Tanggal : 11/04/19 Peserta : - Agus Faizin - Cecep - Eki Maradani - Idham Andi T - Andry Setiawan - Roy Setiadi - Tian Taufik - Vina
No Description PIC Status Remark
1 Terminal point piping: 1 m outside from boiler building Piping To be confirmed during project (esp. location) 2 Tie in list to be developed Piping 3 Limestone and Bedmaterial Handling System : Piping – I&c Info - Instrument air piping for control valve (by WIKA) - Service air distribution piping, tie in 1 m outside building (by WIKA) - Control valve & piping insulation (by Vendor) 4 Fuel Oil Firing System : Piping Info - Fuel oil piping 1 m from boiler building (by WIKA) - Return line fuel oil piping 1 m from boiler building (by WIKA) - Service air piping 1 m from boiler building (by WIKA) - Instrument air piping 1 m from boiler building (by WIKA) 5 IBD & CBD Tank : Piping – I&c Info - Venting CBD Tank (by WIKA) - All Manual Valve Blow Down Tank (By WIKA) - All Drain Valve (By WIKA) - Overflow Piping (by WIKA) - Field Instrument & acc which connect to tank (by WIKA) 6 Electrostatic Precipitator: Mechanical Info - Any pipe required for ESP System such as venting, etc (by Vendor) - All Instrument (by Vendor) - Any utility piping routed from main header such as service air, service water, instrument air (by WIKA) - Deliverable document reviewed (by WIKA) – All discipline 7 Steam Turbine : Mechanical Info - Grey Color on P&ID (by WIKA) - Instrument air piping (by WIKA) - Nozzle from Vendor as per ASME B16.5 8 LP & HP Heater : Piping Info - Drain Valve (by WIKA) - Venting (by WIKA) - Blind Flange (by WIKA) - Goose Neck, if any, such as for tank (By Vendor) 9 Compressed Air System : Piping Info All piping inside compressor building (by WIKA) 10 Coal Handling System: Piping To be confirmed Service water piping to transfer tower for dust suppression during project (containment pond under transfer tower) (by WIKA) 11 Plant Water System ; Piping Info - Seawater intake GRE piping to MMF Nozzle (by WIKA) - Piping from WTP to tank farm, tie in 1 m outside building (by WIKA) - Piping from compressor to WTP, tie in 1 m outside building (by WIKA) - P&ID battery limit to be updated 12 Waste Water System : Piping Info - Piping from sump pit to WWTP (pond) (by WIKA) - Discharge piping from WWTP Discharge Pump Nozzle (by WIKA) - Piping from Filter Press Nozzle (by WIKA) - P&ID battery limit to be updated 13 Fire Protection System : Process To be confirmed - Fire pump : Only pump not package Piping during project - All piping by WIKA 14 Chemical Feed & Sampling System : Piping Info - Chemical feed connection until pump discharge nozzle (by WIKA) - Sampling pipe until sampling rack including insulation (By WIKA) - Study building to be relocated to center area between boiler 15 Chlorination : Piping - Connection to pump Nozzle (by WIKA) - Diffuser (by Vendor) - Chlorination Building follow up to Civil to be updated into 1 building - Chlorination Building optimize to Circulating water pump 16 Garage House & Coal handling control room subject to review for Piping relocation