Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2 For all stages of Cracking, the design Crack width Wk may be calculated by :
Where,
Sr,max = Maximum Crack Spacing
Єsm = Mean strain in Reinforcement under relevant combinations of loads
Єcm = Mean strain in Concrete between the cracks
a. the spacing of bonded reinforcement within the tension zone is reasonably close i.e.≤ 5(C+ φ/2
φ = bar diameter =
φeq = (𝑛_1 =
𝜙_1^2+𝑛_2
𝜙_2^2)/(𝑛_1
c = clear cover𝜙_1+𝑛_2
to the longitudinal
𝜙_2 ) reinforcement =
k1 = for deformed bars =
for bars with an efectively plain surface =
For epoxy coated bars,the above values shall be increased by 25 %.
k2 = for bending =
for pure tension =
Sr,max = (3.4�+0.17𝜙)/𝜌_(𝑝,𝑒𝑓𝑓 =
)
c. Where the spacing of the bonded reinforcement exceeds 5(C+ φ/2) or where there is no bonde
reinforcement within the tension zone,
h= efective depth =
x= depth of neutral axis from the compression face =
Where the angle between the axes of principal stress and the direction of the reinforcement, for members
reinforced in two orthogonal directios y & z is significant(>15°)
1/(cos𝜃/𝑠_(𝑟,max𝑦 ) +sin𝜃/𝑠_(𝑟,𝑚𝑎×𝑧) )
Sr,max =
θ= angle between the r/f in the y direction & the direction of principal tensile stress
3 For all stages of Cracking, the design Crack width Wk may be calculated by :
286.32 mm
20 mm
50 mm
0.8
1.6
0.5
1
0
0
0
5932.55 mm
335.179 mm
350 mm
92.17 mm
Mx My Mxy
Plate L/C
kNm/m kNm/m kNm/m
Max Mx 5528 71 1.25 DL + 2 SIDL + 1.60 EQ LONG 159.78 -5.38 -9.25
Min Mx 4452 71 1.25 DL + 2 SIDL + 1.60 EQ LONG -116.10 -6.20 -22.56
Max My 7134 51 2.0 SIDL + 1.25 DL + 1.50 LL 7.92 171.03 -10.13
Min My 5302 61 1.25 DL + 2 SIDL + 1.60 WL -85.35 -89.53 -13.57
Max Mxy 7209 71 1.25 DL + 2 SIDL + 1.60 EQ LONG 11.53 -48.48 37.38
Min Mxy 7143 71 1.25 DL + 2 SIDL + 1.60 EQ LONG 38.95 51.69 -61.29
B Moment Calculations
Page 9 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
Page 10 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
C Reinforcement Calculations
i] Bottom Reinforcement
4.6 M u
1 1
Fck b d 2
p t 50
Fy
Fck
pt required = 0.056 % Minimum pt = 0.12 %
Page 11 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
Page 12 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
D Shear Check
pt provided = 0.15 %
Clear Cover = 50 mm
w = 3 acr x εm
1 + 2 (acr - cmin)/(D-x)
where,
acr = Distance from the point considered to the surface of the nearest
longitudinal bar = 58
= ε1 - ε2
Page 13 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
d = 842 mm
Page 14 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
= (D - x) / (d-x) x (fs/Es)
Thus, ε1 = 0.001 mm
ε2 = bt(D-x)(a'-x)
3EsAs(d-x)
= 900 mm
= 900 mm
Hence, εm = 0.0004 mm
F SUMMARY
Page 15 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
Mx My Mxy
Plate L/C
kNm/m kNm/m kNm/m
Max Mx 5528 71 1.25 DL + 2 SIDL + 1.60 EQ LONG 159.78 -5.38 -9.25
Min Mx 4452 71 1.25 DL + 2 SIDL + 1.60 EQ LONG -116.10 -6.20 -22.56
Max My 7134 51 2.0 SIDL + 1.25 DL + 1.50 LL 7.92 171.03 -10.13
Min My 5302 61 1.25 DL + 2 SIDL + 1.60 WL -85.35 -89.53 -13.57
Max Mxy 7209 71 1.25 DL + 2 SIDL + 1.60 EQ LONG 11.53 -48.48 37.38
Min Mxy 7143 71 1.25 DL + 2 SIDL + 1.60 EQ LONG 38.95 51.69 -61.29
B Moment Calculations
Page 16 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
Page 17 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
C Reinforcement Calculations
i] Bottom Reinforcement
4.6 M u
1 1
Fck b d 2
p t 50
Fy
Fck
Page 18 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
Page 19 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
D Shear Check
pt provided = 0.15 %
Clear Cover = 50 mm
w = 3 acr εm
1 + 2 (acr - cnom)/(h-dc)
where,
acr = Distance from the point considered to the surface of the nearest
longitudinal bar = 58
Page 20 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
d = 842 mm
Page 21 of 22
Project Name Cal by Date
Structure Chk by Rev
Note No. Project no.
= (D - x) / (d-x) x (fs/Es)
Thus, ε1 = 0.001 mm
�_1−[(3.8𝑏_𝑡 ℎ(𝑎^′−ⅆ_𝑐
ε = ))/(�_𝑠 𝐴_𝑠 (ℎ−ⅆ_𝑐 ) )][1−𝑀_𝑞/𝑀_𝑔 ]× 〖 10 〗 ^(−9)
m
= 900 mm
Hence, εm = 0.0115 mm
F SUMMARY
Page 22 of 22