Round Scaffolding Pty. Ltd.

GREEN FORMWORK
Panel – Prop Early Stripping Formwork System

Green Construction

TABLE SYSTEM - NEW INVENTION


 
About Us …

Round Scaffolding
Pty. Ltd.
ABN: 34 144 505 911
ACN: 144505911
 Green Formwork System
 Quick local deliveries from our various
distribution network at competitive
rates to any location Australia Wide.

 All types of accessories to support and


complete your job.

 Direct container shipments into your


yard anywhere in Australia.
About Green Formwork …
• An advance panel-prop formwork
system
• Allow early strip-off operation
• IBS Concrete System Formwork
• Simple four (4) steps erection
Characteristics …
Main
• SIMPLE & INNOVATIVE
Components  Do not require cross /lateral braces & tripods
 Easy to transfer (horizontally & vertically)

• FAST & EFFICIENT


Panel
 4-worker team for erection, stripping & removal
 Can Achieve 500m2 work done per day-team

• SAFE
 Stable system with 6-direction locking restriction
 No lifting above shoulder required
B35
Steel
Wall Filler Beam Prop
Loading Capacity of Class B
Telescopic Adjustable Steel Prop …
Wall /Beam Forms …
Wall /Beam Forms …
Lifting Equipment …
Use of pedestrian forklift
and reduce dependency on
tower crane

MODEL CTS1048
LIFTING WEIGHT 1000 kg
LIFTING HEIGHT 4800 mm

LIFTING SPEED LOADED 70 (mm/s)


EMPTY 120 (mm/s)
Vertical Transfer …
Advantages …
Easy to learn /trained ….
… Unskilled & semi-skilled workers …
… Less dependency on tower crane

Detailed setting out plan provided …


… High productivity with small work team …
… Shorter casting cycles (early stripping)

Standard modular components …


… Reuse from project to projects …
… High quality bamboo-ply as panel top

Predesigned formwork layout …


… Squareness and level controlled by system …
… Consistent strength & accuracies of factory
manufactured components & parts
Comparison to Other Systems…
(productivity comparison in next slide)

OUR ADVANTAGES DISADVANTAGES


{vs. Flying Table} {vs. Flying Table}
•Less Weather Dependent •Smaller Table Size
•Less Tower Crane Dependent
•Less Noise (Night Work Possible)
•Do Not Require Site Table
Assembly /Dismembering Time
•No Early Stripping

{vs. Alum System} {vs. Alum System}


•Can Transfer Horizontally •Heavier Panels
•Able to Handle Change of •Require Treatment to Panel Joints
Structural Design Efficiently (Cloth Tape)
•Less Noise
Productivity …
Productivity …

Labour Cost = 100%

Dismantle
1 DAY (8 Working Hours)
& Erect

Labour Cost < 70%

Skilled Workers Semi-Skilled Workers


(Ave. RM80/m-day) (Ave. RM70/m-day)
System Design …
Section A
(Cantilever Detail @Edge of Slab)

Section B
(Detail @Change of Slab Thickness)

Section C
(Detail @Slab Drop
Panel Area)
Construction Cycle …
Day-1 Day-2 Day-3 Day-4 Day-5 Day-6 Day-7 Day-8 Day-9

Transfer & Erect


GF @Level 9

Install rebar,
inspectn

Cast
Concrete

Conc Strength Dev.

Formwork Area = 1650m2 Column @Level 10


Shoring Height = 3.65m
F/W Workforce Plan Strip GF Panel,
Supervisor & Foreman = 3 pax Transfer & Erect
Erection /Dismantling Workers = 20 pax @Level 10
General Workers = 6 pax