398.2
-230.9
-230.9
-509.4
-509.4
-41.2
-41.2
34.8
34.8
544087 1.0
-48.3
30.1
233.2
36.9
TIRUVLM 400.5
93.1
-15.2
1
-135.7
-495.3
-495.3
1
-42.2
-17.4
-17.4
-92.9
-68.9
-39.9
48.3
544002 1.0
MADR 397.7
-232.6
-26.7
542117 1.0
330.9
51.5
280.0
44.8
280.0
44.8
280.0
44.8
SVCATRM2 227.1
-128.6 129.0
9.1
50.8
8.3
52.8
9.3
1
1 1 1
-9.1
1 3 X 500 MVA, 400/230 KV ICT 542064 1.0
ORAGADM2 226.2
-329.5
1 1 1
-28.8
540510 1.0
53.6 -53.5
1.0
SPBUDR41 108.0
-279.2
-279.2
-279.2
-30.1
-30.1
-30.1
-3.4
542050 1.0
SPBUDUR2 226.5
35.0
10.2
80.9
18.2
234.5
2.3
-10.3
7.7
-4.0
-10.4
151.4
35.8
151.4
35.8
79.0
23.2
-9.3
-8.8
-11.0
-38.8
-35.6
140.6
-150.7
-150.7
-34.5
-34.5
542016 1.0
KADAPEI2 224.3
-50.8
35.6
-9.0
-80.5
-21.0
6.9
542065 1.0
542007 1.0 542014 1.0
4.0
0.3
MAMSIPC2 226.9
TARMANI2 224.1 NCTPS2 227.4
62.1
28.5
-78.7
-25.5
542017 1.0
-233.1
KORATUR2 224.3
30.3
-80.1
-10.9
542015 1.0
-62.1
-29.3
-52.8
-10.3
38.8
8.2
11.0
10.4
VEMBAKKAM2 225.1
GPOODI2 225.2
29.0
1 542121 1.0
4.3
GUINDY2 223.6
81
1
ALMATI4
544022
544000
CHENN-EX
540204
NCTPSANG1
540.0
544040
MANALI4
250.0H
-538.2 540.0
1
1
-213.9 250.0
0.0
1
-426.6 428.0
123.5
-86.9 80.5
397.6
540207
21.7 NCTPSANG2
-538.2 540.0
540.0
1
1
1
-213.9 250.0
250.0H
21.7
-359.3 360.0
-33.7 25.1
1
82
544088
VALLUR TPS
-180.5 180.5
SVCHTRM
544090
143.8 -144.8
-323.8 324.7
-32.5 17.3 -180.5 180.5
Agenda for 1st meeting of SRSCT (07.09.2018)
-112.0L
-323.8 324.7
-32.5 17.3
Base Case : 2019-20 Year Network condition -NCTPS Stage III (1X 800 MW)
450.0
2
-112.0L
399.7
-277.9 278.4
450.0
3
401.7
-23.7 7.8
-112.0L
-277.9 278.4
Annex-X/1
-23.7 7.8
401.5
400.2
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-X/2
Case 1: Base case + NCTPS Stage III (1 X 800 MW) Contingency arrangement of making LILO of Alamathy - Manali 400 kV # at 765/400 kV North Chennai Pooling Station
1 1 2 3
1
250.0H
-112.0L
-112.0L
-112.0L
540.0
250.0H
450.0
450.0
450.0
540204
540.0
544088
184.3R
NCTPSANG2 21.8
548013
NCTPS-STG3 765.0
540.0
250.0
146.3
-141.8
146.3
-141.8
261.1
5.5
261.1
5.5
540.0
250.0
720.0
184.3
1
1
1 1
1
-538.2
-214.3
-538.2
-214.3
-146.3
-146.3
140.7
140.7
-719.9
-194.0
544000
249.8
12.8
338.9
388.3
99.7
12.8
253.5
388.3
719.9
-55.8
1
-719.9
77.6
544130
NORTH CHEN P 401.0
160.1
-90.7
559.9
63.4
-387.1
-24.4
-387.1
-24.4
544090
SVCHTRM 402.3
-253.0
-115.9
-559.3
-62.4
544040
MANALI4 400.0
-90.9
-22.2
0.0
125.0
-159.9
-260.6
-260.6
-338.3
-21.4
-22.5
-22.5
73.5
91.0
-31.8
544022
ALMATI4 1 402.9
83
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XI/1
544127 1.0
ARIYALUR4 402.9
92.9
-89.5
92.9
-89.5
-18.5
-97.6
-18.5
-97.6
544046 1.0
18.6
35.8
18.6
35.8
NNTPS4 409.1
228.9
101.1
-27.6
28.3
1
-82.3
544003 1.0
27.8
SALEM4 397.8
-92.6
-92.6
545001 1.0 1
-6.5
-6.5
MANALMEDU4 407.7
-228.4
-90.3
542184 1.0
-272.8
2.4
NNTPS2 230.8
275.3
114.5
10.2
114.5
10.2
-29.3
544001 1.0
NLCTPS_II 402.5
542056 1.0
CUDALRE2 230.2
72.8
4.5
72.8
4.5
72.8
4.5
27.2
-16.9
-175.7
30.1
35.5
-21.9
35.5
-21.9
-108.0
17.0
-33.0
-0.1
1 1 1
-114.4
-114.4
177.5
-25.7
-11.8
-11.8
542011 1.0
NEYVELI2 230.5 1 1 1
109.0
-19.3
542073 1.0
NEYZERO2 230.3
117.7
3.0
117.7
3.0
117.7
3.0
-72.6
-72.6
-72.6
540712 1.0
1.7
1.7
1.7
CUDALU21 109.6
-35.2
-35.2
542063 1.0
-0.9
-0.9
1 1 1
5.5
31.8
10.3
8.1
-12.1
38.7
7.2
70.1
18.4
-16.7 16.7
52.4
13.2
VEERPRM2 231.6
541190 1.0
-5.5
1 1 1 CAPERHIL 109.6
-27.1
542006 1.0
8.2
-69.4
-17.5
-117.3
-117.3
540497 1.0 1
5.3
5.3
5.3
NLCTNEB21 109.9
82.7
-17.9
82.7
-17.9
-73.7
18.0
3.3
10.2
-52.2
-13.1
1
-31.7
-10.4
1 1
-11.5
-7.2
540700 1.0
NATAPATU 109.3
-82.3
-82.3
540517 1.0
26.4
26.4
VILPRM21 112.9
-38.6
540701 1.0
11.5
-7.4
6.9
31.7
10.4
1 SEMNKUPM 109.0
-23.2
542139 1.0
74.2
33.1
-9.1
ULUNDR2 230.3
-11.9
-13.5
1
39.0
14.0
541182 1.0
18.0
5.6
PANRUT_URBAN 109.3
61.4
4.6
61.4
4.6
540657 1.0 1
11.3
12.0
12.5
-8.0
1 1
-18.0
-5.6
BMUTLUR 110.0
1 1
-82.7
21.5
7.1
-25.4
-30.9
540747 1.0
28.1
18.0
5.4
PANRUTI1 109.4
-61.3
-61.3
541375 1.0
-1.0
-1.0
ULUNDR21 109.7
1
37.5
12.3
540939 1.0
25.6
30.6
CHIDAMB1 111.4
1
9.3
28.3
84
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XI/2
544127 1.0
ARIYALUR4 404.5
-77.7
-77.7
19.4
-95.0
19.4
-95.0
180.7
180.7
-19.3
-19.3
544046 1.0
32.7
32.7
NNTPS4 410.1
289.7
103.0
121.4
1.7
1
-120.8
-52.4
544003 1.0
-179.6
-179.6
SALEM4 401.0
-10.4
-10.4
545001 1.0 1
MANALMEDU4 407.0
-288.9
-86.8
542184 1.0
-279.4
7.5
NNTPS2 231.3
282.0
141.4
10.4
141.4
10.4
-34.3
544001 1.0
NLCTPS_II 405.1
542056 1.0
CUDALRE2 230.4
91.6
9.0
91.6
9.0
91.6
9.0
14.1
-19.2
-146.6
20.2
-8.4
-18.4
-8.4
-18.4
-97.2
12.4
-28.3
-3.5
1 1 1
-141.3
-141.3
147.8
-18.8
-11.8
-11.8
542011 1.0
NEYVELI2 231.0 1 1 1
-15.8
542073 1.0
98.0
NEYZERO2 230.7
154.1
5.2
154.1
5.2
154.1
5.2
-91.3
-91.3
-91.3
540712 1.0
1.0
1.0
1.0
CUDALU21 109.3
542063 1.0
-6.4
-6.4
1 1 1
8.4
8.4
5.5
31.8
10.3
38.3
-10.3
50.2
8.0
76.6
17.2
-16.7 16.7
60.3
13.8
VEERPRM2 232.9
541190 1.0
-5.5
1 1 1 CAPERHIL 109.3
-14.1
542006 1.0
10.2
-75.8
-16.0
-153.3
-153.3
540497 1.0 1
9.0
9.0
9.0
NLCTNEB21 110.1
87.7
-18.8
87.7
-18.8
-52.5
15.7
3.3
10.2
-60.0
-13.5
1
-31.7
-10.4
1 1
-3.7
-6.8
540700 1.0
NATAPATU 109.0
-87.2
-87.2
540517 1.0
28.3
28.3
VILPRM21 113.4
-49.9
540701 1.0
-7.9
3.7
6.5
31.7
10.4
1 SEMNKUPM 108.6
-22.1
542139 1.0
52.8
28.4
-5.9
ULUNDR2 230.9
7.2
-12.6
1
39.0
14.0
541182 1.0
18.0
5.6
PANRUT_URBAN 109.6
68.6
4.3
68.6
4.3
-38.1
540657 1.0 1
10.1
11.6
-7.2
1 1
-18.0
-5.6
BMUTLUR 109.1
1 1
-62.7
21.5
7.1
23.8
-28.7
540747 1.0
22.2
18.0
5.4
PANRUTI1 109.8
-68.5
-68.5
541375 1.0
1.1
1.1
ULUNDR21 110.1
1
37.5
12.3
-23.6
540939 1.0
28.4
CHIDAMB1 109.7
1
9.3
28.3
85
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XI/3
CASE 1: WITH PROPOSED 400kV CUDDALORE SS WITH SOURCE AS 400kV DC LINE TO MANALMEDU SS & 400 kV DC LINE TO NLCTSII SS
544127 1.0
ARIYALUR4 404.7
97.3
-69.5
97.3
-69.5
17.9
-94.0
17.9
-94.0
-17.8
-17.8
544046 1.0
31.6
31.6
NNTPS4 410.2
153.9
-0.5
-153.1
-47.1
544003 1.0
SALEM4 401.3
-97.0
-26.9
-97.0
-26.9
545001 1.0
MANALMEDU4 406.5
-177.7
-36.5 -7.5
178.7
544001 1.0
-96.7
27.6
-96.7
27.6
NLCTPS_II 404.9
382.6
7.1
382.6
7.1
2 1
-382.0
-382.0
127.3
127.3
-89.7
-89.7
-31.6
-31.6
545002 1.0
96.8
96.8
0.0
0.0
CUDDALORE4 403.7
542073 1.0
130.9
-8.5
130.9
-8.5
154.2
2.5
154.2
2.5
NEYZERO2 231.0
1 1 1 1
-13.6
-14.1
1 1 1 1
-153.7
-153.7
540712 1.0
-130.7
-130.7
6.8
6.8
542056 1.0
13.6
11.5
11.5
CUDALU21 110.7
6.3
CUDALRE2 232.3
70.1
21.3
16.7
5.5
31.8
10.3
62.7
-18.6
59.4
4.9
66.7
11.7
31.8
-20.4
31.8
-20.4
96.0
-15.9
57.7
18.1
30.7
9.3
-16.7
541190 1.0
-5.5
CAPERHIL 110.7
-30.6
-14.2
542011 1.0
-95.2
542006 1.0
11.5
NEYVELI2 231.1
-69.4
-20.3
1
140.6
-0.2
140.6
-0.2
140.6
-0.2
92.3
-24.2
92.3
-24.2
40.4
-38.5
10.2
3.3
-66.3
-11.2
1 1 1 541093 21.0 1.0
7.0
1 1 1 KULNCVDI 109.8
-31.5
-31.5
542063 1.0
-3.2
-3.2
VEERPRM2 233.3
1
1 1
-31.7
-10.4
2.6
-9.0
1 1 1 540700 1.0
-91.8
-91.8
540517 1.0
35.0
35.0
NATAPATU 110.4
VILPRM21 114.1
-140.0
-140.0
-140.0
540497 1.0
12.1
12.1
12.1
-59.0
-2.6
8.7
31.7
10.4
1 SEMNKUPM 109.9
-46.6
-57.3
-25.7
0.0
-51.7
542139 1.0
38.8
ULUNDR2 228.1
64.8
-25.0
22.6
-18.1
39.0
14.0
541182 1.0 1
18.0
5.6
1 PANRUT_URBAN 110.2
95.9
72.8
95.9
72.8
-62.0
-22.4
540657 1.0 1
19.4
17.4
0.9 0.9
-18.0
-5.6
BMUTLUR 110.4
1 1
-63.6
21.5
7.1
63.0
540747 1.0
-43.8
26.4
18.0
5.4
PANRUTI1 110.4
-95.6
-61.3
-95.6
-61.3
541375 1.0
ULUNDR21 114.3
1
37.5
12.3
-62.2
540939 1.0
44.9
CHIDAMB1 111.0
1
28.3
9.3
86
1
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XII/1
01235123
1
31
7
7
838
27
713
31
7
09711
1
81
11
1
97 !1
53
11
1
77
8 "3
!
!1 ! 1
0971 ! 1181
0!
!
113
71 1! 9 3 1!
1
18872331
3 7891
! 1
!
!298911
72911
1
6789
121831
7
7
3988
12722722326
87
Annex-XII/2
SIRIPALLE220 47.3
-156.0L 45.2 -31.9 -8.8
-120.7 30.3
178.7 -178.7 1.0
-47.9 55.3 -55.3 134.3
1.0000 1.0000
1.1250 1.1250
1 175.5 511126
45.2 -31.9
512114 44.2 -38.8 RCPE
178.7 -178.7 -4.3 BHIMAVARAM
Agenda for 1st meeting of SRSCT (07.09.2018)
GVK-II
-223.5 403.0 -32.5
61.1 226.5 -226.1 -163.4 -66.0 134.2 1.0 512091 7.4
-47.7 214.9 RCPE220 -14.2
223.5 -87.9 35.9 -75.2 -9.3 25.1 32.6
-223.5 -77.7 77.7 -77.7 -15.0
1.0000 1.0000
1.1250 1.1250
61.1 -163.4 -66.0 134.2 1.0 14.1
-47.7 1.0 214.7 -57.7 57.7 -47.8 -6.8
1.0 -75.2 -9.3 25.1 15.0 511060 1
402.4 512043 -77.7 77.7 -77.7
400.0 KDA
263.4 1.0 JEGURUPADU2 6.2
216.3 -57.7 57.7 -47.8
88
200.0 61.2 66.1 78.0 3.8 -3.8
270.5 512032 512248 T1 1.0 -2.4 75.0
BHIMADOLU PALLANTLA -28.0L 263.4 8.0 54.4 214.1 4.6 -6.1 1
00
58.1 00 2.4 1.1 38.0
61.2 1. 66.1 78.0
-46.9 47.1 9 35.6 -3.0 -35.5
1.0 90 8.0 54.4
00 .9
0.6 -9.1 402.5 00 0 15.4 511087 -15.5
1. -263.4 GOLLAPALEM13 103.0
176.4 -46.9 47.1 09 512113 1
99 -43.1 PEDDAPURAM 19.1 -19.1 -8.9 8.9 25.8
37.2 0.6 -9.1
512061 0.
NIDADAVOLU -263.4 512034 10.1 -10.8 -1.8 0.5
1.0 1.0 1.0
512116 BOMMURU
217.0 214.7 -0.5 0.5 -43.1 19.1 -19.1 135.8
PATTISEEMA22
-43.1 1.0
64.1 -63.9 0.9 -8.2 -82.6 82.9 114.6 10.1 -10.8 135.7 511517
-6.8 EDITHA
-5.2 -0.5 -0.5 0.5 -24.0 22.3 -16.2 1.0
-134.1 135.3
-176.0 64.1 -63.9 0.9 -8.2 114.6 -114.0 6.3
-25.1
-37.2 -5.2 -0.5 1.0 -16.2 12.2 27.8
-134.1 -6.2
1.0 214.8 180.0 106.5 -114.0 1.0
215.3 G1 -25.1 136.3 -28.5
132.0 512010 45.0H 16.5 12.2
1 512027 KORUKONDA220 -106.3 29.2
66.0 -84.2 PURUSHOTHAPA 1.0 56.4 -56.2 1
1.1 216.5 -16.8 14.6
-18.4 40.0 -13.3 9.6
1 -12.3 -1.1 1.0
1.0 20.0 1.0 134.6
215.8 1.1 6.9 216.0
-270.2 57.0 -56.8 512028
-12.3 KRISHNAVARAM -1.1
-56.2 1.7 -6.4
25.0 -25.0 6.9
57.0 -56.8
6.5 -12.5 1.0
1.7 -6.4 216.0 WITH GAS AT VEMAGIRI
25.0 -25.0 50.0
84.3 1 EHT TRANSMISSION LOSSES: 451.340 MW
6.5 -12.5 25.0
16.8
1.0
72.0 215.0
1
36.0
1.0
1.0 215.6
216.2
Annex-XII/3
SIRIPALLE220 47.3
-156.0L 45.1 -31.8 -8.8
-120.8 30.3
178.3 -178.3 1.0
-47.9 55.3 -55.3 134.3
1.0000 1.0000
1.1250 1.1250
1 176.0 511126
45.1 -31.8
512114 44.2 -38.8 RCPE
178.3 -178.3 -4.3 BHIMAVARAM
Agenda for 1st meeting of SRSCT (07.09.2018)
GVK-II
-224.5 403.0 -32.5
61.3 225.5 -225.1 -162.9 -65.6 132.7 1.0 512091 7.4
-47.8 214.9 RCPE220 -14.3
224.5 -88.0 35.9 -75.0 -9.2 24.9 32.6
-224.5 -77.7 77.7 -77.7 -15.0
1.0000 1.0000
1.1250 1.1250
61.3 -162.9 -65.6 132.7 1.0 14.1
-47.8 1.0 214.7 -57.7 57.7 -47.9 -6.9
1.0 -75.0 -9.2 24.9 15.1 511060 1
224.5 402.4 512043 -77.7 77.7 -77.7
400.0 KDA
262.9 1.0 JEGURUPADU2 6.2
47.8 216.3 -57.7 57.7 -47.9
89
200.0 61.0 65.6 78.0 3.8 -3.8
224.5 512032 512248 T1 1.0 -2.4 75.0
BHIMADOLU PALLANTLA -28.0L 262.9 7.9 54.4 214.2 4.6 -6.1 1
00
47.8 00 2.4 1.2 38.0
61.0 1. 65.6 78.0
-45.9 46.1 09 35.6 -3.0 -35.5
1.0 9 7.9 54.4
00 0.9
0.6 -9.2 402.5 00 15.4 511087 -15.5
1. -262.9 GOLLAPALEM13 103.0
-45.9 46.1 09 512113 1
99 -43.0 PEDDAPURAM 19.1 -19.1 -8.9 8.9 25.8
0.6 -9.2
512061 0.
NIDADAVOLU -262.9 512034 10.1 -10.8 -1.8 0.5
1.0 1.0 1.0
512116 BOMMURU
217.0 214.7 -2.2 2.2 -43.0 19.1 -19.1 135.8
PATTISEEMA22
-42.6 1.0
61.5 -61.3 0.7 -8.1 -83.6 83.9 114.6 10.1 -10.8 135.7 511517
-6.7 EDITHA
-5.5 -0.3 -2.2 2.2 -24.0 22.4 -16.2 1.0
-132.6 135.3
61.5 -61.3 0.7 -8.1 114.6 -114.0 6.3
-24.8
-5.5 -0.3 1.0 -16.2 12.2 27.8
-132.6 -6.2
-127.5 1.0 214.8 180.0 105.5 -114.0 1.0
215.2 G1 -24.8 136.3 -28.4
132.0 -27.5 512010 45.0H 16.3 12.2
1 512027 KORUKONDA220 -105.3 29.2
66.0 -127.5 PURUSHOTHAPA 1.0 56.6 -56.4 1
4.8 216.5 -16.6 14.6
-27.5 -224.3 40.0 -13.3 9.6
1 -11.7 -4.8 1.0
1.0 -46.9 20.0 1.0 134.6
215.7 4.8 6.3 216.0
-224.3 60.7 -60.5 512028
-11.7 KRISHNAVARAM -4.8
-46.9 2.4 -7.0
25.0 -25.0 6.3
127.6 60.7 -60.5
6.5 -12.5 1.0
26.5 2.4 -7.0 216.0 WITH GAS AT VEMAGIRI
25.0 -25.0 50.0
127.6 1 EHT TRANSMISSION LOSSES: 451.320 MW
6.5 -12.5 25.0
26.5
1.0
72.0 215.1
1
36.0
1.0
1.0 215.7
216.3
LOAD FLOWS WITH & WITHOUT PROPOSED 220kV FEATURES AT 400 KV GVK POWER PLANT TO EXTEND
POWER SUPPLY TO PROPOSED 220/132/33 KV RAMACHANDRAPURAM SS
Annex-XII/4
90
18 220/132 kV Siripalli - Amalapuram 2 x 35.5 2 x 47.3 2 x 47.3
19 220/132 kV Siripalli - Kothapeta 44.7 26.5 26.5
20 220/132 kV Siripalli - Ramachandrapuram 21.7 -10.4 -10.4
21 132 kV Ramachandrapuram - Kothapeta 5.7 - -
22 132 kV Ramachandrapuram - Kakinada 2 x -18.3 -2.4 -2.4
23 132 kV Ramachandrapuram - Editha -22.6 - -
24 132 kV Gollapalem - Kakinada -47 -8.9 -8.9
25 220/132 kV RC Puram - Kothapeta - 23.9 23.9
26 220/132 kV RC Puram - Editha - 6.3 6.3
1 x 32.6+ 1 x 15.0 + 1 x 1 x 32.6 + 1 x 15.1 + 1 x
27 220/132 kV RC Puram - RC Puram -
35.6 35.6
28 220/132 kV RC Puram - Kakinada - 3.8 3.8
29 220/132 kV RC Puram - Gollaplem - 2 x 19.1 2 x 19.1
EHT Transmission Losses 463.430 451.340 451.320
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/1
Annexure – 1
1. List of applicants granted Stage-I Connectivity in 23rd Connectivity / LTA meeting of SR held on 07.06.2018.
Sl. Applicatio Applicant Location Date of Connectivity Nature Primary location for Dedicated Tr. Alternative location Dedicated Tr.
No. n No. Application Quantum of Connectivity / Tr. System for Connectivity / Tr. System for
(MW) Applican System under ISTS System under ISTS alternative
t connectivity
Connectivity applications near Munirabad
Koppal / Ostro Dakshin – Munirabad-III (new)
Koppal, Ostro Dakshin –
12000004 Ostro Dakshin Munirabad-II Koppal / Establishment of
1. Karnataka 21.06.2016 300 Wind Munirabad-III
05 Power Pvt. Ltd. (new) Munirabad-II Munirabad-III
220kV S/c line
Establishment of 220kV S/c line 400/220kV S/s at
Gadag & Koppal / Clean Wind – suitable location
Clean Wind –
12000006 Clean Wind Power Koppal, Munirabad-II Koppal / near Munirabad
2. 13.01.2017 300 Wind Munirabad-III
16 Tuticorin Pvt. Ltd. Karnataka 400/220kV S/s at Munirabad-II along with 1x500
220kV S/c line
suitable location 220kV S/c line MVA, 400/220kV
Mytrah Energy Koppal near Mytrah Energy – ICT
Mytrah Energy –
12000006 (India) Pvt. Ltd. Dist., Koppal/Muniraba Koppal / Munirabad-III –
3. 22.02.2017 200 Wind Munirabad-III
50 (Kyadiguppa Wind Karnataka d along with Munirabad-II Munirabad-II or
220kV S/c line
Farm) 1x500 MVA, 220kV S/c line Munirabad
400/220kV ICT IMPEL (existing) 400kV
Koppal/Muniraba Renewable – Quad/HTLS D/c
300
d-II – Munirabad Koppal / line with carrying
(enhanced IMPEL
Koppal, (existing) 400kV Munirabad-II capacity of 2000
12000007 IMPEL Renewable from 250 Renewable –
4. Karnataka 09.05.2017 Wind Quad/HTLS D/c 220kV S/c line MW at nominal
22 Power Pvt. Ltd. MW as per Munirabad-III
line with carrying
applicant 220kV S/c line
capacity of 2000
request)
MW at nominal
voltage
Connectivity applications near Gooty/Kurnool
91
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/2
CTU Agenda for 1st SRSCT
92
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/3
CTU Agenda for 1st SRSCT
Establishment of
Tuticorin-III(new)
400/230kV S/s at
suitable location
near Tuticorin
*Mytrah Energy Tirunelveli, Tuticorin-II GIS Mytrah Energy – along with 1x500
MVA, 400/230kV Mytrah Energy –
12000006 (India) Private Ltd Tamil PS (erstwhile Tuticorin-II
20. 04.01.2017 200 Wind ICT Tuticorin-III
13 (Maniyachi Wind Nadu Tirunelveli GIS 230kV D/c line
230kV S/c line
Farm) PS) (existing) Tuticorin-III(new)
– Tuticorin-
II(existing) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
93
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/4
CTU Agenda for 1st SRSCT
*Note: M/s Mytrah Energy (India) Private Ltd requested that they intend to utilize the existing 230 kV D/c line implemented as a part of already granted connectivity for 300 MW
wind farms of MEIPL at Tirunelveli and connectivity may be allowed on the same transmission system, the same was agreed subject to MEIPL fulfills the criteria stipulated in the
Detailed Procedure.
Praptha Tuticorin-III
Renewable Energy Thoothukd Praptha – Praptha –
12000006 i,Tamil Establishment of
21. Pvt. Ltd. 30.01.2017 250 Wind Tuticorin-II Tuticorin-III
10 Nadu Tuticorin-III(new)
(Thoothukudi Wind 230kV S/c line 230kV S/c line
Farm) 400/230kV S/s at
Tuticorin, suitable location
Green Infra Green Infra – near Tuticorin Green Infra –
12000006 Tamil
22. Renewable Energy 02.03.2017 250 Wind Tuticorin-II along with 1x500 Tuticorin-III
75 Nadu
Ltd. 230kV S/c line MVA, 400/230kV 230kV S/c line
Madathupt Ecoren Anemoi – ICT Ecoren Anemoi –
12000007 Ecoren Anemoi ti, Tamil Tuticorin-III(new)
23. 27.05.2017 250 Wind Tuticorin-II Tuticorin-III
48 Winds Pvt. Ltd. Nadu – Tuticorin-
230kV S/c line 230kV S/c line
II(existing) 400kV
Tuticorin, Tuticorin-II GIS Quad/HTLS D/c
Green Infra – Green Infra –
12000007 Green Infra Wind Tamil PS (erstwhile line with carrying
24. 31.05.2017 250 Wind Tuticorin-II Tuticorin-III
64 Energy Ltd. Nadu Tirunelveli GIS capacity of 2000
230kV S/c line 230kV S/c line
PS) MW at nominal
Sitac Starcap Tuticorin, Sitac Starcap – voltage Sitac Starcap –
12000007 Tamil
25. buildwell Private 14.06.2017 600 Wind Tuticorin-II Tuticorin-III
70 Nadu
Ltd. 230kV D/c line 230kV D/c line
Tuticorin, Clean Wind – Clean Wind –
12000007 Clean Wind Power Tamil
26. 20.06.2017 300 Wind Tuticorin-II Tuticorin-III
91 (Tuticorin) Pvt. Ltd Nadu 230kV S/c line 230kV S/c line
Orange Ashok
North Wind Power Thoothuku Orange Ashok – Orange Ashok –
12000008 di, Tamil 30.10.2017
27. Pvt. Ltd. 300 Wind Tuticorin-II Tuticorin-III
84 Nadu
(Thalavaipuram 230kV S/c line 230kV S/c line
Wind Farm)
Connectivity applications at Narendra
Narendra(Existing) Wind World – Narendra-III(new) Wind World –
12000005 Wind World (India) Dharwad
28. 28.11.2016 500 Wind Establishment of Narendra 220kV Narendra-III
54 Ltd. Dist, Establishment of
400kV Narendra D/c line 220kV D/c line
94
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/5
CTU Agenda for 1st SRSCT
95
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/6
CTU Agenda for 1st SRSCT
was proposed at Pugalur-II (New substation) in the agenda looking into the bay constraints at Pugalur(existing) substation. However, considering the number of applications
and the consideration of 220kV bays as GIS bays at Pugalur (existing) substation, it was agreed that the Stage-I connectivity may be granted to the applicants with
Pugalur(existing) as primary location and Pugalur-II(new)/Karur as alternate location.
Further establishment of Pugalur-II(new)/Karur substation by LILO of Pugalur-Pugalur (HVDC) 400kV Quad D/c line was agreed in place of earlier proposed Pugalur-II-
Dharmapuri 400 kV D/c line. Further Pugalur-II- Dharmapuri 400 kV D/c line shall be taken up as additional transmission scheme for power evacuation from Pugalur-
II(new)/karur.
Mytrah Energy
Karur, Mytrah Energy – Mytrah Energy –
12000006 (India) Pvt. Ltd. 23.02.201 Wind
34. Tamil 200 Pugalur 230kV Pugalur-II/Karur
58 (KParamathi Wind 7
Nadu S/c line 230kV S/c line
Farm)
Karur, Zalki Renewable Zalki Renewable
12000007 Zalki Renewable 29.05.201
35. Tamil 200 Wind – Pugalur 230kV –Pugalur-II/Karur
56 Pvt. Ltd. 7 Pugalur-II (new) /
Nadu S/c line 230kV S/c line
Umrani Karur Umrani
Karur,
12000007 Umrani Renewable 29.05.201 Renewable – Renewable –
36. Tamil 200 Wind Establishment of
55 Pvt. Ltd. 7 Pugalur 230kV Pugalur-II/Karur
Nadu Karur / Pugalur-II
S/c line 230kV S/c line
400/230kV S/s at
Karur, Hertz Wind – suitable location Hertz Wind –
12000007 Hertz Wind Parks 02.06.201
37. Tamil 250 Wind Pugalur 230kV near Pugalur Pugalur-II/Karur
66 Pvt. Ltd. 7
Nadu Pugalur (existing) S/c line along with 1x500 230kV S/c line
Tripur, Clean Wind – MVA, 400/230kV Clean Wind –
12000007 Clean Wind Power 20.06.201
38. Tamil 300 Wind Pugalur 230kV ICT Pugalur-II/Karur
89 (Tuticorin) Pvt. Ltd. 7
Nadu S/c line LILO of Pugalur- 230kV S/c line
Sprng Renewable Sprng Pugalur (HVDC) Sprng
Tirupur,
12000008 Energy Pvt. Ltd. 13.12.201 Renewable – 400kV Quad D/c Renewable –
39. Tamil 300 Wind
63 (Mulanur Wind 7 Pugalur 230kV line at Pugalur-II Pugalur-II/Karur
Nadu
Farm) S/c line (new)/ Karur 230kV S/c line
Pugalur, Sprng Vayu – Sprng Vayu –
12000011 Sprng Vayu Vidyut 02.05.201
40. Tamil 300 Wind Pugalur 230kV Pugalur-II/Karur
55 Private Limited 8
Nadu S/c line 230kV S/c line
Sprng Natural Pugalur, Sprng Natural – Sprng Natural –
12000011 02.05.201
41. Power Source Tamil 300 Wind Pugalur 230kV Pugalur-II/Karur
54 8
Private Limited Nadu S/c line 230kV S/c line
Connectivity application at Hyderabad
96
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/7
CTU Agenda for 1st SRSCT
Maheshwaram-II
Establishment of
12000006 Maheshwaram-II
49 Maheshwaram 400/220kV S/s at
765/400kV suitable location
(Existing) near
Maheshwaram
Mytrah Energy Establishment of Mytrah Energy – along with 1x500
Rangared Mytrah Energy –
(India) Pvt. Ltd. 22.02.201 separate 220kV MVA, 400/220kV
42. dy, 200 Wind Maheshwaram Maheshwaram-II
(Tapaspalle Wind 7 GIS bus with ICT
Telangana 220kV S/c line 220kV S/c line
Farm) 1x500 MVA, Maheshwaram-II
400/220kV ICT at – Maheshwaram
Maheshwaram 400kV
765/400kV S/s Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity applications at Hiriyur
Mytrah Energy Mytrah Energy – Hiriyur-II (new) Mytrah Energy –
43.
12000006 (India) Pvt. Ltd. Hiriyur, 22.02.201
200 Wind Hiriyur 220kV S/c Establishment of Hiriyur-II 220kV
51 (Lakkenahalli Wind Karnataka 7 line Hiriyur-II
S/c line
Farm) 400/220kV S/s at
300 suitable location
(enhanced near Hiriyur along
Chitradurg IMPEL Power – IMPEL Power –
12000007 IMPEL Power 09.05.201 from 250 with 1x500 MVA,
44. a, Wind Hiriyur 220kV S/c Hiriyur-II 220kV
23 Solutions Pvt. Ltd. 7 MW as per 400/220kV ICT
Karnataka Hiriyur (Existing) line S/c line
applicant Hiriyur-II –
request) Hiriyur(existing)
INOX Wind Chitradurg Inox Wind – 400kV Inox Wind –
12000007 12.05.201
45. Infrastructure a, 500 Wind Hiriyur 220kV Quad/HTLS D/c Hiriyur-II 220kV
29 7
Service Ltd. Karnataka D/c line line with carrying D/c line
Clean Wind – capacity of 2000 Clean Wind –
12000007 Clean Wind Power Hiriyur, 20.06.201 300
46. Wind Hiriyur 220kV S/c MW at nominal Hiriyur-II 220kV
87 (Tuticorin) Pvt. Ltd. Karnataka 7
line S/c line
97
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/8
CTU Agenda for 1st SRSCT
*270 voltage
#Vempalli (enhanced Vempalli Vempalli
Davanger
12000009 Renewable Energy 22.11.201 from 170 Renewable – Renewable –
47. e, Wind
15 Pvt. Ltd. (Mustur 7 MW as per Hiriyur 220kV S/c Hiriyur-II 220kV
Karnataka
Wind Farm) applicant line S/c line
request)
#Note: M/s Vempalli Renewable Energy Pvt. Ltd.(VREPL) (Mustur Wind Farm) requested for enhancement of connectivity quantum to 270 MW. CTU stated that since the
change in connectivity quantum is less than 100 MW same may be allowed. It was agreed that a formal request shall be submitted by applicant by 23.06.2018 failing
which intimation for 170 MW shall be issued. Subsequently, VREPL has submitted formal request for enhancement in connectivity vide letter dated 07.06.2018.
Connectivity application at Udumalpet
Arasur-II (new)
Establishment of
Arasur-II
400/230kV S/s at
suitable location
Mytrah Energy near Arasur along
12000006 Tiruppur, Mytrah Energy – with 1x500 MVA, Mytrah Energy –
(India) Pvt. Ltd. 23.02.201
48. 60 Tamil 200 Wind Arasur(Existing) Arasur 230kV 400/230kV ICT Arasur-II 230kV
(Devanallur Wind 7
Nadu S/c line S/c line
Farm) Arasur-II – Arasur
(existing) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity application at Palakkad
Palakkad-II (new)
300 Establishment of
Mytrah Energy (enhanced Palakkad-II
12000006 Coimbator Mytrah Energy – Mytrah Energy –
(India) Pvt. Ltd. 23.02.201 from 200 as 400/220kV S/s at
49. 57 e, Tamil Wind Palakkad(Existing) Palakkad 220kV Palakkad-II
(Mettupalayam 7 per suitable location
Nadu S/c line 220kV S/c line
Wind Farm) applicant near Palakkad
request) along with 1x500
MVA, 400/220kV
98
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/9
CTU Agenda for 1st SRSCT
ICT
Palakkad-II –
Palakkad
(existing) 400kV
Quad/HTLS D/c
line with carrying
capacity of 2000
MW at nominal
voltage
Connectivity applications at Mahaboob Nagar/ Raichur
Mahaboob Induvasi Wind – Raichur-II Induvasi Wind –
12000006 Induvasi Wind farm 20.03.201
50. Nagar, 300 Wind Raichur 220kV Raichur-II 220kV
91 Pvt. Ltd. 7 Establishment of
Telangana S/c line S/c line
Raichur-II
Mahaboob Raichur Kondapalli Wind 400/220kV S/s at Kondapalli Wind
12000006 Kondapalli Wind 20.03.201 765/400kV
51. Nagar, 300 Wind – Raichur 220kV suitable location – Raichur-II
92 farm Pvt. Ltd. 7 (Existing)
Telangana S/c line near Raichur 220kV S/c line
Mahaboob Achyuta Power – along with 1x500 Achyuta Power –
12000006 Achyuta Power 27.03.201 Establishment of
52. Nagar, 250 Wind Raichur 220kV MVA, 400/220kV Raichur-II 220kV
97 Pvt. Ltd. 7 separate 220kV
Telangana S/c line ICT S/c line
GIS bus with
Raichur-II –
1x500 MVA,
Raichur(Existing)
400/220kV ICT at
Clean Wind Power 400kV
Raichur Clean Wind – Clean Wind –
12000007 (Tuticorin) Pvt. Ltd. Raichur, 19.06.201 Quad/HTLS D/c
53. 300 Wind 765/400kV S/s Raichur 220kV Raichur-II 220kV
90 (Sindhnur Wind Karnataka 7 line with carrying
S/c line S/c line
Farm) capacity of 2000
MW at nominal
voltage
Connectivity application at Khammam
Khammam Khammam-II (new)
(Existing)
Establishment of
Mytrah Energy Mytrah Energy –
12000006 Krishna, Installation of Khammam-II Mytrah Energy –
(India) Pvt. Ltd. 22.02.201 Khammam
54. 55 Andhra 200 Wind 1x500 MVA, 400/220kV S/s at Khammam-II
(Gowravaram Wind 7 220kV S/c line
Pradesh 400/220kV ICT at suitable location 220kV S/c line
Farm)
Khammam S/s near Gooty along
Establishment of with 1x500 MVA,
99
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/10
CTU Agenda for 1st SRSCT
100
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/11
CTU Agenda for 1st SRSCT
2. List of applicants granted Stage-I Connectivity in 24th Connectivity / LTA meeting of SR held on 11.07.2018.
Sl. Application Applicant Location Date of Connec Nature of Proposed primary Dedicated Tr. Proposed Alternative Dedicated Tr.
No. No. Application tivity Applican location for System location for Connectivity / Tr. System for
Sought t Connectivity System under ISTS alternative
(MW) connectivity
Connectivity applications near Tirunelveli
Betam Wind Betam Wind – Tuticorin-III Betam Wind –
Tuticorin,
1. 1200001415 Energy Private 12.06.2018 250.2 Wind Tuticorin-II 230kV Establishment of Tuticorin- Tuticorin-III
Tamil Nadu
Limited Tuticorin-II GIS PS S/c line III(new) 400/230kV S/s at 230kV S/c line
(erstwhile Viento suitable location near Viento
Viento
1200001448 Tirunelveli, Tirunelveli GIS PS) Renewables – Tuticorin along with 1x500 Renewables –
2. Renewables 15.06.2018 300 Wind
Tamil Nadu Tuticorin-II 230kV MVA, 400/230kV ICT Tuticorin-III
Private Limited
S/c line 230kV S/c line
101
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/12
CTU Agenda for 1st SRSCT
Tuticorin-III(new) –
Anurudra Anurudra – Tuticorin-II(existing) 400kV Anurudra –
Thuthukudi,
3. 1200000974 Renewables Pvt 29.12.2017 300 Wind Tuticorin-II 230kV Quad/HTLS D/c line with Tuticorin-III
Tamil Nadu
Ltd S/c line carrying capacity of 2000 230kV S/c line
MW at nominal voltage
Connectivity applications near Munirabad
Axis Wind farm Koppal / Axis Wind – Axis wind –
Koppal,
4. 1200000604 (Anantapur) Pvt. 22.12.2016 300 Wind Munirabad-II(new) Koppal/Munirabad Munirabad-III
Karnataka Munirabad-III(new)
Ltd. Establishment of -II 220kV S/c line 220kV S/c line
Establishment of
Orange Ashok Koppal /
Orange Ashok – Munirabad-III 400/220kV Orange Ashok –
Wind Power Pvt. Gadag, Munirabad-II
5. 1200000883 31.10.2017 500 Wind Koppal/Munirabad S/s at suitable location Munirabad-III
Ltd. (Jakkali Karnataka 400/220kV S/s at
-II 220kV D/c line near Munirabad along with 220kV D/c line
Wind Farm) suitable location
1x500 MVA, 400/220kV
near Koppal /
Hungund Hungund – ICT Hungund –
Gadag, Munirabad along
6. 1200001102 Renewable 17.03.2018 300 Wind Koppal/Munirabad Munirabad-III
Karnataka with 1x500 MVA,
Energy Pvt Ltd -II 220kV S/c line 220kV S/c line
400/220kV ICT
Connectivity applications near Hiriyur
Hiriyur-II (new)
Establishment of Hiriyur-II
400/220kV S/s at suitable
location near Hiriyur along
ReNew Power – with 1x500 MVA, 400/220kV ReNew Power –
ReNew Power Davangere,
7. 1200001464 22.06.2018 300 Wind Hiriyur (Existing) Hiriyur 220kV S/c ICT Hiriyur-II 220kV
Ltd. Karnataka
line Hiriyur-II – Hiriyur (existing) S/c line
400kV Quad/HTLS D/c line
with carrying capacity of
2000 MW at nominal
voltage
Connectivity application at Pavagada
102
Agenda for 1st meeting of SRSCT (07.09.2018) Annex-XIII/13
CTU Agenda for 1st SRSCT
Pavagada-II (new)
Establishment of Pavagada-
II 400/220kV S/s at suitable
location near Pavagada
Cuddalore Cuddalore along with 1x500 MVA, Cuddalore
Bioenergy Pvt. Tumkur, Tumkur (Pavagada) Bioenergy – 400/220kV ICT Bioenergy –
8. 1200000876 18.10.2017 300 Wind
Ltd. (Pavagada Karnataka Existing Pavagada 220kV Pavagada-II – Pavagada Pavagada-II
Wind Farm) S/c line (Existing) 400kV 220kV S/c line
Quad/HTLS D/c line with
carrying capacity of 2000
MW at nominal voltage
103