Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
60
50
Blocked
40
30 ID Defect
OD & ID Defect
20
10 020‐ET01.01
030‐E02
0
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Total tube 020.ET01.01 = 1762 (3% pluged); 030-E02 = 754 (2% Pluged)
Introduction
Inspection plan 2016 :
- Eddy current test
- Plugging
- Retubing (prepare spre tube as a number of plug) on TA 2017
17 Jan 2017 – Recomendation of retubing program heat exchanger of unit 020-ET01.01 and 030-E02 are
released for TA 2017
There are different dimension, this condition will lead to retubing plan and mechanical strength
issues, Seamleass tube bellow are mentioned :
EQUIPMENT ORIGINAL MATERIAL INCOMING MATERIAL
020-ET01.01 Material : ASTM B111 UNS C70600 Material : ASTM B111 UNS C70600
(Condenser) Dimensi : 25,4 OD x 1,25 Thk x 5452 L (mm) Dimensi : 24,5 OD x 1,3 Thk x 6510 L mm
030-E02 Material : ASTM B111 UNS C70600 Material : ASTM B111 UNS C70600
(Prerun Column Condenser) Dimensi : 25,0 OD x 2 Thk x 5000 L (mm) Dimensi : 24,5 OD x 1,3 Thk x 6010 L mm
Objective
Analyze all mechanical strength issues that could be happened on the tubes
Decide on the utilization of tube, installation strategy and inspection plan
Risk Mitigation
Retubing Plan :
Retubing will be done by utilize incoming tubes for a year (or more). The following item should
be done :
1. Engineering review for all mechanical issues that are occured on the tubes.
- Tube Expanding Plan
- Pull Out Force vs Force due to internal pressure to tubesheet
- Material Strength vs Internal and External Pressure
- Tube Stess vs Tube allowable stress at Transition Zone
- Fluid Limit Velocity
2. Special visual inspection, eddy current test and fill test will be conducted every year to
ensure the condition of the tubes.
Mechanical Issues on The Tube to Tubesheet Joint
Requirement should be fulfilled :
1. Wall reduction 8 – 10%
Ftubesheet 2. Fpo > Ftubesheet
3. treq > tafter expand
4. τactual > τallowable
Allowable
Fpo Pint
FTubesheet
Source :
Merah. N., Al‐Zaher. A., Shuaib. A., and Arif. A., ” Finite element
Fpo evaluation of clearance effect on tube‐to‐tubesheet joint
strength” International Journal of Pressure Vessels and Piping
80 2003 879–885, Page 882 – 883.
Pull Out Force Calculation 030-E02
,
Pe 240 N/m2 1,945‐1,384 . ) 156,22 N/m2
,
, ,
Pcon 156,22 N/m2 1‐ 2 – .240 N/m2. ln
, ,
Pint
, ,
tinternal = 0,24 mm
, ,
texternal 0,20 mm
Tinitial, after expand 1,3 x 92% 1,19 mm
Sourch : Updike. D.P., Kalnins. A., and Caldwell.
S.M.,”Residual Stresses in Transition Zones of Heat Hence, tinitial, after expand tinternal or external : 1,19 0,24 mm
Exchanger Tubes” Journal of Pressure Vessel Technology,
Vol 114, May 1992, Page ‐ 155 Safe for Operation
Internal & External Pressure at Transition Zone 020-ET01.01
Pext
Pint
, ,
tinternal = 0,11 mm
, ,
texternal 0,10 mm
Tinitial, after expand 1,3 x 92% 1,19 mm
Sourch : Updike. D.P., Kalnins. A., and Caldwell.
S.M.,”Residual Stresses in Transition Zones of Heat
Exchanger Tubes” Journal of Pressure Vessel Technology, Hence, tinitial, after expand tinternal or external : 1,19 0,11 mm
Vol 114, May 1992, Page ‐ 155
Safe for Operation
Stress at Transition Zone 030-E02
FTubesheet 210.000 N/m2 x 0,6254 m 2 131.324 N
FTubesheet 131.324 N / 754 tube 174,17 N / tube
Tactual
Do 24,5 mm ; LDo 3,14 x 24,5/2 2 471,2 mm2
Di 24,5 – 1,3 x 2 21,9 mm ; LDi 3,14 x 21,9/2 2 376,5 mm2
,
Tactual 1,84 N/mm2
, ,
Tactual
,
Tactual 1,25 N/mm2
, ,
Velocity through the tube at those unit 020-ET01.01 and 030-E02 still in
range for safety operation
Original Material
Wall reduction 8% Wall reduction 10%
Equipment Di (mm) Fcp (N) Equipment Di (mm) Fcp (N)
030-E02 22,9080 3.790.217 030-E02 22,9600 3.583.703
020-ET01.01 23,3080 13.899.072 020-ET01.01 23,3600 13.138.809
14000
12000 Wt 8%
10000
Wt 10%
8000 Original Tube Incoming Tube
6000
Wt 8% Wt 10%
4000
2000
0
0 1 2 3 4 5
EXPAND STRATEGY WITH DIFFERENT TUBE DIMENSION
Special visual inspection, eddy current test and fill test will be conducted every year to ensure the condition of the tubes.