Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
STEP 2:
STEP 3:
Exposure category B : height > 9m ; roughness distance = 790m OR 20 x h of the building, which is
greater (NSCP 2015, see section 207A.7)
𝐾𝑧𝑡 = ( 1 + 𝐾1 + 𝐾2 + 𝐾3 )2
𝑲𝒛𝒕 = 𝟏
Gf = 0.85
1+1.7𝑔𝑄 𝐼𝑧̅ 𝑄
G = 0.925( 1+1.7𝑔𝑣 𝐼𝑧̅
) (NSCP 2015, section 207A.9.4, Equation 207A.9-6, p. 2-56)
10 1
𝐼𝑧̅ = 𝑐( 𝑧̅ )6 (NSCP 2015, section 207A.9.4, Equation 207A.9-7, p. 2-56)
𝑧̅ = 0.6ℎ ≮ 𝑧𝑚𝑖𝑛
𝑧𝑚𝑖𝑛 = 9.14m (NSCP 2015, Table 207A.9-1, p. 2-58)
0.6ℎ = 0.6(15𝑚) = 9𝑚
𝑧̅ = 9 < 𝑧𝑚𝑖𝑛
𝒛̅ = 𝟗. 𝟏𝟒𝒎 (NSCP 2015, Table 207A.9-1, p. 2-58)
10 1
= (0.30)( )6
9.14𝑚
𝑰𝒛̅ = 0.3045
1
𝑄= √ 𝐵+ℎ 0.63 (NSCP 2015, section 207A.9.4, Equation 207A.9-8, p. 2-56)
1+0.63( )
𝐿𝑧̅
𝓵 = 𝟗𝟕. 𝟓𝟒𝒎
𝟏
̅=
∈
𝟑.𝟎
𝒛̅ = 𝟗𝒎
1
9
𝐿𝑧̅ = 97.54(10)3.0
1
𝑄= √ 10+15 0.63
1+0.63( )
94.1738
𝑸 = 𝟎. 𝟖𝟖𝟔𝟐
1+1.7𝑔𝑄 𝐼𝑧̅ 𝑄
G = 0.925( 1+1.7𝑔𝑣 𝐼𝑧̅
)
1+1.7(3.4)(0.3045)(0.8862)
G = 0.925( 1+1.7(3.4)(0.3045)
)
G = 0.8579
Exposure B: 0.807
STEP 5:
values:
Kz = 0.807 STEP 4
Kd= 0.85
𝑽 = 𝟐𝟑𝟎 𝒌𝑷𝒉
qz = 0.613(0.807)(1)(0.85)(230𝑘𝑃ℎ)2
𝑭 = 2919.69 kN
𝑭 = 𝟒𝟖. 𝟔𝟔𝟏𝟓 𝒌𝑵
Figure 2. Frame
𝑘𝑔 𝑚
𝑊𝑇𝑎𝑟𝑝 = (0.25 ) ( 9.81 𝑠2 ) (9𝑚)(4𝑚)
𝑚2
5
𝐿𝐹𝑟𝑎𝑚𝑒 = 𝑚 (12) + 9𝑚(3) + 2𝑚(14) = 85𝑚
2
𝑘𝑔 𝑚
𝑊𝐹𝑟𝑎𝑚𝑒 = (9.42
𝑚
) (9.81 𝑠2 ) (85𝑚)
Figure 3. Loadings