Sei sulla pagina 1di 2

BILL OF SUPPLY RESIDENTIAL 24x7 Powerline CUSTOMER CARE CENTRE/

INTERNAL GRIEVANCE REDRESSAL CELL


We’re (IGRC)

GOMTIDEVI SUBHEDAR VERMA


SURYA NAGAR, R NO 9
19122 listening. i)Tilak Nager, Road no-3, Chembur, Mumbai 400 089 Fax:
30092022 ii)Sakinaka Junction., Andheri-Kurla Road,
Mumbai 400 072

POWAI ROAD, VIKHROLI W For power SMS POWER <9 digit account no.> to www.adanielectricity.com
NR SHIVSENA SHAKHA interruption, 7065313030 from any mobile no. helpdesk.mumbaielectricity@adani.com
complaint or Give us a missed call on 1800 532 9998 Join us on,
MUMBAI 400079 restoration from your registered mobile no.
status
Mobile No 84******87 For other queries:WhatsApp on
9022 81 3030 (8am to 8pm)
Email Id sr***********87@gmail.com
Connected Load in kW 0.40 Bill No. 100548607269 Bill Date 27-07-2019 Cycle No. 07
PAN Bill Distribution No. EAST/EZ1-POWAI/07/114/005/005/001 Type of Supply SINGLE
PHASE
GSTIN
This electricity bill niether reflects a title nor is to be used as a proof of any property or premises.

To update your email Id and mobile no.,call us on 19122


YOUR CURRENT CONSUMPTION

ACCOUNT NO
Tariff Meter Multiplying Energy consumption Energy Fixed
151846134 number Factor
Present Previous Consumption
charge charge
(MF) (`) (`)
reading reading (Unit kWh)
LT I (B) 8558775 1 7384.00 7247.00 137.00 522.74 105.00
BILL MONTH
JUL-19
TOTAL 137 522.74 105.00

DUE DATE
17.08.2019
Tentative meter reading date for your AUG-19 bill is 23-
TRACK YOUR CONSUMPTION (UNITS) ●

08-2019.
● Please check/update your PAN number by visiting
nearest Customer Care Center or email to

IMPORTANT MESSAGE
AUG-18 154
helpdesk.mumbaielectricity@adani.com with copies of
370 SEP-18 159 PAN for verification.
OCT-18 163
NOV-18 142
DEC-18 101
DUE AMOUNT JAN-19 63
FEB-19 76

` 1110.00* MAR-19
APR-19
110
118

Earn Points on E-payments/Cashless MAY-19 150


NEW Payments. Please login to JUN-19 105
Adani Electricity Mobile App 137 200
to view/ redeem points JUL-19 JUL-18
( Electric Smiles) earned.
Refer to Important Message

DISCOUNTED BILL AMOUNT


Round sum bill payable (after discount
of ` :9.23) on or before discount
date 03-08-2019 ` 1100.00

LATE PAYMENT BILL AMOUNT


Round sum bill payable (including
DPC of ` :13.83) after due
date 17.08.2019 ` 1120.00 #
*Refers only to current bill amount. Previous balance is
payable immediately.
#Payable until one month after due date, there after
interest applicable as per MERC tariff order.

Abbr. in receipt: ‘Q’ for cheque. ‘C’ for cash. E.&O.E. CONSOLIDATED STAMP DUTY PAID BY For Advertisement please contact on
ORDER NO. CSD/25/2019/2160/19 dated 15.05.2019 info@seshaasai.com
PAY-IN SLIP FOR CHEQUE DROP

If paying by cheque, please remember:


● Cheque should be Account payee of local clearing and not post-dated

● Always attach payment slip. Do not staple ● Make cheque payable to Adani Electricity Mumbai Ltd. A/C No.:151846134

● Mention A/c No. and respective amount on back of the cheque,when making multiple bill payments by single cheque.

07/114/005
b/f :2.24Cr 005/001/R02
0151846134500001110170820190000112000000110003082019
Round Sum payable: ` 1110.00 Discounted Amount(Round sum): ` 1100.00 Amount after due date (Round sum): ` 1120.00
JUL-19 151846134 /5/ Due date: 17.08.2019 Discount date: 03-08-2019
HOW YOUR BILL WAS CALCULATED Rate `
0151846134500001110170820190000112000000110003082019

Electrical Energy ( HSN Code 27160000)


YOU CAN USE
Fixed Charge 105.00
RTGS/NEFT VIA
Wheeling charge 215.09
NETBANKING TO PAY
Regulatory asset charge 31.84
YOUR ELECTRICITY BILL
Energy Charge 522.74
Fuel Adjustment Charge (FAC)# (Refer Your Tariff 48.18
Structure below)
Government electricity duty 16.00 % 147.66
Maharashtra Govt. tax on sale of electricity 26.04 p/unit 35.67
Current month's bill amount (A) 1106.18 ADD US AS A PAYEE FOR A
NEW ACCOUNT
Others 0.00
(No need to change the existing
Delayed Payment Charge on previous month's bill 9.81 account)
Digital Payment Discount 1.63 Cr
Payee Account No.
Interest on arrears 0.00
EPAEML151846134
Adjustments 0.00
Payee Name
Net Other Charges in current bill (B) 8.18
Adani Electricity Mumbai Limited
Current Month charges (A+B) 1114.36
Bank Name
Previous month's bill amount 787.76
HDFC Bank Ltd.
Payment received upto 19.07.2019 790.00
Branch Name
Prompt Payment Discount 0.00
Kanjurmarg Branch,Mumbai
Net previous balance(C) 2.24 Cr
IFSC HDFC0004989
Total bill amount(A+B+C) 1112.12
Account Type Current
Amount deferred 0.00
#FAC is being included in your monthly charges in accordance with MERC (MYT 3rd Amendment) Regulations, 2014 dated 8th
May 2014. Please refer to “your tariff structure” below.
AEML CIN U74999GJ2008PLC107256

Regd. Office: Adani Electricity Mumbai Ltd.


Adani House, 56, Shrimali Society, Nr. Mithakhali Six Roads, Navrangpura, Ahmedabad, Gujarat 380009

ROUND SUM KEEP A WATCH TO MANAGE YOUR ENERGY CONSUMPTION


PAYABLE Your tariff structure (Effective from 01.04.2019)
WITH THIS BILL 1110.00 Tariff Tariff slabs Fixed Charge Energy Charge Wheeling charges RA charge FAC rate
Paise/unit
LT I (B):LT- `/month `/unit `/unit `/unit JUL-19
Your security deposit 120.00 Residential
(SD) with us 0-100 65 3.00 1.57 0.20 29.15
101-300 105 6.02 1.57 0.32 51.44
Your unpaid security
deposit (SD) 301-500 105 7.15 1.57 0.36 57.49
> 500(balance 130 8.90 1.57 0.46 67.23
Meter reading date units)
24-07-2019
Previous meter reading date *Above fixed charges are for single phase connections.Fixed charge of Rs 130 per month will be levied on residential consumers
24-06-2019 availing 3 phase supply.Additional Fixed charge of Rs 130 per 10kW load or part thereof above 10kW load shall be payable.
PAN

As per Electricity Supply Code, you can also opt for your own meter Electricity Duty as per Govt. of Maharashtra Notification No. ELD.2015/CR 21/NGR-1 of 13-04-2015. Tax on Sale of Electricity as per
(adhering to BIS standards) Govt. of Maharashtra Notification No.VVK-2018/CR-161/Energy-1 of 26-12-2018
AADCD0086F

NOTE Now you can earn a high interest rate of up to 10.05% per annum on
• To pay online, visit www.adanielectricity.com your Adani Electricity Security Deposit*
• Cash payment limited to `20,000 or bill amount whichever is lower
Enjoy the convenience of paying your Security Deposit amount
• Adani Electricity counter timings: through Adani Electricity Mobile App or www.adanielectricity.com
9:30 a.m. to 12.30 p.m. and 1.30 p.m. to 5.05 p.m
GSTN

• Get 1% discount on energy charges by payment within 7 days of bill *Interest on Security Deposit comprises SBI MCLR rate as on
date 1st April for one year + 150 Basis Points(8.55% + 1.50%).
• Get 7% interest on VDS (reducing balance) For FY 2019-20,it is 10.05%
27AADCD0086F1ZW

Consumer Grievance Redressal Forum (CGRF)


POWER THEFT RESULTS IN POWER TARIFF HIKE - REPORT THEM
Only for grievances unresolved by IGRC,
reach Consumer Grievance Redressal Forum at Honest citizens bear the cost of power stolen by unauthorized elements.
Adani Electricity, 1st Floor, Devidas Lane, If you spot an electrical theft please report on 19122.
Off SVP Road, Near Devidas Lane Telephone
Exchange, Borivali West, Mumbai 400 103

T 3009 4247
PLEASE REMEMBER
E Consumerforum.Mumbaielectricity@adani.com Using electricity connection for purposes other than that provided for is a tariff violation and may lead to
W cgrf.adanielectricity.com disconnection/penal action as per law.

Kindly note that theft of electricity in any manner attracts penal action under the Electricity Act, 2003.

Please quote your account no.151846134in all your correspondence.

------------------------------------------------------------------------------------------------------------------------------------

Potrebbero piacerti anche