ISSUED: 04/21/19
COMPANY IN-CHARGE: P-DELTA ENTERPRISE
ITEM DESCRIPTION QTY
I I GENERAL REQUIREMENTS
a Mobilization and Demobilization 1.00
b Temfacil, Field Office, Warehouse, Fences 1.00
c Management of Works 1.00
d Bonds and Permits 1.00
e Safety Sign (Including PPE) 1.00
f Surveying, Staking and Building Layout 2.00
g Security Services 1.00
h Material Testing 1.00
TOTAL GENERAL REQUIREMENTS
II II SITE WORKS
a Clearing and Grubbing 100.00
b Delivery of Materials 1.00
c Excavation 40.50
d Backfilling 42.00
e Gravel Bedding 9.50
f Soil Poisoning 60.00
TOTAL SITE WORKS
III III STRUCTURAL WORKS
A CONCRETE FORMING
a Phenolic Board 23.00
b Rough Lumber 1,015.00
f Scaffolds 890.00
Sub-Total A
B CONCRETE REINFORCING
a D10 mm x 6m SG RSB 210.00
b D12 mm x 6m SG RSB 173.00
c D16 mm x 6m SG RSB 45.00
f #16 GI Wire 20.00
Sub-Total B
C CAST IN-PLACE CONCRETE
a Columns
Portland Cement 31.00
River Sand 1.70
3/4 '' Gravel 3.40
Water 186.00
c Girders and Slabs
Portland Cement 66.00
River Sand 4.40
3/4 '' Gravel 8.70
Water 396.00
d Footing
Portland Cement 8.00
River Sand 0.50
3/4 '' Gravel 0.90
Water 48.00
CLIENT: AILEEN ARDELLE CABUTOTAN
ISSUED: 04/21/19
COMPANY IN-CHARGE: P-DELTA ENTERPRISE
e Stairs
Portland Cement 10.00
River Sand 1.30
3/4 '' Gravel 2.00
Water 60.00
Sub-Total C
D ROOFING WORKS
a 2" x 3" Purlins 46.00
b 2" x 4" Rectangular Hollow Bar 105.00
c 10Ø Sagrod 4.50
d GI Sheet 20.00
e Roofing Insulation (1-Sided Alum, 10mm) 20.50
f Anchor Bolts and Nuts 8.50
Sub-Total D
TOTAL STRUCTURAL WORKS
IV IV ARCHITECTURAL WORKS
A MASONRY
a 4'' Thk CHB 3,098.00
b PLASTERING
Portland Cement 5.00
River Sand 1.50
Water 30.00
Sub-Total A
B STEEL RAILINGS
a Stair Railings 1.00
b Balcony Railings 1.00
Sub-Total B
CLIENT: AILEEN ARDELLE CABUTOTAN
ISSUED: 04/21/19
COMPANY IN-CHARGE: P-DELTA ENTERPRISE
C WATERPROOFING
a Toilet and Bath 6.25
b Balconies 3.55
Sub-Total C
D DOOR
a 1.8 x 1.0 m 40mm thick Wooden Door w/ Jamb 1.00
b 1.8 x 0.8 m 40mm thick Wooden Door w/ Jamb 3.00
c 1.8 x 0.6 m PVC Flush Door w/ Jamb 2.00
d 2.0 x 2.4 m Glass Sliding Door 1.00
Sub-Total D
E WINDOWS
a 1.6 x 1.4m Alum Glass Window 8.00
b 1.4 x 1.2m Alum Glass Window 4.00
Sub-Total E
F TILE WORKS
a 600mm x 600mm x 6mm Ceramic Floor Tiles 150.00
b 400mm x 400mm x 6mm Outdoor Tiles 30.00
c 300mm x 300mm x 6mm Ceramic Floor Tiles 130.00
d 300mm x 300mm x 6mm Ceramic Wall Tiles 50.00
e Concreting
Portland Cement 7.00
River Sand 2.30
Water 42.00
Tile Grout 58.00
Tile Adhesive 5.00
Sub-Total F
G CEILING FINISHES
a 9mm thick Gypsum Board 82.50
b 4.5mm thick Ficem Board 10.55
c Spandrel Ceiling 19.85
Sub-Total G
H PAINTING
Walls(Interior, Exterior); Ceilings
Glazing Putty 18.00
Semi Gloss Latex Paint 55.00
Primer Paint 10.00
#80 Sand Paper 3.00
#120 Sand Paper 11.00
#1'' Paint Brush 3.00
#3'' Paint Brush 3.00
#7'' Paint Roller with Handle 3.00
Sub-Total H
TOTAL ARCHITECTURAL WORKS
V V ELECTRICAL WORKS
A FEEDERLINE AND PANEL BOARD
a MDP 1.00
b LP 1.00
c PP 1.00
d PPACU 1.00
CLIENT: AILEEN ARDELLE CABUTOTAN
ISSUED: 04/21/19
COMPANY IN-CHARGE: P-DELTA ENTERPRISE
e MCB NEMA 3r, 200 AT, 230 V, 3 pole 1.00
f ECB NEMA 3r, 40 AT, 230 V, Single Phase 1.00
g ECB NEMA 3r, 30 AT, 230 V, Single Phase 1.00
h Trunking Gutter 1.00
i Pullbox 3.00
j Fittings 1.00
k Hanger and Supports 1.00
l Miscellaneous/Consumables 1.00
Sub-Total A
B LIGHTING FIXTURES
a 2 x 40 Watts Fluorescent Lamp 2.00
b Chandelier 1.00
c Pinlights 45.00
d Circular Lights 10.00
e Wall Lamps 4.00
f Outdoor Lights 10.00
g LED Lights 1.00
Sub-Total B
C LIGHTING LAYOUT AND SWITCHES
a 15mm Ø PVC 65.00
b 3.5mm2 THHH 850.00
c One gang switch 5.00
d Two gang switch 15.00
e Three gang Switch 10.00
f Two Way Two Gang Switch 5.00
Sub-Total C
D POWER LAYOUT AND CONVENIENCE OUTLETS
a 15mm Ø PVC 45.00
b 3.5mm2 THHH 850.00
c Single Convenience Outlet, 1 gang 8.00
d Duplex Convenience Outlet, 2 gang 28.00
e Wetherproof Convenience Outlet, 1 gang 4.00
f Boxes and Fittings 1.00
g Hanger and Supports 1.00
Sub-Total D
TOTAL ELECTRICAL WORKS
VI VI PLUMBING AND SANITARY WORKS
A SOIL, WASTE AND VENT SYSTEM
a 50mm Ø PVC Pipe 10.00
b 100mm Ø PVC Pipe 13.00
c Drains and Accessories 5.00
d Fittings and Accessories 1.00
e Septic Tank 1.00
Sub-Total A
B STORM DRAINAGE SYSTEM
Pipeworks and Fittings
a 50mm Ø PVC Pipe 3.00
b 75mm Ø PVC Pipe 30.00
c Pipe Fittings 1.00
CLIENT: AILEEN ARDELLE CABUTOTAN
ISSUED: 04/21/19
COMPANY IN-CHARGE: P-DELTA ENTERPRISE
d Drains and Accessories 10.00
e Catch Basin/Area Basin 3.00
Sub-Total B
C WATER DISTRIBUTION SYSTEM
a 25mm Ø PPR Pipe 23.00
b 32mm Ø PPR Pipe 7.00
c Pipe Fittings for PPR PN 20 1.00
d Gate Valve PPR 25mm Ø (3/4'') 10.00
e Check Valve 25mm Ø (3/4'') 1.00
f Water Meter25mm Ø (3/4'') 1.00
g Consumables, Excavation, Chipping Works 1.00
Sub-Total C
D SUPPLY & INSTALLATION OF PLUMBING FIXTURES
a Water Closet & Accessories 2.00
b Lavatory and Accessories 3.00
c Shower 2.00
Sub-Total D
TOTAL PLUMBING AND SANITARY WORKS
VII VII MECHANICAL WORKS
A VENTILATION SYSTEM
a Ceiling Exhaust Fan, 100CFM 1.00
b Range Hood 1.00
Sub-Total B
TOTAL MECHANICAL WORKS
TOTAL MATERIALS COST
LABOR COST(45%)
CONTINGENCY COST(10%)
CONTRACTORS PROFIT(12%)
OVERHEAD (1%)
lot - -
lot - -
lot - -
lot 50,000.00 50,000.00
lot 5,000.00 5,000.00
lot 5,000.00 10,000.00
lot - -
lot - -
ERAL REQUIREMENTS 65,000.00
kg 48.00 2,208.00
kg 48.00 5,040.00
kg 150.00 675.00
sq. m. 550.00 11,000.00
sq. m. 135.00 2,767.50
kg 150.00 1,275.00
Sub-Total D 22,965.50
RUCTURAL WORKS 201,390.50
li 120.00 2,160.00
li 380.00 20,900.00
li 300.00 3,000.00
yrd 160.00 480.00
yrd 165.00 1,815.00
pcs 35.00 105.00
pcs 75.00 225.00
set 90.00 270.00
Sub-Total H 28,955.00
HITECTURAL WORKS 398,182.00
This file originally contained features which were not recognized by this 1
version of Excel. These features are not preserved when saving an OpenXML
file to the XLSB file format, or vice versa.
Version
Excel 2007