BAR BENDING SCHEDULE

TOTAL
DIA & LENGTH WEIGHT
P.NO SHAPE NUMBER WEIGHT REMARKS
GRADE IN 'm' IN 'N/m'
IN 'N/m'

BOTTOM DISTRIBUTORS IN
1 10 # 2475 2.475 5 6.20 76.73
LANDING SLAB

2 6# 1188 1.19 36 + 17 2.20 138.75 DISTRIBUTORS

700
31
50
MAIN REINFORCEMENT IN
3 12 # 4.750 7 8.89 295.593
FLIGHT - A (LANDING)
550
350

BOTTOM MAIN
1080 75 113.881
4 12 # 0 1.830 7 8.89 REINFORCEMENT IN
LANDING SLAB
75
0 MAIN (BOTTOM)
5 12 # 800 1.900 7 8.89 118.237 REINFORCEMENT IN
FLIGHT - A
350

TOP DISTRIBUTORS IN
6 8# 2475 2.475 5 4.00 49.50
LANDING SLAB

MAIN REINFORCEMENT
0

8.89
90

7 12 # 1.700 7 105.79
800 IN FLIGHT - B

1000
MAIN REINFORCEMENT
00

8 12 # 4.600 7 8.89 286.26


25

IN FLIGHT - B
1100

MAIN REINFORCEMENT
0

9 12 # 1285 2.035 7 8.89 126.64


75

IN FLIGHT - B

Total = 1311.38 N
Add 5% for wastage in cutting, overlapping etc = 65.56 N
Total quantity of steel required = 1376.94 N