Wajid Hussain

E-mail: engr.wajidawan07@hotmail.com

Cell Pak# +923335152307 , +923135264860

To join a dynamic and progressive organization offering ample


OBJECTIVE: opportunities for diversified exposure, enhancement of professional
skills and career growth in the field of Projects.

PROFESSIONAL
EXPERIENCE
ELECTRICAL ENGINEER WITH MORE THAN FOUR YEAR
EXPERINCE AND TRAINING IN ELECTRICAL , CIVIL AND
MECHANICAL FIELDS
WORK EXPERIENCE

Experienced 132KV/11.5KV Grid-station

 Working with Syndicate Engineering services as a Site manager since 1ST


OCT 2016.

 Supervised the installation of the HVAC systems, fire protection systems in


accordance with technical, quality and safety requirements.

 Supervised the installation of HVAC system as per SMACNA and ASHRAE


standards, Fire Fighting installation, Testing and Commissioning as per NTDC
& Islamabad Electric supply company requirements
SITE MANAGER
 Working with Syndicate Engineering services as a site Engineer from
Project :
2016 to 2019.

Construction of 132/ 11.5KV Grid Station Bahria Enclave


Islamabad (from 7 March 2017 to 20 August 2018).

CLIENT : BAHRIA ENCLAVE ISLAMABAD


CONSULTANT : BAHRIA ENCLAVE ISLAMABAD
ELECTRICAL : SIEMENS PAKISTAN

RESPONSIBILITIES :
 Coordination with electrical as well as civil works
 Electrical Panel installation and coupling of panels
 Erection of AIS GRID STATION Mechanical structure and level and alignment
 132 KV substation testing of Transformer bay and 11KV incoming , outgoing
truly testing metering , O/C&E/F ,protection relays
 Construction of cable trenches for control and power cables
 Construction of 11kv room and control room with panel installation
 Preparation of Mark up and As Built Drawings as per the site Installation.
 Closing of Punch List with client.
 Preparation of Field Change Notice in case of any mismatch of Drawing as
per Site Situation in switchyard specially
 Dehydration of T/F oil

Project :
Construction of 132/ 11.5KV Grid Station of TP-1000
PROJECT (from 22 August 2018 till present).

CLIENT : K-ELECTRIC KARACHI


CONSULTANT : SIEMENS PAKISTAN
RESPONSIBILITIES :
 Coordination with electrical as well as civil works
 Supervise the HVAC installation activities as per approved drawings
 Electrical equipment foundation and trenches construction as per Electrical
Equipment
 Electrical Panal leveling and installation of 11kv room and control room
 Preparation of Mark up and As Built Drawings as per the site Installation.
 Closing of Punch List with client.
 Preparation of Field Change Notice in case of any mismatch of Drawing as
per Site Situation in switchyard specially
 Termination of electrical panels

Power line Construction Company (Pvt.)Ltd


Working with Power line Construction Company (Pvt.) Ltd as a Junior
Engineer.
WORK EXPERIENCE
Construction of Neelum Jhelum 500-kV Double Circuit Quad Bundle
Transmission Line (from 12-01-2016 to 28-07-2016).
Route Length: 45 km (Lot-1) Total Sites: 115 Tower Types: DS1, DA1 and DD1
Project :
Foundation Type: D1, D2, D3 Erection: Installation of normal and angle Towers

Stringing: ACSR Drake Conductor, OPGW and SHIELD wire.

Responsibilities:
Erection of mechanical structure of DD1, DA1 and DS1 tower.
Planning daily activities and also coaching several site execution staff. Site
Supervision, checking and assuring that the work is done as per the project
technical specifications. Coordinating with Consultants and Subcontractors for
smooth flow of work. Inspecting and testing material prior to their use at site as
per sample approved by the consultant. Ensuring that all work is done without
wastage of material. Monitoring daily progress of site and also preparing running
Account bills. Additional responsibility as a Store Officer.

POWER PLANT INSTALLATION


Experienced 12MW WASTE HEAT RECOVERY POWER PLANT
Training EXPERIENCE
BESTWAY CEMENT FACTORY

Working with Advance Engineering services as a Trainee Engineer

 Supervised the installation of the HT/MT/LT systems, fire protection systems in


accordance with technical, quality and safety requirements.

Construction of 12MW WASTE HEAT RECOVERY POWER PLANT


Training EXPERIENCE
BESTWAY CEMENT FACTORY kallar kahar (01/08/2016 to

7/09/2016).

RESPONSIBILITIES :
 Training on all necessary area within the department and process familiarization
including cross departmental activities.

 Installation of boilers sensors and panel termination , installation and testing

 Have been involved in maintenance activities like troubleshooting and repairing of


electrical equipment’s such as Transformer, AC/DC motors, Variable frequency
drives, Liquid rotor starters, HT/LT panels, PFI Panels, Protection relays, Circuit
breakers, Battery chargers, UPS in all areas of cement plant.

 Planning of daily maintenance activities using Computer Aided Maintenance and


Management software (ERP) & provide technical assistance to the execution staff.

 Conducted on-site technical training session’s e.g. Protection relays, Liquid rotor
starter for operation and maintenance staff.

 Conducted Safety audits within the department and ensuring the compliance from
all the employees and updating the checklists and audit reports.
Thermal Power Station (GENCO-III) Mehmood Kot Road,
Muzaffargarh (12/08/2015 TO 11/10/2015)
Training EXPERIENCE I worked as Trainee Engineer and got a lot of information about the power
generation process. There are six units installed in this plant and total
installed capacity is about 1350MW.
RESPONSIBILITIES :
Studied the working of Boiler, Steam Turbine, Cooling Tower, and
Condenser.
Practically analyzed the working of Power generating components and their
maintenance.
Assisting of the ground staff with the supply of raw material & necessary
activities

Islamabad Electric Supply Company (IESCO) (from 01/08/2016 to


7/09/2016)
Training EXPERIENCE
I worked as Testing Engineer and got a lot of information about the grid station
and electromechanical equipment’s

RESPONSIBILITIES: .Performed Maintenance, Operation and Testing of


132/11 KV Substation equipment like Circuit Breakers, Isolators, Power
Transformers, Batteries and Power Cables.

Attend the Shutdowns to the work on Power Transformers, Circuit breakers,


11kv Feeder Panels and Transmission Lines etc for Testing and Maintenance
work.

Performed different types of Tests on Oil Filled Transformers like (Dielectric


Strength Test of Transformer Oil, C&DF Test, Insulation Test, Earthing Test,
T.T.R. test, Winding resistance tests etc.) by using different Test Kits

Performed different types of test on H.V/L.V Circuit breakers like (Contact


Resistance test, Closing & Tripping timing test, Insulation test, C&DF Test).

Also Performed control operations of 132/11KV Substations equipment like


Circuit Breakers, Isolators, Earth Switches as per requirements of N.P.C.C,
R.C.C.

CIVIL AVIATION MUTAN FROM (1/07/2015 TO 31/12/2015)

RESPONSIBILITIES:
Lighting Fixtures & Automation, ELV Systems, Structure Cabling, Integration
of ELV Systems, Switchgear(LT/MV), Distribution Transformer, Electrical
Cabling(L.T/MV/cable tray & trunches ),Distribution Boards, Earthing,
Lightning Arrester, Technical Submittal Review, standby power generators

Training EXPERIENCE
CPDP held in APCOMS under PEC 1 day short
course Under PEC 2014

Qualification Board/University Year


B.Sc (Electrical (UET) University of Engineering Taxila 2015
Engineering)
Intermediate(FSC) BISE Rawalpindi 2010
High School (Matric) BISE Rawalpindi 2008

Father’s Name : Ahmed Khan


Date of Birth : 10th September
Marital Status : Single
Nationality : Pakistani
Membership. : Having Valid Registration In Pakistani Engineering Council
Religion : Islam
Training Course Languages : Fluent in English, Urdu
Office address : Village Chakora (kallar kahar) Tehsil & Post Office Kallar Kahar

District Chakwal District Chakwal

Academic Credentials

Personal Information