Sei sulla pagina 1di 26

Job No : BLR A 056

Project Name : Brigade Tech Garden


Client : Brigade Enterprises Limited.
Title: Main Summary of C2 Tower ID Works
Date : 30-04-2019

MAIN SUMMARY Bill No

TENDER FOR BTG - C2 TOWER ID WORKS

1.00 ATRIUM BILL 1

2.00 LIFT LOBBY BILL 2

3.00 FURNITURE BILL 4

4.00 TOILET BILL 5

TOTAL AMOUNT OF FIXED PRICE TENDER


CARRIED TO FORM OF TENDER [EXCLUDING
GOODS SERVICE TAX (GST), OCTROI, DUTIES ETC

SUB TOTAL
ADD EXTRA FOR TAXES
GST @ 18.00% OR Amount in INR

Other Taxes ( if any )

GRAND TOTAL Including all Taxes

Amount in
words ...................................................................

.........................................................................................
……

......................................................................................
…….. Incl of all taxes

Dated this.............................Day of .............................…


2019.

Signed
....................................Name .......................................

in the capacity
of....................................................................

Duly authorised to sign on behalf


of......................................

Pg GLEEDS CONSULTING (I) PVT.LTD- ID WORKS -BRIGADE - BTG -


MS:01 BANGALORE
Gleeds Consulting (I) Pvt.Ltd.
Job No : BLR A 056
Project Name : Brigade Tech Garden
Client : Brigade Enterprises Limited.
Title : Atrium Interior Works BOQ - C2 Tower
Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

INTERIOR WORKS- C2 TOWER

A FLOORING WORKS

1.00 Marble Flooring


Providing and laying 18mm thick marble flooring as per detail in
drawings (including cut to size in required shape and pattern), Marble
to be fixed with cement mortar (1:6) bed of thickness up to 25mm and
white cement slurry, The works to include colour joint filler at joints to
match the stone colour, mirror polish finish consisting of 7 coats of
polish including one coat of tin oxide polish finish on top surface, All
sides and bottom surfaces of the slabs shall be finished with sealer
coats as recommended by Laticrete make and neatly finished to the
approval of the Engineer in charge, The cost to also include all
material, labour, wastages, curing, cleaning, lead, lifts, protection
with 4mm thk cello bubble sheet till handover, polishing/finishing as
specified, any other related works, all complete as per drawings BBF-
GF-C2-FL-01A/00, specifications, and as instructed and directed by
the Engineer in charge, Basic rate of marble shall be Rs 3440/- per
sqm (Landing cost at site),

Flooring
i 1500MM X 750MM tile (Coral Grey) to Atrium - Ground Floor Sqm 573
ii Star shaped at the Atrium centre -combination of Shade Billiamo grey
Sqm 16
& William grey

Marble Flooring Band (Biliamo Grey)


iv Curve Marble - Atrium - 200 Mm Wide - Ground Floor Rmt 55
v Straight Marble- Atrium - 200 Mm Wide - Ground Floor. Rmt 50
vi Diamond/Tapered shape band (Width 300 to 0mm) Rmt 44
vii Threshold at Corridors - 200 Mm Wide Rmt 10

2.00 Marble Skirting

Brigade - BTG - Bangalore- ID Works Page 3 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Providing and laying 18mm thick marble skirting as per detail in


drawings (including cut to size in required shape if necessary), Marble
to be fixed with cement mortar / paste (1:4) bed of thickness up to
12mm and white cement slurry, The works to include colour joint filler
at joints to match the stone colour, mirror polish finish consisting of 7
coats of polish including one coat of tin oxide polish finish on top
surface, All sides and bottom surfaces of the slabs shall be finished
with sealer coats as recommended by Laticrete make and neatly
finished to the approval of the Engineer in charge, The cost to also
include all material, labour, wastages, curing, cleaning, lead, lifts,
protection till handover, polishing/finishing, any other related works, all
complete as per drawings, specifications, and as instructed and
directed by the Engineer in charge, Basic rate of marble shall be Rs
3440/- per sqm (Landing cost at site excluding taxes),

i 100mm height - Ground Floor Rmt 37

B FALSE CEILING

1.00 12.5 mm thick Gypsum Plaster Board Suspended False Ceiling

Providing and fixing in 12.5 mm thick gypsum plaster board


suspended false ceiling in horizontal / vertical surfaces, stepped,
cove, consisting of G.I Perimeter channel of size 0.50mm thick having
one flange of 20mm and other flange of 30mm and a web of 27mm
along with the perimeter of ceiling, screws fixed to brick wall / partition
with the help of nylon sleeves and screw at 610mm centres, Then
suspend G,I, Intermediate channels of size 45mm x0.8mm thick with
two flanges of 15mm each from the soffit at 900mm centres with
ceiling angle of width 25 x10 x0.50mm thick to soffit with G.I cleat and
steel expansion fasteners,

Ceiling sections of 0.5mm thickness having web of 51.5mm and two


flanges of 26mm each with laps of 10.5mm are then fixed to the
intermediate channels with connecting clips and in direction
perpendicular to the intermediate channel at 457mm to 600mm / as
required, 12.5mm thick gypsum plasterboard with edges as required,
then screwed to the ceiling section with help of 25mm drywall screw at
300mm centres, using gypsteel (IG) make, Board should be placed
staggered to avoid jointing crack,

Finally boards should be jointed and finished with self-adhesive glass


fibre mesh tape to have a flush look which includes filling and finishing
tile tapered edge of the board, The item includes providing and fixing
angle beads,20x12mm aluminium "L" channel for shadow line, edge
beads of 20mm x 27mm x 30mm x 0.55mm wherever AC/ Light fittings
are to be installed as directed, The item also includes providing cut-
outs for electrical fixtures, trap doors, other services required etc,
Marking has to be provided for Sprinkler, Smoke Detectors & speaker,
other services, etc, as required on the ceiling and also templates have
to be provided and fixed in the ceiling made of 6.0 mm to 19mm thk
BWP Ply as required, The rate to include cost of making and marking
of layout, drops upto 300mm, fascia's, projections, necessary
staging/scaffolding, labour, materials, wastages, cleaning, cutting, all
lead, lifts, etc,,

Brigade - BTG - Bangalore- ID Works Page 4 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

All works are to be done as per approved drawings, and to include


coordination with other related agencies, The job shall be completed
in all aspects as shown in the drawing, specifications and as specified
by the Engineer, Make - Gypsteel (India Gypsum), (Note : Hangers to
have two anchor fasteners at ceiling and main channels),
(Mode of Measurement : Plan area shall be measured and paid, Rate
is includes drops, bulk heads, coves, projections, etc,,) Sqm 148

Using Gypsteel (India Gypsum) make


Location : At all levels and locations as directed by EIC

2.00 12.5 mm thick Gypsum Plaster Board Suspended Double Height


False Ceiling
Providing & fixing in 12.5mm Gypsum plaster board suspended
double height false ceiling in horizontal/ vertical surfaces, stepped,
cove, consisting of GI , perimeter channel of size 0.55mm thick having
one flange of 20mm and the other flange of 30mm and a web of
27mm along with the perimeter of ceiling, screws fixed to existing
block wall/ partition wall with the help of nylon sleeves and screwed at
610mm centres. The GI intermediate channels of size 45mm x 0.9mm
thick with two flanges of 15mm each from the soffit at 1220mm
centres are suspended with ceiling angle of width 25mm x 0.55mm
thick to soffit with GI cleat and steel expansion fasteners.

Ceiling sections of 0.5mm thickness having web of 51.5mm and two


flanges of 26mm each with laps of 10.5mm are then fixed to the
intermediate channels with connecting clips and in direction
perpendicular to the intermediate channel at 457mm to 600mm / as
required, 12.5mm thick gypsum plasterboard with edges as required,
then screwed to the ceiling section with help of 25mm drywall screw at
300mm centres, using gypsteel (IG) make, Board should be placed
staggered to avoid jointing crack,

Finally boards should be jointed and finished with self-adhesive glass


fibre mesh tape to have a flush look which includes filling and finishing
tile tapered edge of the board, The item includes providing and fixing
angle beads,20x12mm aluminium "L" channel for shadow line, edge
beads of 20mm x 27mm x 30mm x 0.55mm wherever AC/ Light fittings
are to be installed as directed, The item also includes providing cut-
outs for electrical fixtures, trap doors, other services required etc,
Marking has to be provided for Sprinkler, Smoke Detectors & speaker,
other services, etc, as required on the ceiling and also templates have
to be provided and fixed in the ceiling made of 6.0 mm to 19mm thk
BWP Ply as required, The rate to include cost of making and marking
of layout, drops upto 300mm, fascia's, projections, necessary
staging/scaffolding, labour, materials, wastages, cleaning, cutting, all
lead, lifts, etc,,

Brigade - BTG - Bangalore- ID Works Page 5 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

All works are to be done as per approved drawings, and to include


coordination with other related agencies, The job shall be completed
in all aspects as shown in the drawing, specifications and as specified
by the Engineer, Make - Gypsteel (India Gypsum), (Note : Hangers to
have two anchor fasteners at ceiling and main channels),
Drop & vertical above 50mm to be measured same in ceiling measure
and paid (paint shall be paid separately).
The rate shall also include necessary scaffolding and staging required
for the execution of double height ceiling. sqm 382
(Mode of Measurement : Plan area shall be measured and paid, Rate
is includes drops, bulk heads, coves, projections, etc,,)

Location : Ground Floor Atrium - Double Height Ceiling up to 8 Mtr


Using Gypsteel (India Gypsum) make

3.00 Gypsum Bulkhead on Curved periphery beam


Providing and fixing of curved bulk head with basic structure made
with 12.5mm thk gypsum board and aluminium framing of size
25mmX50mm at 600mm centres at all vertical and horizontal. The
bulk head is extended at the top to match in line and level with the
beam/slab. The cost shall include providing necessary supports from
the beam/slab/or the closest structural member, providing required
cuts/opens to receive ducts, electrical fittings, trays and other
services, the gypsum board shall be jointed and finished with self-
adhesive glass fibre mesh tape to have a flush look which includes
filling and finishing tile tapered edge of the board.
The item also includes providing cut-outs for electrical fixtures, trap
doors, other services required etc, Marking has to be provided for
Sprinkler, Smoke Detectors & speaker, other services, etc, as required
on the ceiling and also templates have to be provided and fixed in the
ceiling made of 6.0 mm to 19mm thk BWP Ply as required, The rate to
include cost of making and marking of layout, drops, fascia's, Sqm 157
projections, labour, materials, wastages, cleaning, cutting, all lead,
lifts, etc,,
All works are to be done as per approved drawings, and to include
coordination with other related agencies, The job shall be completed
in all aspects as shown in the drawing, specifications and as specified
by the Engineer, The rate shall also include necessary scaffolding and
staging required for the execution of double height ceiling.
(Mode of Measurement : Plan area shall be measured and paid, Rate
is includes drops, bulk heads, coves, projections, etc,,)

Location : Ground Floor Atrium - Double Height Ceiling up to 8 Mtr

4.00 Designer Ceiling

Brigade - BTG - Bangalore- ID Works Page 6 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

4.1 Providing & fixing of 125mm x 125mm x 125mm triangular frame


suspended designer ceiling over the MS support structure from wall
and true ceiling. The rate shall be inclusive of matt finish melamine
4mm veneer over 6mm Ply and 12mm ply base with internal vertical
supports in ply or wood, the shop drawing to be submitted by the
vendor and refer intent drawing for the quote. The cost to include all
materials, labour, wastages, lead, lifts, necessary staging/scaffolding,
cutting, drilling, necessary hardware, anchor bolts, tools and Rmt 249
machinery, other related works, complete as per the approved
drawings BBF-GF-C2-SD-01A/00, specifications and as instructed and
directed by the Engineer in charge.
Location : Ground Floor Atrium

or
4.2 Providing & fixing of 125mmx125mmx1.5mm MS triangular framed
designer ceiling over the MS support structure from true ceiling. The
rate shall be inclusive of powder coated finish with wooden grains and
MS framed structure for suspended ceiling , the shop drawing to be
submitted by the vendor & refer intent drawing for the quote, The cost
to include all materials, labour, wastages, lead, lifts, necessary
staging/scaffolding, cutting, drilling, necessary hardware, anchor bolts, Rmt QRO
tools and machinery, other related works, complete as per drawings
BBF-GF-C2-SD-01A/00, specifications and as instructed and directed
by the Engineer in charge,
Location : Ground Floor Atrium

4.3 Providing & fixing of 125mmx125mm pinewood triangular framed


suspended designer ceiling. The rate shall be inclusive of duco paint
finish for the pinewood and MS framed structure from true ceiling for
suspended ceiling , the shop drawing to be submitted by the vendor &
refer intent drawing for the quote, The cost to include all materials,
labour, wastages, lead, lifts, necessary staging/scaffolding, cutting,
drilling, necessary hardware, anchor bolts, tools and machinery, other Rmt QRO
related works, complete as per drawings BBF-GF-C2-SD-01A/00,
specifications and as instructed and directed by the Engineer in
charge,
Location : Ground Floor Atrium

4.4 same as item no:4.1 but of 75mm x 75mm x 75mm triangular frame
with provisions to receive acrylic light fixtures. Cost to exclude light Rmt 69
fixtures

5.00 Trap Doors


Providing and fixing in place trap door of all sizes for services, Trap
door made of 19mm thick BWP ply board shutter with 50mm
aluminium framing as required, edges of shutter to have metal edges,
all surfaces of door shall be lined with 1mm thick laminate to match
the ceiling colour, The cost to include all related hardware (Allen key
locks, pivot hinges, wire hook, etc,), necessary supports, materials,
labour, wastages, lead, lifts, necessary staging/scaffolding, cutting, Sqm 10
tools and machinery, coordination with other related agencies, other
related works, all complete as per drawings BBF-GF-C2-SD-01A/00,
specifications and as instructed and directed by the Engineer in
charge,
Location : At all levels and locations as directed by EIC

Brigade - BTG - Bangalore- ID Works Page 7 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

6.00 Ready Made Access Panel / Trap Door (AMF Make)


Providing and installation of ready made access panels made of
moisture resistant 12.5mm thick Gypsum board with stable Aluminium
Frame, The panel to be finished in flush with existing gypsum ceiling
and securing the hatch using self adjusting clasping spring , with a
lock and hinge mechanism that is integrated in the frame corners and
concealed, The cost to include providing trap doors as required, all
related hardware (Allen key locks, pivot hinges, wire hook, etc,),
necessary supports, materials, labour, wastages, lead, lifts, necessary
staging/scaffolding, cutting, tools and machinery, coordination with
other related agencies, other related works, all complete as per
drawings, specifications and as instructed and directed by the
Engineer in charge,
Location : At all levels and locations as directed by EIC

i Size of 450mm x 450mm Nos QRO


ii Size of 600mm x 600mm Nos QRO

C WALL FINISHES

1.00 POP Punning


Providing and applying P.O.P punning on walls (a thickness of up to
12 mm in average) to make surface smooth and levelled to receive
paint/wall paper/wall covering, The job shall include hacking the
existing surface for proper bond, The job shall also include making
groove, pattas necessary staging/scaffolding, labour, materials,
wastages, cleaning, all lead, lifts, etc,, all shall be completed in all
aspects as shown in the drawings BBF-GF-C2-CD-01A/00 , Sqm QRO
specifications, including all other necessary related works as specified
and as instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

2.00 SS Skirting
Providing and fixing in position of 75mm high and 1.5mm thick
brushed finish SS skirting (SS 304 Grade) as per the profile given in
the drawing fixed onto a wall/column with flexible ply of 6mm thick ,
Cost to include necessary approved adhesive (Kerakoll make),
counter sunk screws, materials, labour, wastages, lead, lifts, tools,
tackles and machinery, other related works, protected and kept
Rmt 19
together with masking tape and all complete as per drawings BBF-GF-
C2-CD-01A/00, specifications and as instructed and directed by the
Engineer in charge,
Location : Circular columns at all levels

3.00 Anodized Aluminium Groove "C" Profile 8mm x 8mm

Brigade - BTG - Bangalore- ID Works Page 8 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Providing and fixing in place C shape Anodised aluminium groove


profile of size 8mm x 8mm x 1.2mm as detailed in the drawing, on top
of skirting in line, level & plumb to stone/tile cladding , the corner
profile is fixed to wall with required adhesive / hardware adhering to
manufacturers specifications as per approved sample, The cost to
include all materials, wastages, labour, tools tackles, lead and lift, Rmt QRO
protection etc,, all complete as per drawings ,specifications and to the
approval of the Engineer in charge,
Location : At all levels and locations as directed by EIC

4.00 Acrylic emulsion painting for Ceiling (Asian )


Providing and applying three coats ( till desired finishes achieved) of
acrylic emulsion paint with required finish for ceiling of approved
colour and shade (Asian - make), The cost to include applying 2 coat
putty, 1 coat primer, necessary staging/scaffolding, lead, lift, all other
related works, etc,, all complete at all levels as per drawings BBF-GF-
C2-CD-01A/00 , specifications, manufacture's specifications, and as
instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

i Atrium Ceiling paint Sqm 740

5.00 Acrylic Emulsion painting for Walls (Asian )


Providing and applying three coats ( till desired finishes achieved) of
acrylic premium emulsion paint with required finish for wall and other
surfaces of approved colour and shade (Asian - make), The cost to
include applying 2 coat putty, 1 coat primer, necessary
staging/scaffolding, lead, lift, all other related works, etc,, all complete
at all levels as per drawings BBF-GF-C2-CD-01A/00, specifications,
manufacture's specifications, and as instructed and directed by the
Engineer in charge,
Location : At all levels and locations as directed by EIC

i Atrium wall paint Sqm 185


ii Atrium Column paint Sqm QRO

6.00 Vinyl Wall Paper


Providing and fixing in position fabric backing vinyl wall paper of
approved make and shade which have 100% washable, Scratch
resistance, Peel proof, & fire retardant properties fixed with approved
ready mixed heavy duty vinyl adhesive onto a wall surface, The cost
to include provision for fixing electrical fixtures, all materials, labour,
wastages, lead, lifts, necessary staging/scaffolding for double height,
base preparation, cutting, necessary approved adhesive, tools and
machinery, protections all complete as per drawings BBF-GF-C1-CD-
01A/00, specifications and to the approval of the Engineer in charge,
Basic rate for wall paper shall be Rs 1830/- per sqm (Landing cost at
site excluding taxes),
Note: Surface area will be considered for payment

i Atrium Column Sqm 46

7.00 Texture painting for Wall - Concrete Finish

Brigade - BTG - Bangalore- ID Works Page 9 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Providing and applying of polished Plaster (Texture paint) which is a


natural mineral material composed of hydrated lime, crushed marble
and cement combined with special additives to control working
characteristics, The cost to including preparation of surface,
appropriate primer coat, 1 coat putty, repeating a coat of oil base
primer, 1 coat of base material of texture paint, touching up with putty,
2 coats of paint, necessary staging/scaffolding, lead, lift, all other
related works, etc,, all complete at all levels as per drawings BBF-GF-
C2-CD-01A/00, specifications, manufacture's specifications, and as
instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC
Basic rate of armourcoat or equivalent make is Rs. 120/Sft
(Supply+Apply )

i Atrium Wall Sqm QRO

8.00 Vinyl Letter Printed


Providing and fixing of fabric backing vinyl wall cladding on the
existing wall /partition with letters, letters to be printed as per the detail
in drawing, Cost to include chasing of wall / plaster wherever required,
surface preparation, provision of electrical fixtures and services,
labour, materials, wastages, cleaning, all lead, lifts, necessary
staging/scaffolding for double height area, any other related works,
etc,, all complete as per drawing BBF-GF-C1-CD-01A/00,
specifications and as directed by the Engineer in charge,

i Behind the vertical baffles Sqm 9


ii Double height Atrium wall Sqm 203

D PARTITIONS

1.00 Plywood Panelling


Providing and fixing in position ply wall panelling with the basic
structure is made with one layer of 12mm thick BWP ply backing &
one layer of 12.5mm thick gypsum panels all fixed to a framework
made of 50mmX25mmXupto 1.2mm thick aluminium framing at 600c/c
or as required, The cost to include all materials, making 6mm groove
at the bottom above skirting, labour, wastages, lead, lifts, necessary
staging/scaffolding for double height, cutting, necessary hardware,
tools and machinery, other related works, provision for service cutouts, Sqm 180
finishing the gypsum board and joints in line and level to receive
texture paint, complete as per drawings specifications and as
instructed and directed by the Engineer in charge,
Note: Plywood surface area will be considered for payment

2.00 AHU Room Access Door with laminate finish

Brigade - BTG - Bangalore- ID Works Page 10 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Providing and fixing in position DB shutter made of 19mm thick of


marine grade plywood for frame and the box should have shutters as
shown in the drawing, as per detailed in the drawing, the base
structure shall be made with marine ply backing fixed to a framework
consisting of 25mm x 50mm Xupto 1.2mm thick aluminium framing at
600c/c or as required, All exposed ply surfaces shall be lined with
1mm thick laminate using approved adhesive, The cost to include all
materials, labour, wastages, lead, lifts, necessary staging/scaffolding, sqm 22
cutting, necessary hardware, tools and machinery, other related
works, complete as per drawings specifications and as instructed and
directed by the Engineer in charge,
Note: Laminate surface area will be considered for payment
(White/grey laminate)

3.00 Portal on wall with Ply boxing and S.S Hairline finish
Providing and fixing in position wall portal finished with 0.8mm
thick(SS 304 grade) S.S sheet cladding lined on top of 50x100mm ply
boxing , above AHU door architrave, boxing shall be made with 12mm
thick BWP ply & necessary framework with 25x50mmXupto 1.2mm
thick aluminium framing , fixed to wall with necessary
projections/profiles as required . The cost to include all materials,
labour, wastages, lead, lifts, necessary staging/scaffolding, cutting, Rmt 34
necessary hardware, tools and machinery, other related works,
complete as per drawings BBF-GF-C2-01A/00, specifications and as
instructed and directed by the Engineer in charge.

4.00 Vertical Baffle Cladding


Providing & fixing of vertical baffle on the existing wall / Partition, This
shall consist of 1.2mm thick aluminium extruded section , The size of
the aluminium sections shall be 50mmx50mm thick with a clear space
of 100mm distance, The baffles shall be fixed to the clip on system on
the wall or wooden surface area, These baffle & connector shall have
self interlocking system, The connector to be fixed on the wall /
wooden surfaces using a suitable screw system,
The cost to include all materials,labour,wastages, necessary supports
from wall and ceiling as per manufacturer specification,upto 80micron
thick powder coated in approved colour and stain, leads, lifts,
necessary staging/scaffolding, cutting, necessary hardware, tools and Sqm 9
machinery, other related works, complete as per drawings BBF-GF-
C2-CB-02A/00, specifications and as instructed and directed by the
Engineer in charge,
Note: Elevational area will be considered for payment
Location : At all levels and locations as directed by EIC

5.00 Glass Partition @ Ground Floor Atrium near Lift Lobby Entrance

Brigade - BTG - Bangalore- ID Works Page 11 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Providing and fixing in position of 1020mm high glass partition with


13.52mm thick clear toughened frosted laminated fixed glass (6mm
toughened+1.52pvb+6mm toughened) with 950x100mm 3M frosting
film (silver dust type applied from lift core side) at lift lobby entrance
security equipments with polished edges, complete etc., the cost to
include providing necessary supports from flooring and walls, dorma
manet (90 degrees connection system floor anchored), necessary Sqm 33
silicon seal, related hardware, materials, labour, wastages, lead, lifts,
cutting, tools and machinery, other related works, all complete as per
drawings BBF-GF-C2-PA- 02A/00, specifications and as instructed
and directed by the Engineer in charge

6.00 Single Glazed Partition (With Modular Frame)


Supply and installation of Hytek single glazed partition system formed
of proprietary matt anodised finish aluminium extrusions of 102 mm
Height X 25 mm X upto 1.5mm thick section for top, bottom and for
verticals all finished same as item 4.0. Glass to be 13.52mm thick
clear toughened laminated fixed glass (6mm
toughened+1.52pvb+6mm toughened) and glass to glass joints with
hytek aluminium frames as per manufacture's specifications and Sqm 58
drawings BBF-GF-C2-CD-01A/00, The item is to be finished
complete in all respects. Rate to include all the necessary corner, 3
way & glass to glass H profiles . Prices excluding partition above false
ceiling.
MAKE : Aluminium frame to be from Hytek make

7.00 Modular Double Leaf Glass Door: (1800mm x 2400mm) - One way
Swing
Providing and fixing in position stile glass door with tested sound
reduction property up to RW 36Db at passenger lift lobby of overall
size 1800mm x 2400mm, The door frame consist of aluminium frames
of size 25mm x 102mm, shutter shall be made of perimeter rail of
aluminium frame of size 100mm x 45mm x upto 1.5mm thick all
frames finished same as item 4.0 or as approved and 10 mm
toughened glass, glass and frame joints to be treated with 3M sealing
tape double sided adhesive tape maintaining a joint width of 3 mm as
per manufacture's specifications .
Make : Hytek

Cost to include supply and fixing of all ironmongeries Dorma


Hardware to be used. Dorma H Type Handle TGDI-H1200, 1200mm &
917NDLP dead-lock with 1-side key & 1-side thumb turn operation,
BTS84-Concealed floor spring , ITS-96-2-4 Door Closer with 96N
Slide channel arm and 3108 - Floor Mounted Half dome Door stopper,
4nos of door hinges per shutter as per approved sample, The cost to
include all material, labour, wastages, leas and lift, necessary Nos 4
staging/scaffolding. cutting, necessary hardware, protections, tools
and machinery, other related works, all complete as per drawings
BTG-BLR-C2-TYP- 01A/00, specifications, and as directed by the
Engineer in charge
Make of Iron Mongeries : Dorma

8.00 Screen Partition

Brigade - BTG - Bangalore- ID Works Page 12 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Screen Partition:- Providing & fixing of 12mm white frosted glass


panels fixed vertically at every 75mm spacing on 300mm x 75mm ply
boxing on all sides. The boxing to be made of 19mm marine plywood
fixed on 50x50mm MS box sections at every 600mm spacing running
both sides. The sections are to be placed on 6mm MS base plates
grouted to the floor along the length of the partition. The ply boxing to
be finished in 3mm Corian all round, of approved shade, all as
a approved by architect / EIC. The frosted panels to be fixed at top and Sqm 9
bottom with U channels provided and to run in curved length as per
detailed drawing. 2 nos of MS fins/ panels cut into shape of the glass
panels to be fixed in between for necessary supports. The MS panels
to be white duco painted. The rate shall be excluding MS works &
including Corian boxing, glass, frosting & necessary supports. BR of
Corian Rs.6190/sqm (excluding taxes) Location- Behind Reception
table

b MS works for the above partition MT 1

9.00 75mm Gypsum Partition


Providing and fixing in position 75mm wide gypsum board partition
above AHU access door made out of 25mmx25mmxupto2.80 mm
Aluminium framing and 1 layer of 12.5mm thick gypsum board on
either side. The cost to include all cutting, glass wool infill, necessary
hardware, provision for services, additional supports from true ceiling,
necessary painting above the ceiling, all materials, labour, fixing, Sqm 8
wastages, lead, lifts, necessary staging/scaffolding. etc., all complete
as per drawings, specs and to the approval of the engineer in charge.
Note : One side Elevational area will be measured for payment

E Misc. Works
1.00 Providing & fixing of DB shutter made of 19mm thick of marine grade
plywood for frame and the box should have shutters as shown in the
drawing, Boxing to be 400mm wide 6'long, internal surface to be
laminated with 1mm thick of approved shade & colour and external
surface to be texture paint as on the walls, the rate shall be inclusive Sqm 25
of necessary hardware & fittings, 200x 300 of size glass vision panel -
toughened glass- 6mm thickness
Location : At all levels and locations as directed by EIC

2.00 Providing & Fixing sill panelling made of 19mm ply boxing with
necessary framework and having laminate finish as approved shade &
colour, Panelling to be finished in laminate, To add necessary packing, Sqm QRO
to maintain the plumb level,
Location : At all levels and locations as directed by EIC

3.00 350 wide x 100mm ht "L" shaped pelmet made of 19mm thick
plywood finish with 12mm thick gypsum board & premium acrylic
emulsion paint, The necessary support needs to be taken from the
wall / true ceiling, This should be strong to take the weight of Curtain /
Blinds etc, Rmt 47
Location : At all levels and locations as directed by EIC
Note : The quoted rate shall be exclusive of paint and it will paid under
painting item

Brigade - BTG - Bangalore- ID Works Page 13 of 26


Gleeds Consulting (I) Pvt.Ltd.

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

4.00 Providing andfixing of 25mmx25mm brushed finish SS Solid rods as


per the design to be inserted into the ply panelling with required
recessed and projection to receive vinyl printed graphics to form the
shape as per the intent shown in drawings, Cost to include all
materials, labour, wastage, fixing using explansion hold fasts, joining Rmt 758
of SS with required welding, grinding and neatly finishing, all other
related works to complete the job as shown in details, drawings, and
as instructed by the EIC.

5.00 "Providing and Fixing in position of 25mm wide stainless steel (304
grade) 6mm thick floor inset of approved finish in line and level in
required pattern, Cost to include all materials, labour, wastages, lead,
lifts, all complete as per drawings GF-C2-FL-01A,TYP-C2-FL-01A , Rmt 17
specifications and to the approval of the Engineer in charge specified
and as directed,
Location : At all levels and locations as directed by EIC"

Brigade - Tech Garden - Bangalore To Main


GHC BILL NR 01 - Atrium ID Works Summary

Brigade - BTG - Bangalore- ID Works Page 14 of 26


Job No : BLR A 056
Gleeds Consulting (I) Pvt.Ltd.
Project Name : Brigade Tech Garden
Client : Brigade Enterprises Limited.
Title : Lift Lobby Interior Works BOQ -C2 Tower

Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

INTERIOR WORKS- C2 TOWER

A FLOORING WORKS

1.00 Marble Flooring (Billiamo Grey)


Providing and laying 18mm thick marble flooring as per detail in
drawings (including cut to size in required shape and pattern), Marble
to be fixed with cement mortar (1:6) bed of thickness up to 25mm and
white cement slurry, The works to include colour joint filler at joints to
match the stone colour, mirror polish finish consisting of 7 coats of
polish including one coat of tin oxide polish finish on top surface, All
sides and bottom surfaces of the slabs shall be finished with sealer
coats as recommended by Laticrete make and neatly finished to the
approval of the Engineer in charge, The cost to also include all
material, labour, wastages, curing, cleaning, lead, lifts, protection with
4mm thk cello bubble sheet till handover, polishing/finishing as
specified, any other related works, all complete as per drawings BBF-
GF-C2-FL-01A/00, specifications, and as instructed and directed by
the Engineer in charge, Basic rate of marble shall be Rs 3440/- per
sqm (Landing cost at site),
Location: At ground floor

Flooring
i Lift Lobby Sqm 114
Marble Flooring Band/Strips/Inlays/Thresholds (Biliamo Grey)

ii Lift Lobby - 150 mm Wide Rmt 20


iii Lift Lobby - 200 mm Wide threshold to lift opening
Rmt 10
Location: Ground Floor

2.00 Marble Skirting


Providing and laying 18mm thick marble skirting as per detail in
drawings (including cut to size in required shape if necessary), Marble
to be fixed with cement mortar / paste (1:4) bed of thickness up to
12mm and white cement slurry, The works to include colour joint filler
at joints to match the stone colour, mirror polish finish consisting of 7
coats of polish including one coat of tin oxide polish finish on top
surface, All sides and bottom surfaces of the slabs shall be finished
with sealer coats as recommended by Laticrete make and neatly
finished to the approval of the Engineer in charge, The cost to also
include all material, labour, wastages, curing, cleaning, lead, lifts,
protection till handover, polishing/finishing, any other related works, all
complete as per drawings, specifications, and as instructed and
directed by the Engineer in charge, Basic rate of marble shall be Rs
3440/- per sqm (Landing cost at site excluding taxes),
Location: At ground floor

i 75mm height Rmt QRO


ii 100mm height Rmt 32

3.00 Granite Flooring with adhesive and Ply in Lift Car


Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

Providing and laying 18mm thick Steel Grey Granite flooring as per
detail in drawings (including cut to size in required shape if
necessary), Granite to be fixed with required adhesive on 6mm thick
BWP plywood base, The works to include finishing the joints with grout
and pigment to match the stone colour and neatly finished to the
approval of the Engineer in charge, The cost to also include all
material, labour, wastages, cleaning, lead, lifts, protection with 4mm
thk cello bubble sheet till handover, 12mm plywood for protection,
finishing as specified, any other related works, all complete as per
drawings TYP-B3-CB-01A/00, specifications, and as instructed and
directed by the Engineer in charge, Basic rate of granite shall be Rs
1938/- per sqm (Landing cost at site excluding taxes),
The Rate shall be inclusive of 6 mm BWP ply

i Granite Flooring Sqm 30

4.00 Granite Threshold - Steel Grey


Providing and laying 18mm thick Steel Grey Granite flooring as per
detail in drawings (including cut to size in required shape if
necessary), Granite to be fixed with cement mortar (1:6) bed of
thickness up to 25mm and cement slurry, The works to include
finishing the joints with grout and pigment to match the stone colour
and neatly finished to the approval of the Engineer in charge, The cost
to also include all material, labour, wastages, curing, cleaning, lead,
lifts, protection with 4mm thk cello bubble sheet till handover, finishing
as specified, any other related works, all complete as per drawings
TYP-C2-CB-01A/00, specifications, and as instructed and directed by
the Engineer in charge, Basic rate of granite shall be Rs 1938/- per
sqm (Landing cost at site excluding taxes),
Location : At all levels and locations as directed by EIC

i Granite Threshold - 200 mm Wide Rmt 77

B FALSE CEILING

1.00 12.5 mm thick Gypsum Plaster Board Suspended False Ceiling

Providing and fixing in 12.5 mm thick gypsum plaster board


suspended false ceiling in horizontal / vertical surfaces, stepped, cove,
consisting of GI Perimeter channel of size 0.50mm thick having one
flange of 20mm and other flange of 30mm and a web of 27mm along
with the perimeter of ceiling, screws fixed to brick wall / partition with
the help of nylon sleeves and screw at 610mm centres, Then suspend
G,I, Intermediate channels of size 45mm x0.8mm thick with two
flanges of 15mm each from the soffit at 900mm centres with ceiling
angle of width 25 x10 x0.50mm thick to soffit with GI cleat and steel
expansion fasteners,

Ceiling sections of 0.5mm thickness having web of 51.5mm and two


flanges of 26mm each with laps of 10.5mm are then fixed to the
intermediate channels with connecting clips and in direction
perpendicular to the intermediate channel at 457mm to 600mm / as
required, 12.5mm thick gypsum plasterboard with edges as required,
then screwed to the ceiling section with help of 25mm drywall screw at
300mm centres, using gypsteel (IG) make, Board should be placed
staggered to avoid jointing crack,
Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

Finally boards should be jointed and finished with self-adhesive glass


fibre mesh tape to have a flush look which includes filling and finishing
tile tapered edge of the board, The item includes providing and fixing
angle beads,20x12mm aluminium "L" channel for shadow line, edge
beads of 20mm x 27mm x 30mm x 0.55mm wherever AC/ Light fittings
are to be installed as directed, The item also includes providing cut-
outs for electrical fixtures, trap doors, other services required etc,
Marking has to be provided for Sprinkler, Smoke Detectors & speaker,
other services, etc, as required on the ceiling and also templates have
to be provided and fixed in the ceiling made of 6.0 mm to 19mm thk
BWP Ply as required, The rate to include cost of making and marking
of layout, drops upto 300mm, fascia's, projections, necessary
staging/scaffolding, labour, materials, wastages, cleaning, cutting, all
lead, lifts, etc,,

All works are to be done as per approved drawings, and to include


coordination with other related agencies, The job shall be completed in
all aspects as shown in the drawing, specifications and as specified by
the Engineer, Make - Gypsteel (India Gypsum), (Note : Hangers to
have two anchor fasteners at ceiling and main channels),
(Mode of Measurement : Plan area shall be measured and paid, Rate
is includes drops, bulk heads, coves, projections, etc,,) Sqm 115

Using Gypsteel (India Gypsum) make


Location : At all levels and locations as directed by EIC

2.00 Trap Doors


Providing and fixing in place trap door of all sizes for services, Trap
door made of 19mm thick BWP ply board shutter with 50mm
aluminium framing as required, edges of shutter to have metal edges,
all surfaces of door shall be lined with 1mm thick laminate to match
the ceiling colour, The cost to include all related hardware (Allen key
locks, pivot hinges, wire hook, etc,), necessary supports, materials,
labour, wastages, lead, lifts, necessary staging/scaffolding, cutting,
tools and machinery, coordination with other related agencies, other Sqm QRO
related works, all complete as per drawings BBF-TYP-C2-SD-
01A/00, specifications and as instructed and directed by the Engineer
in charge,
Location : At all levels and locations as directed by EIC

3.00 Ready Made Access Panel / Trap Door (AMF Make)


Providing and installation of ready made access panels made of
moisture resistant 12.5mm thick Gypsum board with stable Aluminium
Frame, The panel to be finished in flush with existing gypsum ceiling
and securing the hatch using self adjusting clasping spring , with a
lock and hinge mechanism that is integrated in the frame corners and
concealed, The cost to include providing trap doors as required, all
related hardware (Allen key locks, pivot hinges, wire hook, etc,),
necessary supports, materials, labour, wastages, lead, lifts, necessary
staging/scaffolding, cutting, tools and machinery, coordination with
other related agencies, other related works, all complete as per
drawings BBF-TYP-C2-SD- 01A/00, specifications and as instructed
and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

i Size of 450mm x 450mm Nos QRO


ii Size of 600mm x 600mm Nos QRO
Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

C WALL FINISHES

1.00 POP Punning


Providing and applying P.O.P punning on walls (a thickness of up to
12 mm in average) to make surface smooth and levelled to receive
paint/wall paper/wall covering, The job shall include hacking the
existing surface for proper bond, The job shall also include making
groove, pattas necessary staging/scaffolding, labour, materials,
wastages, cleaning, all lead, lifts, etc,, all shall be completed in all
aspects as shown in the drawing TYP-C2-CB-01A/00, specifications, Sqm QRO
including all other necessary related works as specified and as
instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

2.00 Acrylic emulsion painting for Ceiling (Asian )


Providing and applying three coats ( till desired finishes achieved) of
acrylic emulsion paint with required finish for ceiling of approved
colour and shade (Asian - make), The cost to include applying 2 coat
putty, 1 coat primer, necessary staging/scaffolding, lead, lift, all other
related works, etc,, all complete at all levels as per drawings BBF-
TYP-C2-SD- 01A/00, specifications, manufacture's specifications, and
as instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

i Lift lobby Ceiling Paint Sqm 121

3.00 Marble Cladding with cement mortar backing


Providing and fixing in position 20mm thick Marble cladding to as per
pattern shown in the drawing, Marble to be fixed to the surfaces with
cement mortar (1:6) bed of thickness up to 30mm and white cement
slurry, . Rate to include necessary 4mm chamfering at edges/joints to
form 'V' grooves in the joints as per directions of Engineer-in-charge.
The works to include finish in grout with pigment to match the stone
colour, mirror polishing with minimum 7 coats of tin oxide and neatly
finished to the approval of the Engineer in charge, The rate shall also
include necessary cutouts / notches in Marble for services as per the
detailed drawing. The rate to include applying sealer coat to all sides
of the Marble. Rate to include jambs provided to lift openings. Refer
dwg BBF-GF-C2-PA-01A/00.
Basic rate of marble shall be Rs 3440/- per sqm (Landing cost at site
excluding taxes),

i For lift walls- Ground floor Sqm 73

4.00 Marble Cladding with ply backing


Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

Providing and fixing in position 20mm thick Marble cladding to as per


pattern shown in the drawing, Marble to be fixed to the surfaces using
approved adhesive (Laticrete or equivalent). The marble cladding to
have 19mm thick BWP ply backing fixed to the necessary support
using 25MM X 50MM aluminium framework at 600mm c/c spacing,
vertically/ horizontally. Rate to include necessary 4mm chamfering at
edges/joints to form 'V' grooves in the joints as per directions of
Engineer-in-charge. The works to include finish in grout with pigment
to match the stone colour, mirror polishing with minimum 7 coats of tin
oxide and neatly finished to the approval of the Engineer in charge,
The rate shall also include necessary cutouts / notches in Marble for
services as per the detailed drawing. The rate to include applying
sealer coat to all sides of the Marble. Rate to include jambs provided
to lift openings. Refer dwg BBF-GF-C2-PA-01A/00.
Basic rate of marble shall be Rs 3440/- per sqm (Landing cost at site
excluding taxes),

i For Lift opening jambs - Ground Floor Sqm 26

5.00 Vertical Baffle Cladding


Providing & fixing of vertical baffle on the existing wall / Partition, This
shall consist of 1.2mm thick aluminium extruded section , The size of
the aluminium sections shall be 75mmx50mm thick with a clear space
of 100mm distance, The baffles shall be fixed to the clip on system on
the wall or wooden surface area, These baffle & connector should
have self interlocking system, The connector to be fixed on the wall /
wooden surfaces using a suitable screw system,
The cost to include all materials,labour,wastages, necessary supports
from wall and ceiling as per manufacturer specification,upto 80micron
thick powder coated finish in approved colour and stain, leads, lifts,
necessary staging/scaffolding, cutting, necessary hardware, tools and Sqm 108
machinery, other related works, complete as per drawings BBF-TYP-
C2-PA- 01A/00 , specifications and as instructed and directed by the
Engineer in charge,
Note: Elevational area will be considered for payment
Location : At all levels and locations as directed by EIC

6.00 Acrylic Emulsion painting for Walls (Asian )


Providing and applying three coats ( till desired finishes achieved) of
acrylic premium emulsion paint with required finish for wall and other
surfaces of approved colour and shade (Asian - make), The cost to
include applying 2 coat putty, 1 coat primer, necessary
staging/scaffolding, lead, lift, all other related works, etc,, all complete
Sqm 492
at all levels as per drawings BBF-TYP-C2-PA- 01A/00, specifications,
manufacture's specifications, and as instructed and directed by the
Engineer in charge,
Location : At all levels and locations as directed by EIC

7.00 Vinyl Wall Paper


Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

Providing and fixing ( Including base preparation) in position fabric


backing vinyl wall paper of approved make and shade which have
100% washable, Scratch resistance, Peel proof, & fire retardant
properties fixed with approved ready mixed heavy duty vinyl adhesive
onto a wall surface, The cost to include provision for fixing electrical
fixtures, all materials,labour,wastages, lead, lifts, necessary
staging/scaffolding, cutting, necessary approved adhesive, tools and
machinery, protections all complete as per drawings BBF-GF-C1-CD-
01A/00, specifications and to the approval of the Engineer in charge,
Basic rate for wall paper shall be Rs 1830/- per sqm (Landing cost at
site excluding taxes),
Note: Surface area will be considered for payment

i Ground Floor circular columns Sqm 35

8.00 Vinyl Letter Printed


Providing and fixing of fabric backing vinyl wall cladding on the
existing wall /partition with letters, letters to be printed as per the detail
in drawing, Cost to include chasing of wall / plaster wherever required,
surface preparation, provision of electrical fixtures and services,
labour, materials, wastages, cleaning, all lead, lifts, necessary
staging/scaffolding, any other related works, etc,, all complete as per
drawing BBF-TYP-C2-PA- 01A/00, specifications and as directed by Sqm 108
the Engineer in charge, Basic rate of printed vinyl shall be Rs 1000/-
per sqm (Landing cost at site excluding taxes),
Location : At all levels and locations as directed by EIC

9.00 Lift wall Glass Cladding


Providing and fixing of 6mm thick annealed, premium GRIHA rated
lacquered glass (from Saint-Gobain or equivalent) of approved color
by Architect/ Client / Customer, mounted on clips (SGG PLANICLIP
(J2/J1/I type) on a perfectly levelled surface( 12mm thick BWP
plywood / MDF / Mineral fibre board/ RCC wall/any other structure).
Lacquered glass must be made industrially (via curtain coating
process); opaque (if viewed against a support wall), coated with PU
lacquer (50 micron thick); color consistency (measured by Minolta
spectrophotometer CM5081); highly durable (passes PERSOZ
hardness test for minimum 220 oscillations); humidity resistant
(conforms to BS EN 1036 1999); environmentally friendly (no lead, no Sqm 310
arsenic, no copper, no formaldehyde); appropriate recycled content
(12% post industrial / 6% post consumer); compressive strength (1000
MPa) & tensile strength (40 MPa),same as float glass. Fixed with clips
(either of I/J1/J2, made of polycarbonate, grey backing foam to
accommodate substrate undulation, with a horizontal load capacity of
30Kg/100mm and vertical pullout load > 200kg/100mm)
Location: Lift Walls at First Floor & Typical Floors

10.0 Ply backing for lift wall cladding


Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

Providing and fixing in position wall panelling, the base structure shall
be made with 19mm thick BWP ply backing fixed to a framework
consisting of 50mmX25mmXupto 1.2mm thick aluminium framing at
600c/c or as required, The cost to include all materials, labour,
wastages, lead, lifts, necessary staging/scaffolding, cutting, necessary
hardware, tools and machinery, other related works, provision for
service cutouts, complete as per drawings specifications and as Sqm 310
instructed and directed by the Engineer in charge,
Note: Plywood surface area will be considered for payment.
Location: Lift Walls at First Floor & Typical Floors

11.00 Shaft door


Providing and fixing shaft door of size 2000mmx900mm finished with
approved Duco paint, the door shall be made of 19mm plywood to
receive the Duco paint finish, with a corner framing for shutter of
27mm x 27mm x up to 1.5mm thick Al corner "L" profile with up to 80
micron thick approved powder coated finish, fixed with necessary
hardware including hinges, allen key lock etc., to be fixed as per the
detail shown in drawing. The cost to include all materials, labour,
wastages, lead, lifts, necessary staging/scaffolding, cutting, necessary No 2
hardware, tools and machinery, other related works, complete as per
drawing BBF-GF-C5-PA- 01A/00, specifications and as instructed and
directed by the Engineer in charge.
Location: Ground Floor Lift Wall Shaft opening

12.00 Acrylic Back Lite Box


Providing & fixing of 12mm thick single side BWP ply partition using
25MM X 50MM and 2mm thick aluminium framework at every
600mmx 600mm spacing, vertically/ horizontally, extended to the
nearest structural members, The boxing to be 150mm clear gap inside
& internal surface of ply to be finished with laminate of approved
shade & colour and front facia to be finished with 6mm thick Frosted /
Milky white Acrylic sheet as shown in the drawing, If necessary 12mm
thick ply backing support to be given for skirting, The cost to include all
provision for back lite, materials,labour,wastages, lead, lifts, necessary
Sqm 6
staging/scaffolding, edge profile, cutting, necessary hardware, tools
and machinery, other related works, complete as per drawings BBF-
TYP-C2-PA- 01A/00, specifications and as instructed and directed by
the Engineer in charge,
Note: Acrylic sheet surface will be considered for payment
Location : At all levels and locations as directed by EIC

13.00 Single Glazed Partition (With Modular Frame)


Supply and installation of Hytek single glazed partition system formed
of proprietary matt anodised finish aluminium extrusions of matt
natural finish of 102 mm Height X 25 mm X upto 1.5mm thick section
for top, bottom and for verticals all frames finished as same as item
4.0. Glass to be 10 mm toughened and glass to glass joints to be
treated with 3M sealing tape double sided adhesive tape maintaining a
joint width of 3 mm as per manufacture's specifications and drawings
BBF-TYP-C2-PA- 01A/00, The item is to be finished complete in all Sqm 245
respects. Rate to include all the necessary corner, 3 way & glass to
glass H profiles . Prices excluding partition above false ceiling. MAKE :
Aluminium frame to be from Hytek make (Lift lobby entrance- typical
floors)
Date : 30-04-2019 Gleeds Consulting (I) Pvt.Ltd.

Sl No GHC Description Unit Total Quantity

14.00 100mm Gypsum Partition


Providing and fixing in position 100mm wide gypsum board partition
above glazed partitions door made out of 25mmx25mmxupto2.80 mm
Aluminium framing and 1 layer of 12.5mm thick gypsum board on
either side. The cost to include all cutting, glass wool infill, necessary
hardware, provision for services, additional supports from true ceiling,
necessary painting above the ceiling, all materials, labour, fixing,
wastages, lead, lifts, necessary staging/scaffolding. etc., all complete Sqm 209
as per drawings, specs and to the approval of the engineer in charge.
Note : One side Elevational area will be measured for payment
Location: Above Single Glazed partitions at First Floor & Typical Floors
Lift Lobbies

15.00 Modular Double Leaf Glass Door : (1800mm x 2400mm) - One way
Swing
Providing and fixing in position stile glass door with tested sound
reduction property up to RW 36Db at passenger lift lobby of overall
size 1800mm x 2400mm, The door frame consist of aluminium frames
in natural anodized finish of size 25mm x 102mm, shutter shall be
made of perimeter rail of aluminium frame of size 100mm x 45mm and
10 mm toughened glass, glass and frame joints to be treated with 3M
sealing tape double sided adhesive tape maintaining a joint width of 3
mm as per manufacture's specifications .
Make : Hytek

Cost to include supply and fixing of all ironmongeries Dorma Hardware


to be used. Dorma H Type Handle TGDI-H1200, 1200mm & 917NDLP
dead-lock with 1-side key & 1-side thumb turn operation, BTS84-
Concealed floor spring , ITS-96-2-4 Door Closer with 96N Slide
channel arm and 3108 - Floor Mounted Half dome Door stopper, 4nos
of door hinges per shutter as per approved sample, The cost to
include all material, labour, wastages, leas and lift, necessary Nos 32
staging/scaffolding. cutting, necessary hardware, protections, tools
and machinery, other related works, all complete as per drawings
BTG-BLR-C2-TYP- 01A/00, specifications, and as directed by the
Engineer in charge
Make of Iron Mongeries : Dorma

16.00 Providing and fixing of 8mm x 8mm SS U channels as per the design
to be inserted between glass joints on the lift wall, as indicated in the
detail drawings. Cost to include all material, labour, wastage, fixing as
per the details, leads, lift, loading and unloading and all other allied Rmt 625
works and completing the job as per the details, specifications and as
instructed by the EIC

Brigade - Tech Garden - Bangalore To Main


GHC BILL NR 01 - Lift Lobby ID Works Summary
Gleeds Consulting (I) Pvt.Ltd.
Job No : BLR A 056
Project Name : Brigade Tech Garden
Client : Brigade Enterprises Limited.
Title : Furniture Works - C2 Tower

Date : 30-04-2019

Total
Sl No GHC Description Unit
Quantity

INTERIOR WORKS- C2 TOWER

A FURNITURE WORKS

1.00 ATRIUM - RECEPTION TABLE- -(4400 OAL x 900 OAW x 1050


OAH)
Supplying and installation of reception table of 4400mm OAL x
900mm OAW x 1050mm OAH with the Visitor's desk top at 1050mm
and 75mm thick finished in 6mm thick approved white dupont corian
with 19mm BWP ply backing and necessary hardwood frame work.
Working desk at 750mm height and 75mm thk table top finished in
6mm thick approved white dupont corian with 19mm BWP ply backing
and necessary hardwood frame work. Front facia shall be be made
with 6mm thick BWP ply cladding on the existing 19mm BWP ply and
framework with araldite, recessed wherever required as per the design
pattern specified in the detail drawing. The ply surface to finished in
metallic brass finish in duco paint. The table shall also have 100mm Nos 1
high skirting at the bottom with 12mm thk BWP ply finished in 6mm
approved white dupont corian. The rate should be inclusive of all
necessary support , provisions to receive any services, cut out,
hardware, fitting, all materials, labour, leads, lifts, transport,,loading
and unloading and completing the job in all aspecets as shown in
drawings, specifications, or as instructured by th EIC . Drawing no:
BBF-GF-C2-LF- 01A/00

2.00 PEDESTAL UNIT FOR RECEPTION TABLE


Supplying and installation of Pedestal Unit For Reception Table with 3
Drawer Pedestal type- 675mm H x 450mm W x 600mm D unit on
castors : Supply of mobile pedestals made of 18mm thick pre
laminated boards with two small drawers and one deep drawer
mounted on telescopic slides. Pedestal unit to have once central lock
and recessed handles on each drawer. Pedestal to be mounted on
castors which to be lockable. refer drawing BBF-GF-C2-CB- 02A/00
for more details. All types of fitting & fixtures to be hettich make to be Nos 2
used. The rate should be inclusive of all necessary support ,
provisions to receive any services, cut out, hardware, fitting, all
materials, labour, leads, lifts, transport,,loading and unloading and
completing the job in all aspecets as shown in drawings,
specifications, or as instructured by th EIC .

Brigade - Tech Garden - Bangalore To Main


GHC BILL NR 01 - Furniture Works Summary

Brigade - BTG - Bangalore- ID Works Page 23 of 26


Gleeds Consulting (I) Pvt.Ltd.
Job No : BLR A 056
Project Name : Brigade Tech Garden
Client : Brigade Enterprises Limited.
Title : Toilet Interior Works BOQ - C2 Tower
Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

INTERIOR WORKS- C2 TOWER

A WALL FINISHES

1.00 Vanity Mirror (500mm x 1200mm)


Providing and fixing in position vanity mirror of overall size 500mm x
1200mm as per detail in drawing, Base shall be made out of upto
30mmx35mmx1.2mm thk aluminium framing and 12mm thick BWP ply
backing / as required, 6mm thick mirror shall be fixed with silicon / 3M
both side tape, Edge to have 22mmx12mmx up to 1.5mm thk L shape
Aluminium profile of approved stain, The cost to include all related
hardware, finishing of all exposed frames and backing with approved
paint, materials, labour, wastages, lead, lifts, necessary
staging/scaffolding, cutting, tools and machinery, other related works,
all complete as per drawings GF-C2-CW-01A,TYP-C2-CW-01A and as
instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

i At Ground Floor Nos 11


ii At First Floor & Typical Floors Nos 160

2.00 Full Height Mirror (700mm x 1800mm)


Providing and fixing in position vanity mirror of overall size 700mm x
1800mm as per detail in drawing, Base shall be made out of upto
30mmx35mmx1.2mm thk aluminium framing and 12mm thick BWP ply
backing / as required, 6mm thick mirror shall be fixed with silicon / 3M
both side tape, Edge to have 22mmx12mm x up to 1.5mm thk L shape
Aluminium profile of approved stain, The cost to include all related
hardware, finishing of all exposed frames and backing with approved
paint, materials, labour, wastages, lead, lifts, necessary
staging/scaffolding, cutting, tools and machinery, other related works,
all complete as per drawings GF-C2-CW-01A,TYP-C2-CW-01A and as
instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

i At Ground Floor Nos 2


ii At First Floor & Typical Floors Nos 32

3.00 PH Toilet Mirror (500mm x 955mm)

Brigade - BTG - Bangalore- ID Works Page 24 of 26


Gleeds Consulting (I) Pvt.Ltd.
Date : 30-04-2019

Sl No GHC Description Unit Total Quantity

Providing and fixing in position PH toilet mirror of overall size 500mm


x 955mm as per detail in drawing, Base shall be made out of 12mm
thick BWP ply backing / as required, 6mm thick mirror shall be fixed
to ply with silicon / 3M both side tape, Edge to have 24mmx12mm x
up to 1.5mm thk L shape Aluminium profile of approved stain, The
cost to include all related hardware, finishing of all exposed frames
and backing with approved paint, hook and chain arrangements for
fixing to wall, materials,labour,wastages, lead, lifts, necessary
staging/scaffolding, cutting, tools and machinery, other related works,
all complete as per drawings GF-C2-CW-01A,TYP-C2-CW-01A and as
instructed and directed by the Engineer in charge,
Location : At all levels and locations as directed by EIC

i At Ground Floor Nos 1


ii At First Floor & Typical Floors Nos 16

4.00 Modular Urinal Partition


Providing & fixing of 12m thick compact LAM-4 laminated modular
urinal partition of size 850mmx450mm with the SS 304 grade
hardware & fittings, The cost to include labour, materials, all lead, lifts,
edge binding, any other related works, etc, all complete as per
drawings GF-C2-CW-01A,TYP-C2-CW-01A, specifications and as
directed by the Engineer in charge.

i At Ground Floor Nos 5


ii At First Floor & Typical Floors Nos 80

Brigade - Tech Garden - Bangalore To Main


GHC BILL NR 01 - Toilet ID Works Summary

Brigade - BTG - Bangalore- ID Works Page 25 of 26


Gleeds Consulting (I) Pvt.Ltd.
Job No : BLR A 056
Project Name : Brigade Tech Garden
Client : Brigade Enterprises Limited
Title: C2 Drawings List
#REF!
Architectural Drawings list
No. of Revision
S.no Drawing Title Drawing No Date Remarks
sheets no.

GROUND FLOOR
1 Flooring Layout Ground Floor GF-C2-FL-01A/00 1 0 16.03.2019
2 False Ceiling Layout Ground Floor GF-C2-SD- 01A/00 2 0 16.03.2019
3 Interior Coding Ground Floor GF-C2-CD-01A/00 1 0 16.03.2019
4 Lift Lobby Glass Barrier GF-C2-PA- 02A/00 1 0 16.03.2019
5 Double Height area GF-C2-CB-02A/00 1 1 16.03.2019
6 Ground Floor Lift Lobby GF-C2-PA- 01A/00 2 0 16.03.2019
7 Furniture Coding GF-C2-CD-04A/00 1 0 16.03.2019
8 Lift Lobby Glass Barrier GF-C2-PA- 02A/00 1 0 16.03.2019
9 Reception Partition GF-C2-PA- 03A/00 1 0 16.03.2019
10 Doors GF-C2-DW-01A/00 1 0 16.03.2019
11 Service Lift Lobby GF-C2-CB- 01A/00 1 0 16.03.2019
12 Double Height Area GF-C2-CB- 02A/00 1 0 16.03.2019
Reception Table I
13 GF-C2-CB- 02A/00 1 0 16.03.2019
Ground Floor-C2
14 Toilets GF-C2-CW-01A/00 3 0 16.03.2019
15 Physically Challenged Toilet GF-C2-CW-O2A/00 1 0 16.03.2019
16 Executive Toilet GF-C2-CW-O3A/00 1 0 16.03.2019

FIRST FLOOR
1 Interior Coding Typical Floor FF-C2-CD-01A/00 1 0 16.03.2019
2 Flooring Layout Typical Floor FF-C2-FL-01A/00 1 0 16.03.2019
3 Toilet Drawing Typical Floor FF-C2-CW-01A/00 3 3 16.03.2019
4 Typical Floor Lift Lobby FF-C2-PA- 01A/00 2 0 16.03.2019
5 Typical Floor Pantry FF-C2-CB-04A/00 1 0 16.03.2019
6 Physically Challenged Toilet FF-C2-CW-O2A/00 1 0 16.03.2019
7 Doors FF-C2-DW-01A/00 1 0 16.03.2019
8 Service Lift Lobby FF-C2-CB- 01A/00 1 0 16.03.2019
9 False Ceiling FF-C2-SD- 01A/00 1 0 16.03.2019

C2 TYPICAL FLOOR - CORRIDOR


10 FF-C2-SD- 01A/00 2 0 16.03.2019
FALSE CEILING LAYOUT (FUTURE SCOPE )

TYPICAL FLOORS
1 Interior Coding Typical Floor TYP-C2-CD-01A/00 1 0 16.03.2019
2 Flooring Layout Typical Floor TYP-C2-FL-01A/00 1 0 16.03.2019
3 Toilet Drawing Typical Floor TYP-C2-CW-01A/00 3 3 16.03.2019
4 Typical Floor Lift Lobby TYP-C2-PA- 01A/00 2 0 16.03.2019
5 Typical Floor Pantry TYP-C2-CB-04A/00 1 0 16.03.2019
6 Physically Challenged Toilet TYP-C2-CW-O2A/00 1 0 16.03.2019
7 Doors TYP-C2-DW-01A/00 1 0 16.03.2019
8 Service Lift Lobby TYP-C2-CB- 01A/00 1 0 16.03.2019
9 False Ceiling TYP-C2-SD- 01A/00 1 0 16.03.2019

C2 TYPICAL FLOOR - CORRIDOR


10 TYP-C2-SD- 01A/00 2 0 16.03.2019
FALSE CEILING LAYOUT (FUTURE SCOPE )

Brigade - BTG - Bangalore- ID Works Page 26 of 26