Sei sulla pagina 1di 5

Express Receipt Process

Concept:
This process will be used to perform the Express Receipt. Receiving will be done against
the delivery number which will be available on the Label. The Outermost LPN will be
Scanned to Receive the entire Material.

1. Move the shaded area to ‘Default’ and hit ‘Enter’.

2. Enter the user name > Hit ‘Enter’ > Enter the password > Hit ‘Enter’.

3. Select the required responsibility: Move the shaded area to ‘Whse Mgmt’ and hit
‘Enter’.

4. Select the required menu: Move the shaded area to ‘Inbound’ and hit ‘Enter’.
5. Select the required menu: Move the shaded area to ‘Express Receive’ and hit
‘Enter’.

6. Select the required menu: Move the shaded area to ‘Int Ship’ and hit ‘Enter’.

7. Enter the required organization: Enter facility code and hit ‘Enter’.

8. Scan the Ship Num from the LPN. This is the Delivery Number from the Label.
9. Scan the Master LPN from the Label

10. If Required, Enter the Receiving Subinventory

11. If Required, Enter the Receiving Locator. Select the <Next LPN> Button, to
Receive More LPN’s.
12. Scan other LPN’s and repeat the Steps 9, 10, 11 till All are Received.

13. Select the <Done> Button, Complete the Receipt.

14. Receipt Information is displayed.


15. Select the <Done> Button, in the Receipt Information Page.

16. “Txn Success.” Message is displayed.

Potrebbero piacerti anche