Sei sulla pagina 1di 31

KSK Mahanadi Power Company Ltd.

KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 1 of 114
No: 1

PREVENTIVE MAINTANENCE

FOR

DRY FLY ASH EVACUATION


SYSTEM

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 2 of 114
No: 1

FLOWCHART OF SMP:
APPLY PTW

ISOLATION OF EQUIPMENT

ISSUING PTW

INSPECTION OF WORK
AREA/EQUIPMENT

CARRYING OUT WORK AS PER


CHECKLIST

EQUIPMENT BOX-UP AREA


HOUSEKEEPING

SURRENDER OF PTW AND TRIAL RUN

NORMALIZATION OF EQUIPMENT

CANCELLATION OF PTW

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 3 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
AHP HOPPER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 4 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-
1. Inspection of Oil Condition &
Level.
2. 'V'-Belt Tension/Condition
Inspection.
3. Inspection/Cleaning of Air
Breather Plug.
4. Inspection/Cleaning of Drain
Plug.
5. Inspection of Pulley.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 5 of 114
No: 1

6. Checking/Cleaning of Suction
Filter.
7. Checking of Fasteners/Mounting
tightness etc.
8. Checking of NRV.
9. Cleaning & Greasing of Safety
Valve.
10. Clearance Checking of Lobe.
11. Inspection of Oil Seal.
12. Observation

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 6 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
ESP HOPPER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 7 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-
1. Inspection of Branch Isolation Valve.
2. Inspection of Manual Isolation Valve.
3. Inspection of Swing Disc Valve.
4. Fasteners/Mounting Bolt tightness
Checking.
5. Inspection of Fluidizing Tiles/Pad.
6. Inspection of Fluidizing Valves.
7. Inspection of moisture content in
fluidizing line.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 8 of 114
No: 1

8. Inspection of Vacuum Air Intake.


9. Observation.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 9 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
BUFFER HOPPER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 10 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-
1. Bags Inspection & Cleaning.
2. Inspection of Moisture content in
Purging Air.
3. Purging Header Inspection.
4. Fasteners/Mounting tightness
Checking.
5. Cage Inspection.
6. Inspection of Air Manifold
Diaphragm & Clamp Tightening.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 11 of 114
No: 1

7. Inspection of Cage Locking


Arrangement.
8. Vent Fan Inspection.
9. Observation.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 12 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
Transport Air Compressor
(TAC)

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 13 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-

1. Oil Level Inspection.


2. Water Line Flow and Pressure
Inspection.
3. Air Filter Cleaning.
4. Air Outlet Valve inspection.
5. Water inlet & Outlet valve
inspection.
6. TAD after cooler inspection.
7. Observation.
Prepared by: Reviewed by: Approved by:
Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 14 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
SILO VENT FILTER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 15 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-
1. Bags Inspection & Cleaning.
2. Inspection of Moisture content in
Purging Air.
3. Purging Header Inspection.
4. Fasteners/Mounting tightness
Checking.
5. Cage Inspection.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 16 of 114
No: 1

6. Inspection of Air Manifold


Diaphragm & Clamp Tighten.
7. Inspection of Cage Locking
Arrangement.
8. Observation

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 17 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
ROTARY FEEDER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 18 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-
1. Bearing Inspection.
2. Bearing Greasing.
3. Gear Box Inspection/Bearing
inspection.
4. Gear-Box Greasing
5. Rotor Clearance inspection.
6. Rotor Fin Inspection.
7. Observation

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 19 of 114
No: 1

PREVENTIVE MAINTENANCE
FOR
DRY ASH UNLOADER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 20 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-

1. Bearing Inspection.
2. Bearing Greasing.
3. Gear Box Inspection/Bearing
inspection.
4. Gear-Box Greasing.
5. Rotor Clearance Inspection/Setting.
6. Vent Filter Bag Inspection &
Cleaning.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 21 of 114
No: 1

7. Rotor Fin Inspection.


8. Dome valve inspection.
9. Chute assembly inspection.
10. Wire Rope inspection.
11. Observation.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 22 of 114
No: 1

PREVENTIVE MAINTANENCE

FOR

SCREW CONVEYOR

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 23 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-

1. Checking of Screw.
2. Inspection of Coupling.
3. Bearing Greasing.
4. Speed Reducer Oil Inspection.
5. Inspection of Seal Ring.
6. Fasteners/Mounting tightness
Checking.
7. Observation

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 24 of 114
No: 1

PREVENTIVE MAINTANENCE

FOR

PADDLE MIXER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 25 of 114
No: 1

KSK Mahanadi Power Company Ltd. KMPCL/MAINT/FBFAS/01

6 X 600 MW Power Plant


Power from knowledge SMP FOR FLUIDIZING BLOWER OF FLY ASH S
ILO
Issue No: 1 Issue Date: Revision: 1 Revision Date: File no: Page 25 of 27

CHECK LIST:

ACTIVITY TO BE DONE:-

1. Checking of Oil Level of Reducer.


2. Oil Quality Inspection of Reducer.
3. Checking of Water Flow.
4. Chain Inspection.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 26 of 114
No: 1

5. Gland adjustment and


setting/Replacement.
6. Inspection of Nozzles for any kind
of Blockage.
7. Inspection for any Kind of Ash
Leakage.
8. Inspection of any kind of scrap or
Ash accumulation.
9. Inspection of Blade Fasteners/
Mounting for tightness.
10. Greasing Of Bearings.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 27 of 114
No: 1

11. Inspection Blade for Weariness.


12. Inspection of Shaft Flange Joint.
13. Inspection of End Shaft.
14. Inspection of Blade Holder Shaft.
15. Observation

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 28 of 114
No: 1

PREVENTIVE MAINTANENCE

FOR

SILO FLUIDIZING BLOWER

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 29 of 114
No: 1

CHECK LIST:

ACTIVITY TO BE DONE:-

1. Inspection of Oil Condition &


Level.
2. 'V'-Belt Tension/Condition
Inspection.
3. Inspection/Cleaning of Air
Breather Plug.
4. Inspection/Cleaning of Drain Plug.
5. Inspection of Pulley.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 30 of 114
No: 1

6. Checking/Cleaning of Suction
Filter.
7. Checking of Fasteners/Mounting
tightness etc.
8. Checking of NRV.
9. Cleaning & Greasing of Safety
Valve.
10. Clearance Checking of Lobe.
11. Inspection of Oil Seal.
12. Observation.

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:
KSK Mahanadi Power Company Ltd.
KMPCL/MAINT/DFAES/01
6 X 600 MW Power Plant
Power from knowledge
SMP FOR DRY FLY ASH EVACUATION SYSTEM
Issue Issue Date: Revision: 1 Revision Date: File no: Page 31 of 114
No: 1

Prepared by: Reviewed by: Approved by:


Signature: Signature: Signature:
Name: Name: Name:
Designation: Designation: Designation:

Potrebbero piacerti anche