Sei sulla pagina 1di 51

JAN-901/701/901M/NDC-1186

JAN-1290A/3598A
ECDIS/Navigation Workstation

Additional Manual
for Chart Installation

For further information,contact:

Not use the asbestos

74. JVVRYYYLTEEQLR
/CTKPG5GTXKEG&GRCTVOGPV
6GNGRJQPG 
(CEUKOKNG 
GOCKN VOUE"LTEEQLR
#/56'4&#/$TCPEJ
6GNGRJQPG 
(CEUKOKNG 
GOCKN UGTXKEG"LTECOUPN
5'#66.'$TCPEJ
6GNGRJQPG 
(CEUKOKNG 
GOCKN UGTXKEG"LTECOGTKECEQO
%1&'0Q<20#% '6/ +51+51%GTVKHKGF
,7.'FKVKQP,4% Printed in Japan
WARNING
Turn off the power before opening the front cover for confirming licence key
(eToken). And do NOT touch the other parts. Otherwise, an electric shock or
a malfunction may occur.

CAUTION
Do NOT insert the disk in Floppy disk drive and CD-ROM drive for long time.
Doing so will cause damage to drive.

Do NOT turn off the power during index creation by Chart Portfolio.
Doing so may cause a malfunction.

Do NOT remove the licence key (eToken).


Otherwise a malfunction may occur.

Chart Portfolio ii
(5) Importing/Updating C-MAP Ed.3 Chart

Importing/Updating by CD-ROM

Start

Checkout(6.1)

What is the type of Chart Update CD


CD-ROM?

Base CD

Import Chart(6.2) Update Chart(6.3)

Yes Is there still other CD?

No

Is getting permission Yes


already completed?

No Yes was the new License got?

Get permission(6.2)
No

Completed

7 Chart Portfolio
Updating by e-mail

Start

Checkout(6.1)

Is Base CD already Yes


installed?

No

Import Chart(6.2)

Is getting permission Yes


already completed?

No

Get permission(6.2)

Updating chart by e-mail(6.4)

Completed

Chart Portfolio 8
1. Entering/Exiting the Chart Portfolio
1.1 Entering the Chart Portfolio (Startup Menu)
[Startup Menu]
1) On the operation panel, turn ON the power by
pressing the [PWR] key.
The Startup menu will be displayed.
2) Move the cursor with the mouse and left-click the
“ ” in the startup menu.
Then, the Chart Portfolio screen will be displayed.

Note:
• if no operation is conducted for about 10 seconds, the
Navigation & Planning start up screen will be displayed
automatically.

1.2 Entering Chart Portfolio (Navigation & Planning menu)


1) In the normal menu, select [MENU] - [(8) Tool] - [(2) Chart Portfolio] - [(1) Create] in that
order. The Chart Portfolio screen will be displayed.

When Starting Chart Portfolio from the Navigation & Planning Menu
Both Navigation & Planning and Chart Portfolio are running concurrently. When changing
the display from Navigation & Planning to Chart Portfolio, select the following in order.

・ How to change the display from Navigation & Planning to Chart Portfolio
In the Navigation & Planning menu
Select [MENU]-[(8) Tool]-[(2) Chart Portfolio]-[(2) Top Window] in that order.

・ How to change the display from Chart Portfolio to Navigation & Planning
In the Chart Portfolio menu
Select [Tool]-[Change Navigation & Planning] in that order.
Note:
• When Chart Portfolio is started by selecting [Menu] - [(8) Tool] - [(2) Chart Portfolio] - [(1)
Create] from Navigation & Planning, be sure to exit Chart Portfolio before exiting Navigation &
Planning.
• It is not possible to select Chart Portfolio when the relative motion mode is selected or the radar
image is displayed.
• When a C-MAP Ed.3 chart is installed, Chart Portfolio cannot be started from the Navigation &
Planning.

9 Chart Portfolio
[Chart Portfolio Screen]
Menus Buttons [Exit] Button

Source Chat Table/System Chart Table

The record of importing/updating process will be displayed.

Note:
・CD-ROM is checked when starting Chart Portfolio.
If CD-ROM is in CD drive, starting time may take longer.

Chart Portfolio 10
1.3 Exiting the Chart Portfolio

Do not turn off the power during index creation by Chart Portfolio.
Doing so may cause a malfunction.

1) Left-click the [Exit] button on the Chart Portfolio main screen


Then, the following confirmation dialog box opens. Left-click the [OK] button to exit the
Chart Portfolio.
If an ARCS chart has been imported/updated, an index (chart management information) is
created after the [Exit] button is pressed. If the power fails and Navigation & Planning
cannot be started, see “Troubleshooting” in page 89.

11 Chart Portfolio
1.4 Chart Portfolio Screen
The Chart Portfolio main screen consists of the following parts:
• Menus
• Buttons (All button function can be accessible from the menu)
• Chart table display area

1) Menus
Chart:

●[ARCS] - [Import/Regist Chart Permit]:


Opens “Import/Enter Chart Permit” panel for importing and registering the Chart
Permit. (This is an administration tool.)
●[ARCS] - [Regenerate Index]:
Regenerates ADCS index (chart management information).
●[C-MAP Ed.2] - [Regist/Confirm User/Authorization Code]:
Opens the “C-MAP Authorization Wizard” panel for license registration and
confirmation operation.
●[C-MAP Ed.3] - [Order/Regist/Confirm License]:
Opens the “CM93/3 Registration Wizard” panel for license registration and
confirmation operation.
●[C-MAP Ed.3] - [Update Charts]
Opens the “C-MAP Ed.3 Chart Update” panel for chart update operation.
●[Import/Update]:
Starts importing/updating the charts read from the CD-ROM.
●[Abort]: Aborts the importing/updating processing.
●[Exit]: Exits the Chart Portfolio.

Chart Portfolio 12
Sort:

Selectable chart types

●[Retry Auto-Detect]:
Left-clicking this menu will re-read the charts of the selected type from the CD-ROM.
●Chart types ([S-57], [S-63 (Offline)], [C-MAP Ed.2], [C-MAP Ed.3] or [ARCS]):
The charts of the selected type will be displayed in the source/system chart table in
the Chart Portfolio main screen.

Edit:

●[Selectable Filter]:
Turns ON/OFF the filtering function.
●[Select All]:
Selects the all cells/zones in the source chart table on the Chart Portfolio main
screen.
●[Delete]:
Delete the selected cell in the system chart table on the Chart Portfolio main screen.

View:

●[Chart Information]:
Shows the detailed cell information of the chart being selected in the source or
system chart table on the Chart Portfolio main screen. (For S-57/S-63/C-MAP
Ed.2/C-MAP Ed.3)
●[ARCS License Information]:
Checks the validity of the ARCS license information and shows the check result.
●[Log]:
Displays the log on the right side of the screen during importing/updating process.
Other log may be displayed.

13 Chart Portfolio
●[Last Update]:
“Last Update” instead of “Expiry” is displayed in the System Chart column of ARCS.
A date of updating by Chart Portfolio is displayed in the “Last Update” column.
●[Expiry]:
“Expiry” instead of “Last Update” is displayed in the System Chart column of ARCS.
A term of validity of the chart is displayed in the “Expiry” column.
●[View old Edition]:
As the latest edition is installed in the system, the older editions will not be displayed
in the source chart table.
Selecting this menu will show the older editions in the source chart table, and make
it possible to use them as desired.

Tool:

Note:
・This is an administration tool. Do not use this menu.

●[Selectable Filter]
Filters the source charts to be displayed in the source chart table on the Chart
Portfolio main screen.
●[Clear Log]
Clears the log.

Note:
This function clears all log data. Clearing a part of log data is not supported.

●[Option]
Used to set options for “S-57”, “S-63”, “C-MAP Ed.2”, “C-MAP Ed.3”, “ARCS”, “Boot”
and “Advanced” panels.
●[Technical Tool]
(An administration tool.)
●[Change Navigation & Planning]
This item will be valid when [MENU] - [(8) Tool] - [(2) Chart Portfolio] - [(1) Create] is
selected from the Navigation & Planning menu. Chart Portfolio will not be displayed.
In order to redisplay the Chart Portfolio, select [MENU] - [(8) Tool] - [(2) Chart
Portfolio] - [(2) Top Window] from the Navigation & Planning menu.
Note:
• [Change Navigation & Planning] will only close the Chart Portfolio display. It will not exit
Chart Portfolio. In order to exit Chart Portfolio, left-click the [Exit] button.
• When C-MAP Ed.3 is installed in the system, it takes approximately 10 seconds for “Option”
panel of “Tool” menu to open after it was selected.

Chart Portfolio 14
Version:

●[Chart Portfolio Version]


Opens the version “Version” panel.

2) Button functions

Left-clicking this menu will re-read the charts of the selected type
from the CD-ROM.

Starts importing/updating the charts.

Aborts the importing/updating processing.

Shows the detailed information of the chart being selected in the source or
system chart table on the Chart Portfolio main screen.

Displays the log on the right side of the screen during importing/updating
process.

Exits the Chart Portfolio.

15 Chart Portfolio
6. Import/Update of C-MAP Ed.3 by Chart
Portfolio

Note:
• For CM-93/3 Electronic Chart Database (C-MAP Ed.3), an optional CMAP Ed.3 Upgrade
Kit is needed. Please contact our head office, a nearby branch or local office to request
the kit.
• For Navigation Workstation (NWS), an optional CMAP Ed.3 Upgrade Kit for NWS, not
same as for ECDIS, is needed. Please contact our head office, a nearby branch or local
office to request the kit.
• JRC standard ECDIS does not consist of DVD-ROM Drive. But CMAP Company has
promised to supply CMAP Ed.3 with CD-ROM. Please contact chart distributor to request
CMAP Ed.3 with CD-ROM if CMAP Ed.3 with DVD-ROM is supplied.
• For CMAP Ed.3 with DVD-ROM, an optional DVD-ROM Drive Kit is needed. Please
contact our head office, a nearby branch or local office to request the kit.
• Under upgrading CMAP Ed.3, the following items are not functioned. Thank you for
your understanding.
- Relative Motion Mode / Course Up Azimuth Mode
- Chart Fix mode
- Manual Updating
- Running Chart Portfolio on Navigation & Planning

63 Chart Portfolio
6.1 Checkup of C-MAP Ed.3 Chart
Expiry date of license (e-Token)

The license has an expiry date.

(a) (b)

Present date Course of time


60 days
Expiry date of license

(a) For 60 days before the expiry date of license.


The following message is displayed for 60 days before the expiry date of license.

Expiry date of license

(b) After the expiry date of license.


The following message is displayed. The chart is displayed only for 15 minutes after it is
started.

Note:
• If the message (a) or (b) above is displayed, the license should be updated. Contact
a C-MAP dealer.

Chart Portfolio 64
6.2 Import of C-MAP Ed.3 Chart
6.2.1. Import of C-MAP Ed.3 chart
1) Insert C-MAP Ed.3 CD-ROM into the CD drive.
2) Select [Sort] - [C-MAP Ed.3] in that order.
C-MAP Ed.3 chart list is displayed.

C-MAP Ed.3 chart list

If C-MAP Ed.3 chart list is not displayed, left-click the [Auto Detect] button.

3) Left-click the [Import/Update] button.


Import of C-MAP Ed.3 chart is started.

Import/Update] button

65 Chart Portfolio
Left-clicking of the [Log] button will show the import result.
[Log] button

Import result

4) Check that the import is completed, and then, left-click the [Exit] button to exit Chart
Portfolio.

(2) Left-click the [Exit] button.

(1) Check that the import is completed.

Chart Portfolio 66
6.2.2. Acquisition of Permission
1) Select [Tool] - [Option] in that order.
The “Option” panel opens.

2) Left-click the [C-MAP Ed.3] tab, and then, [Order/Regist/Confirm License...] button.
The “Registration Wizard” panel opens.

3) Select [Ordering], and left-click the [Next(N)] button.

Select [Ordering].

67 Chart Portfolio
4) Select zones or areas, and left-click the [Add->] button. Then left-click the [Next(N)]
button.

Left-click the [Add->] button.

Select zones or areas.

Check the [Purchase] when buying up.


(Update services not available.)

5) Insert a blank FD into the FD drive.


6) Check the order information, and left-click the [Save] button.
The “Browse for Folder” panel opens.

Check the order information.

Chart Portfolio 68
7) Select the FD drive where the order information will be saved, and left-click the [OK]
button to close the panel.
The name of the saved file is “order.txt”.

Select the FD drive.

8) Send the saved order information (order.txt) to C-MAP by e-mail.


If the e-mail is not available, write down the order information, and send it by fax.
You will have an eToken license issued by C-MAP.

(1) Send “order.txt” you have saved.

(2) You will have a license issued by C-MAP.


User C-MAP

Send to : C-MAP Norway


e-mail address : license@c-map.no
Fax No. : + 47 51464701

69 Chart Portfolio
6.2.3. Loading of eToken license
1) Select [Tool] - [Option] in that order.
The “Option” panel opens.

2) Left-click the [C-MAP Ed.3] tab, and then, [Order/Regist/Confirm License...] button.
The “Registration Wizard” panel opens.

3) Select [Regist License], and left-click the [Next(N)] button.

Select [Regist License].

Chart Portfolio 70
4) Select [Add License from file], and left-click the [Load] button.
The “Select License file” panel opens.

Select [Add License from file]

5) Insert the eToken license FD into the FD drive.


6) Select [password.usr], and left-click the [Open(O)] button.
The “Information” panel opens.

Select “password.usr”.

7) Check that the loading is completed, and left-click the [OK] button.
The display returns to the “Registration Wizard” panel.

Check that the loading


is completed

71 Chart Portfolio
8) Left-click the [Close] button.
The display returns to the “Option” panel.

9) A message indicating the completion of license registration appears. (It takes several
seconds for the message to appear.)
Then, left-click the [Order/Regist/Confirm License...] button.
The “Registration Wizard” panel opens.

Message indicating the completion


of license registration.

Chart Portfolio 72
10) Select [Confirm License], and left-click the [Next(N)] button.

Select [Confirm License].

11) Check the license information, and left-click the [Close] button.
The display returns to the “Option” panel.

Check the license information.


(Information at left is a sample.)

73 Chart Portfolio
12) Left-click the [OK] button to close the panel.

13) Exit Chart Portfolio.

Chart Portfolio 74
6.2.4. Checking of chart display
1) Left-click [ ] in the startup menu to start Navigation & Planning.

2) Left-click the [MENU] button, and select [(2) Chart] - [(0) Option] - [(1)
S-57/C-MAP/ARCS...] in that order.
The “Chart Option” panel opens.

75 Chart Portfolio
3) Left-click the [View Common] tab.
If the “World” check box is blank, check it.

Check the “World” check box.

4) Left-click the [View 1] tab, and select [C-MAP Ed.3].


Finally, left-click the [OK] button to close the panel.

[View 1] tab

Select [C-MAP Ed.3].

Chart Portfolio 76
6.3 Update of C-MAP Ed.3 Chart
1) Insert C-MAP Ed.3 CD-ROM into the CD drive.
2) Select [Sort] - [C-MAP Ed.3] in that order.
C-MAP Ed.3 chart list is displayed.

C-MAP Ed.3 chart list

If C-MAP Ed.3 chart list is not displayed, left-click the [Auto Detect] button.

3) Left-click the [Import/Update] button.


Update of C-MAP Ed.3 chart is started.

[Import/Update] button

77 Chart Portfolio
Left-clicking of the [Log] button will show the update result.

[Log] button

Update result

4) Check that the update is completed, and then, left-click the [Exit] button to exit Chart
Portfolio.

(2) Left-click the [Exit] button.

(1) Check that the update is completed.

Chart Portfolio 78
6.4 Update of C-MAP Ed.3 Chart by e-mail
6.4.1. Real Time Updating (RTU) service
A Real Time Updating (RTU) service updates the CM-93/3 chart database via an E-mail using a
RTU server.

Update of C-MAP Ed.3 Chart by e-mail

①Order ②Send

ECDIS User C-MAP RTU Server

① Create a order file(e.g. JRC eT 30001.ord) by Chart Portfolio and save it to the floppy disk.
② Attach the order file to e-mail, and send it to the RTU Server (E-mail:updates@c-map.no).

④Update ③Receive

ECDIS User C-MAP RTU Server

③ The e-mail will be automatically treated at the RTU server and the updates will be generated and
replied to you. (e.g. u001x002.ans)
④ Save the update(s) file(s) to the floppy disk or CD-R/RW and update the CM-93/3 chart
database by Chart Portfolio.

C-MAP RTU Server e-mail address

E-mail: updates@c-map.no

79 Chart Portfolio
6.4.2. Update of C-MAP Ed.3 Chart by e-mail
1) Select [Chart] – [C-MAP Ed.3] – [Update Charts] in that order.
“C-MAP ED3 Chart Update” panel opens.

2) Left-click the [Create Chart Update Order to send via E-mail] button.
“C-MAP ED3 - Create Chart Update Order to send via E-mail” panel opens.
eToken number

This is a sample.

Chart Portfolio 80
3) Insert a blank FD into the FD drive.
4) Select an updating database in the “Database” list box (a).
5) Select an updating Zone or Area in the “Zones” list box (b), and left-click the [>] button
(c).
6) Select a file size when receiving the update(s) file(s) from the RTU server from the “Select
e-mail size” combo box (d). [Recommended file size : 1.44MB(Floppy)]
7) Left-click the [Create] button.
A order file was created, “Select drive” panel opens.

(a)

(b)

(c)

(d)

Check the [All available zones] when all licensed Zone/Area from
selected database(a) is selected.(Recommendation)

81 Chart Portfolio
8) Select the FD drive, and left-click the [OK] button.

Select the FD drive.

9) Left-click the [OK] button.


The name of the saved file is “JRC eT *****.ord”. (“*****” is eToken number.)

This is a sample.

10) Attach the saved order file (JRC eT *****.ord) to e-mail, and send it to the RTU Server
(E-mail:updates@c-map.no).
The e-mail will be automatically treated at the RTU server and the updates will be
generated and replied to you. (e.g. u001x002.ans)

(1)Send “JRC eT *****.ord” you have saved.

(2) You will have the update(s) file(s).

User C-MAP RTU Server

RTU Server e-mail address: updates@c-map.no

Chart Portfolio 82
Note:
・Check your number of e-mail from C-MAP(updates@c-map.no). One “*.ans” file
is attached with every e-mail.
・File name rule
uXXXxYYY.ans
YYY: number of files
XXX: file number
Ex:Four division
u001x004.ans
u002x004.ans
u003x004.ans
u004x004.ans

11) Save the received update(s) file(s) to the FD(CD-R/RW).


Note:
・The update(s) file(s) must be saved in the root directory of FD(CD-R/RW).

12) Insert the update(s) file(s) FD into the FD drive.


13) Left-click the [Apply Chart Update from Files] button.
Then, message dialog is displayed.

This is a sample.

83 Chart Portfolio
14) Left-click the [OK] button.

15) Left-click the [OK] button.

When update(s) file(s) is in the FD(CD-R/RW),


left message is displayed.
(CD-R/RW is drive D)

16) Left-click the [Apply Updates] button.


Then, update of Chart is started.

The update(s) file(s) in the FD(CD-R/RW) is


searched.

The drive path of update(s) file(s) When using other update(s) files(s), left-click the
is displayed. [Browse] button, select the drive path of update(s) file(s).

Chart Portfolio 84
The left message is displayed during
update of Chart, it takes several minutes.

17) After updating Chart, the following message dialog is displayed.


Left-click the [OK] button.

Note:
・When there are two or more media, perform 16) to 17) again.

18) Left-click the [Close] button to close the “C-MAP Chart Update – Apply Chart Update
from Files” panel.

85 Chart Portfolio
19) Left-click the [Review Updates] button.
Then, the “Review Updates” panel opens.

This is a sample.

20) Select chart database from database list.


The details of Database are displayed on the lower side..

The database list

The detail of chart database

Chart Portfolio 86
Right-click the detail of chart database, the following menu can perform.

:Publisher
:Chart name
:Update unit
:Object

Refresh The detail of database is refreshed.


Reject selected Selected renewal of a tree subordinate is rejected
(deleted).
Delete mark of update (Currently not available.)

Double-click the object, the detail of object is displayed.(It takes several seconds.)

The detail of object

87 Chart Portfolio
21) After confirming, click the [close] button in the “Review Updates” panel.

22) Left-click the [Close] button to close the “C-MAP ED.3 Chart Update” panel.

This is a sample.

23) Left-click the [Exit] button to close the “Chart Portfolio”.

Left-click the [Exit] button.

Chart Portfolio 88
3. Symptom/Cause/Countermeasure (C-MAP Ed.3)
Symptom Cause Countermeasure
Register the latest eToken license within the expiration
eToken license has been Ex- date, and then import C-MAP Ed.3 charts. Refer to the
C-MAP Ed.3 chart is not displayed.
pired. attached document ‘Notice about Alarm Messages of
C-MAP Ed.3’

C-MAP Ed.3 chart will not be dis-


Details of contract were Contact the retailer from whom C-MAP was purchased
played, though it has been displayed
changed. to check the details of the contract.
normally by that time.

eToken panel is displayed in


Navigation & Planning or Chart
Portfolio, and a password is
demanded.
It is an authentication proce-
dure when C-MAP security Press Cancel button.
device (eToken) is accessed.

Message “C-MAP Ed.3 : Key device Press [POWER] to exit software and OS, and then,
(e-Token) not found” is displayed in C-MAP security device press [POWER] again to start ECDIS again.
Navigation & Planning. (eToken) was not recognized. It is not necessary to keep [POWER] pressed to turn off
the power.

C-MAP security device


Connect the C-MAP security device (eToken).
(eToken) was not connected.

Message “System detected non


response from security device Press [POWER] to exit software and OS, and then,
(eToken),and needs to reboot. Please C-MAP security device press [POWER] again to start ECDIS again.
press [POWER] button shutdown.” is (eToken) was not recognized. It is not necessary to keep [POWER] pressed to turn off
displayed in Chart Portfolio. the power.

C-MAP security device


Connect the C-MAP security device (eToken).
(eToken) was not connected.

“Startup Menu” hang-up.

C-MAP security device


Connect the C-MAP security device (eToken).
(eToken) was not connected.

Connect chart distributor to request computerized


eToken license is not registered. The license is send by FAX.
eToken license.

91 Chart Portfolio
4. Symptom/Cause/Countermeasure (C-MAP Ed.2)
Symptom Cause Countermeasure
Error code ”error(0xFFFFFFFA)”
or ”Error: Bad Authorization Code or file
Authorization code is not correct. Reenter the received authorization code.
format error” is displayed in log window of
Chart Portfolio.

Chart list is not displayed in Chart


“Selectable Filter” was turned ON. Turn OFF “Selectable Filter”.
Portfolio.

Message “Insert another C-MAP Ed.2


CD” is displayed in Chart Portfolio.
Import/update after selecting the
Licensed zone was not selected.
licensed zone.

5. Symptom/Cause/Countermeasure (S-57/63)
Symptom Cause Countermeasure

Error code ”error(0x000000xx)”is Refer to the attached document ‘Notice Refer to the attached document ‘Notice
displayed in log window of Chart Portfolio. about Alarm Messages of S-57’. about Alarm Messages of S-57’.

Message “There is no licensed chart.” is


displayed in Chart Portfolio.
Licensed chart is not contained in this Insert licensed CD-ROM into CD-ROM
CD-ROM. drive.

Message “Warning SA public key


supplied on the ENC media unmatches the
pre-installed SA public key.” is displayed
Different SA Certificate file was Select SA Certificate file of the data
in Chart Portfolio.
selected. server to import.

Message “Errors occurred in Decryption! Cell permit was not imported.


Refer the log to check the detail” is
displayed in Chart Portfolio. Different Cell permit was imported.
Import the correct cell permit.
Cell permit was deleted.

License was expired.

Even if the latest Cell permit is Register the latest Cell permit ater
registered, “Error: Subscription license Expired Cell permits are remaindered. deleting Cell permit. See “Section 3.4
has expired.” message is appeared. Deleting Cell permit”.

Chart Portfolio 92
6. The reference about a chart

Refer to the following purchase of chart, contract, and service.

UKHO(ARCS,S63)
URL : http://www.ukho.gov.uk/
e-mail : helpdesk@ukho.gov.uk

C-MAP(Ed2,Ed3)
URL : http://www.c-map.no/
e-mail : market@c-map.no

93 Chart Portfolio
Reference Document: Alarm Information of C-MAP Ed.3

This section explains the details of the alarm information that may appear while C-MAP Ed.3 chart is displayed on
ECDIS.
No. Error message Measures to take
License has not yet been installed.
1 C-MAP Ed.3 : No license installed.
Register the license in Chart Portfolio.

C-MAP Ed.3 : One or more licenses expired. The license is invalid. The chart is displayed only for 15 minute after it is
2 Please contact your C-MAP agent for a license started.
renewal. Contact your C-MAP agent to request license renewal.

C-MAP Ed.3 : One or more licenses will The license will expire on DD/MM/YYYY. It will expire in less than 2
3 expire at DD/MM/YYYY. Please contact your months.
C-MAP agent for a license renewal. Contact your C-MAP agent to request license renewal.

C-MAP security device (eToken) cannot be recognized. Press [POWER]


C-MAP Ed.3 : Key device (e-Token) not
4 to exit the software and OS, and then, press [POWER] again to start the
found.
equipment.

Com port error was detected. Press [POWER] to exit the software and
5 C-MAP Ed.3 : COM error
OS, and then, press [POWER] again to start the equipment.

An unknown error was detected. Press [POWER] to exit the software


6 C-MAP Ed.3 : Unknown error
and OS, and then, press [POWER] again to start the equipment.

Chart Portfolio 96
Reference Document: Confirming of C-MAP Ed.3 Chart
This document describes the confirming items for correct installation of the C-MAP Ed.3 Chart.

WARNING
Turn off the power before opening the front cover for confirming licence key
(eToken). And do NOT touch the other parts. Otherwise, an electric shock or
a malfunction may occur.

CAUTION
Do NOT remove the licence key (eToken).
Otherwise a malfunction may occur.

121 Chart Portfolio


1. Confirming License Key (e-Token)
(1) Turn off ECDIS by pressing the [PWR] key or the [POWER] key on the operation panel.
The [PWR] or the [POWER] key light will be turned off after the power is off.
(2) Remove the front cover.

Unscrew the four


screws
USB port

(3) Confirm the License Key is installed into the USB port, and also check the System ID of the
installed Key.

This is sample.
Do NOT remove the
License Key.

(4) After checking, put the front cover on again.

2. Confirming System ID
(1) Press the [PWR] key to turn on ECDIS.
(2) After the [Startup] menu is displayed, click the [Chart Portfolio] button to start Chart Portfolio.
(3) Select [Tool] – [Option] in that order to display the [Option] dialog box.
(4) Click the [C-MAP Ed.3] tab and then the [Order/Regist/Confirm License…] button to display the
[Registration Wizard] dialog box.

Chart Portfolio 122


(5) Confirm the [System ID:] on the upper right side of the dialog box is same as the [System ID:] of
the key installed into the USB port.
If they are different each other, or the [System ID:] is set as “0”, the license cannot be acquired.
Please contact our head office, a nearby branch or local office.

3. Confirming the media


Confirm that the chart-installed media is CD-ROM. If it is DVD-ROM, the charts cannot be used.
Contact a sales representative of the Chart or C-MAP, Inc. to request the CD-ROM version.

123 Chart Portfolio


4. Confirming Pass of C-MAP Ed.3 Chart
(1) Press the [PWR] key to turn on ECDIS.
(2) After the [Startup] menu is displayed, click the [Chart Portfolio] button to start Chart Portfolio.
(3) Select [Tool] – [Option] in that order to display the [Option] dialog box.
(4) Click the [Advanced] tab and then the [Advanced Option] button to display the [Advanced Option]
dialog box.

(5) Confirm the C-MAP Ed.3 Pass destination in [Source Chart Path] is “D:”
If it is not “D:”, click the […] button to change it into “D.”

Confirm “D:” is set.

Chart Portfolio 124


5. Confirming expiry date
(1) Click the [Chart Portfolio] button on the [Startup] menu to start Chart Portfolio.
(2) Select [Tool] – [Option] in that order to display the [Option] dialog box.
(3) Click the [C-MAP Ed.3] tab and then the [Order/Regist/Confirm License…] button to display the
[Registration Wizard] dialog box.
(4) Put a check mark in the [Confirm License] and click the [Next] button. Then, the dialog will be
switched.
Confirm the expiry date.
(5) After confirmation, click the [Close] button.

(6) Select [Sort] – [C-MAP Ed.3] in that order.


(7) Click the “[C-MAP Ed.3] System Chart” tab and click the folder under the “CM93 Ed.3” folder.

125 Chart Portfolio


(8) Confirm the expiry date.

If the charts are expired, contact a sales representative of the Chart or C-MAP, Inc. to update the
subscription.

Chart Portfolio 126


6. Cleaning by the lens cleaner for CD drive
If the lens of the CD-ROM drive is dirty, the CD cannot be read correctly.
(1) Insert the attached CD-ROM lens cleaner into the CD drive.

This is sample.

Clean with the


attached cleaner kit.

(2) After the [Startup] menu is displayed, move the cursor onto it and right-click to display the
[Password] dialog box.
(3) Enter the four digits password “0000” and click the [OK] button to display the [User Maintenance
Menu].

Enter “0000” as the password.


Right-click

Startup Menu Password Dialog Box

(4) Click the [CD Cleaner] button. Then, the dialog box is displayed and the cleaning starts.
To stop cleaning, click the [OK] button. Perform the cleaning for a few minutes.

User Maintenance Menu

127 Chart Portfolio


CD Cleaner dialog box

7. Selecting C-MAP Ed.3 Chart


Select the chart type displayed on Navigation & Planning.
(1) Press the [PWR] key to turn on ECDIS.
(2) After the [Startup] menu is displayed, click the [Navigation & Planning] button to start Navigation
& Planning.
(3) Select [Menu] - [Chart] – [Option] – [S57/C-MAP/ARCS...] in that order to display the [Chart
Option] dialog box.
(4) Click the [View Common] tab, and put a check mark in [C-MAP Ed.3 Database] list.

Confirm the check mark is


inputted.

Chart Portfolio 128


(5) Click the [View1] tab and put a check mark in ”C-MAP Ed.3.”

Put a check mark in the “C-MAP Ed.3.”

(6) Click the [OK] button to close the dialog box.

129 Chart Portfolio


JAN-901/701/901M/NDC-1186
JAN-1290A/3598A
ECDIS/Navigation Workstation

Additional Manual
for Chart Installation

For further information,contact:

Not use the asbestos

74. JVVRYYYLTEEQLR
/CTKPG5GTXKEG&GRCTVOGPV
6GNGRJQPG 
(CEUKOKNG 
GOCKN VOUE"LTEEQLR
#/56'4&#/$TCPEJ
6GNGRJQPG 
(CEUKOKNG 
GOCKN UGTXKEG"LTECOUPN
5'#66.'$TCPEJ
6GNGRJQPG 
(CEUKOKNG 
GOCKN UGTXKEG"LTECOGTKECEQO
%1&'0Q<20#% '6/ +51+51%GTVKHKGF
,7.'FKVKQP,4% Printed in Japan

Potrebbero piacerti anche