1. The state company Activos Mineros initiated the remediation of the largest environmental
passive in Peru with an investment of 151 million soles.
2. the Peruvian state ended 61 years of negative environmental impact in Cerro de Pasco.
3. The execution of the work was financed by the National Fund for the Financing of Business
Activity of the State (FONAFE).
4. The execution of the work of the generation of environmental actives was carried out by the
International Consortium "San Camilo"
5. The work of the generation of environmental actives was supervised by the "Cerro de Pasco"
Consortium.
6. Objectives of the closure plan were to preserve Human Health and Safety.
7. The predominant weather conditions were described and the weather stations in the area
identified.
8. we provide a detailed list of all the interest groups related to the closure of the passives.
9. The timeline proposed in the closure plan identified the dates on which the closing activities
will be carried out.
10. Among the details of the closure of the processing facilities was the withdrawal of batteries
of concentrates, minerals and waste.

Present

1. "Activos Mineros" confirms the start of the execution phase of the environmental
remediation work of the Excélsior debris deposit located in Cerro de Pasco.
2. The stages of the work include physical, chemical and hydrological stability, concrete wall
construction, slope profiles, coronation channels, coverage and revegetation.
3. It is a most important environmental remediation project in the history of the country.
4. The execution of the closure plan of the Relavera Quiulacocha are currently in the process of
selection.
5. The Mining Environmental Passives Closure is the set of activities to be implemented in order
to meet the specific environmental criteria and achieve the desired social objectives.
6. The generation of mining environmental actives includes activities that range from the
preparation of the passive identification form.
7. The condition of a certain active after the execution of the closing activities may be a
condition of no care and active care condition.
8. Active Care Condition requires long-term post-closure care and maintenance programs.
9. Closure Plan is an environmental management instrument that includes all the technical and
legal actions required.
10. The closure is the execution of the activities contemplated in the Closing Plan Approved by
the Ministry of Energy and Mines to comply with the specific environmental and social
objectives.