Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Y +10 800
Y +10 600
Y +10 400
Y +10 200
1087m
m
1086m
1086
X +2 632 200 X +2 632 200 X +2 632 200
Steilloo
BUS S
1086
(N11)T
m
TOP
7m POND
108
p
1088m ng
1087m
Dibe
arred ro
RESERVOIR
BM3
Ch1
0
ad
00
m
1088
m
86
10
km 0.105
2 x 1.2x1.2 B.C
Maloko q = 71°
ng
11
C h9
PI 1
1°
A
1087m L=15.60m
.
Ch0
00
0 .C
0.85 4B
km .5 x 2. B
1
8 x 0°
9
1089m q=
EXISTING CULVERT
.
m
Ch100
EC:
88
108
10
Ch8
9m
Ch
INTERSECTION No.1
00
1086m
814
.789
ROAD D3377 = km 0,000
Ch200
Y +10 200
m
ROAD N11 = ?
BUS S
87
10
= 111°22'53.42"
Ch70
1089m
T
05
OP
D3377
Ch300
10
0
h 294.7
90
10 BENCH MARKS DETAILS Lo 27
m
m
90
LEGEND:
Ch600
1087m
89
BC: C
Ch400
1088m 10234.158 2632238.538 1086.549
BM3
Ch500
10 ROAD SIGN
89
m
ROAD SETTING OUT DATA Lo 29 BENCH MARK
e EXISTING FENCE
rlin PI No. Ch YLo XLo Radius DA TL AL
owe
Mokop
1091m ne
9
Y +10 800
Y +10 600
Y +10 400
91
m CONCRETE DRAIN
10 PI 2 10510.619 2632365.049 1000 29°47'55" 266.066 520.083
LAYOUT PLAN TREE
m
EC 2 814.789 10259.042 2632278.444
GATE
1092
SCALE 1:1000
BC 3 1996.411 9141.770 2631893.821
m
91
m
GUARDRAIL LEFT ( A = TYPE OF TERMINAL SECTION) 10
88
10
CONCRETE SIDE DRAIN LEFT
STAKED LINE
PRECEDING FOLLOWING
PLAN No.
- PLAN No.
MVE/RAL01/19/LS02
HL HR
HM
3,5m 3,5m 1098
3
5m
1
1088
0
NATURAL GROUND
0 10 20 30 40 50
50m 1083
ON ORIGINAL PLAN
LEGEND
Datum 1078
Chainages
1000
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
620
640
660
680
700
720
740
760
780
800
820
840
860
880
900
920
940
960
980
20
40
60
80
0
1087.908 1087.834 1087.760
270.000
450.000
590.000
810.000
10.000
30.000
70.000
3%
Superelevation -2% (L+R) -2% (L+R)
-3%
1089.737 294.705
814.788
Direction Curve 1 Left Direction
Horizontal Curves
BCC
ECC
280.48.09 Radius=1000m 251.00.14
I= 29.47.55
1087.834
1087.882
1088.064
1088.215
1088.462
1088.660
1088.788
1088.965
1089.247
1089.318
1089.441
1089.526
1089.607
1089.680
1089.698
1089.714
1089.650
1089.539
1089.367
1089.188
1089.000
1088.755
1088.552
1088.396
1088.193
1087.956
1087.702
1087.476
1087.325
1087.042
1087.019
1086.712
1086.502
1086.403
1086.224
1086.144
1085.982
1086.137
1086.448
1086.721
1086.933
1087.000
1087.111
1087.223
1087.315
1087.424
1087.479
1087.548
1087.638
C/L/ Peg Levels
1089.249
-0.000
-0.009
0.042
0.156
0.172
0.214
0.302
0.316
0.199
0.269
0.261
0.266
0.250
0.220
0.239
0.211
0.219
0.238
0.278
0.349
0.401
0.434
0.286
0.278
0.222
0.213
0.238
0.280
0.295
0.238
0.336
0.204
0.382
0.493
0.521
0.655
0.719
0.893
0.779
0.536
0.355
0.239
0.268
0.253
0.237
0.241
0.228
0.269
0.296
0.302
CUT/ FILL
SURVEYED BY CONSULTANT
DESIGNED T.M. PROJECT NUMBER : RAL/T945/2018 TYPE OF PLANNING : TENDER AS BUILT PLAN SHEET 1 OF 4
..................................... ..................... DESIGN AND CONSTRUCTION OF 3KM OF D3377 FROM LIMBURG TOWARDS MATLALA AND INSTALLATION OF
DESIGN CHECKED T.M. CLIENT DATE STORM-WATER SYSTEMS. PHASE A: IMPROVEMENT OF THE STRUCTURAL CAPACITY OF THE PAVEMENT LAYERS SCALE
AS SHOWN
AND PHASE B: UPGRADING FROM GRAVEL TO BITUMINOUS SURFACE IN THE CAPRICORN DISTRICT OF
DRAWN N.A LIMPOPO PROVINCE REVISION
Ls/03
DATE REVISION REVISED BY DATE DRAWING CHECKED T.M.
.....................................
CONSULTING ENGINEER
.....................
DATE ROAD D3377 LAYOUT PLAN WITH LONGITUDINAL SECTION: Km 0,000 TO Km 1,000 0