Sei sulla pagina 1di 2

Update: 14-Sep-09

Edit by: SHo


NON-CONFORMANCE REGISTER

Proposed Disposition

Use as is
Rework

Replace
Repair
Date of
Reference Number Scope Location Description Contractor Date issued Date cleared Status NCR canceled Causes
Proposition

1 MNC-ACT-BBI-NCR-FON-001 D-wall P22 to P24 Execution of the guide wall was not according to the proposed sections BSV 11-Jun-08 20-Mar-09 7-Apr-09 Closed NCR BBI 001 Method Statement Implementation

Guide walls panels 22 to


2 MC-BBI-Q+-NC-BA-FON-002 D-wall Action prior to document approval BSV 6-Jun-08 27-Sep-08 Closed Method Statement Implementation
26

3 MC-BBI-Q+-NC-BA-FON-003 D-wall P26 Un-appropriate excavation during excavation along house No.3 Ham Nghi BSV 12-Jun-08 4-Jul-08 Closed Shop drawings conformity

Site Rebar's yard -


4 MC-BBI-Q+-NC-BA-FON-004 Other Un-proper lifting operation BSV 23-Jun-08 10-Jul-08 Closed Method Statement Implementation
Crawler Crane

Minimun distance of 4 meters between crane and edge of Guide wall during
5 MC-BBI-Q+-NC-BA-FON-005 D-wall In front of Panel 1 BSV 16-Sep-08 10-Mar-08 Closed Method Statement Implementation
D-wall excavation not follow MOS

6 MNC-ACT-BBI-NCR-FON-002 D-wall Next to P20-P09-P47 Non-protected Inclinometer and Piezometer Pipes IBST 15-Sep-08 20-Mar-09 7-Apr-09 Closed NCR BBI 006 Method Statement Implementation

Waiting for completion of the


7 MNC-ACT-BBI-NCR-FON-003 D-wall Panel P44 Insufficient concrete level BSV 24-Sep-08 26-Mar-09 NCR BBI 007 Method Statement Implementation
work
Reinforcement cage (left) floats to Approximately 110mm during concrete Waiting for completion of the
8 MNC-ACT-BBI-NCR-FON-004 D-wall Panels P09 BSV 30-Sep-08 27-Mar-09 Method Statement Implementation
pouring work
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
Panels P7A BSV 3-Oct-08 26-Mar-09 NCR BBI 010 Undeterminated
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method
9 MNC-ACT-BBI-NCR-FON-005 D-wall Panels P11 BSV 3-Oct-08 26-Mar-09 7-Apr-09 NCR BBI 011
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P44 BSV 3-Oct-08 26-Mar-09 7-Apr-09 NCR BBI 012
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P01 BSV 10-Oct-08 26-Mar-09 Closed Undeterminated
statement
10 MNC-ACT-BBI-NCR-FON-006 D-wall
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P18 BSV 10-Oct-08 26-Mar-09
statement
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
11 MNC-ACT-BBI-NCR-FON-007 D-wall Panels P06 BSV 11-Oct-08 26-Mar-09 NCR BBI 013 Undeterminated
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method
12 MNC-ACT-BBI-NCR-FON-008 D-wall Panels P43 BSV 11-Oct-08 25-Apr 25-Apr-09 Closed Undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P02 BSV 11-Oct-08 25/4/09 25-Apr-09 Closed Undeterminated
statement
13 MNC-ACT-BBI-NCR-FON-009 D-wall
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P05 BSV 11-Oct-08 26-Mar-09 7-Apr-09
statement
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
14 MNC-ACT-BBI-NCR-FON-010 D-wall Panels P17 BSV 16-Oct-08 26-Mar-09 NCR BBI 014 Undeterminated
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method 3/26/2009 Waiting for completion of the
Panels P03 BSV 20-Oct-08 NCR BBI 015 Undeterminated
statement work
15 MNC-ACT-BBI-NCR-FON-011 D-wall
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P50 BSV 20-Oct-08 25-Apr-09 25-Apr-09 NCR BBI 016
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
16 MNC-ACT-BBI-NCR-FON-012 D-wall Panels P09 BSV 24-Oct-08 26-Mar-09 7-Apr-09 Closed NCR BBI 009 Undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
17 MNC-ACT-BBI-NCR-FON-013 D-wall Panels P10 BSV 24-Oct-08 26-Mar-09 NCR BBI 017 Undeterminated
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method
Panels P04 BSV 24-Oct-08 26-Mar-09 3-Apr-09 Undeterminated
statement
18 MNC-ACT-BBI-NCR-FON-014 D-wall
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
Panels P46 BSV 24-Oct-08 26-Mar-09 NCR BBI 018
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
19 MNC-ACT-BBI-NCR-FON-015 D-wall Panels P21 BSV 28-Oct-08 26-Mar-09 NCR BBI 019 Undeterminated
statement work
Non conformance of the depth after excavation and depth before casting Waiting for completion of the
20 MNC-ACT-BBI-NCR-FON-016 D-wall Panels P30 BSV 28-Oct-08 26-Mar-09 NCR BBI 008 Undeterminated
concrete work
Non conformance of Sonic Test results with the ratings Criteria on Method
21 MNC-ACT-BBI-NCR-FON-017 D-wall Panels P49 BSV 28-Oct-08 25-Apr 25-Apr-09 Closed NCR BBI 020 Undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
22 MNC-ACT-BBI-NCR-FON-018 D-wall Panels P15 BSV 28-Oct-08 25-Apr-09 25-Apr-09 Closed NCR BBI 021 Undeterminated
statement

P11-P08-P43-P02-P09-
P10-P16-P04-P33-P28-
23 MC-BBI-Q+-NC-BA-FON-022 D-wall P49-P26-P34-P15-P29- D-wall concrete casting level is higher than required BSV 7-Nov-08 10-Mar-09 Closed Method Statement Implementation
P30-P25-P35-P42-P31-
P24-P41-P13-P39-P36

Non conformance of Sonic Test results with the ratings Criteria on Method
24 MNC-ACT-BBI-NCR-FON-019 D-wall Panels P48 BSV 4-Nov-08 25-Apr 25-Apr-09 Closed Undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
25 MNC-ACT-BBI-NCR-FON-020 D-wall Panels P30 BSV 11-Nov-08 25-Apr 25-Apr-09 Closed Undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
26 MNC-ACT-BBI-NCR-FON-021 D-wall Panels P06 BSV 11-Nov-08 26-Mar-09 Undeterminated
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method
27 MNC-ACT-BBI-NCR-FON-022 D-wall Panels P38 BSV 18-Nov-08 25-Apr-09 25-Apr-09 Closed Undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method
28 MNC-ACT-BBI-NCR-FON-024 D-wall Panels P42 BSV 18-Nov-08 25-Apr-09 25-Apr-09 Closed undeterminated
statement
Non conformance of Sonic Test results with the ratings Criteria on Method Waiting for completion of the
29 MNC-ACT-BBI-NCR-FON-023 D-wall Panels P35 BSV 3-Dec-08 26-Mar-09 Undeterminated
statement work
Non conformance of Sonic Test results with the ratings Criteria on Method
30 MNC-ACT-BBI-NCR-FON-026 D-wall Panels P37 BSV 1-Dec-08 26-Mar-09 7-Apr-09 Closed undeterminated
statement
Non-conformance of depth of excavation based on the approved drawings.
31 MNC-ACT-BBI-NCR-FON-027 Bored Pile BP142 BVN 30-Dec-08 20-Mar-09 26-Mar-09 Closed Method Statement Implementation
Excavtion exceede 2.5m
Non conformance of Sonic Test results with the ratings Criteria on Method
32 MNC-ACT-BBI-NCR-FON-025 D-wall Panels P13 BSV 19-Jan-09 26-Mar-09 7-Apr-09 Closed undeterminated
statement
Pouring Concrete inside Steel Stanchions without prior inspection od NDT
33 MNC-ACT-BBI-NCR-FON-028 Bored Pile BP106 BVN 14-Jan-09 20-Mar-09 26-Mar-09 Closed Method Statement Implementation
or welded joints
Defective Hollow Sections 300x300x16m m not conforming on the quality Waiting for approval of the
34 MNC-ACT-BBI-NCR-FON-029 Stanchion 300x300 C&T 16-Jan-09 23-May-09 Quality of Material
base on the UT conducted proposed disposition

35 MNC-ACT-BBI-NCR-FON-030 Bored Pile BP 43 Pouring without Stanchions BVN 27-Feb-09 20-Mar-09 26-Mar-09 Closed Method Statement Implementation

Non conformance of inclinometer pipes of steel sranchion with the ratings


36 MNC-ACT-BBI-NCR-FON-031 Bored Pile BP 37 BVN 4-Mar-09 20-Mar-09 26-Mar-09 Closed Method Statement Implementation
Criteria on Method statement
Non-conformance of spiral link of reinforcement cages with the raiting
37 MNC-ACT-BBI-NCR-FON-032 Bored Pile BP54 BVN 9-Mar-09 20-Mar-09 26-Mar-09 Closed Shop drawings conformity
criteria on the design drawing
Non-conformance of M27*100 (abp) bolts Tensile strength test results with Waiting for completion of the
38 MNC-ACT-BBI-NCR-FON-033 Stanchion S54-S32-S72-S68 EEI 13-Mar-09 20-Mar-09 Quality of Material
the raiting criteria on the design drawing work
Non conformance of Sonic Test results with the ratings Criteria on Method
39 MNC-ACT-BBI-NCR-FON-034 Bored Pile BP136 BVN 20-Mar-09 14-Apr 17-Apr-09 Closed Method Statement Implementation
statement
BP 1 to 4, 30, 37, 41,
Non conformance of steel plate (200mm) strength of steel stanchion type Waiting for approval of the
40 MNC-ACT-BBI-NCR-FON-035 Stanchion 42, 44, 49, 51, 60, 62, 24-Mar-09 22-May Quality of Material
300x300 and 450x450 with the raiting criteriaon the drawing proposed disposition
63, 64

41 MC-BBI-Q+-NC-BA-FON-023 Bored Pile BP 141 139 144 142 Non conformance of steel cages top level BVN 7-May-09 16-Jun-09 16-Jun-09 Closed Method Statement Implementation

BP 102, 21, 22, 31, 32,


38, 39, 71, 72, 11, 12,
42 MC-BBI-Q+-NC-BA-FON-024 Bored Pile Non conformance of number of stiffeners of the bottom cage of bored piles BVN 14-May-09 16-Jun-09 16-Jun-09 Closed Shop drawings conformity
25, 26, 27, 28, 59, 69,
70, 45, 46, 56, 56

43 MC-BBI-Q+-NC-BA-FON-025 Bored Pile BP 146 Shaft grouting work not as per design, tube No 7, 1 and 6 BVN 28-May-09 10-Aug-09 14-Sep-09 Closed Method Statement Implementation

44 MC-BBI-Q+-NC-PO-GEN-026 Capping Beam CB 12 & CB 11 16 starters bars located on the top of the d-wall are broken HBC 15-Jun-09 17-Jun-09 11-Aug-09 Closed Method Statement Implementation

Waiting for SIDF


45 MC-BBI-Q+-NC-PO-GEN-027 Transfer cap TC 19 The length of the bended side of the rebar mounted with coupler is too short HBC 19-Jun-09 Pending proposed disposition Shop Drawings Conformity
report

Some rebars are not aligned with the rest and are coming out of the frame
46 MC-BBI-Q+-NC-PO-GEN-028 Transfer cap TC 20,21 HBC 25-Jun-09 25-Jun-09 11-Aug-09 Closed Method Statement Implementation
of 5 to 8 cm because the reinforcement bars were too long.

P34-P35; P35-P36; P37-


P38; P38-P39; P39-P40;
Waiting for approval of the
47 MC-BBI-Q+-NC-BA-FON-029 D-wall P40-P41; P41-P42; Non conformance of joint between d-wall panels BSV 16-Jun-09 10-Jul-09 NCR ACT 36 to 47 Document
proposed disposition
P42-P43; P46-P47; P47-
P48

Two missing column hooks at first layer and hooks reference 32 not closed
48 MC-BBI-Q+-NC-PO-GEN-030 Transfer Cap TC 10 HBC 7-Jul-09 22-Jul-09 7-Aug-09 Closed Workmanship
properly.
Hooks HA 16 reference 25 are not installed properly: one side of the hooks
49 MC-BBI-Q+-NC-PO-GEN-031 Transfer cap TC 9 HBC 7-Jul-09 10-Jul-09 11-Aug-09 Closed Workmanship
is not bent into the column.

50 MC-BBI-Q+-NC-PO-GEN-032 Transfer cap TC 10 Formwork was not closed properly. Tie rods missing HBC 7-Jul-09 22-Jul-09 7-Aug-09 Closed NCR ACT 049 Workmanship

51 MC-BBI-Q+-NC-PO-GEN033 Transfer cap G106/ TC10 Installation of starter bars for G106 without ACT Approval BBI 11-Jul-09 14-Jul-09 7-Aug-09 Closed NCR ACT 048 Method Statement Implementation
Update: 14-Sep-09
Edit by: SHo
NON-CONFORMANCE REGISTER

Proposed Disposition

Use as is
Rework

Replace
Repair
Date of
Reference Number Scope Location Description Contractor Date issued Date cleared Status NCR canceled Causes
Proposition

Deformation of the formwork during concreting leading to TC concrete line


52 MC-BBI-Q+-NC-PO-GEN-034 Transfer cap TC 2 HBC 17-Jul-09 29-Jul-09 12-Aug-09 Closed Method Statement Implementation
out of tolerance.

53 MC-BBI-Q+-NC-PO-GEN-035 Transfer cap TC 23 core 1 Uneven surface of concrete - poor installation of formwork. HBC 17-Jul-09 29-Jul-09 14-Sep-09 Closed NCR ACT 050 & 51 Method Statement Implementation

Transfer cap TC 1 missing U bar diametre 20 anchored in the first casting


54 MC-BBI-Q+-NC-PO-GEN-036 Transfer cap TC 01 HBC 18-Jul-09 17-Aug-09 Closed NCR ACT 054 Workmanship
stage.

55 MC-BBI-Q+-NC-PO-GEN-037 Transfer cap TC 15 The installed starter bar of ground beam G84 from TC 15 is too high HBC 18-Jul-09 31-Jul-09 Closed NCR ACT 053 Shop Drawings Conformity

One water stop was not poured inside CB 11. Incorect installation of
56 MC-BBI-Q+-NC-PO-GEN-038 Capping Beam CB 11 HBC Pending proposed disposition Method Statement Implementation
formwork

57 MC-BBI-Q+-NC-PO-GEN-039 Transfer cap TC 18 Column hooks not closed properly at layers 11 to 17 at reference 24. HBC 20-Jul-09 5-Aug-09 11-Aug-09 Closed Shop drawings conformity

58 MC-BBI-Q+-NC-PO-GEN-040 Transfer cap Tc 10 Bar reference 15 not installed in first casting HBC 20-Jul-09 3-Aug-09 7-Aug-09 Closed NCR ACT 057 Shop drawings conformity

59 MC-BBI-Q+-NC-BA-FON-041 Stanchion S40 Starter bars were cut HBC 21-Jul-09 22-Jul-09 11-Aug-09 Closed Workmanship

The corner of flange at the top of stanchions were bended by excavator


60 MC-BBI-Q+-NC-BA-FON-042 Stanchion S37 S49 HBC 23-Jul-09 25-Jul-09 17-Aug-09 Closed Workmanship
during excavation work.

61 MC-BBI-Q+-NC-PO-GEN-043 D-wall D'wall P01 P02 & P09 Broken bars during straightening up HBC 30-Jul-09 1-Aug-09 17-Aug-09 Closed Workmanship

Concrete pouring of Ground Floor Slab 1.1 not conforming with Waiting for approval of the
62 MNC-ACT-BBI-NCR-FON-052 GFL Slab Slab 1.1 HBC 17-Jul-09 Method Statement Implementation
insufficient cleaning and improper installation of hydrophilic joints proposed disposition

63 MNC-ACT-BBI-NCR-FON-055 GFL Slab P 09 piezometer P. 09 does not confirm with Method statement HBC 23-Jul-09 Pending proposed disposition Method Statement Implementation

Installation of sheet piles at west area not according to the method


64 MNC-ACT-BBI-NCR-FON-056 GFL Slab HBC 25-Jul-09 Pending proposed disposition Method Statement Implementation
statement

Surface of P05 is not aligned with adjacent one and theoritical position of
65 MC-BBI-Q+-NC-BA-FON-044 D-wall P05 BSV 1-Aug-09 6-Aug-09 14-Sep-09 Closed Workmanship
CB, the deviation is about 50mm comparing to the outer concrete surface.

The installed starter bar of the beam G95 from transfer cap TC05 are
66 MC-BBI-Q+-NC-PO-GEN-045 Transfer cap TC 05 HBC 1-Aug-09 3-Aug-09 17-Aug-09 Closed Workmanship
wrong position (235mm fronm the side of the beam)

Top concrete of TC 03 & TC 04 does not comply with the quality


67 MNC-ACT-BBI-NCR-FON-058 Transfer Cap TC 04 & TC 03 HBC 3-Aug-09 10-Sep-09 14-Sep Closed Workmanship
requirement
68 MNC-ACT-BBI-NCR-FON-059 GFL Slab Slab 2.1 Structural cracks are found at the soffit of slab 2.1 HBC 6-Aug-09 4-Sep-09 14-Sep Closed Undeterminated
69 MC-BBI-Q+-NC-PO-GEN-046 Beam G 33 Starter bars touching soffit of beam formwork HBC 11-Aug-09 13-Aug-09 14-Sep Closed Workmanship
70 MC-BBI-Q+-NC-PO-GEN-047 Beam TC2 G76 Starter bars touching soffit of beam formwork HBC 13-Aug-09 20-Aug-09 14-Sep Closed Shop drawings conformity
71 MC-BBI-Q+-NC-PO-GEN-048 Beam G 30 Starter bars touching soffit of beam formwork HBC 14-Aug-09 17-Aug-09 14-Sep Closed Shop drawings conformity
Starter bars of beam G46 have not been installed during the 1st casting of
72 MC-BBI-Q+-NC-PO-GEN-049 Beam G 46 HBC 14-Aug-09 19-Aug-09 14-Sep Closed Shop drawings conformity
Tower Crane pad 2.
73 MC-BBI-Q+-NC-PO-GEN-050 Beam G 55 Starter bars touching soffit of beam formwork HBC 19-Aug-09 20-Aug-09 14-Sep Closed Shop drawings conformity
The downstand beam incorporated in the temporary slab over the ramp void
74 MC-BBI-Q+-NC-PO-GEN-051 GFL Slab Slab 2.5 HBC 27-Aug-09 27-Aug-09 7-Sep Closed Shop drawings conformity
is offset by 300mm
75 MC-BBI-Q+-NC-PO-GEN-052B Core wall Wall 19 Embedded plate forgotten HBC 20-Aug-09 31-Aug-09 7-Sep Closed Shop drawings conformity
76 MC-BBI-Q+-NC-PO-GEN-053 Transfer cap TC 3 Starters bars missing during the first casting of TC 3 HBC 22-Aug-09 31-Aug-09 7-Sep Closed Shop drawings conformity
Waiting for approval of the
77 MC-BBI-Q+-NC-PO-GEN-054 Capping Beam CB at Ramp 3 Embedded plate forgotten HBC 24-Aug-09 14-Sep-09 Shop drawings conformity
proposed disposition
78 MC-BBI-Q+-NC-PO-GEN-055 Core wall wall 19 20 Cross head bars were not installed in the 1st castiong step HBC 24-Aug-09 26-Aug-09 14-Sep Closed Shop drawings conformity
Lapping length of column reinforcements at C07 does not comply with
79 MNC-ACT-BBI-NCR-FON-060 Transfer cap TC05 HBC 25-Aug-09 4-Sep-09 14-Sep Closed Shop drawings conformity
design drawings
Alignement of column reinforcement at C6 10 32 not comply with the
80 MNC-ACT-BBI-NCR-FON-061 Transfer cap TC08 TC 15 HBC 25-Aug-09 3-Sep-09 3-Sep Closed Shop drawings conformity
design drawings

81 MNC-ACT-BBI-NCR-FON-062 GFL Slab Slab 1.4 Long Crack on surface of Slab 1.4 HBC 28-Aug-09 Pending proposed disposition Undeterminated

82 MNC-ACT-BBI-NCR-FON-063 Column TC 15 Lightning Reinforcement rod is out of column position HBC 28-Aug-09 10-Sep-09 14-Sep Closed Workmanship
83 MNC-ACT-BBI-NCR-FON-064 GFL Slab Slab 1.3 Long crack on surface of slab 1.3 HBC 31-Aug-09 Pending proposed disposition Undeterminated

Construction Joint between slab 1.3 a nd slab 2.5 does not conform with
84 MNC-ACT-BBI-NCR-FON-065 GFL Slab Slabs 1.3 / 2.5 HBC 31-Aug-09 Pending proposed disposition Undeterminated
requirement

85 MNC-ACT-BBI-NCR-FON-066 GFL Slab Slab 1.1 Long crack on soffit of slab 1.1 HBC 31-Aug-09 Pending proposed disposition Undeterminated

86 MC-BBI-Q+-NC-PO-GEN-056 GFL Slab C 18 C19 Starter bars misplaced HBC 5-Sep-09 8-Sep-09 14-Sep Closed Shop drawings conformity
87 MC-BBI-Q+-NC-PO-GEN-057 GFL Slab C24,25,26,27 Starter bars too short HBC 5-Sep-09 8-Sep-09 14-Sep Closed Shop drawings conformity
Waiting for approval of the
88 MC-BBI-Q+-NC-PO-GEN-058A Core wall W19 Starter bar installation not as per the design HBC 6-Sep-09 8-Sep-09 Shop drawings conformity
proposed disposition
The bars HA20 reference 36 were not installed in the first casting of
89 MC-BBI-Q+-NC-PO-GEN-059 Capping Beam CB 3 HBC 7-Sep-09 9-Sep-09 14-Sep Closed Document
Capping Beam CB3.
Waiting for approval of the
90 MC-BBI-Q+-NC-PO-GEN-060 Column C10 and 32 Starter bars of the coulumn are too short HBC 9-Sep-09 12-Sep-09 Shop drawings conformity
proposed disposition

91 MNC-ACT-BBI-NCR-FON-067 Column C28 Segregation of concrete HBC 5-Sep-09 Pending proposed disposition Undeterminated

Waiting for approval of the


92 MC-BBI-Q+-NC-PO-GEN-061 Core wall W45 Expansion wall of W45 - Missing Starter Bars HBC 11-Sep-09 12-Sep-09 Shop drawings conformity
proposed disposition

93 MNC-ACT-BBI-NCR-FON-068 Core wall W11 Cavity in core Wall 11 under Beam G86 HBC 11-Sep-09 Pending proposed disposition

C 1, 2, 3, 4, 5, 8, 9, 12, Waiting for approval of the


94 MC-BBI-Q+-NC-PO-GEN-062 Column Starter bars of the coulumn are too short HBC 11-Sep-09 12-Sep-09 Shop drawings conformity
13, 14 proposed disposition
Starter bars of corewall installed in Transfer Core are out of tolerance Waiting for approval of the
95 MC-BBI-Q+-NC-PO-GEN-063 Core wall W45 HBC 11-Sep-09 12-Sep-09 Shop drawings conformity
leading to a non respect of concrete cover proposed disposition