WASTE HEAT RECOVERY SYSTEM FOR CEMENT PLANT
: ________________________________________________
Sr.
Unit Kiln 1 Kiln 2 Kiln 3 Kiln 4
No.
2.1 Clinker Production Capacity Ton/day
2.2 Preheater
1. Type
2. Make
3. Number of Preheater stages
Kg/hr.
4. Exhaust Gas Quantity at Preheater outlet
Nm3/hr
Exhaust Gas Temperature at Preheater
5. Deg. C
outlet
Kg/hr.
6. Exhaust Gas quantity required for Raw Mill
Nm3/hr
Kg/hr.
7. Exhaust Gas quantity required for Coal Mill
Nm3/hr
Exhaust Gas Temperature required at inlet
8. Deg. C
of Raw Mill
Exhaust Gas Temperature required at inlet
9. Deg. C
of Coal Mill
Permissible pressure drop across Waste
10. Heat Recovery Boiler Systems on exhaust mm WC
gas side
Page 1 of 6
gms/Nm
11. Dust load
3
2.3 A Grate Cooler / Clinker Cooler
1. Type
2. Make
Exhaust Gas Quantity at Cooler outlet Kg/hr.
3.
Nm3/hr
4. Exhaust Gas Temperature at Cooler outlet Deg. C
Kg/hr.
5. Exhaust Gas quantity required for Raw Mill
Nm3/hr
Kg/hr.
6. Exhaust Gas quantity required for Coal Mill
Nm3/hr
Exhaust Gas Temperature required at inlet
7. Deg. C
of Raw Mill
Exhaust Gas Temperature required at inlet
8. Deg. C
of Coal Mill
Permissible pressure drop across Waste
9. Heat Recovery Boiler Systems on exhaust mm WC
gas side
gms/Nm
10. Dust load
3
Clinker Cooler Mid – Tap Off condition flow
2.3 B
& temperatures
Kiln -1
Vent gas temp. Vent gas flow at
Sr. Mid Tap Gas Temp. Mid Tap Gas Flow
At Cooler exit Cooler exit
No Deg. C Kg/hr
Deg. C Kg/hr
1. 360
2. 380
3. 400
Kiln -2
Vent gas temp. Vent gas flow at
Sr. Mid Tap Gas Temp. Mid Tap Gas Flow
At Cooler exit Cooler exit
No Deg. C Kg/hr
Deg. C Kg/hr
1. 360
2. 380
3. 400
Kiln -3
Vent gas temp. Vent gas flow at
Sr. Mid Tap Gas Temp. Mid Tap Gas Flow
At Cooler exit Cooler exit
No Deg. C Kg/hr
Deg. C Kg/hr
1. 360
2. 380
3. 400
2.5 Kindly provide the Process Flow Diagrams of the Preheater as well as Clinker Cooler exhaust gases.
3.0
i. Choice of condensing system for power generation Water Cooled / Air Cooled
(Depending upon availability and cost of raw water)
4.1 Source of Raw water : Bore Well / River / Lake / Dam on River
Magnesium Hardness as
Total Solids Lime as CaO
CaCO3
Suspended Solids Total Hardness as CaCO3 Magnesium as MgO
Volatile Solids PH Colour
Silica As SiO2 Acidity / Alkalinity as CaCO3 Turbidity
Dissolved Iron as Fe Sulphates as SO Smell
Electrical
Manganese as Mn Chlorides as Chlorine
Conductivity
Calcium Hardness as CaCO3 Nitrate Nitrogen
b) Average __________________________MW.
Page 3 of 6
5.4 Frequency _________________________ Hz
b) Average _________________________MW.
5.6 Source of Captive power Rankine Cycle / Combined Cycle / Otto Cycle / Diesel Cycle
(Steam Turbine / Gas Turbine / D.G.Set)
1) Rankine Cycle Power Plants:
a) Peak _________________________MW
b) Average _________________________MW
LCV _________________________Kcal/kg
HCV _________________________Kcal/kg
Sr.
Details plant1 Plant2 Plant3
No.
a) Capacity
b) Type
c) Make
d) Steam Pressure
e) Temperature
Sr.
Details Plant 1 Plant 2 Plant 3
No.
a) Capacity
Page 4 of 6
b) Type
c) Make
Plant 1 Plant 2 Plant 3
d) Inlet Steam
Flow
Pressure
Temperature
e) Condenser Pressure
Page 5 of 6
1) Cost of Grid Power
a) Fixed _________________
b) Variable _________________
a) Fixed _________________
b) Variable _________________
6. 0 Ambient Temperature:
Special requirements/remarks:
__________________________________________________________________________________
__________________________________________________________________________________
Name : _________________________________
Designation : _________________________________
Date : _________________________________
Page 6 of 6