IAS LOOTAH CONTRACTING

PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
132/11k V Garden City Substation- Update 07/01/2019
Project Milestones
1 Mile 1000 Basement -11kv Clean access
2 Mile 1010 Basement-132 GIS clean access
3 Mile 1020 Ground Floor - 11kv Room Clean access
4 Mile 1030 Ground Floor - 132 GIS Room Clean access
5 Mile 1040 Ground Floor - Capacitor Room Clean access
6 Mile 1050 First Floor - Control Room clean access
7 Mile 1060 First Floor - LVAC Room Clean access
8 Mile 1070 First Floor - Charger Room Clean access
9 Mile 1080 First Floor - Telecom & HVAC Room clean access
10 Mile 1090 First Floor - Nitrogen Room clean access
11 Mile 1100 First Floor - Battery Room & Corridor clean access
12 Mile 1105 Roof - MEP Clean access
13 Mile 1110 IDT Clean access
14 Mile 1120 ET Clean access
15 Mile 1130 OWT clean access
16 Mile 1140 Shunt reactor clean access
17 Mile 1150 FPR clean access
18 Mile 1160 Security Room acces
19 Main Building
20 Finishing
21 Basement
22 11kv Basement
23 F1080 Surface preparation for wall & ceiling painitng works 1
24 F1090 Ceiling painting works 6
25 F1100 Wall Painting works 8
26 F1110 Floor surface preparation for floor epoxy works 6
27 F1120 Floor epoxy paint works 8
28 F1130 11kV Basement - Clean access 0
29 132GIS
30 F1131 Surface preparation for wall & ceiling painitng works 10
31 F1132 Ceiling painting works 7
32 F1133 Wall Painting works 8
33 F1134 Floor surface preparation for floor epoxy works 3
34 F1135 Floor epoxy paint works 7
35 F1136 132 GIS Basement - Clean access 0
36 Ground Floor
37 11 kV Panel Room
38 F1180 ceiling & Wall Surface preparation for painting 8
39 F1190 Ceiling painting works 6

1 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
40 F1200 Wall painting works from 2m above from Floor 5
41 F1202 Edge angle fixing & Screed concrete 4
42 F1203 MEP Access for Duct works 5
43 F1203a Bulkhead drop fixing 5
44 F1204 Wall Painting works upto 2m from Floor 4
45 F1210 Epoxy screed works 8
46 F1220 11kV Ground Floor Clean access 0
47 132 GIS
48 F1250 Plastering works 15
49 F1255 ceiling preparation for painting 8
50 F1260 Wall Preparation for painting works 8
51 F1270 Ceiling & Wall (upto corbal level) painting works 7
52 F1272 LSP/Fire fighting works- Access 2
53 F1273 Wall painting works above 2m from Floor level 6
54 F1274 Mid-Scaffolding Removal & platform height reduction works 6
55 F1290 MEP Access for Duct works 4
56 F1291 Scaffolding Removal 4
57 F1293 Edge angle fixing & Screed concrete 3
58 F1294 MEP second access for Overhead crane erection 8
59 F1296 Wall painting works upto 2m from Floor level 5
60 F1300 Epoxy Paint works 6
61 F1310 132 GIS Floor Clean access 0
62 Capacitor Bank rooms
63 F1340 Plastering works 10
64 F1360 ceiling & Wall Surface preparation for painting 7
65 F1370 Ceiling painting works 7
66 F1380 Wall painting works 7
67 F1385 MEP Access for Duct works 5
68 F1386 Bulkhead drop fixing 5
69 F1390 Epoxy screed works 10
70 F1400 Capacitor Room Clean access 0
71 First Floor
72 Control & Protection Room
73 F2030 Plasterworks 8
74 F2040 Ceiling Preparation upto False ceiling level 4
75 F2050 wall preparation for painting 5
76 F2060 protective coat on ceiling 2
77 F2070 Floor preparation for Dust proof paint 5
78 F2075 Aluminium Grid works- False ceiling 5
79 F2080 Wall Paint 5
80 F2090 Dust proof paint on floor 2

2 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
81 F2100 Raised floor works 7
82 F2110 Clean access- Control room 0
83 LV & AC Room
84 F2150 Plasterworks 7
85 F2160 Ceiling Preparation upto False ceiling level 4
86 F2170 wall preparation for painting 5
87 F2180 protective coat on ceiling 2
88 F2190 Floor preparation for Dust proof paint 4
89 F2200 Wall Paint 7
90 F2210 Aluminium Grid works- False ceiling 5
91 F2220 Dust proof paint on floor 2
92 F2230 Raised floor works 7
93 F2240 Clean access- LVAC room 0
94 Charger Room
95 F2280 Plasterworks 7
96 F2290 Ceiling Preparation upto False ceiling level 4
97 F2300 wall preparation for painting 5
98 F2310 protective coat on ceiling 2
99 F2320 Floor preparation for Dust proof paint 5
100 F2330 Wall Paint 7
101 F2340 Aluminium Grid works- False ceiling 5
102 F2350 Dust proof paint on floor 3
103 F2360 Raised floor works 7
104 F2370 Clean access- Charger room 0
105 Telecom & HVAC Room
106 F2410 Plasterworks 7
107 F2420 Ceiling Preparation upto False ceiling level 4
108 F2430 wall preparation for painting 5
109 F2440 protective coat on ceiling 2
110 F2450 Floor preparation for Dust proof paint 5
111 F2460 Wall Paint 7
112 F2470 Aluminium Grid works- False ceiling 5
113 F2480 Dust proof paint on floor 3
114 F2490 Raised floor works 7
115 F2500 Clean access- Telecom & HVAC Room 0
116 Nitrogen Room
117 F2540 Plasterworks 8
118 F2545 Floor screed works 6
119 F2550 Ceiling Preparation for painting 5
120 F2560 wall preparation for painting 5
121 F2570 ceiling painting 6

3 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
122 F2590 Wall Paint 7
123 F2610 Floor epoxy screed works 7
124 F2630 Clean access- Nitrogen room 0
125 Battery Room 1 & 2, corridor
126 F2680 MEP fixtures, Waterproofing & Floor screed works 8
127 F2685 Plasterworks 7
128 F2690 Ceiling Preparation for painting 4
129 F2700 wall preparation for painting 5
130 F2710 ceiling painting 5
131 F2720 Wall Paint upto 2.1m above from FFL 5
132 F2740 Wall & Floor Tile works 10
133 F28000 Clean access- Battery room 1 & 2 0
134 Roof
135 F3010 Roof waterproofing works upto leak test 2
136 F3020 Water leak test 4
137 F3030 waterproofing final works 12
138 F3035 Roof pedestal - Epoxy works 12
139 F3036 Roof Clean access-MEP works 0
140 F3040 Roof - Parapet (AAC Block works) 12
141 F3070 GRC works 10
142 Auxiliary Buildings
143 U/G oil water Tank
144 AB1096 SHORING- I Beam removal 3
145 AB1100 Slab @ -2.400 -Rebar/formwork/ concrete works 3
146 AB1110 side walls - Tank entry - Rebar/Formwork/concrete works 6
147 AB1120 External-Surface Preparation 5
148 AB1130 External Waterproofing works 5
149 AB1145 Manhole cover fixing works 5
150 AB1150 GRP lining works 10
151 Shunt Reactor
152 AB2080 Walls - 3rd Lift ( Rebar/Formwork/concrete) 8
153 AB2090 Shunt reactor corbals ( Rebar/Formwork/concrete) 8
154 AB2100 Parapet wall works (Rebar/Formwork/concrete) 6
155 AB2110 Trench & Nib casting 8
156 AB2120 outside- Wall Surface Preparation works 5
157 AB2130 outside -Waterproofing works 5
158 AB2140 Internal - Wall surface preparation works 5
159 AB2150 Internal - Wall painting works 7
160 AB2160 Plinth epoxy works 3
161 AB2161 concrete screed on the floor 3
162 AB2170 shunt reactor base Floor/wall & trench epoxy works 10

4 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
163 AB2180 Clean access- Shunt Reactor 0
164 ET Building
165 AB3085 ET Plinth 1,2,3-Rebar/Formwork/concrete 4
166 AB3090 Wall 2nd Lift -Rebar/Formwork/concrete 8
167 AB3095 Wall 3rd Lift with corbal -Rebar/Formwork/concrete 12
168 AB3100 Parapet - Rebar/Formwork/concrete 6
169 AB3110 ET- Surface preparation works for Painting 14
170 AB3120 ET-Wall Painting works 14
171 AB3125 ET- Plinth Epoxy works 7
172 AB3130 ET- Inside Scaffolding Removal 5
173 AB3140 ET- Surface Prep for Screed works 2
174 AB3150 ET- Screed works 3
175 AB3160 ET-Trench slab workks 5
176 AB3170 ET-Base -Surface prep for Wall Epoxy works 10
177 AB3175 ET - Clean access 0
178 AB3180 ET- Base- Wall epoxy works 10
179 AB3190 ET-EXT-Scaffolding removal 5
180 AB3200 ET-EXT-Excavation of Backfilled Soil around ET 5
181 AB3210 ET-EXT-Surfacepreparation for Wall Waterproofing 10
182 AB3220 ET-EXT-Water proofing works 7
183 AB3230 ET-EXT-Backfilling works upto Security Room Raft Level 7
184 AB3240 ET-EXT-Scaffolding for painting works 6
185 AB3250 ET- EXT- Surface prep for External Painting works 7
186 AB3260 ET-EXT-wall Painting works 10
187 IDT Finishing work
188 AB6000 IDT- Trench & Nib Works 15
189 AB6005 IDT-Floor screed works 5
190 AB6010 IDT- Scaffolding erection 6
191 AB6020 IDT-surface preparation works 15
192 AB6030 IDT-Painting 15
193 AB6040 IDT-Plinth Epoxy works 5
194 AB6045 IDT- Clean access 0
195 AB6060 IDT-Base walls & Trench Surface preparation works 10
196 AB6070 IDT-Basewall & Trench epoxy paint work 8
197 Fire Pump House
198 Fire Pump house-Structure
199 AB4085 FPR - Light weight concrete 3
200 AB4086 FPR- Ground floor slab works @ LVL-.200 SSL - R/F/C 8
201 AB4090 FPR Columns - Rebar/Formwork/concrete (LVL+.300 to +5.90) 8
202 AB4095 FPR - Scaffolding for Lower slab @+6.900 SS 3
203 AB4100 FPR Slab @+6.900 SSL R/F/C 10

5 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
204 AB4110 FWT bottom Slab @+8.600 SSL R/F/C 12
205 AB4120 FWT - walls R/F/C 15
206 AB4130 FWT - Top slab LVL @+14.670 - R/F/C 10
207 AB4140 FPR - Parapet works - @+16.170 R/F/C 7
208 AB4150 FPR- Roof water proofing works 7
209 AB4155 FRR- Deshuttering works -Slab @ +6.900 SSL 5
210 AB4220 FPR - Ground floor Upstand / Foundation concrete R/F/C 6
211 Fire pump house -Finishing
212 FPR - Finishing
213 AB4230 Block works 6
214 AB4240 Plastering-Internal 8
215 AB4245 Floor Drainage Rebar/ Formwork/Screed concrete 3
216 AB4250 Surface preparation for Ceiling & Wall 4
217 AB4260 Ceiling & Wall Painting 6
218 AB4270 Floor Preparation for Epoxy paint 2
219 AB4280 Epoxy Screed & paint 5
220 AB4290 Clean access-Fire Pump Room 0
221 FWT - Finishing
222 AB4300 Surface preparation for GRE Lining works 10
223 AB4310 GRE lining works 10
224 Security Room
225 Structure
226 AB5002 ET wall surface preparation & Waterproofing 3
227 AB5005 Backfillig & Formation preparation 3
228 AB5010 Road base -2 layer 3
229 AB5020 Blinding 1
230 AB5030 waterproofing 2
231 AB5040 Protetion screed 1
232 AB5045 Raft R/F/C 4
233 AB5050 Basement Wall R/F/C 5
234 AB5060 Column up +4.00 LVL 4
235 AB5070 GF slab @ +4.00LVL 7
236 AB5080 Columns upto roof lvl + 8.550 4
237 AB5090 Roof beams -R/F/C 5
238 AB5100 Upstand concrete @ FF slab 5
239 AB5110 De-shuttering works +4.00LVL Slab 3
240 AB5120 SR-BASE- MEP duct fixing & Light weight concrete 3
241 AB5170 GF- Floor slab R/F/C@-.200 SSL 4
242 Finishing
243 Ground floor
244 AB5180 Duct Laying & Floor screed works 4

6 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
245 AB5185 Blockwork @ GF 6
246 AB5190 Plastering work @ GF 6
247 AB5200 Surface preparation for painting 4
248 AB5210 ceiling & wall Painting works 6
249 AB5220 Floor -Epoxy works 5
250 First Floor
251 AB5230 Duct Laying & Floor screed works 4
252 AB5240 Blockwork @ FF 6
253 AB5250 Plastering work @ FF 6
254 AB5260 Surface preparation for painting 5
255 AB5270 Aluminium Roof installation works 10
256 AB5280 ceiling & wall Painting works 8
257 AB5290 Floor -Epoxy works 5
258 Boundary wall
259 Elevation -1
260 SUBSTRUCTURE
261 Part-1-Grid 1 to 5
262 BW1010 Part-1 Back filling, Formation & Levelling 8
263 BW1020 Part-1 Road base -2 Layers 5
264 BW1030 Part-1 Blinding 3
265 BW1050 Part-1 Waterproofing 3
266 BW1060 Part-1 Protection screed 2
267 BW1070 Part-1 Raft - R/F/C works 10
268 BW1080 Part-1 Wall-R/F/C works (15m panels-2 nos) 20
269 BW1090 Part-1 De-shuttering works 3
270 BW1100 Part-1 Surface preparation-Waterproofing 5
271 BW1110 Part-1 Waterproofing ( Internal & External) 6
272 BW1120 Part-1 External Backfilling works 5
273 Part-2 Grid 5-A1
274 BW1130 Part-2 Excavation 10
275 BW1140 Part-2 Waterproofing on Elev1 Mainbuilding walls 7
276 BW1150 Part-2 Back filling, Formation & Levelling 10
277 BW1160 Part-2 Road base -2 Layers 5
278 BW1170 Part-2 Blinding 3
279 BW1180 Part-2 Waterproofing 3
280 BW1190 Part-2 Protection screed 2
281 BW1200 Part-2 Raft - R/F/C works 10
282 BW1210 Part-2 Wall-R/F/C works (15m panels-2 nos) 20
283 BW1220 Part-2 De-shuttering works 3
284 BW1230 Part-2 Surface preparation-Waterproofing 5
285 BW1240 Part-2 Waterproofing ( Internal & External) 6

7 / 16
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY SUBSTATION

UPDATED MICRO SCHEDULE FOR BALANCE WORKS

Remaining
Sl.No Activity ID Activity Name Duration
286 BW1250 Part-2 External Backfilling works 5
287 Elevation - 2
288 Part-1 Type 3 Foundation
289 BW2080 Duct Bank works 12
290 BW2090 Wall-R/F/C upto +0.00 LVL 10
291 BW2100 water proofing works 6
292 BW2110 Backfilling upto the Ground Level 10
293 Part-2 Type 2 Foundation
294 BW2280 Wall - R/F/C works 10
295 BW2290 Waterproofing works 5
296 BW2300 Backfilling upto Ground level 10
297 Elevation - 3
298 Part -1 Type 2 Foundation
299 BW3080 Waterproofing works 7
300 part-2 Type 1 Foundation
301 BW4220 Formation & Levelling 2
302 BW4230 Backfilling -10 Layers 6
303 BW4240 Road base -2 Layers 6
304 BW4250 Blinding 2
305 BW4260 Waterproofing 4
306 BW4270 Protection screed 2
307 BW4280 Raft - R/F/C works 10
308 BW4290 Wall-R/F/C works 15
309 BW4300 Waterproofing works 7
310 Elevation - 4
311 SUBSTRUCTURE
312 TYPE 3 FOUNDATION-50Mtrs
313 BW4090 Surface preparation-Waterproofing 3
314 BW4100 Waterproofing ( Internal & External) 6
315 BW4110 External Backfilling works 5

8 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

23-Jan-19
12-Feb-19
18-Feb-19
16-Mar-19
14-Mar-19
25-Feb-19
25-Feb-19
5-Mar-19
5-Mar-19
16-Mar-19
9-Mar-19
10-Feb-19
12-Mar-19
24-Apr-19
20-Feb-19
7-Mar-19
15-Apr-19
29-Apr-19

02-Oct-18 A 7-Jan-19
26-Dec-18 A 14-Jan-19 11kv2 Completed on 07/01/2018
26-Dec-18 A 16-Jan-19 11kv2 Completed
13-Jan-19 19-Jan-19
15-Jan-19 23-Jan-19
23-Jan-19

15-Dec-18 A 19-Jan-19
20-Jan-19 27-Jan-19
23-Jan-19 31-Jan-19
2-Feb-19 4-Feb-19
5-Feb-19 12-Feb-19
12-Feb-19

23-Oct-18 A 15-Jan-19
16-Jan-19 22-Jan-19

9 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

19-Jan-19 23-Jan-19
27-Jan-19 30-Jan-19
31-Jan-19 5-Feb-19
6-Feb-19 11-Feb-19
6-Feb-19 10-Feb-19
10-Feb-19 18-Feb-19
18-Feb-19

20-Dec-18 A 23-Jan-19
15-Jan-19* 23-Jan-19
24-Jan-19 2-Feb-19
28-Jan-19 4-Feb-19
5-Feb-19 6-Feb-19
5-Feb-19 11-Feb-19
7-Feb-19 13-Feb-19
12-Feb-19 16-Feb-19
17-Feb-19 20-Feb-19
21-Feb-19 24-Feb-19
25-Feb-19 5-Mar-19
6-Mar-19 11-Mar-19
10-Mar-19 16-Mar-19
16-Mar-19

15-Jan-19* 26-Jan-19 After 132GIS plasterworks


27-Jan-19 3-Feb-19
4-Feb-19 11-Feb-19
12-Feb-19 19-Feb-19
20-Feb-19 25-Feb-19
26-Feb-19 3-Mar-19
4-Mar-19 14-Mar-19
14-Mar-19

13-Jan-19* 21-Jan-19
22-Jan-19 26-Jan-19
27-Jan-19 31-Jan-19
2-Feb-19 3-Feb-19
4-Feb-19 9-Feb-19
4-Feb-19 9-Feb-19
10-Feb-19 14-Feb-19
16-Feb-19 17-Feb-19

10 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

18-Feb-19 25-Feb-19
25-Feb-19

13-Jan-19 20-Jan-19
21-Jan-19 24-Jan-19
26-Jan-19 30-Jan-19
31-Jan-19 2-Feb-19
3-Feb-19 6-Feb-19
7-Feb-19 14-Feb-19
3-Feb-19 7-Feb-19
16-Feb-19 17-Feb-19
18-Feb-19 25-Feb-19
25-Feb-19

19-Jan-19 26-Jan-19
27-Jan-19 30-Jan-19
31-Jan-19 5-Feb-19
6-Feb-19 7-Feb-19
9-Feb-19 13-Feb-19
14-Feb-19 21-Feb-19
9-Feb-19 13-Feb-19
23-Feb-19 25-Feb-19
26-Feb-19 5-Mar-19
5-Mar-19

19-Jan-19 26-Jan-19
27-Jan-19 30-Jan-19
31-Jan-19 5-Feb-19
6-Feb-19 7-Feb-19
9-Feb-19 13-Feb-19
14-Feb-19 21-Feb-19
9-Feb-19 13-Feb-19
23-Feb-19 25-Feb-19
26-Feb-19 5-Mar-19
5-Mar-19

24-Jan-19 2-Feb-19
3-Feb-19 9-Feb-19
10-Feb-19 14-Feb-19
16-Feb-19 20-Feb-19
21-Feb-19 27-Feb-19

11 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

28-Feb-19 7-Mar-19
9-Mar-19 16-Mar-19
16-Mar-19

12-Jan-19* 20-Jan-19
30-Jan-19 6-Feb-19
7-Feb-19 11-Feb-19
12-Feb-19 17-Feb-19
18-Feb-19 23-Feb-19
20-Feb-19 25-Feb-19
26-Feb-19 9-Mar-19
9-Mar-19

27-Dec-18 A 8-Jan-19
05-Jan-19 A 13-Jan-19
14-Jan-19 27-Jan-19
28-Jan-19 10-Feb-19
10-Feb-19
28-Jan-19 10-Feb-19
17-Feb-19 27-Feb-19

7-Jan-19 9-Jan-19
27-Dec-18 A 9-Jan-19
10-Jan-19 16-Jan-19
17-Jan-19 22-Jan-19
23-Jan-19 28-Jan-19
22-Jan-19 27-Jan-19
28-Jan-19 7-Feb-19

7-Jan-19 15-Jan-19
16-Jan-19 24-Jan-19
26-Jan-19 31-Jan-19
26-Jan-19 3-Feb-19
7-Jan-19 12-Jan-19
13-Jan-19 17-Jan-19
2-Feb-19 6-Feb-19
7-Feb-19 14-Feb-19
16-Feb-19 18-Feb-19
21-Feb-19 24-Feb-19
25-Feb-19 7-Mar-19

12 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

7-Mar-19

11-Nov-18 A 10-Jan-19 FCR received on 02/01/2018


23-Jan-19 31-Jan-19
2-Feb-19 14-Feb-19
16-Feb-19 21-Feb-19
23-Feb-19 10-Mar-19
11-Mar-19 26-Mar-19
19-Mar-19 26-Mar-19
27-Mar-19 1-Apr-19
2-Apr-19 3-Apr-19
4-Apr-19 7-Apr-19
8-Apr-19 13-Apr-19
14-Apr-19 24-Apr-19
24-Apr-19
25-Apr-19 6-May-19
28-Feb-19 5-Mar-19
6-Mar-19 11-Mar-19
12-Mar-19 23-Mar-19
24-Mar-19 31-Mar-19
1-Apr-19 8-Apr-19
9-Apr-19 15-Apr-19
16-Apr-19 23-Apr-19
24-Apr-19 5-May-19

02-Jan-19 A 23-Jan-19
24-Jan-19 29-Jan-19
30-Jan-19 5-Feb-19
6-Feb-19 23-Feb-19
24-Feb-19 12-Mar-19
7-Mar-19 12-Mar-19
12-Mar-19
13-Mar-19 24-Mar-19
25-Mar-19 2-Apr-19

05-Jan-19 A 9-Jan-19
10-Jan-19 19-Jan-19
20-Jan-19 28-Jan-19
29-Jan-19 31-Jan-19
2-Feb-19 12-Feb-19

13 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

17-Feb-19 2-Mar-19
3-Mar-19 19-Mar-19
20-Mar-19 31-Mar-19
1-Apr-19 8-Apr-19
9-Apr-19 16-Apr-19
2-Mar-19 6-Mar-19
7-Mar-19 13-Mar-19

7-Mar-19 13-Mar-19
14-Mar-19 23-Mar-19
24-Mar-19 26-Mar-19
27-Mar-19 31-Mar-19
1-Apr-19 7-Apr-19
8-Apr-19 9-Apr-19
10-Apr-19 15-Apr-19
15-Apr-19

17-Apr-19 28-Apr-19
29-Apr-19 9-May-19

17-Jan-19 20-Jan-19
21-Jan-19 23-Jan-19
24-Jan-19 27-Jan-19
28-Jan-19 28-Jan-19
31-Jan-19 2-Feb-19
3-Feb-19 3-Feb-19
4-Feb-19 7-Feb-19
9-Feb-19 13-Feb-19
14-Feb-19 18-Feb-19
19-Feb-19 26-Feb-19
27-Feb-19 3-Mar-19
4-Mar-19 9-Mar-19
10-Mar-19 14-Mar-19
13-Mar-19 16-Mar-19
17-Mar-19 19-Mar-19
20-Mar-19 24-Mar-19

25-Mar-19 28-Mar-19

14 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

30-Mar-19 4-Apr-19
6-Apr-19 11-Apr-19
13-Apr-19 16-Apr-19
17-Apr-19 23-Apr-19
24-Apr-19 29-Apr-19

16-Mar-19 19-Mar-19
20-Mar-19 26-Mar-19
27-Mar-19 2-Apr-19
3-Apr-19 8-Apr-19
9-Apr-19 20-Apr-19
21-Apr-19 29-Apr-19
30-Apr-19 5-May-19

7-Jan-19 15-Jan-19
16-Jan-19 21-Jan-19
22-Jan-19 24-Jan-19
26-Jan-19 28-Jan-19
29-Jan-19 30-Jan-19
31-Jan-19 11-Feb-19
12-Feb-19 6-Mar-19
7-Mar-19 10-Mar-19
11-Mar-19 16-Mar-19
17-Mar-19 23-Mar-19
24-Mar-19 28-Mar-19

10-Jan-19* 21-Jan-19 After Fire Pump room Raft


22-Jan-19 29-Jan-19
30-Jan-19 10-Feb-19
11-Feb-19 16-Feb-19
17-Feb-19 19-Feb-19
20-Feb-19 23-Feb-19
24-Feb-19 25-Feb-19
26-Feb-19 9-Mar-19
10-Mar-19 1-Apr-19
2-Apr-19 4-Apr-19
6-Apr-19 10-Apr-19
11-Apr-19 17-Apr-19

15 / 16
ACTING
TY SUBSTATION

BALANCE WORKS

Start Finish Remarks

18-Apr-19 23-Apr-19

05-Jan-19 A 20-Jan-19
28-Jan-19 7-Feb-19
21-Jan-19 27-Jan-19
28-Jan-19 7-Feb-19

7-Jan-19 17-Jan-19
19-Jan-19 23-Jan-19
24-Jan-19 4-Feb-19

15-Jan-19* 22-Jan-19 Manholes drawing received on 06/01/2018

29-Jan-19 30-Jan-19 Near Oil water tank portion only


31-Jan-19 6-Feb-19
7-Feb-19 13-Feb-19
14-Feb-19 16-Feb-19
17-Feb-19 20-Feb-19
21-Feb-19 23-Feb-19
24-Feb-19 6-Mar-19
7-Mar-19 24-Mar-19
25-Mar-19 1-Apr-19

02-Jan-19 A 9-Jan-19
10-Jan-19 16-Jan-19
17-Jan-19 22-Jan-19

16 / 16