Sei sulla pagina 1di 1

Section

QEHS Company Profile QEHS PR-07

Subject Effectivity Date Revision Page


Process Affectors Diagram
1 1 of 1

INFRASTRUCTURE INFORMATION MATERIALS


Computers with network/internet; Schedule of maintenance works of equipment; Office supplies
MS Application software Current stock of materials (raw mats, clinker,
additives, gypsum, cement, and fuel)

FUNDING PEOPLE
Operational Expenditures (OPEX) Production Manager
Production Engineer

SUPPLIER INPUT PRODUCTION OUTPUT CUSTOMER


Customer Requirements Determination Sales Forecast PLANNING Production Plan Raw Materials Preparation; Raw Meal Preparation;
Clinkering; Cement Grinding; Packaging;
Dispatching

WORK ENVIRONMENT PROCESS PERFORMANCE MEASURE


Workplace Safety, Ventilation, Lighting, 100% Accuracy of indicated material stocks and
Cleanliness grinding schedule for proper preparation in
succeeding processes
-Delivery of required output based on forecast
meeting the demand
METHODS & CONTROL -100% accuracy and completeness of production
Weekly preparation every Wednesday; PRODUCT & PROCESS RISKS plan RELATED PROCESSES
specs of raw materials to be used; Inaccuracy in sales forecast, and current Raw Mat's Preparation, Raw Meal Preparation,
Procedure for Production Planning; stock of materials; error in inputting of data Clinkering, Cement Grinding, Packaging, and
Documents and Records Control; Dispatching, HR Processes
health & safety; environmental

Republic Cement & Building Materials, Inc. Corporate Office:


Norzagaray Plant The Salcedo Towers
Barrio Bigte, Norzagaray, Bulacan 169 H.V. dela Costa Street
3013 Philippines Salcedo Village, Makatiy City
1227 Philippines

Potrebbero piacerti anche