GREEN FORMWORK
Panel – Prop Early Stripping Formwork System
Green Construction
Round Scaffolding
Pty. Ltd.
ABN: 34 144 505 911
ACN: 144505911
Green Formwork System
Quick local deliveries from our various
distribution network at competitive
rates to any location Australia Wide.
• SAFE
Stable system with 6-direction locking restriction
No lifting above shoulder required
B35
Steel
Wall Filler Beam Prop
Loading Capacity of Class B
Telescopic Adjustable Steel Prop …
Wall /Beam Forms …
Wall /Beam Forms …
Lifting Equipment …
Use of pedestrian forklift
and reduce dependency on
tower crane
MODEL CTS1048
LIFTING WEIGHT 1000 kg
LIFTING HEIGHT 4800 mm
Dismantle
1 DAY (8 Working Hours)
& Erect
Section B
(Detail @Change of Slab Thickness)
Section C
(Detail @Slab Drop
Panel Area)
Construction Cycle …
Day-1 Day-2 Day-3 Day-4 Day-5 Day-6 Day-7 Day-8 Day-9
Install rebar,
inspectn
Cast
Concrete