Sei sulla pagina 1di 34
Mee LL ea eed LU@PoweR™ Premera info@luxpowertek.com ENUM 1.018 USER MANUAL LXP 3K/4K/4K6/5K Hybrid Installation Conne Commissioning LU@PoOwER™ LUX POWER TECHNOLOGY CO., LTD CONTENTS About This Manual I Safety 1.1 Symbol Explanation 1.2 Safety Instruction 2 Briefintroduction 2.1 System Solution 2.2 Product Description 3 Pre-Installation 3.1 Unpacking & Storing 3.2 Product Overview 3.3 Select Location 3.4 Clearance Requirements 3.5 Tools & Materials 4 installation 4.1 Installthe toverter 4.2 Installthe Meter 5 Connection 5.1 Connection Overview 5.2 PVConnection 5.3 Battery Connection 54 Grid Connection 5.5 EPS/Back-up Connection 5.6 Meterand CT Connection 5.7 Communication Connection ol 02 02 03 os os 06 07 o7 09 13 Is le 17 7 8 19 19 20 21 23 25 26 28 10 S73 Balancing Resistor Configuration SW 5.8 Grounding Operation Guide 6.1 LCD Menu Structure Overview 6.2 LCD Operation & Setting Guidance 62.1 Information Searching 6.3 Inverter Working Status 6.4 System Working Modes 6.5 Start-up / Shut-down/ Restart the Inverter 652 van eloverter Commissioning 7.1 Inspection 7.2 Commissioning Procedure Troubleshooting & Maintenance 8.1 Troubleshooting €12 Toslemootng aed OnLCD Dipay 82 Maintenance Decommissioning Specification 26 38 39 39 a 48 53 57 58 58 58 59 59 6 62 63 LU@POwER™ About This Manual Target Group How to Use This Manual Scope of Validity “This manuals appl cab eto flow ng models ofiverter rom LuxPowerTeenvology Co. Li |. Safety LU@POWER™ 1.1 Symbol Explanation Symbols in This Manual “The generalatomiton ad sfety nd PE A WARNING Pee hed wi fallowingsynbotsinthis manual Symbols on Inverter Label ce > Gg & ‘| A A ® A RCH ark LU@POwER™ 1.2 Safety Instruction General Safety Instructions Injury ardestn tothe operatoror thi panyior arageto the inverterandathersropertes belongingtothe operator or ath party. Important Safety Notifications ‘There ave many safety iaues need to be caetuly noted before, daring and ater the instalition, and ako in future ‘operation and maintenance, following sknportan safety noueatlons to operator, owner and user of hs product in appropriate vege PREY oan cers of High Voltages and Large Current pare of high PV vokage, Plate tur-of the DC switch of PY Pane! output before ane during tne tation toavoig electric shock Donet pen te inverter when ts work ng ta avoid electri smock and damages ram live wotage and Dorot operate the inverter when's working ony the LCD and button canbe touched in mite cases by qualiieg personne, other pars ofthe inverter canbe touched when the inverter is under 2 se alee gfally hutedown) oot connector eacannect any eannections (PV battery, ge, communion et) ofthe verter reionsbleandprofessorlinulstion mestureerts (ag person protective equipment (PPE) Inspect celevart exited wiring ont of the ineallition is under good contion before etalon, Ingpect the connections are good between inverter and PY battery and grid during instalation to PNT te] Avoid misoperation and Inappropriate Usage LU@POWER™ [Al the work of this product (system design instalation, operation, setting and configuration rsntenance ete, nue earriecoutby quale personnelat aquired ‘Allconnections mustbein accordance witlocalangnations regions andstandars PNUZSIING user's safety ‘A the warming tab oF nae ware of buringhut,the never ancsome prtsolihesytem coud eho! when working, plese do nol touch the inverter surace ar mos af th parts when they are working. Dating inverter working states onlytheLCD andbuttors could be touched Pee COnyqualted perserse can change the ivertersetng. Posse carefully rex! this manu! telore any work eared oul on ths inverter, flr the sala, LU@POWER™ 2. Brief Introduction 2.1 System Solution A. Solarand energy storage hybrid system LU@POWER™ D. Usage in retrofitting solar energy storage system 2.2 Product Description ‘The LAP seres hybrid solar arc energy storage system appiations interes Standards and Cert LU@POwER™ 3. Pre-Installation 3.1 Unpacking & Storing Check Packaging Overview Width (mm) | Height (mm) | Depth (mm) Packaging List LU@POWER™ No. Qty Remarks 5 ee ‘ ee a o LU@POWER™ Storing the Inverter ‘Tae inverermustbe sores appropriately rot istales mediate refertobelow are Ween) Thelnvertrandite:ompanents must bestoredinitsarigialpaceaging ‘The packaging shouldbe vera ‘Themaninum laced pert Donetexporedtheinverterand ts psckagingto raincrons Keep the inverter ants packaging aay rom corrosion 3.2 Product Overview Inverter Overview ‘The inverters mensionieshown inbelow fgueasareference LU@POWER™ are Bottom area andalitelnrertaces ie shownin below fgure ae reference rt ty No. Items Remarks ‘Comemureaton Inerties Area AC Output inteace Grid Connection LU@POWER™ No. Items i Dis © ‘Running LED Faia © 2 Warning LED Meter/CT Overview A) Meter Overview No. Function Pin Remarks 7 Pulse Output Connection Meter Specification LU@POWER™ Model SDM120 Modbus Pin ‘Nominal Voltage (Un) oVvacor?30Va0 ‘Operational Voltage le Currene (ib) Maximum Rated Current (Imax) ‘Over Current Withstand al Standard ‘Accuracy Class case ‘Active Energy LU@POWER™ B) CT Overview - Optional Model ESCT-T24-1 ‘Accuracy 3.3 Select Location ondivons. However, slecing an ootinalinstallavon cation ishghyreconmmended toncreasethe safety, performance andlfespan ofthe invert Suggestions and Requirements 3) The wal rong enough to bear the weight ofthe inverter during system's service ime ©) Thesmbienttemparatreisrequredtobewitin-25% ~ 60%. LU@POWER™ Never instal the inverterexposeste directv ww fgureancsslect wel v - z . oe 1 4 ae 0 | Xe 6 t 1 9 Vf todelow gure eto sure easy operation and view he cipliy ofthe verter Plumbing orgasppeline nthe wal LU@POWER™ LU@POWER™ 3.4 Clearance Requirements 3.5 Tools and Materials A) Tools \ LU@POWER™ LU@POWER™ 4. Installation 4.1 Install the Inverter (emer VEEP 4.2 Install the Meter LU@POWER™ 5. Connection Thi partisan shows the stest correctly cannet LAP hybrid iwerter PREG sich voitage might cause damages and injuries. Make suretheallealesare ot lve sctive equipment PPE) PUGS Makesure all the ables and connections are well connected wit femly atacyed, undamaged, propery Oe Only quaifedpereenrecin make the connection wore 5.1 Connection Overview Comprehensive System Connection Diagram: ie LU@POWER™ Connection Terminals and Interfaces Overview 5.2 PV Connection nePV connection ofLXPhybicinerteris tn stmetotradtionalomgrid sola inverter (tring invert). Cable Requirement: Cross-section] Cable Diameter | Minimum Voltage 2) Sirp6-Smminsuiaton ram tnecable ene a= — 2» LU@POWER™ 1b) Assemble tne cable ends to cmp conta. ae > y 12) Lead the cable through the cable gang, then nse into the corresponding insulator unt tsps inte plise nen tattenthe cable pane lp ln Sp ‘wmon verfled ine PV connector ight align the 2 halfconnector and mate them together by hangs uci ite or %8 i) 5.3. Battery Connection Battery Power Connection Cross-section Type Diameter 4 LU@POWER™ ‘Seep i Assemble the termina 1) Strip LOmminsulaton romthe abiesna 1b) Uninsallne waterproof cover (BAT) an eae sry cables through te corresponding cable sand el ing anethveadedsleove. Then crimp the OT terminal install te heat svinkabecasing. ‘Step: instal he basery power connector 12) _fastentne connection erminltacorespondng BAT erm nl locks (GAT + and BAT.) 1) Frminsallthewaterprat cover (GAT) bakiath inert Battery Communication Connection IF he battery type Is thiumion oF ternary battery which need communiation between the inverter and battery the communieation connection must be ised. Please refer to Chepter 5.7 Camano 2 LU@POwER™ 5.4 Grid Connection Cable Requirements: Cross-section Diameter 1b) _Refertobelow gure anc conirm the AC cables are corectiyconnectes » LU@POWER™ 1) Assemble the AC connector and make sve that the oof he termina Blockang the graove on he nousing engage perfecy unt ‘lek isheardorfe. 1) Connecttne PE conductor to grounding electrode, anéconnectihe NaneL cone 8) ConnecttheAC breskerstathe AC grid LU@POwER™ LU@POWER™ 5.5 EPS/Back-up Connection 5.6 Meterand CT Connection LU@POWER™ LU@POWER™ on ine ofthe meter tothe inert slease rele to Chapter §.7.2 Mater RS4OS/CT 5.7 Communication Connection Connection oe no ee, “2 ee eae “aggeust: cc ») Connect the cr 5.7.1 Battery RS485/CAN Connection LU@POWER™ l45 Terminal Configuration of Battery Communication oo} Pin | Function Description Pin | Function Description " ear a0s@ 5 NC 2 BATABSA 6 BaTNTE 3 BATCANT 7 BAT Wane UP 4 BAT CAN ° exo s ake the RUS ternal bated an above introduction ofeach Pin definition, you culd either make RSABS connector or cable Connection 1) Unscrew and remove the water root cover ofommunictanineracesanslogsen the able gare ont 1) Lead he RSE /CAN cable throu the able grand pope RS485/CAN terminal ino corrsparcing » LU@POWER™ artery AS4BS/CAN ports interfaces ery (2) _Hyoutish all the other commuricat on connections, thenfsten the abl and andintllthe wate proof cover of ersten b) 5.7.2 Meter RS485/CT Connection Meter and CT Communication Interface Overview LU@POWER™ l45 Terminal Configur ET Communteation oo} Pin | Function Description Pin | Function Description v earaesa 5 crn 2 BATABSA * cP 3 Ne 7 crN 4 Ne ° cap “Splie Phase Meter rn =| 1 RS485 Cable Connection Overview ro =| Single ‘Split Phase CT Cable Connection Overview LU@POWER™ 148 CT Cable Connection Overview = 85 Connect Meter RS40S or CT » » o Lead the Meter RS485 oF CT cable trough the cable land and plug the RS4BS or CT terminal into orresponsing meteriCT ports intertacestry communication interaces back to inverter rly OF you cas continue ether communication connection watks recy alter step by LU@POWER™ 5.7.3 DRM Connection 1c Overview Pin | Function Description Pin | Function Description v DAMS: 5 ReGen 2 RMS ‘ RM 4 Ea a ADs LU@POWER™ DRM Control Circuit Connection Diagram, Inverter ORED aa oa amar + | Res 19R 88: REF GEN/D Hed conse) | [Een ae | | | | Connect ORM 1) Unterewandremavethe water roof cover of commeniationinteracesndlonen the abl and ont 8) Lead the Meier 54850 LU@POWER™ LU@POWER™ 5.7.4 Safety Standard Con! LU@POWER™ LU@POWER™ 5.7.6 Wireless Communication Module Connection 5.8 Grounding Wireless Communication Interface Overview ‘The Wireless Communication Interface Detalls COTNGTES instait the Protective Shett Pin | Function Description Pin | Function Description LU@POWER™ 6. Operation Guide 6.1 Menu Structure Overview Display Menu Sea coy =) (an cal re LCD Menu Structure Overview LU@POWER™ sn] Rete to Chapter 6.21 #5,| Information Seorching - 4) Grid ito. cluding power, energy and SOC| Search Measured Information EPS fo, os. dt forguidanceane cet ‘See COMAdGress Sar Time [The setting options ofthe inverter] Reler to Chapter 6.2.2 Sertings 1 Sec Language See Bate | Ser PV input Ser EPS Mode 150 AC Charge sestngs ncucing 6 Guidence or udancearaaerais sumption. e Chapter 6.21 Informetion Searching - 6) 1 and alarm] Search History Information for Noun Explanation of LCD Displays Explanation Remarks © Chapter 6.3 Inverter veluding| Relay be Chapter 6.2.1 Informetion Searching - €) number, firmware version and bud] Search Product Infermetion for Parameter Explanation of LCD Displays Epvlal oxlenergy generated of?V20-ay Sac; apparentpowerofACoutut Epyaal: tral energy gereratesofPVaray2 “0 LU@POwER™ 6.2 LCD Operation and Setting Guidance 6.2.1 Information Searching 2) Enter into Display Mane a) i Prauce into | history b) Search History Information LU@POWER™ ©) Search Product inermation ru and touth Enter button to enter inthe Praductlnfo. mena Display Manu — |__ Prodcur into. Model: none FW Version? wxxmR SerNo: wexxwxxxinxx |“? | Guidi: xxxxuxxnenns 14nd touch Enter burton t enter inthe Measured Info. es of tne system, suchas battery. giana EPS dts a LU@POWER™ LU@POWER™ 6.2.2 Settings Guidance » onl Sm {sa com Asien | LU@POWER™ LU@POWER™ 8) Time Sectings Serna 3 = poinrepy ot wa2s a) 1538 4s “ LU@POWER™ LU@POWER™ hy AC Charge Seccings 6.3. Inverter Working Status ees “Theinverter cul workin several workings. and the LD wild crresponingnforntion a) Starting yee Teer iTS praia In Setuingnteace, search nd select he Set AC Charge menu and enter into AC charge setting tree Follow tne es adel een spieriere rections betow low charge to enable or daableAC charg function, enable then congue relevantparaeters | Diiplay Wen b) Standby Inverter is waiting or slit DC valage ram the PV a ater. occurs whan th unit israt sullen! lormake the verter work nan battery SOC slow lower iaey | (naa soc ae | fae 2 Faute Fault occurs withthe inverter or system, Inverter wil top working unas faut or eror is fed. Dated information sndtroubleshooting please referto Chapter 8 Troubleshooting & Maintenance errr fervor information Flash Thereare2 waysto upgrade the femur of inverter emote upgrang based on remotely comectedserver through the wireless communication module Foaranmia fw Version: xxx GEE -- Ge) Ga «7 “ LU@POWER™ 9) PvGridon “The inverters working normally ong an the al he paar generated by PY wil exgars of fading the AC pd LU@POWER™ hy BateeryGridon The iereris working ang with nV powar input ardthereare suicert nergy stared inthe battery, the inverters ‘The nuerter it working normaly. he power generated by PViewihina range hatlltne PY power ie ures to charg ne batery wilethereare no excessive power rested a ouput rom nether the AC Grid comnestionnorEPS connection YCRATEE es eax W J [os ee VSO ea Powe raey —|—| charge 2) PVCharge+Gridon ‘The verter s working normally on i the power generates by BV is sulcent and within a ange which PV power i used to carge the battery ac there ae sil excessive PY power rested to export or fe Under inverter wortng tau, your genera loads wil ether consumption the power rom PY o7 ute power rom tne {dor atthem same tine frm the two sources, the detalled situations based onthe PY power output range and your seneralloads power demands difeences, Ste - 7 a | a in | “ wonton TeITar Wear Sa TE Pp velox “pacar nc tt Kaine si SverraO ~ ~ TVGITEOr Eiatls RW) einvaay:xza.x kwh ETE (eae) -— Es Sane 1) PVeBatteryGridon ‘working sats te limited PV power it ud tgether wih the battery dtchargng power to export or feedin via the AC | ReETEON Dd ACCharge battery au configured prviouiy (the function shouldbe enabled fry a+ Chapter 6.2.2 Inverter Settings -&) AC Setting deserves). == — fem 50 LU@POWER™ LU@POWER™ fy PVFACCharge 1) PV ChargeGridon “The inverters warkingneraliyon-ri with imited PV input powe and the batter SOC isnet sulin iat this time te The inverter is working normaly ll-grd with sullen PV input power and thebatery SOC insuicient When inverter ‘everterisconiguredto charge the ballerywthbathY power anaAC gris pawer then verter wiltunin estas works atthistaus, tne inverter i charging the allery using PV pawerand thee ar excessive power tested to output via the EPS connection. PVERCERATOE PUPRCCHRTGE PUTACTHATgE RE lppus wwe / exe W bs pes wx w Eeday: wees kWh — ae | | rao | 7 PUFRCCHOOE gp vb: xxx SOC: wx 96 1) BatteryGridowt ‘Tae inverter i working normally of-grid with no PV input ower vebatery SOC sufcant. When inverter works at ‘tv sstaus, thebttey i cchaging to output power vashe PS connection ree) seth mm) PYBateeryGridor “The nverter is working normaly of with Iited PV inp rane the battery SOC i sufcen. When inverter ‘works att statu, te battery cichargng together wih the PY power to ouput athe EPS connection st 2 LU@POWER™ LU@POWER™ 6.4 System Working Modes 6.4.1 Self Use enabled) 2 LU@POWER™ 6.4.2 Force Time Use to eheote whatnerto charge he Daltery using a powerithe regulations period Tismoce stor stuaon where se price diference of energy is big uncer Time of Use (TOU) Ths alk use to Nexibly make use of your system by Hy: 6.4.3 Export Control ‘To enable thie ysem warkng moce, the seting interface isnot opened through the inverter LCD spay area pease sk the manuacurer or yourinsalr/stbuter fr farther assistance 6.4.4 EPS/Back-up/Off-grid 2) EPSMode- When PY powerislimited Under the EPS mode when PV powers aw ot rot sulin! enough, system will ue all ballery power and PY sower to peweronthe EPS lauds 5 LU@POWER™ = ¥i «ca 2 | --- Be 4G E> 1b) EPS Mode-When Ph 5 Under EPSorade, when PY power islet the PY power willbe tly consumes by EPSloasandthen charg tery. a CE «Be 7 i | agecel Undershs mode, EFSmede mustbe enables and complete the output voltage anc frequency sein EPS ouput lcs areinductive or capactive loads, to ensure testa and eliabtyofeytem, 14° recommended corgurethe power ofthese loscetobe within SO EPS outputpowerrange LU@POwER™ 6.5 Start-up/Shut-down/Restart the Inverter 6.5.1 Start-up the Inverter Ac Frequency 50/608 PvVoliage —|20~S50¥ rig ACVottage 2300 AC Frequency 50/602 2) Tumthe AC switchon, waitithe LCD is ightingandtnencanfmthe AC vohage ata epayed normaly 1) Tumthe DCewitenes on andthen confirm the PV voltage dt apayed normaly. ©) Observetne Battery voltage diplsyed on LCD, sur ofthe battery itehesen vaage reaches 48 4) Whirl he inverter selechecking finshed, ite green LED Keeps ligting then the inverter is started up and normally workingon-er 6.5.2 Shut-down the Inverter faced on asl sustion, have to sut-downshe running inverter plese strc followingbelow procedure 2) (he EPS cup s connected with sensitive nase server compute ate Please sly mate sre these devices 1b) Temotbatery switch ©) TumottDCswithes 4) Tumotacieh 1) It neectoeaconnecihe inverter ables, please wait atleasS min Belore touching these paso inverter to take imeasurerentsofdsconnection 6.5.3 Restart the Inverter 2) Fallowitepuianceshows in Chapteré $2 olalyshul-downthelnverer 1b) Thenstrupthe inverterfolow ne procedure sowsin Chanter 6.5.1 to restart the inverter. 12) Very an conten the inverter is working novly, pot, then please refer to Chapter 8, Troubleshooting & Maintenance tof faut and erors, then repeat step a) to Hit stil doesnt wark. Then contact profesional tecmians or support. 7 LU@POwER™ 7. Commissioning 7.1 Inspection Before commissioning, the operator orinstaler(qualfe personnel mustinspectthe system carefully and make sure 12) The system is fumiyinstaled correct folowing ne content nd not cations ofthis manu, and thre are enous spaces for operation, malntenanceandventiation 1b) Altheterminaisandeablsarsin good condition witnout any samazes 1) Nokemsareleftonthe inverter orsithinthe required clearance section 4) The PVeray batterypack working normally, and grid is normal 7.2 Commissioning Procedure 2) TumontheaCswtchbutweennvere output (AC) andthe gi 1b) Turon the OC swten between nverter input and he PV aray there i enneet the PY array output 0 2 Tumonthe DC switch between inverter ourput(DC)andshebtte'y.anethenturn onthe switch on battery packi thereis) Then turn onthe integrates DC switch ofthe inverter 4) LCD willbe activated within seconds and complet the inverter ating flow the crectons show in Chapter 6.2.2 LD op. Setting Gul 19) Staringtne inverter inverter wil uninta “staring state arsthen “running” ste, curing this process he LED ignt shouldbe green FLED turns ee pease recheck tthe connection andinsaliions carried out correcty according tot manus the Parry battery packandridienormal, inverter run int fault” sae, pleate record he error cde o tut description short term on LCD screen and ‘eler to Chapter &. Troubleshooting & Meintenance (crs solution nly doesnt work contact your 1) Setingthe montringeytem inaesorsancew threlovat montringestom manual intrusions 2) Finihcommissoning se LU@POWER™ LU@POWER™ 8. Troubleshooting & Maintenance 8.1 Troubleshooting e017 | internal communication ul a core Internal communication fault 3 018. " ‘ 8.1.1 Introduction to LED Displays Running, Fault e022 ecu ‘ tons Neale Newatut Warning eon bom : ‘ LED Display Description Suggestion “_ n LCD Displays “ Code Description LED Display | Troubleshooting woes Batcery fata tery al tact LU@POWER™ word Pyenorereut Peron [Checkane ix PV input connect wor atery open cre a ‘Check andi battery connection 8.2 Maintenance 8) Checcineinvertor every ¢mantnto very ithe aperning parameter isnormalanctnee iene abrarmalhetingor Check the inverter every 6 manths to confirm there snathing covers the inverler het sink, thet i, shut dow inaintennce, when you carried out these ers requreme LU@POWER™ 9. Decommissioning Pease sry flow the order of dacommitsioning in ths chapter when you need to decommision Power Offand Dismantle the Inverter 2) Turnofthe ternal DCawiteh tthe avert 8) Tumoitthe DC switch between battery andi 1) Tuotfthe DC ewiteh between PV ray and inverte 4) Tumoifthe ACswitchbetweeninverterane aid 19) Wat Sminatertur offallthese srtehes, then caconnect the connections inthe order of AC connection, battery on lon connection and Wie sonecton, EPS connection, com 1) Winen contrmed the temparture of he inverter andthe neat sn stable for tou screw off he necessary. thewal-mountng rina ecsandremmaves alo. Packaging 2) Strongenoughte Bearthe weight (2h ofthe inverterandits 8) Saiyfortandiesndraneportatn rietin case of reistaltion 9 Canbota packaged to protect iverterand Storing fosore he inverter pease ef torelevant content of Chapter 3.1 Unpacking & Storing Re-install or Disposal 2) ihe nverer is sed bereinsale, seas refer to relevant Chopter 4 Installation snd Chopter &) When user need to dispose the inverter or relied components or aces LU@POwER™ LU@POWER™ 10. Specification 3KHybrid 4K Hybrid i Y 5 i i z i = i ° os

Potrebbero piacerti anche