FROM: HEAD OPERATIONS, SAIJ BASE
Near Miss on
Section Monthly Cumulative
31.05.2019
Chemistry 1 2
Maintenance
CTU 6 7
N2 2 3
HF 4 6
Acid/HOC 1 2 5
GP 2 3
Total 1 15 23
HSE
LM-CTU KLL#02 1 6 7
LM-HF 4 4
LM-Sand 2 6
Control
LM-Stimulation 1
I/c Chemistry 0
I/c Maintenance 1
I/C HSE 6 6
I/c Nitrogen 3 5
Total 1 25 37
CTU-ACID
WI
41 75
Pay:N2-1+N2
NGM#061
PI:1899-1900M,1903.5-1904.5M,
1905.5-1931M,1931.5-1945.5M
BB:1897.5M
ACID CB:1965M
JOB SEQUENCE-
TOTAL FLUSH- 3m3
(10%HCL+1%ACI+2%ACETIC+
0.5%SURF+0.8%EDTA)
BJ INJ- 140LPM@2500PSI
AJ INJ- 160LPM@2500PS
Oil well
Pay:K-VIII
PI:1563-69M
BB:1552.9M
Unit-1426
Pkr 1517
P.I. 1501-03&09-12mts
Appiled N2 through CT
upto1517mts
NDD#05 Return water,oil, frac fluid,foam
and NE
Ln2 consumed 3.5m3
Unit 8507
LN2
T/S: 2114,
PI:2127-2132 mts
0 to 135 kg water,
SKD#165
K/O 1600 mts)
N2 3.5 M3
Unit skid
CTU-FOAM
Gas Well
KLL#02
PI:1314-1318M
BB:1296M
CB:1360M
CTU-1139
APU- 7711
Dpr: 31.05.2019
CTU- HOC/SolventTubing Probe
planned on 31.05.2019 at
GTC-50-I
Oil Well
PI:2161-2169M
HydPkr:2150.12M
CTU- 9282
CTU-BC-DPMA
DPR: 31.05.2019
NGM GGS 2
WI
Pay:N2-1+N2
PI:1899-1900M,1903.5-1904.5M,
1905.5-1931M,1931.5-1945.5M
BB:1897.5M
CB:1965M
NGM#061
CTU-7733 , APU-8513
DPR-CTU-BC-Injectivity Job
planned on 31.05.2019 at KLL
GGS 7
WI,Pre-PM
Pay:K-IVA
PI:1549-1544m
BB:1540M
CB:1611M
CTL required upto CB.
CTU-VE. APU-VE
HOC job with CTU for Tubing
Probe done on 31.05.2019 at
AM#166 GTC-50-I
Oil Well
HOC AMD#166 PI:2161-2169M 21 39
HydPkr:2150.12M
Circulated 15m3 hot oil through
CTU
temperature 85c
pressure 3200 psi
Solvent 6 12
GP
08 14
TGP 09 22
Surging 2
Surfactan
t
Others
(WSO
NDN#19 05 16
Polymer
Mixing)
Total
(Actual 16 380 697
/ Plan)
STOCKS
NE
7460 KG ACETIC ACID 59 MT
(KLL&NGM)
PLAN ACTUAL
ACID 1 2
LN2 6 5
SOLVENT 1 0
HOC 1 1
GP 0 0
OTHERS 0 0
ACID/
Others/ 1/1/1 1/0/0 1/0/0
WSO
LN2 6 4 4
CTU 6 5 5
HOC/
1/0 1/0 1/0
SOLVENT
GP/CTC/T
1/1/1 0/0/0 0/0/0
GP
Upcoming Wells:
Wells
Sn. Service Asset
Wells not
Wells ready
ready
AMD#75
AMD#130
GMJ#227
Ahmedabad
GMJ#38_Z
KLL#411
1 HF KLL#766
LNC#133
Mehsana
NDN#140
Cambay Kathana#48
GND#710
Ankleshwar Dahej#18
ANK#315, 378
5 6016 -Damaged totque rod bush replaced with new one. Tested ok.
8 7711 - Attended off road unit at well site. Found abnormal sound
and Allison oil leakage near PTO. Unit brought back to Saij
after topping up Allison oil. Dismantled PTO drive shaft .
Further work is in progress.
PREVENTIVE MAINTENANCE
INSTRUMENTATION MAINTENANCE
ELECTRICAL MAINTENANCE
OPERATIONAL MAINTENANCE
Service
Sn Jobs carried out on 31.05.2019
s
1 CTU
2 HF
3 ACID
4 GP
5 LN2
6 HOC
CHEMISTRY
S/N Jobs carried out 31.05.2019 Status
"Sent to RGL
Sampled & bonded sample of
1 VADODARA for quality
Ammonium Chloride -
conformance"
Matrix Acidization & core flow study "Lab study is in progress"
2
of Wasna#08 & Wasna#14-
Dose optimization for a suitable " Lab study completed,
3 thermogel for GP JOBS- Report preparation is in
progress"
N.B. - KINDLY ENSURE THAT THE VEHICLE HAS BEEN CLEANED / WASHED
BEFORE PARKING AT THE SERVICING SECTION.