GENERAL NOTES CONCRETE COMPOSITE STEEL BEAMS

1 REFER TO ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR ANCHORS, 1 CAST IN PLACE CONCRETE SHALL MEET THE FOLLOWING REQUIREMENTS: 1 SHORING OF STEEL BEAMS IS NOT REQUIRED.
INSERTS, REGLETS AND EMBEDDED ITEMS NOT SHOWN ON STRUCTURAL DRAWINGS. 1.A .....CLASS A 2 STUD LENGTH AND DIAMETER SHALL BE AS INDICATED IN THE DECK SECTION BELOW.
2 CONTRACTOR IS TO VERIFY DIMENSIONS AT THE SITE. 1.A a ..........28 DAY STRENGTH: 3,000 PSI 3 ALL SHEAR STUDS SHALL BE APPLIED IN THE FIELD UNLESS NOTED OTHERWISE. & AND HK HOOK
3 CONTRACTOR IS TO VERIFY MECHANICAL LOADINGS AND LOCATIONS. NOTIFY ARCHITECT IF
WEIGHTS AND LOCATIONS OF MECHANICAL UNITS DIFFER FROM THOSE SHOWN ON PLAN.
1.A
1.A
b
c
..........AGGREGATE TYPE: ASTM C33
..........AGGREGATE SIZE: 1 INCH MAXIMUM
4
4.A
STUD PLACEMENT:
DECK RIBS PERPENDICULAR TO SUPPORTS
@
AB
AT
ANCHOR BOLT
HSS
INFO
HOLLOW STEEL SECTION
INFORMATION STRUCTURAL PLAN SYMBOLS
4 PRINCIPAL OPENINGS ARE INDICATED ON THE DRAWINGS. SEE ARCHITECTURAL,

5
MECHANICAL, AND ELECTRICAL DRAWINGS FOR SLEEVES, BLOCKOUTS AND CURBS.
CONCRETE TRUCKS, CRANES, OR OTHER VEHICLES WITH A WHEEL LOAD GREATER THAN 2000
1.A
1.A
d
e
..........SLUMP: 6-8 INCHES
..........WATER / CEMENTITIOUS RATIO: 0.50
4.A.a FEWER STUDS THAN VALLEYS – STARTING AT BEAM ENDS, PLACE A STUD IN EVERY FOURTH
FLUTE WORKING TOWARDS MIDSPAN. BEGIN PLACING REMAINING STUDS HALFWAY BETWEEN
ADDTL
ALT
ADDITIONAL
ALTERNATE
INT
JST
INTERIOR
JOIST AND LEGENDS
THOSE ALREADY SET. IF YET MORE STUDS REMAIN, PLACE THEM IN REMAINING EMPTY ARCH, ARCH'L ARCHITECT, ARCHITECTURAL JT JOINT
POUNDS ARE NOT TO BE PERMITTED ON THE STRUCTURAL SLAB WITHOUT PRIOR WRITTEN 1.A f ..........ALLOWABLE FLY ASH REPLACEMENT: 40%
FLUTES WORKING FROM BEAM END TOWARD MIDSPAN. BL BRICKLEDGE KB KNEE BRACE
www.stantec.com
AGREEMENT OF THE ARCHITECT/ENGINEER. 1.A g ..........AIR ENTRAINMENT: 3% - 5%
4.A.b MORE STUDS THAN VALLEYS – PLACE ONE STUD IN EACH VALLEY (EXCEPT AT SIDE LAPS). BLDG BUILDING L ANGLE, ANGLE SHAPE
A 6 CONSTRUCTION EQUIPMENT WITH A TOTAL LOADED WEIGHT OF MORE THAN 3000 POUNDS IS 1.A h ..........USE: PIERS STARTING AT BEAM ENDS, PLACE A SECOND STUD IN EACH VALLEY UNTIL ALL STUDS ARE
NOT PERMITTED ON THE COMPOSITE FLOOR SLAB WITHOUT PRIOR WRITTEN AGREEMENT OF 1.B .....CLASS B BM BEAM LB POUND, CELLULAR BEAM Copyright Reserved
USED. WT10
THE ARCHITECT/ENGINEER. 1.B a ..........28 DAY STRENGTH: 4,000 PSI BOB BOTTOM OF BEAM LF LINEAR FOOT WALL OR FOOTING SPLICE
4.A.c FOR 2 AND 3 INCH DECKS, PLACE STUD ON THE SIDE OF THE STIFFENING RIB AWAY FROM THE The Contractor shall verify and be responsible for all dimensions.
7 CONSTRUCTION MATERIALS ARE TO BE SPREAD OUT IF PLACED ON FRAME FLOORS OR ROOF. 1.B b ..........AGGREGATE TYPE: ASTM C33 BEAM MIDSPAN. BOD BOTTOM OF DECK LG LENGTH TYPE DO NOT scale the drawing - any errors or omissions shall be
LOAD IS NOT TO EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE BOS BOTTOM OF STEEL LLH LONG LEG HORIZONTAL WF24 MOMENT reported to Stantec without delay.
1.B c ..........AGGREGATE SIZE: 1 INCH MAXIMUM 4.B DECK RIBS PARALLEL TO SUPPORTS
SHORING AND/OR BRACING WHERE STRUCTURE HAS NOT OBTAINED DESIGN STRENGTH. CONNECTION The Copyrights to all designs and drawings are the property of
1.B d ..........SLUMP: 4-6 INCHES 4.B.a STARTING AT ONE FOOT FROM COLUMN CENTERLINE AT EACH END, PLACE A SINGLE ROW OF BOTT BOTTOM LLV LONG LEG VERTICAL
LATERAL BRACE Stantec. Reproduction or use for any purpose other than that
8 THERE SHALL BE NO DEVIATIONS FROM THESE CONSTRUCTION DOCUMENTS UNLESS STUDS EQUALLY SPACED. IF REQUIRED SPACING IS LESS THAN 6 INCHES, USE A DOUBLE ROW BRG BEARING LO LOW authorized by Stantec is forbidden.
1.B e ..........WATER / CEMENTITIOUS RATIO: 0.48 SLOPE MARK
APPROVED BY THE ENGINEER OF RECORD. ANY DEVIATION FROM, ADDITION TO, OF STUDS EQUALLY SPACED. BTWN BETWEEN LT WT LIGHTWEIGHT
SUBSTITUTION FOR, OR MODIFICATION TO THE STRUCTURE OR ANY PART OF THE STRUCTURE 1.B f ..........ALLOWABLE FLY ASH REPLACEMENT: 30%
SEE PLAN

COL
CB CASTELLATED BEAM MAX MAXIMUM
SHOWN ON THESE DRAWINGS SHALL BE SUBMITTED IN WRITING TO THE ENGINEER OF 1.B g ..........AIR ENTRAINMENT: 3% - 5%
FOR SIZE GRID BUBBLE Consultants
RECORD FOR REVIEW. SHOP DRAWINGS THAT ARE SUBMITTED FOR REVIEW DO NOT 1.B h ..........USE: GRADE BEAMS OPEN WEB STEEL JOISTS CF CONTINUOS FOOTING MC MOMENT CONNECTION
KNEE BRACE Civil: Stantec
CONSTITUTE “IN-WRITING” UNLESS IT IS CLEARLY NOTED THAT SPECIFIC CHANGES ARE BEING 1.C .....CLASS C CFMF COLD-FORMED METAL FRAMING MCJ MASONRY CONTROL JOINT GRID BUBBLE 12.4 Landscape: KGA/DeForest, LLC
SUGGESTED. 1 STEEL JOISTS ARE TO CONFORM TO THE LATEST AISC-SJI SPECIFICATIONS AND AS CJ CONTROL JOING MECH'L MECHANICAL
1.C a ..........28 DAY STRENGTH: 4,000 PSI Structural: Stantec
EXISTING STRUCTURAL & EXISTING CONDTIONS OTHERWISE SPECIFIED. CJP COMPLETE JOINT MEZZ MEZZANINE DENOTES BOTT OF
1.C b ..........AGGREGATE TYPE: ASTM C33 MEP: Stantec
PENETRATION KNEE BRACE DECK SYMBOL
1.C c ..........AGGREGATE SIZE: 1 INCH MAXIMUM 2 ALL STEEL SHALL BE DOMESTICALLY (INCLUDING CANADA) MILLED AND FABRICATED. FOREIGN MFR MANUFACTURER Information Technology: Stantec
1 CONTRACTOR IS TO NOTIFY ENGINEER OF QUESTIONABLE EXISTING STRUCTURAL STEEL SHALL NOT BE UTILIZED WITH OUT PRIOR APPROVAL FROM THE STRUCTURAL CL CENTERLINE MID MIDDLE Food Service: FCA Design
1.C d ..........SLUMP: 4-6 INCHES ENGINEER. THE APPROVAL PROCESS SHALL TAKE PLACE DURING BIDDING TIME. ANY SLAB DEPRESSION
COMPONENTS (MASONRY WALLS, STEEL BEAMS & LINTEL, EXPOSED FOUNDATIONS, ETC.) AND CLR CLEAR MIN MINIMUM, MINUTE Theatrical Design: Texas Scenic Co.
FRAMING CONNECTIONS WHEN ENCOUNTERED. 1.C e ..........WATER / CEMENTITIOUS RATIO: 0.45 REQUEST TO UTILIZE FOREIGN STEEL MADE AFTER BIDDING SHALL BE REJECTED. (OVER) 8"
CMU CONCRETE MASONRY UNIT MISC MISCELLANEOUS ELEVATION MARK
2 GRIDLINES ARE SHOWN ON THE STRUCTURAL DRAWINGS AND THESE REFLECT ASSUMED 1.C f ..........ALLOWABLE FLY ASH REPLACEMENT: 20% 3 PROVIDE BRIDGING & CAMBER FOR STEEL JOISTS IN COMPLIANCE WITH MANUFACTURERS
COL COLUMN
Legend
1.C g ..........AIR ENTRAINMENT: NONE REQUIREMENTS. MO MASONRY OPENING SLAB DEPRESSION
ARCHITECTURAL AND STRUCTURAL DIMENSIONS. IN MOST CASE, GRID LINES COINCIDE WITH
EXISTING COLUMN AND PILASTER CENTERLINES. IF ACTUAL FIELD DIMENSIONS VARY, NOTIFY CONC CONCRETE MTL METAL (UNDER) 8" 0
1.C h ..........USE: SLABS ON GROUND 4 WHERE AIR DUCTS OR OTHER EQUIPMENT INTERRUPTS HORIZONTAL BRIDGING, SUPPLY SECTION MARK
ARCHITECT OR ENGINEER. DIAGONAL BRIDGING IN BAYS ADJACENT TO INTERRUPTED BAY. CONNX CONNECT, CONNECTION N NORTH S501
1.D .....CLASS D SLOPE UP
3 CONTRACTOR TO VERIFY EXACT LOCATION OF ALL EXISTING STRUCTURAL COMPONENTS 5 JOIST GIRDERS ARE TO CONFORM TO THE LATEST AISC-SJI SPECIFICATIONS. BOTTOM CHORDS CONT CONTINUOUS NTS NOT TO SCALE
1.D a ..........28 DAY STRENGTH: 4,000 PSI
THAT WILL BE CONNECTED TO NEW FRAMING PRIOR TO STEEL FABRICATION. IT IS THE OF JOIST GIRDERS ARE TO BE STABILIZED DURING ERECTION TO PREVENT OVERTURNING PER CTR CENTERED OC ON CENTER SLOPE DOWN ELEVATION 0
1.D b ..........AGGREGATE TYPE: ASTM C330
CONTRACTOR’S RESPONSIBILITY TO VERIFY ALL EXISTING DIMENSIONS AND COORDINATE MANUFACTURERS RECOMMENDATION OR METHOD RECOMMENDED BY THE CWI CERTIFIED WELDING OH OPPOSITE HAND S501
THESE DIMENSIONS WITH THE STEEL FABRICATOR PRIOR TO STEEL FABRICATION TO ENSURE 1.D c ..........AGGREGATE SIZE: 1 INCH MAXIMUM ARCHITECT/ENGINEER. INSPECTOR OPNG OPENING
ARCHITECTURAL AND STRUCTURAL DESIGN CONCEPT. CONTRACTOR SHALL NOTIFY 1.D d ..........SLUMP: 4-6 INCHES SLAB RECESS & SLOPE
6 BOTTOM CHORDS OF JOISTS IN LINE WITH COLUMNS ARE TO BE EXTENDED AS DETAILED. D, DIA DIAMETER PL PLATE REVISION NUMBER 1
ARCHITECT AND/OR ENGINEER OF DISCREPANCIES. 1.D e ..........WATER / CEMENTITIOUS RATIO: 0.45
7 OPEN WEB STEEL JOISTS ARE TO BE DESIGNED FOR A NET UNFACTORED WIND UPLIFT LOAD DBA DEFORMED BAR ANCHOR PLYWD PLYWOOD RIDGE

-2 .0
4 CONTRACTOR IS TO FURNISH ENGINEER A PROPOSED SEQUENCE OF EXISTING COMPONENT 1.D f ..........ALLOWABLE FLY ASH REPLACEMENT: 20% NORMAL TO THE SURFACE OF THE ROOF PER THE DIAGRAM ON SXXX.

F5
DBL DOUBLE

"
'-0
REMOVAL. METHODS OF SAW CUTTING, TEMPORARY SHORING AND OTHER PERTINENT TASKS 1.D g ..........UNIT WEIGHT; 144 PCF PSF POUNDS PER SQUARE FOOT FOOTING SIZE
8 OPEN WEB STEEL JOIST SUPPLIER IS TO SUBMIT SHOP DRAWINGS PREPARED UNDER THE DEF DEFORMED, DEFINITION VALLEY
RELATING TO EXISTING COMPONENT REMOVAL IS TO BE SUBMITTED TO THE PSI POUNDS PER SQUARE INCH
B ARCHITECT/ENGINEER FOR REVIEW AND TO VERIFY THAT WORK IS IN GENERAL
1.D h ..........AIR ENTRAINMENT: NONE SUPERVISION OF A LICENSED ENGINEER IN THE STATE OF TEXAS TO THE DET, DTL DETAIL
1.D i ..........USE: SLABS ON METAL DECK ARCHITECT/ENGINEER FOR REVIEW FOR GENERAL CONFORMANCE WITH THE CONTRACT R RADIUS
CONFORMANCE. DIAG DIAGONAL
2 HORIZONTAL CONSTRUCTION JOINTS IN CONCRETE POURS SHALL BE PERMITTED ONLY DOCUMENTS. SEE THE SPECIFICATIONS FOR OTHER SUBMITTAL REQUIREMENTS. REF REFER, REFERENCE SLAB MARK
CODES DN DOWN
WHERE INDICATED ON THE DRAWINGS. ALL VERTICAL CONSTRUCTION JOINTS SHALL BE REINF REINFORCED, REINFORCEMENT
MADE AT THIRD POINTS IN ACCORDANCE WITH TYPICAL DETAILS. CONTRACTOR SHALL DWG DRAWING REM REMAINDER
1 BUILDING CODE: INTERNATIONAL BUILDING CODE 2015. COLD FORMED METAL FRAMING S1
SUBMIT PROPOSED LOCATIONS FOR CONSTRUCTION JOINTS NOT SHOWN ON DRAWINGS EA EACH REQ'D REQUIRED SLAB LEGEND
2 STRUCTURAL CONCRETE: BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, FOR REVIEW BY THE ARCHITECT AND STRUCTURAL ENGINEER. ADDITIONAL CONSTRUCTION EF EACH FACE
JOINTS MAY REQUIRE ADDITIONAL REINFORCING AS SPECIFIED BY THE ENGINEER WHICH 1 METAL FRAMING IS TO CONFORM TO ASTM A446. MINIMUM YIELD STRENGTH IS TO BE 50,000 REQ'MTS, REQMTS REQUIREMENTS
AMERICAN CONCRETE INSTITUTE ACI 318-11. EJ EXPANSION JOINT
SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. PSI, WITH 1 5/8” MINIMUM FLANGE WIDTH SC SLIP CRITICAL DENOTES DIRECTION
3 CONCRETE MASONRY: BUILDING CODE REQUIREMENTS FOR CONCRETE MASONRY EL, ELEV ELEVATION OF SCHED MAIN REINFORCEMENT
STRUCTURES, AMERICAN CONCRETE INSTITUTE, ACI 530-05/ASCE 5-05/TMS 402-05. 3 ROUGHEN THE SURFACE OF ALL HORIZONTAL CONSTRUCTION JOINTS SO THAT THE 2 MEMBERS ARE TO BE FABRICATED IN ACCORDANCE WITH AISI SPECIFICATIONS FOR THE SCHED SCHEDULE
DESIGN OF COLD-FORM STEEL STRUCTURAL MEMBERS, LATEST EDITION. MEMBERS ARE TO ELEV ELEVATOR SCJ SAWN CONTROL JOINT
4 BRICK MASONRY: RECOMMENDED PRACTICE FOR ENGINEERED BRICK MASONRY, BRICK AGGREGATE IS EXPOSED UNIFORMLY, LEAVING NO LAITANCE, LOOSENED PARTICLES OR
INSTITUTE OF AMERICA, 1969. DAMAGED CONCRETE. BE GALVANIZED. EOS EDGE OF SLAB SF SQUARE FEET DENOTES EXTENT
4 ALL CONCRETE SHALL BE DESIGNED, MIXED TRANSPORTED, AND PLACED IN ACCORDANCE 3 CONNECTIONS ARE TO BE SCREWED OR WELDED, WITH A MINIMUM OF 2 - #12 TEK SCREWS OR EQ EQUAL SHT SHEET OF SLAB MARK
5 STRUCTURAL STEEL: STEEL CONSTRUCTION MANUAL THIRTEENTH EDITION.
WITH THE LATEST SPECIFICATIONS OF THE AMERICAN CONCRETE INSTITUTE. 3/16 FILLET WELD AND USED AT EACH CONNECTION AS MINIMUM. EQ SPA EQUAL SPACE
6 COLD FORMED STEEL: NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD FORMED SIM SIMILAR
STEEL STRUCTURAL MEMBERS, AMERICAN IRON AND STEEL INSTITUTE, LATEST EDITION. 5 SLEEVES OR OTHER PENETRATIONS CAN BE ALLOWED THROUGH STRUCTURAL MEMBERS 4 METAL FRAMING MEMBERS ARE TO BE CLOSED OFF AT BOTH ENDS WITH CONTINUOUS METAL EW EACH WAY SPA SPACES
ONLY WITH PRIOR WRITTEN AGREEMENT OF ARCHITECT/ENGINEER. REQUESTS FOR REVIEW TRACK OF EQUIVALENT GAGE OR GREATER THICKNESS THAN METAL GAGE MEMBERS. EXIST EXISTING
7 WOOD FRAMING: NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION WITH SQ SQUARE INDICATES APPROXIMATE EXISTING GRADE
SUPPLEMENT, NATIONAL FOREST AND PAPER PRODUCTS ASSOCIATION, 2005. ARE TO BE SUBMITTED IN WRITING A MINIMUM OF FIVE WORKING DAYS PRIOR TO THE 5 METAL FRAMING SUPPLIER IS TO PROVIDE DESIGN CALCULATIONS FOR REVIEW. FD FLOOR DRAIN
CONCRETE POUR. CALCULATIONS ARE TO BE PREPARED AND SEALED BY A LICENSED ENGINEER IN THE STATE STD STANDARD 670 BASED ON SURVEY BY CIVIL ENGINEER.
8 STRUCTURAL PLYWOOD: PLYWOOD DESIGN SPECIFICATION, AMERICAN PLYWOOD FF EL FINISH FLOOR ELEVATION STL STEEL CONTRACTOR TO FIELD VERIFY ACTUAL
6 CONTINUOUS WATERSTOP IS TO BE USED AT JOINTS WHERE DETAILED AND AT OTHER OF TEXAS AND ARE TO BE SUBMITTED TO THE ARCHITECT/ENGINEER FOR REVIEW AND TO
ASSOCIATION, LATEST EDITION. VERIFY THAT WORK IS IN GENERAL CONFORMANCE. REFER TO SPECIFICATION FOR FNDN FOUNDATION CONDITIONS PRIOR TO BEGINNING PIER CONSTRUCTION.
CONSTRUCTION JOINTS IN CONCRETE ELEMENTS BELOW FINISH GRADE. STRUCT STRUCTURE, STRUCTURAL
9 PREFABRICATED METAL PLATE CONNECTED WOOD TRUSSES: NATIONAL DESIGN STANDARD ADDITIONAL INFORMATION. FOA FACE OF ANGLE
7 EMBEDDED CONDUITS, PIPES, AND SLEEVES SHALL MEET THE REQUIREMENTS OF ACI 318, TEMP TEMPERATURE, TEMPORARY
FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION, ANSI/TPI 1-02. FOC FACE OF CONCRETE
SECTION 6.3, INCLUDING THE FOLLOWING: TOC TOP OF CURB, TOP OF
10 PREFABRICATED FLOOR TRUSS JOISTS: PRODUCTS SHALL BE PROVEN BY TESTING AS FOM FACE OF MASONRY CONCRETE
DEMONSTRATED EITHER BY ICBO AND NRB ACCEPTANCE OR THROUGH A TEST PROGRAM 7.a .....CONDUITS AND PIPES EMBEDDED WITHIN A SLAB, WALL, OR BEAM (OTHER THAN THOSE STEEL DECKING 18KSPI
PASSING THROUGH) SHALL NOT BE LARGER IN OUTSIDE DIMENSION THAN 1/3 THE OVERALL FT FEET TOM TOP OF MASONRY
MEETING UBC STANDARD 25.1737.
THICKNESS OF THE SLAB, WALL OR BEAM IN WHICH THEY ARE EMBEDDED. FTG FOOTING TOS TOP OF STEEL LOADING CONDITION
DESIGN LIVE LOADS 1 ROOF DECK TYPE “CSV"
7.b .....CONDUITS, PIPES AND SLEEVES SHALL NOT BE SPACED CLOSER THAN THREE DIAMETERS Fy YIELD STRESS TOSC TOP OF STRUCTURAL OPEN- WEB STEEL JOIST KEY SEE GENERAL NOTES
OR WIDTHS ON CENTER. 1.a .....DEPTH:...............................................................................................1.3 INCH
GA GAGE CONCRETE
1 MINIMUM DESIGN LIVE LOADS ARE IN ACCORDANCE WITH THE LATEST EDITION OF THE 1.b .....PROFILE:............................................................................................CONFORM JOIST SERIES
GALV GALVANIZED TOW TOP OF WALL
INTERNATIONAL BUILDING CODE (IBC) DESIGN LOADS ARE: FORMWORK 1.c .....GAGE:................................................................................................20 GAGE
GB GRADE BEAM TYP TYPICAL
1.a ..........ROOF..........................................................20 PSF 1.d .....MINIMUM YIELD STRENGTH:............................................................33 KSI NOMINAL JOIST DEPTH
GLULAM GLUED-LAMINATED BEAM ULT ULTIMATE
C 1.b ..........ADMIN. (1ST FLOOR).................................80 PSF 1 FORMWORK IS TO COMPLY WITH ACI 347, "RECOMMENDED PRACTICE FOR CONCRETE 1.e .....FINISH:...............................................................................................GALVANIZED G60
H, HORIZ HORIZONTAL UON UNLESS OTHERWISE NOTED
1.c FORMWORK". 2 COMPOSITE FLOOR DECK
HC HOLLOW CORE V, VERT VERTICAL CAMBER AT MIDSPAN
1.d ..........CLASSROOMS...........................................40 PSF 2 LOWER SOFFIT IS TO CARRY THROUGH WHERE BEAMS OF DIFFERENT DEPTHS INTERSECT. 2.a .....DEPTH:.................................................................................................2 INCH
HI HIGH W/ WITH
Notes
1.e ..........CORRIDORS AT (1ST FLOOR ONLY)........100 PSF 3 ANCHOR BOLTS ARE TO BE SET WITH SECURELY FASTENED TEMPLATES. 2.b .....PROFILE:.............................................................................................VLI
WB WIND BRACE BEAM SIZE
1.f ... 4 EARTH FORMING OF GRADE BEAMS IS NOT ACCEPTABLE. 2.c .....GAGE:..................................................................................................18 GAGE
WBBP WIND BRACE BASEPLATE
1.g ..........GYMNASIUM..............................................100 PSF 2.d .....MINIMUM SECTION MODULUS:..........................................................0.355 IN3 HORIZONTAL
WP WORKING POINT
1.h ..........KITCHEN (EXISTING)...................................150 PSF 2.e .....MINIMUM MOMENT OF INERTIA:........................................................0.415 IN4 REACTION AT END OF
REINFORCING STEEL WT WEIGHT
2.f .....FINISH:................................................................................................GALVANIZED G60 BEAM
1.i WWF WELDED-WIRE FABRIC (FACTORED)
1.j ..........PLATFORM.................................................150 PSF
1 DEFORMED BAR CONCRETE REINFORCEMENT FOR STRUCTURES IS TO CONFORM TO ASTM
1.k ..........STORAGE AREAS......................................100 PSF A = ±20K W16x26 (10) C=3/4" R=30K
A615 GRADE 60 UNLESS OTHERWISE NOTED. STEEL BEAM LEGEND
1.l ..........TOILET AREAS............................................60 PSF CUT PLAN
2 ELECTRICALLY-WELDED WIRE FABRIC OF COLD-DRAWN WIRE SHALL CONFORM TO ASTM A185 STEEL DECKING NOTES
2 FLOOR LIVE LOADS HAVE BEEN REDUCED IN ACCORDANCE WITH THE METHOD PRESCRIBED (70,000 PSI) UNLESS OTHERWISE NOTED. NO OF HEADED STUDS

1' - 0"
IN THE ABOVE REFERENCED BUILDING CODE. ROOF LIVE LOADS HAVE NOT BEEN REDUCED.
3 REINFORCEMENT IS TO BE DESIGNED AND DETAILED IN ACCORDANCE WITH THE LATEST 1 ROOF AND FLOOR DECK SHALL BE CONTINUOUS OVER FOUR OR MORE SUPPORTS. AT VERTICAL REACTION AT END OF BEAM
WIND DESIGN DATA EDITION OF THE ACI "MANUAL OF STANDARD PRACTICE FOR DETAILING CONCRETE LOCATIONS WHERE SINGLE OR DOUBLE SPAN CONDITIONS OCCUR, THE CONTRACTOR SHALL (FACTORED)
STRUCTURES" (ACI 315). EITHER SHORE THE DECK, OR ADJUST THE GAGE THICKNESS OF THE DECK IN ACCORDANCE
4 REINFORCEMENT BAR BENDS ARE TO BE MADE COLD. WITH THE MANUFACTURER’S RECOMMENDATIONS. DECK SHALL BE DESIGNED TO PROVIDE
1.a ...........WIND SPEED (ACSE 7-10 ULT).....................150 MPH EQUIVALENT OR GREATER LOAD CAPACITY AS THE SPECIFIED DECK SUPPORT OVER FOUR
5 WELDING OF REINFORCING STEEL WILL NOT BE PERMITTED.
1.b ...........WIND SPEED (ASD).......................................117 MPH SUPPORTS.
6 DEFORMED BAR ANCHORS (DBA’S) SHALL BE WELDED BY A METHOD IN WHICH THE
1.c ..........EXPOSURE CATEGORY.................................................C CONNECTION CAN DEVELOP THE FULL TENSION AND SHEAR CAPACITY OF THE BAR. 2 METAL ROOF DECK SHALL BE CONNECTED TO STRUCTURAL SUBSTRATE WITH WELDS
1.d ..........INTERNAL PRESSURE COEFFICIENT.............................+/- 0.18 PROVIDING A CAPACITY MEETING THE UPLIFT DIAGRAM SHOWN ON S005 AND A DIAPHRAGM PIER LEGEND DENOTES SHAFT DIAMETER (IN)
7 REINFORCEMENT IS TO BE SUPPORTED ON CHAIRS PROVIDING THE FOLLOWING MINIMUM
1.e ..........IMPORTANCE FACTOR (Iw)...........................................1.15 CONCRETE COVER: SHEAR CAPACITY OF 275 PLF UNLESS OTHERWISE NOTED ON PLAN. MINIMUM WELDS AND
DENOTES BELL DIAMETER (IN)
1.f ..........RISK CATEGORY (ASCE 7-10) .................................... III SIDELAPS ARE THE FOLLOWING:
7.a ..........CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH.......................3 IN.
2.a ..........TYPE B ROOF DECK: 36/4/2
SEISMIC DESIGN DATA 7.b .........FORMED, EXPOSED TO EARTH OR WEATHER
2.b ..........TYPE N ROOF DECK: 24/4/2
7.c ..........NO. 6 THROUGH NO. 18 BARS.......................................................................2 IN.
3 PUDDLE WELDS SHALL BE 5/8 INCH DIAMETER. ALL WELDS SHALL BE MADE WITH E70
7.d ..........NO. 5 BAR, W31 OR D31 WIRE, AND SMALLER............................................1 1/2 IN.
1.a ..........SEISMIC IMPORTANCE FACTOR (Ie)..............................1.25 ELECTRODES. WELD WASHERS SHALL BE USED ON ALL DECK UNITS LESS THAN 22 GAGE.
8 FORMED, NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND METAL AROUND WELDS SHALL BE COMPLETELY INTACT AFTER WELDING. CUT PLAN
1.b ..........SPECTRAL RESPONSE ACCELERATION (Ss)...............0.074
8.a ..........SLABS, WALLS, JOISTS: 3.a ..........SIDELAP CONNECTIONS SHALL BE #10 TEK SCREWS OR EQUAL.
1.c ..........SPECTRAL RESPONSE ACCELERATION (S1)...............0.041
D 1.d ..........SITE CLASS.......................................................................D
8.b ....................NO. 14 AND NO. 18 BARS.....................................................................1 1/2 IN. 4 METAL FLOOR DECK SHALL BE CONNECTED TO STRUCTURAL SUBSTRATE WITH 5/8” DIAMETER FINISH FLOOR

1' - 0"
8.c ....................NO. 11 BAR AND SMALLER..................................................................3/4 IN. PUDDLE WELDS AS FOLLOWS:
1.e ..........SPECTRAL RESPONSE COEFFICIENT (Sds).................0.071 g
8.d ..........BEAMS, COLUMNS: 4.b ..........2 INCH FLOOR DECK: 36/4/2 LOAD-BEARING CMU WALL ELEVATION
1.f ..........SPECTRAL RESPONSE COEFFICIENT (Sd1).................0.04 g
8.e ....................PRIMARY REINF, TIES, STIRRUPS, SPIRALS.....................................1 1/2 IN. 5 PUDDLE WELDS SHALL BE 5/8 INCH DIAMETER. ALL WELDS SHALL BE MADE WITH E70
1.g ..........SEISMIC DESIGN CATEGORY........................................A
8.f ..........SHELLS, FOLDED PLATE MEMBERS: ELECTRODES. WELD WASHERS SHALL BE USED ON ALL ..........DECK UNITS LESS THAN 22
1.h ..........BASIC SEISMIC RESISTING FORCE SYSTEM...............NOT SPECIFICALLY DETAILED FOR GAGE. METAL AROUND WELDS SHALL BE COMPLETELY INTACT AFTER WELDING. MASONRY CONTROL
SEISMIC DESIGN 8.g ....................NO. 6 BAR AND LARGER......................................................................3/4 IN. JOINT
8.h ....................NO. 5 BAR, W31 OR D31 WIRE, AND SMALLER..................................1/2 IN. 5.a ..........SIDELAP CONNECTIONS SHALL BE BUTTON PUNCH.
1.i ..........DESIGN BASE SHEAR.....................................................100
9 CONTINUOUS REINFORCEMENT MAY BE USED IN PLACE OF SCHEDULED REINFORCEMENT AS 6 DO NOT SUSPEND LIGHT FIXTURES, CEILINGS, DUCTS OR OTHER UTILITIES FROM THE STEEL MASONRY LINTEL SEE
1.j ..........SEISMIC RESPONSE COEFFICIENT (Cs)....................... 0.01 SCHED ON SHEET S522
LONG AS THE SCHEDULED SIZE AND SPACING IS SATISFIED. WHERE SPLICES ARE NECESSARY, DECK UNLESS SHOWN ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE STRUCTURAL
1.k ..........RESPONSE MODIFICATION FACTOR (R)...................... 3.0 ENGINEER OF RECORD.
THEY ARE TO BE MADE AT LOCATIONS SHOWN IN THE SCHEDULES.
1.l ..........ANALYSIS PROCEDURE USED...................................... EQUIVALENT LATERAL FORCE
10 UNLESS OTHERWISE DETAILED HOOKS ARE TO BE ACI STANDARD 90-DEGREE HOOKS.
PIERS AND STRIP FOOTINGS 11 HOOK TOP AND SIDE REINFORCING BARS AT DISCONTINUOUS ENDS.
12 STIRRUPS OF THE SIZE AND SPACING DETAILED ARE TO PROVIDE THE COVER LISTED ABOVE. REINFORCED MASONRY
LOAD-BEARING CMU WALL AT ROOF
1 PIER DESIGN IS BASED UPON THE FOLLOWING CRITERIA: HOOKS ON STIRRUPS ARE TO BE 90 DEGREES AND ARE TO HAVE 4" MINIMUM EXTENSIONS
UNLESS OTHERWISE NOTED. 1 COMPRESSIVE STRENGTH OF MASONRY (F’m) = 1500 PSI MASONRY OPENING
1.a ..........ALLOWABLE END NET BEARING:.........................................3,800 PSF
13 SPLICES IN GRADE BEAM REINFORCEMENT ARE TO BE A LENGTH EQUIVALENT TO AN ACI 2 HOLLOW LOAD BEARING UNITS SHALL CONFORM TO ASTM C90, LIGHTWEIGHT, GRADE N, TYPE I ABOVE
1.d ..........MINIMUM EMBEDMENT BELOW EXISTING GRADE:........10 FEET CLASS A TENSION LAP SPLICE FOR THE BAR SIZE USED PER THE CHART ON S301. SEE TYPICAL OR II, WITH A MINIMUM COMPRESSIVE STRENGTH OF 1900 PSI ON THE NET AREA.
2 STRIP FOOTING DESIGN IS BASED UPON THE FOLLOWING CRITERIA: GRADE BEAM REINFORCEMENT DIAGRAM FOR PLACEMENT. 3 MORTAR SHALL CONFORM TO ASTM C270, TYPE S. By Appd YYYY.MM.DD
2.a ..........ALLOWABLE NET BEARING:.........................................1,800 PSF 14 MINIMUM LAP OF WELDED WIRE FABRIC IS TO BE 6" OR ONE MESH AND ONE-HALF, WHICHEVER
Revision
4 COARSE MASONRY GROUT SHALL CONFORM TO ASTM C476 WITH A MINIMUM COMPRESSIVE
3 PIER AND STRIP FOOTING DESIGN IS IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE IS GREATER. STRENGTH OF 2500 PSI AT 28 DAYS.
FOLLOWING GEOTECHNICAL REPORT: 15 UNLESS OTHERWISE SHOWN OR NOTED, CORNER BARS OF THE SAME SIZE AS MAIN TOP AND MASONRY LINTEL SEE Issue for Bidding & Construction RAS PMR 2017.10.11
5 LOW LIFT CONSTRUCTION, MAXIMUM GROUT POUR HEIGHT IS 5 FT.
3.a ..........GEOTECHNICAL ENGINEER: FUGRO USA LAND, INC. BOTTOM REINFORCEMENT ARE TO BE PROVIDED AT CORNERS OF BEAMS AND INTERSECTIONS SCHED ON SHEET S4522 By Appd YYYY.MM.DD
OF BEAMS IN WHICH ONE MEMBER IS DISCONTINUOUS. SEE DETAIL FOR PLACEMENT.
6 REFER TO ARCHITECTURAL DRAWINGS FOR SURFACE AND HEIGHT OF UNITS, LAYING Issued
3.b ..........DATE OF REPORT: JUNE 21, 2017 PATTERN AND JOINT TYPE. USE OPEN END UNITS FOR STACKED BOND PATTERN AND BOND
3.c ..........REPORT NUMBER: 04.10170069 BEAM UNITS AT HORIZONTAL REINFORCING.
3.d ..........DATE OF SUPPLEMENT REPORT: SEPTEMBER 28, 2017 7 ON BOTH SIDES OF LOAD BEARING WALL OPENINGS 4'-0" OR WIDER, PROVIDE 1 - #5 BAR IN THE
3.e ..........SUPPLEMENT REPORT NUMBER: 04.10170069 SUPPLEMENT NO. 1 STRUCTURAL STEEL FIRST VERTICAL CELL AND GROUT SOLID WITH 2500 PSI COARSE MASONRY GROUT UNLESS
4 ESTABLISH BOTTOM OF FOOTINGS/PIERS AT ELEVATIONS SHOWN ON PLANS. IF FIELD OTHERWISE SHOWN OR NOTED ON THE DRAWINGS.
CONDITIONS REQUIRE CHANGES TO REACH THE DESIRED STRATUM, ADJUSTMENTS TO 1 STRUCTURAL STEEL IS TO CONFORM TO THE FOLLOWING ASTM SPECIFICATIONS, AND IS TO 8 STEEL JOISTS AND STRUCTURAL STEEL ARE TO BE CLEAR OF MASONRY AND MORTAR IN
CONTRACT ARE TO BE MADE ON A UNIT PRICE BASIS. CONTRACTOR SHALL PROVIDE UNIT BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE LATEST EDITION OF THE AISC WALLS, EXCEPT AS CONNECTED WITH MASONRY ANCHORS OR TIES AS DETAILED.
E PRICE ADD AND DEDUCT FOR EACH PIER SIZE ON THE PROJECT. SPECIFICATIONS. 9 HORIZONTALLY REINFORCE GROUTED MASONRY WITH A MINIMUM OF TWO 9 GAGE OR 3/16”
MCJ (MASONRY CONTROL LOAD-BEARING CMU WALL AT FOUNDATION
JOINT) - SEE SHEET S522
5 DRILLED HOLES ARE TO BE EXCAVATED, CLEANED, REINFORCED, AND FILLED WITH CONCRETE 1.a .....STEEL WIDE FLANGE SECTIONS............ASTM A992 OR ASTM A572 - GRADE 50 DIAMETER WIRES IN A TRUSS LADDER TYPE CONFIGURATION AT 16” O.C. IN BED JOINTS.
DURING THE SAME DAY. NO HOLE IS TO BE LEFT OPEN OVERNIGHT. 1.b .....MISCELLANEOUS STEEL SECTIONS......ASTM A36
6 REINFORCING CAGE SHALL BE HELD SECURELY AWAY FROM EARTH AT SIDES AND BOTTOM BY 1.c .....HOLLOW STEEL SECTIONS.....................ASTM A500, GRADE B
Permit-Seal
SETS OF 3 OR MORE SPACERS AT A MAXIMUM SPACING OF 5 FEET ALONG THE LENGTH OF THE 1.d .....STEEL PIPE SECTIONS.............................ASTM A53, GRADE B
CAGE AND 1 FOOT FROM THE BOTTOM.
2 ALL STEEL SHALL BE DOMESTICALLY (INCLUDING CANADA) MILLED AND FABRICATED. FOREIGN
7 THE CONTRACTOR SHALL VERIFY DEPTHS OF PIERS BEFORE PIER STEEL IS CUT. PIER STEEL STEEL SHALL NOT BE UTILIZED WITH OUT PRIOR APPROVAL FROM THE STRUCTURAL
MAY BE DELIVERED TO THE JOBSITE IN STANDARD LENGTHS OF 40 OR 60 FEET AND CUT AS ENGINEER. THE APPROVAL PROCESS SHALL TAKE PLACE DURING BIDDING TIME. ANY STRUCTURAL S301 STRUCTURAL SECTION
REQUIRED. PROVIDE 64 BAR DIAMETER LAPS IN ALL VERTICAL PIER REINFORCING. REQUEST TO UTILIZE FOREIGN STEEL MADE AFTER BIDDING SHALL BE REJECTED. S001 GENERAL NOTES S302 STRUCTURAL SECTION
8 TOP OF PIERS SHALL BE OF THE SPECIFIED DIAMETER. FORM TOP OF PIER IF REQUIRED TO 3 CONNECTION BOLTS FOR STRUCTURAL STEEL MEMBERS SHALL CONFORM TO ASTM A325 OR S002 STRUCTURAL TESTING & INSPECTIONS S303 STRUCTURAL SECTION
MAINTAIN THE SPECIFIED DIAMETER. ANY CONCRETE EXTENDING BEYOND THE SPECIFIED A490, UNLESS OTHERWISE NOTED. STRUCTURAL STEEL CONNECTIONS SHALL BE DESIGNED
DIAMETER SHALL BE REMOVED. S003 ISOMETRIC VIEW - SMS AREA C S304 STRUCTURAL SECTION
BY THE CONTRACTOR IN ACCORDANCE WITH THE MINIMUM REQUIREMENTS SPECIFIED ON
9 TEMPORARY STEEL CASING MAY BE REQUIRED DURING PIER DRILLING OPERATIONS. PRIOR S501. S004 ISOMETRIC VIEW - JHW S401 LARGE SCALE VIEWS
TO THE PLACEMENT OF CONCRETE, ANY SEEPAGE WATER SHALL BE REMOVED FROM THE 4 WELDING IS TO CONFORM TO THE REQUIREMENTS OF THE AMERICAN WELDING SOCIETY AND S005 WIND UPLIFT DIAGRAM S501 SLAB AND FOUNDATION DETAILS
PIER HOLES. SPECIAL CONSTRUCTION PROCEDURES IN ACCORDANCE WITH ACI 336 AND THE AISC, AND IS TO BE PERFORMED ONLY BY CERTIFIED WELDERS. S006 COLUMN SCHEDULE S502 FOUNDATION DETAILS
SPECIFICATIONS SHALL BE FOLLOWED DURING EXTRACTION OF THE CASING AND DURING S007 GRADE BEAM SCHEDULE AND DETAILS S503 FOUNDATION DETAILS
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

CONCRETE PLACEMENT. 5 STRUCTURAL STEEL, MISCELLANEOUS METAL, AND EMBEDS EXPOSED TO THE EXTERIOR IS TO Client/Project
BE HOT DIP GALVANIZED AFTER FABRICATION, EXCEPT AS NOTED ON THE DRAWINGS. S111 SMS OVERALL FOUNDATION PLAN S504 FOUNDATION DETAILS
10 CONTRACTOR SHALL PROVIDE IN HIS BID A UNIT PRICE ADD AND UNIT PRICE DEDUCT FOR
EACH PIER SIZE UTILIZED ON THE PROJECT.
6 STRUCTURAL STEEL IS TO BE PREPARED AND PRIMED ACCORDING TO THE SPECIFICATIONS.
STRUCTURAL STEEL LOCATED IN CRAWL SPACES OR OTHERWISE INACCESSIBLE AREAS ARE
S112 JHW OVERALL FOUNDATION PLAN S505 FOUNDATION DETAILS Pearland Independent School District
S113 SMS FOUNDATION PLAN "C" S506 SITE FOUNDATION DETAILS
11 CONTRACTOR SHALL PROVIDE AN ALLOWANCE FOR 100% CASING OF DRILLED PIERS. TO RECEIVE 2 COATS OF PRIMER. S114 JHW FOUNDATION PLAN "F" S511 STEEL FRAMING DETAILS
CONTRACTOR SHALL ALSO PROVIDE UNIT PRICE FOR EACH SIZE OF CASING UTILIZED ON THE
PROJECT. PAYMENT FOR CASING SHALL BE BASED UPON NET LENGTH OF CASING UTILIZED
7 EMBED PLATES TO BE INSTALLED IN THE FOUNDATION AND/OR SLAB SHALL BE SUBMITTED S115 JHW FOUNDATION PLAN "G" S512 STEEL FRAMING DETAILS Pearland Junior High West & Sablatura
FOR REVIEW WITH THE ANCHOR BOLTS.
MULTIPLIED BY THE UNIT PRICE.
8 HEADED STUDS SHALL BE WELDED TO EMBED PLATES BY A METHOD IN WHICH THE
S116 JHW FOUNDATION PLAN "J" S521 MASONRY DETAILS Middle School Additions and
S117 JHW FOUNDATION PLAN "K" S522 MASONRY DETAILS
CONNECTION CAN DEVELOP THE FULL TENSION AND SHEAR CAPACITY OF THE STUD.
SLAB SUBGRADE PREPARATION S118 SITE FOUNDATION PLANS S531 METAL FRAMING SECTIONS AND DETAILS Renovations
S119 SITE FOUNDATION PLANS S532 MISC. FRAMING DETAILS Pearland, Texas 77581
1 RECOMMENEDED REMOVAL OF AT LEAST 2'-0" OF SOIL BELOW THE PROPOSED S121 SMS PLATFORM FRAMING PLAN "C" S601 BEAM AND JOIST TAKE OFFS
SLAB-ON-GRADE FOOTPRINT PRIOR TO FILL PLACEMENT. REFER TO GEOTECHNICAL REPORT
S122 SMS MID ROOF FRAMING PLAN "C" S602 COLUMN AND BRACE STEEL TAKE OFFS
FOR BUILDING PAD PREPARATION UNDER STRUCTURAL SLAB, GRADE BEAMS, AND STRIP Title
FOOTINGS. S123 JHW LOW ROOF FRAMING PLAN "F"
F 2 FOR SUBGRADE PREPARATION WITHIN THE BUILDING AREA, REFER TO THE ABOVE MENTIONED S124 JHW LOW ROOF FRAMING PLAN "G" GENERAL NOTES
GEOTECHNICAL REPORT. THIS WORK IS TO BE PERFORMED AS DIRECTED BY THE OWNER'S S125 JHW LOW ROOF FRAMING PLAN "J"
SOILS TESTING LAB. OBSERVATION REPORTS AND TEST REPORTS OF THE SOIL COMPACTION S126 JHW LOW ROOF FRAMING PLAN "K"
ARE TO BE SUBMITTED TO THE ARCHITECT/ENGINEER TO VERIFY THE WORK IS IN GENERAL S127 JHW HIGH ROOF FRAMING PLAN "G"
CONFORMANCE PRIOR TO PLACEMENT OF CONCRETE.
S128 JHW ENTRY CANOPY ROOF Project No. Scale
3 TOP SOIL AND VEGETATION IS TO BE STRIPPED TO DEPTHS ENCOUNTERED AND AS DIRECTED
BY THE OWNER’S SOILS TESTING LAB PRIOR TO DRILLING PIERS, REFER TO SOIL REPORT FOR
S129 JHW AREA Q AUDITORIUM ROOF REINFORCEMENT PLAN 214000507 1" = 1'-0"
SITE PREPARATION. FILL MATERIAL FOR USE UNDER PRESTRESSED HOLLOW CORE PLANKS
Revision Drawing No.
10/10/2017 11:59:46 AM

MAY CONSIST OF OFF-SITE INORGANIC LEAN CLAY, AND HAVE A LIQUID LIMIT NOT GREATER
THAN 35 AND PLASTICITY INDEX NOT GREATER THAN 35.
4 PROVIDE VAPOR RETARDER UNDER STRUCTURAL BEAMS AND SLABS CAST ON GRADE,

5
UNLESS OTHERWISE NOTED.
PROVIDE VAPOR SEAL BARRIER UNDER STRUCTURAL BEAMS AND SLABS CAST ON GRADE
SUPPORTING WOOD FLOORS. S001
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

IBC - TABLE 1705.6 IBC - TABLE 1704.3 AISC - TABLE N5.4-3


REQUIRED VERIFICATION AND INSPECTION OF SOILS REQUIRED VERIFICATION AND INSPECTION OF STEEL CONSTRUCTION INSPECTION TASKS AFTER WELDING

CONTINUOUS DURING PERIODICALLY FREQUENCY OF INSPECTION REFERENCE FOR CRITERIA FREQUENCY OF INSPECTION
VERIFICATION AND INSPECTION TASK TASK LISTED DURING TASK LISTED INSPECTION TASKS AFTER WELDING
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC REFERENCE IBC REFERENCE CONTINUOUS PERIODIC
STANDARD
1. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO WELDS CLEANED — X
— X
ACHIEVE THE DESIGN BEARING CAPACITY.
1. MATERIAL VERIFICATION OF COLD-FORMED STEEL DECK: www.stantec.com
SIZE, LENGTH, AND LOCATION OF WELDS X —
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE
A — X A. FOR OTHER STEEL, IDENTIFICATION MARKINGS TO APPLICABLE
REACHED PROPER MATERIAL.
CONFORM TO ASTM STANDARDS SPECIFIED IN — X ASTM MATERIAL — WELDS MEET VISUAL ACCEPTANCE CRITERIA Copyright Reserved
THE APPROVED CONSTRUCTION DOCUMENTS. STANDARD - CRACK PROHIBITION
3. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS. — X - WELD/BASE-METAL FUSION The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
B. MANUFACTURER’S CERTIFIED TEST REPORTS. — X — — - CRATER CROSS SECTION
4. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES X — reported to Stantec without delay.
X — - WELD PROFILES The Copyrights to all designs and drawings are the property of
DURING PLACEMENT AND COMPACTION OF COMPACTED FILL. - WELD SIZE
2. INSPECTION OF WELDING: Stantec. Reproduction or use for any purpose other than that
- UNDERCUT authorized by Stantec is forbidden.
5. PRIOR TO PLACEMENT OF COMPACTED FILL, OBSERVE SUBGRADE AND - POROSITY
— X A. COLD-FORMED STEEL DECK:
VERIFY THAT SITE HAS BEEN PREPARED PROPERLY.
1) FLOOR AND ROOF DECK WELDS. — X AWS D1.3 — ARC STRIKES X — Consultants
Civil: Stantec
B. REINFORCING STEEL: k-AREA X — Landscape: KGA/DeForest, LLC
IBC - TABLE 1705.7 Structural: Stantec
REQUIRED VERIFICATION AND INSPECTION OF DRIVEN DEEP FOUNDATION ELEMENTS 1) VERIFICATION OF WELDABILITY OF BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED) X — MEP: Stantec
— X Information Technology: Stantec
REINFORCING STEEL OTHER THAN ASTM A 706.
CONTINUOUS DURING PERIODICALLY REPAIR ACTIVITIES X — Food Service: FCA Design
VERIFICATION AND INSPECTION TASK
TASK LISTED DURING TASK LISTED 2) REINFORCING STEEL RESISTING FLEXURAL Theatrical Design: Texas Scenic Co.
AND AXIAL FORCES IN INTERMEDIATE AND DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER X —
1. VERIFY ELEMENT MATERIALS, SIZES, AND LENGTHS COMPLY WITH THE
X — SPECIAL MOMENT FRAMES, AND BOUNDARY X — AWS D1.4 ACI Legend
REQUIREMENTS 318: SECTION —
ELEMENTS OF SPECIAL STRUCTURAL WALLS
OF CONCRETE AND SHEAR REINFORCEMENT. 3.5.2
2. DETERMINE CAPABILITIES OF TEST ELEMENTS AND CONDUCT
X — TMS 602-11/ACI 530.1-11/ASCE 6-11
ADDITIONAL LOAD TESTS, AS REQUIRED 3) SHEAR REINFORCEMENT. X — LEVEL B REQUIRED VERIFICATION AND INSPECTION OF MASONRY CONSTRUCTION
3. OBSERVE DRIVING OPERATIONS AND MAINTAIN COMPLETE AND 4) OTHER REINFORCING STEEL. — X
X — FREQUENCY OF REFERENCE FOR CRITERIA
ACCURATE RECORDS FOR EACH ELEMENT
INSPECTION
VERIFICATION AND INSPECTION
CONTINUOU PERIODIC TMS 402/ACI TMS 602/ACI
4. VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM TYPE AND
S 530/ASCE 5 530.1/ASCE 6
SIZE OF HAMMER, RECORD NUMBER OF BLOWS PER FOOT OF
PENETRATION, DETERMINE REQUIRED PENETRATIONS TO ACHIEVE X — AISC - TABLE N5.6-1
INSPECTION TASKS PRIOR TO BOLTING 1. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS — X — ART. 1.5
DESIGN CAPACITY, RECORD TIP AND BUTT ELEVATIONS AND DOCUMENT
B ANY DAMAGE OF FOUNDATION ELEMENT.
FREQUENCY OF INSPECTION 2. AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
5. FOR STEEL ELEMENTS, PERFORM ADDITIONAL INSPECTIONS IN INSPECTION TASKS PRIOR TO BOLTING
— — CONTINUOUS PERIODIC A. PROPORTIONS OF SITE-PREPARED MORTAR — X — ART. 2.1, 2.6A
ACCORDANCE WITH SECTION 1705.2

6. FOR CONCRETE ELEMENTS AND CONCRETE-FILLED ELEMENTS, PERFORM MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTNER MATERIALS X — B. CONSTRUCTION OF MORTAR JOINTS — X — ART. 3.3B
— —
ADDITIONAL INSPECTIONS IN ACCORDANCE WITHE SECTION 1705.3
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS — X C. GRADE AND SIZE OF PRESTRESSING TENDONS AND ART. 2.4B,
— X —
7. FOR SPECIALTY ELEMENTS, PERFORM ADDITIONAL INSPECTIONS AS ANCHORAGES 2.4H
DETERMINED BY THE REGISTERED DESIGN PROFESSIONAL IN — — PROPER FASTENERS SELECTED FOR THE JOINT DETAIL (GRADE, TYPE, BOLT LENGTH IF
— X D. LOCATION OF REINFORCEMENT, CONNECTORS,
RESPONSIBLE CHARGE. THREADS ARE TO BE EXCLUDED FROM SHEAR) — X — ART. 3.4, 3.6A
PRESTRESSING TENDONS AND ANCHORAGES
PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL — X
E. PRESTRESSING TECHNIQUE — X — ART. 3.6B
CONNECTION ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITION AND
IBC - TABLE 1705.8 — X F. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY X X — ART. 2.1C
SOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
REQUIRED VERIFICATION AND INSPECTION OF CAST-IN-PLACE DEEP FOUNDATION ELEMENTS
PRE-INSTALLATION VERIFICATION TESTING BY INSTALLATION PERSONNEL OBSERVED AND 3. PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
CONTINUOUS DURING PERIODICALLY — X
DOCUMENTED FOR FASTENER ASSEMBLIES AND METHODS USED
VERIFICATION AND INSPECTION TASK TASK LISTED DURING TASK LISTED A. GROUT SPACE — X — ART. 3.2D, 3.2F
PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS AND OTHER FASTENER COMPONENTS — X
1. OBSERVE DRILLING OPERATIONS AND MAINTAIN COMPLETE AND B. GRADE, TYPE, AND SIZE OF REINFORCEMENT AND ANCHOR
ACCURATE RECORDS FOR EACH ELEMENT — X — X SEC. 1.16 ART. 2.4, 3.4
BOLTS, AND PRESTRESSING TENDONS AND ANCHORAGES

2. VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM ELEMENT C. PLACEMENT OF REINFORCEMENT, CONNECTORS, ART. 3.2E,
DIAMETERS, BELL DIAMETERS (IF APPLICABLE), LENGTHS, EMBEDMENT IN AISC - TABLE N5.6-2 — X SEC. 1.16
— X AND PRESTRESSING TENDONS AND ANCHORAGE 3.4, 3.6A
BEDROCK (IF APPLICABLE) AND ADEQUATE END-BEARING STRATA INSPECTION TASKS DURING BOLTING
CAPACITY. RECORD CONCRETE OR GROUT VOLUMES. D. PROPORTIONS OF SITE- PREPARED GROUT AND ART. 2.6B,
— X —
FREQUENCY OF INSPECTION PRESTRESSING GROUT FOR BONDED TENDONS 2.4G.1.b
3. FOR CONCRETE ELEMENTS, PERFORM ADDITIONAL INSPECTIONS IN INSPECTION TASKS DURING BOLTING
— X
ACCORDANCE WITH SECTION 1705.3 CONTINUOUS PERIODIC E. CONSTRUCTION OF MORTAR JOINTS — X — ART. 3.3B
C FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL HOLES AND 4. VERIFY DURING CONSTRUCTION:
WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED — X

A. SIZE AND LOCATION OF STRUCTURAL ELEMENTS. — X — ART. 3.3F


Notes
IBC - TABLE 1705.3
JOINTBROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRETENSIONING OPERATION — X
REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION
B. TYPE, SIZE AND LOCATION OF ANCHORS, INCLUDING
FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING — X SEC. 1.16.4.3,
OTHER DETAILS OF ANCHORAGE OF MASONRY TO — X —
FREQUENCY OF REFERENCE FOR CRITERIA 1.17.1
STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION.
INSPECTION FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION, PROGRESSING
— X SEC.
VERIFICATION AND INSPECTION SYSTEMATICALLY FROM MOST RIGID POINT TOWARD THE FREE EDGES C. WELDING OF REINFORCING BARS.
CONTINUOUS PERIODIC REFERENCE IBC REFERENCE 2.1.7.7.2,
STANDARD X — —
3.3.3.4 (c),
8.3.3.4 (b)
1. INSPECTION OF REINFORCING STEEL, INCLUDING ACI 318: 3.5, D. PREPARATION, CONSTRUCTION AND PROTECTION OF
— X 1910.4 AISC - TABLE N5.6-3 ART. 1.8C,
PRESTRESSING TENDONS, AND PLACEMENT. 7.1-7.7 MASONRY DURING COLD WEATHER (TEMPERATURE
INSPECTION TASKS AFTER BOLTING — X —
BELOW 40* F (4.4 C)) OR HOT WEATHER (TEMPERATURE 1.8D
2. INSPECTION OF REINFORCING STEEL WELDING IN AWS D1.4 ABOVE 90* F (32.2 C)).
— — — FREQUENCY OF INSPECTION
ACCORDANCE WITH TABLE 1705.2.2, ITEM 2B. ACI 318: 3.5.2
INSPECTION TASKS AFTER BOLTING E. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE X — — ART. 3.6B
3. INSPECTION OF ANCHORS CAST IN CONCRETE CONTINUOUS PERIODIC
ACI 318: 8.1.3, F. PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR
WHERE ALLOWABLE LOADS HAVE BEEN INCREASED — X 1908.5, 1909.1 X — — ART. 3.5, 3.6C
21.2.8 DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS X — BONDED TENDONS IS IN COMPLIANCE
OR WHERE STRENGTH DESIGN IS USED

4. INSPECTION OF ANCHORS POST INSTALLED IN ACI 318: 3.8.6, G. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION ART.
— X 1909.1 X X —
HARDENED CONCRETE MEMBERS. 8.1.3, 21.2.8 OF THIN-BED MORTAR JOINTS 3.3B.8
AISC - TABLE N5.4-1 ART.
5. VERIFYING USE OF REQUIRED DESIGN MIX. ACI 318: CH. 4, 1904.2, 5.. OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR 1.4B.2.a.3,
— X INSPECTION TASKS PRIOR TO WELDING
5.2-5.4 1910.2, 1910.3 SPECIMENS, AND/OR PRISMS: 1.4B.2.b.3,
— X —
FREQUENCY OF INSPECTION 1.4B.2.c.3,
6. AT THE TIME FRESH CONCRETE IS SAMPLED TO INSPECTION TASKS PRIOR TO WELDING 1.4B.3, 1.4B.4
ASTM C 172
FABRICATE SPECIMENS FOR STRENGTH TESTS,
X — ASTM C 31 1910.10 CONTINUOUS PERIODIC MINIMUM TESTS
PERFORM SLUMP AND AIR CONTENT TESTS, AND
D DETERMINE THE TEMPERATURE OF THE CONCRETE.
ACI 318: 5.6, 5.8
WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE X — VERIFICATION OF SLUMP FLOW AND VISUAL STABILITY INDEX (VSI) AS DELIVERED TO THE PROJECT SITE IN ACCORDANCE WITH
7. INSPECTION OF CONCRETE AND SHOTCRETE 1910.6, 1910.7, ARTICLE 1.5 B.1.b.3 FOR SELF-CONSOLIDATING GROUT
X — ACI 318: 5.9, 5.10 MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE X —
PLACEMENT FOR PROPER APPLICATION TECHNIQUES. 1910.8
VERIFICATION OF f'm AND f'aac IN ACCORDANCE WITH ARTICLE 1.4B PRIOR TO CONSTRUCTION, EXCEPT WHERE SPECIFICALLY
8. INSPECTION FOR MAINTENANCE OF SPECIFIED ACI 318: 5.11- MATERIAL IDENTIFICATION (TYPE/GRADE) — X EXEMPTED BY THE CODE.
CURING TEMPERATURE AND TECHNIQUES. — X 5.13 1910.9
WELDER IDENTIFICATION SYSTEM — X
9. INSPECTION OF PRESTRESSED CONCRETE:
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
TMS 602-11/ACI 530.1-11/ASCE 6-11
A. APPLICATION OF PRESTRESSING FORCES. X — ACI 318:18.20 — - JOINT PREPARATION
- DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL) LEVEL C REQUIRED VERIFICATION AND INSPECTION OF MASONRY CONSTRUCTION
— X
B. GROUTING OF BONDED PRESTRESSING TENDONS - CLEANLINESS (CONDITION OF STEEL SURFACES)
X — ACI 318: 18.18.4 — - TACKING (TACK WELD QUALITY AND LOCATION) FREQUENCY OF REFERENCE FOR CRITERIA
IN THE SEISMIC-FORCE-RESISTING SYSTEM. INSPECTION
- BACKING TYPE AND FIT (IF APPLICABLE)
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC TMS 402/ACI TMS 602/ACI
10. ERECTION OF PRECAST CONCRETE MEMBERS. — X ACI 318: CH 16 — 530/ASCE 5 530.1/ASCE 6
CONFIGURATION AND FINISH OF ACCESS HOLES — X
11. VERIFICATION OF IN-SITU CONCRETE STRENGTH, 1. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS — X — ART. 1.5
FIT-UP OF FILLET WELDS
PRIOR TO STRESSING OF TENDONS IN POST TENSIONED — X ACI 318: 6.2 — - DIMENSIONS (ALIGNMENT, GAPS AT ROOT) By Appd YYYY.MM.DD
CONCRETE AND PRIOR TO REMOVAL OF SHORES AND
- CLEANLINESS (CONDITION OF STEEL SURFACES)
— X 2. VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE: Revision
FORMS FROM BEAMS AND STRUCTURAL SLABS.
- TACKING (TACK WELD QUALITY AND LOCATION)
A. PROPORTIONS OF SITE-MIXED MORTAR, GROUT, AND ART. 2.1, 2.6A, Issue for Bidding & Construction RAS PMR 2017.10.11
12. INSPECT FORMWORK FOR SHAPE,LOCATION AND PRESTRESSING GROUT FOR BONDED TENDONS — X — 2.6B, 2.6C,
— X ACI 318: 6.1.1 — By Appd YYYY.MM.DD
DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED. 2.4G.1.b Issued
NOTES: B. GRADE, TYPE, AND SIZE OF REINFORCEMENT AND ANCHOR ART. 2.4,
AISC - TABLE N5.4-2 — X SEC 1.16
FOR SI: 1 INCH = 25.4 mm. BOLTS, AND PRESTRESSING TENDONS AND ANCHORAGES 3.4
INSPECTION TASKS DURING WELDING
A. WHERE APPLICABLE, SEE ALSO SECTION 1705.11, SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE.
B. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE RESEARCH REPORT FOR THE ANCHOR C. PLACEMENT OF MASONRY UNITS AND CONSTRUCTION OF
ISSUED BY AN APPROVED SOURCE IN ACCORDANCE WITH ACI 355.2 OR OTHER QUALIFICATION PROCEDURES. WHERE FREQUENCY OF INSPECTION — X — ART. 3.3B
INSPECTION TASKS DURING WELDING MORTAR JOINTS
SPECIFIC REQUIREMENTS ARE NOT PROVIDED, SPECIAL INSPECTION REQUIREMENTS SHALL BE SPECIFIED BY THE
REGISTERED DESIGN PROFESSIONAL AND SHALL BE APPROVED BY THE BUILDING OFFICIAL PRIOR TO THE CONTINUOUS PERIODIC
E D. PLACEMENT OF REINFORCEMENT, CONNECTORS,
X — SEC 1.16
ART. 3.2E,
COMMENCEMENT OF THE WORK. PRESTRESSING TENDONS AND ANCHORAGES 3.4, 3.6A
USE OF QUALIFIED WELDERS — X
E. GROUT SPACE PRIOR TO GROUTING X — — ART. 3.2D,
SPECIAL INSPECTION NOTES: Permit-Seal
CONTROL AND HANDLING OF WELDING CONSUMABLES
- PACKAGING 3.2F
— X F. PLACEMENT OF GROUT AND PRESTRESSING GROUT FOR ART. 3.5, 1. THE STRUCTURAL ENGINEER (STANTEC) IS NOT
- EXPOSURE CONTROL X — —
BONDED TENDONS 3.6C RESPONSIBLE FOR INSPECTIONS AND TESTING.
NO WELDING OVER CRACKED TACK WELDS — X OWNER SHALL PROVIDE OR COORDINATE TO
G. SIZE AND LOCATION OF STRUCTURAL ELEMENTS — X — ART. 3.3F GENERAL CONTRACTOR TO CARRY IN THEIR
CONTRACT. STANTEC CAN PROVIDE AS AN
ENVIRONMENTAL CONDITIONS
H. TYPE, SIZE, AND LOCATION OF ANCHORS INCLUDING SEC. ADDITIONAL SERVICE.
- WIND SPEED WITHIN LIMITS — X OTHER DETAILS OF ANCHORAGE OF MASONRY TO X — 1.16.4.3, — 2. THE OWNER'S (OR GENERAL CONTRACTOR'S)
- PRECIPITATION AND TEMPERATURE
STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION 1.17.1 TESTING LABORATORY SHALL PROVIDE SPECIAL
INSPECTION SERVICES IN ACCORDANCE WITH THE
WPS FOLLOWED SEC.
I. WELDING OF REINFORCEMENT INTERNATIONAL BUILDING CODE FOR THE FOLLOWING
- SETTINGS ON WELDING EQUIPMENT 2.1.7.7.2,
X — — ITEMS LISTED ON THESE SHEETS. ONLY INSPECTIONS
- TRAVEL SPEED 3.3.3.4 (c), AND TESTS ARE REQUIRED FOR THE APPLICABLE
- SELECTED WELDING MATERIALS 9.3.3.4 (b)
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

- SHIELDING GAS TYPE/FLOW RATE


MATERIALS ON THE PROJECT. Client/Project
— X J. PREPARATION, CONSTRUCTION AND PROTECTION OF
- PREHEAT APPLIED
- INTERPASS TEMPERATURE MAINTAINED (MIN./MAX.) MASONRY DURING COLD WEATHER (TEMPERATURE
— X — ART. 1.8C,
Pearland Independent School District
- PROPER POSITION (F,V,H,OH) BELOW 40* F (4.4 C)) OR HOT WEATHER (TEMPERATURE
1.8D
ABOVE 90* F (32.2 C)).
WELDING TECHNIQUES Pearland Junior High West & Sablatura
K. APPLICATION AND MEASUREMENT OF PRESTRESSING FORCE X — — ART. 3.6B
- INTERPASS AND FINAL CLEANING
- EACH PASS WITHIN PROFILE LIMITATIONS — X Middle School Additions and
L. PLACEMENT OF AAC MASONRY UNITS AND CONSTRUCTION
- EACH PASS MEETS QUALITY REQUIREMENTS
OF THIN-BED MORTAR JOINTS
X — — ART. 3.3B.8 Renovations
Pearland, Texas 77581
M. PROPERTIES OF THIN-BED MORTAR FOR AAC MASONRY X — — ART. 2.1C.1

3. OBSERVE PREPARATION OF GROUT SPECIMENS, MORTAR ART. 1.4B.2.a.3, Title


SPECIMENS, AND/OR PRISMS: X — — 1.4B.2.b.3,
F 1.4B3, 1.4B4 STRUCTURAL TESTING & INSPECTIONS
MINIMUM TESTS

VERIFICATION OF SLUMP FLOW AND VISUAL STABILITY INDEX (VSI) AS DELIVERED TO THE PROJECT SITE IN ACCORDANCE WITH Project No. Scale
ARTICLE 1.5 B.1.b.3 FOR SELF-CONSOLIDATING GROUT
214000507 As indicated
VERIFICATION OF f'm AND f'aac IN ACCORDANCE WITH ARTICLE 1.4B PRIOR TO CONSTRUCTION AND FOR EVERY 5,000 SQ. FT. (465 SQ.
Revision Drawing No.
10/10/2017 11:59:47 AM

M) DURING CONSTRUCTION

VERIFICATION OF PROPORTIONS OF MATERIALS IN PREMIXED OR PREBLENDED MORTAR, PRESTRESSING GROUT, AND GROUT
OTHER THAN SELF-CONSOLIDATING GROUT AS DELIVERED TO THE PROJECT SITE

S002
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend

Notes

NOTE: ONLY AREAS OF EXISTING BUILDING MODELED WHERE SOME


EXPECTED WORK TAKING PLACE

ISO SMS AREA C


1

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

Permit-Seal
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F ISOMETRIC VIEW - SMS AREA C

Project No. Scale


214000507
BUILDING ISOMETRIC IS FOR INFORMATION Revision Drawing No.
10/10/2017 12:00:04 PM

PURPOSES ONLY AND SHALL NOT BE USED FOR


QUANTITY TAKE OFFS OR SHOP DRAWING

S003
PREPARATION.

ORIGINAL SHEET - ARCH E1 (30"x42")


1 2 3 4 5 6 7 8

www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend

Notes

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
NOTE: ONLY AREAS OF EXISTING BUILDING MODELED WHERE SOME
EXPECTED WORK TAKING PLACE By Appd YYYY.MM.DD
Issued

ISO JHW OVERALL Permit-Seal


1
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F ISOMETRIC VIEW - JHW

Project No. Scale


214000507
BUILDING ISOMETRIC IS FOR INFORMATION Revision Drawing No.
10/10/2017 12:00:28 PM

PURPOSES ONLY AND SHALL NOT BE USED FOR


QUANTITY TAKE OFFS OR SHOP DRAWING

S004
PREPARATION.

ORIGINAL SHEET - ARCH E1 (30"x42")


1 2 3 4 5 6 7 8

ROOF ZONES DIAGRAM - SABLATURA MIDDLE SCHOOL - AREA C ROOF ZONES DIAGRAM - JUNIOR HIGH WEST WALL ZONES DIAGRAM - GENERAL

www.stantec.com
3 3 3 3
A 2 2
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be

TYP. JHW LOW ROOF


reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

a = 8'-0"
4
Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
2 2 Structural: Stantec
1 1 MEP: Stantec

h = SEE EVEL.
Information Technology: Stantec
2 2 Food Service: FCA Design
4 Theatrical Design: Texas Scenic Co.
5
Legend
5

4 4

TYP. SMS AREA C


a = 9'-0"
3 2 3
B 3 2 3
a a

ROOF PSF LEEWARD WALLS PSF

AREA FT2 AREA FT2


ZONES ZONES
10 100 10 100
-32.3 -29.5 -32.0 -24.6
1 4
16.0 16.0 29.5 22.1
-54.1 -35.0 -39.4 -24.6
2 16.0 16.0 5 29.5 22.1
-81.5 -35.0 ROOF PSF LEEWARD WALLS PSF
3 16.0 16.0
2 1 2 2 AREA FT2 AREA FT2
ZONES ZONES
10 100 10 100
-29.4 -26.9 -29.2 -22.4
1 4
COMPONENTS & CLADDING PRESSURE TABLES (ALLOWABLE) - SMS 16.0 16.0 26.9 20.2
-49.4 -31.9 -35.9 -22.4
2 16.0 16.0 5 26.9 20.2
-74.3 -31.9
C 3 16.0 16.0
Notes
COMPONENTS & CLADDING PRESSURE TABLES (ALLOWABLE) -
AREA F/G/J LOW ROOF
TYP. JHW GYM ROOF
a = 12'-0"

3 2 3

ROOF PSF LEEWARD WALLS PSF

AREA FT2 AREA FT2


ZONES ZONES
2 10 100 10 100
-33.6 -30.8 -33.3 -25.6
1 4
16.0 16.0 30.8 23.1
-56.4 -36.5 -41.0 -25.6
2 16.0 16.0 5 30.8 23.1

TYP. JHW LOW ROOF


-84.9 -36.5
3

a = 8'-0"
16.0 16.0
3
METAL ROOF DECK FASTENING SCHEDULE COMPONENTS & CLADDING PRESSURE TABLES (ALLOWABLE) -
D LABEL SUPPORT PATTERN SIDE LAP TYPE & GAUGE AREA G HIGH ROOF
(#10 TEK SCREWS) (GALV. ROOF DECK)

TYP. JHW LOW ROOF


3 32/4 - 5/8" PUDDLE WELDS (5) 20 GAUGE - 1.3 CSV
2

a = 8'-0"
2 32/4 - 5/8" PUDDLE WELDS (4) 20 GAUGE - 1.3 CSV
3 2 3 2
1 32/4 - 5/8" PUDDLE WELDS (3) 20 GAUGE - 1.3 CSV
2
1
NOTES:

1. ASSUME 6 PSF DEAD LOAD TO GET NET UPLIFT ON JOIST 2


2. ROOF DECK SLOTTED VENTED IN BOTTOM FLUTES 2 By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
2 1 2
METAL ROOF DECK ATTACHMENT SECTION Issued
By Appd YYYY.MM.DD

1
1/32" = 1'-0" 2 ROOF 2 PSF LEEWARD WALLS PSF
1
AREA FT2 AREA FT2
ZONES ZONES
10 100 10 100
E -32.2 -29.5 -32.0 -24.6
1 4
16.0 16.0 29.5 22.1
-54.1 -35.0 -39.3 -24.6 Permit-Seal
2 16.0 16.0 5 26.9 20.2

TYP. JHW ENTRY ROOF


TYP. JHW LOW ROOF

-81.4 -35.0
3 16.0 16.0

a = 9'-0"
a = 8'-0"

3 2 3 3 2 3
COMPONENTS & CLADDING PRESSURE TABLES (ALLOWABLE) -
AREA J HIGH ENTRY ROOF

ROOF ZONES DIAGRAM


C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F WIND UPLIFT DIAGRAM

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:29 PM

S005
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

HIGH ROOF HIGH ROOF


FRAMING FRAMING
130' - 3" 130' - 3"

SMS & ENTRY SMS & ENTRY


ROOF ROOF
www.stantec.com
123' - 2" 123' - 2"
A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
LOW ROOF LOW ROOF reported to Stantec without delay.
FRAMING FRAMING The Copyrights to all designs and drawings are the property of
PLATFORM PLATFORM
HSS5X5X3/16

Stantec. Reproduction or use for any purpose other than that


113' - 4" 113' - 4" authorized by Stantec is forbidden.
112' - 8" 112' - 8"

HSS6X6X3/16
HSS6X6X3/16

HSS6X6X3/16

HSS6X6X3/16
Consultants

HSS4X4X1/4

HSS4X4X1/4

HSS5X5X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4
HSS4X4X1/4

HSS4X4X1/4

HSS6X6X3/8

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS5X5X1/4

HSS5X5X1/4

HSS5X5X1/4
HSS4X4X1/4

HSS4X4X1/4

HSS4X4X1/4

HSS6X6X1/4

HSS5X5X1/4
HSS6X6X1/4

HSS6X6X1/4

HSS4X4X1/4

HSS4X4X1/4
Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
FOUNDATION FOUNDATION Food Service: FCA Design
100' - 0" 100' - 0" Theatrical Design: Texas Scenic Co.

Legend
Column
Locations B.1-7 AC-22 AC-23.3 AF.1-23.5 AF.1-26 AF.9-23.3 AF.9-23.7 AF.9-26 SA-14 SA.1-19 SA.1-20 SB-14 SC-14 SC.1-19 SC.1-20 SD-14 SF-1 SF-3 SF-5 SF-12 SF-13 SF-14 SG-8 SG-12 SH-1 SH-2 SH-6 SH-8 SI-8 SI-9 SJ-1 SJ-2 SJ-6 SJ.2-13.3 SJ.2-14.8

HIGH ROOF HIGH ROOF


FRAMING FRAMING
130' - 3" 130' - 3"
B
SMS & ENTRY SMS & ENTRY
ROOF ROOF
123' - 2" 123' - 2"

LOW ROOF LOW ROOF


FRAMING FRAMING
PLATFORM PLATFORM
113' - 4" 113' - 4"
112' - 8" 112' - 8"
HSS5X0.250

HSS5X0.250
HSS5X0.250

HSS5X0.250
HSS5X0.250

HSS5X0.250
HSS5X0.250

HSS6X0.375

HSS6X6X3/8
HSS5X5X1/4

HSS4X4X1/4
HSS5X5X1/4

HSS4X4X1/4

HSS6X6X3/8

HSS4X4X1/4

HSS6X6X3/8

HSS6X6X3/8

HSS4X4X1/4
HSS4X4X1/4

HSS4X4X1/4

FOUNDATION FOUNDATION
100' - 0" 100' - 0"

Column
Locations SK-1 SK.2-12.5 SK.2-13.2 SL-1 SL-2 SL-4 SL-7 SL-9 SM-1 SM-2 SM-4 SM-7 SM-9 SN-10 SO-7 SO-10 SP-7 SP-10 SQ-7 SQ-10

Notes

COLUMN SCHEDULE
SEE S-501 FOR COLUMN BASE PLATE DETAILS

CONSTRUCTION MANAGER NOTE:

NOTE: COLUMN BASE PLATES SHALL BE SET AT TOP OF GRADE BEAM OR BELL PIER CAPS WHICH ARE
APPROXIMATELY 8” BELOW SLAB AT INTERIOR AND VARY AT EXTERIOR WITH GRADE, REFER TO PLANS AND
DETAILS FOR ELEVATIONS. THIS WOULD ASSUME THAT STEEL COLUMNS ARE SET PRIOR TO CASTING STEM WALLS
AND GROUND FLOOR SLABS.

OPTIONAL: CONTRACTOR/CONSTRUCTION MANAGER MAY PROPOSE TO CAST CONCRETE EXTERIOR STEM WALLS
AND SLAB PRIOR STEEL COLUMN ERECTION, REFER TO DETAIL OPTIONS 2A/ S501, 1/S501 AND 15/S501. ADDITIONAL
COORDINATION WITH STEEL COLUMN BASES MAY BE REQUIRED (I.E. AT BRACED FRAMES), INFORM E.O.R. WHEN
PROJECT IS AWARDED IF THIS OPTION OR SIMILAR (SUCH AS MATCHING EXTERIOR COLUMN BASES TO INTERIOR) IS
CHOSEN.

NOTE: MORE THAN ONE


COL. ANCHOR BOLT MAY BE OUT OF COL.
D COL. NOTE: CONTRACTOR PLACE ON SAME FOOTING,
SHALL COORDINATE WITH HOWEVER 1/2" TOLERANCE
STEEL MANUF. FOOTING, POURED-IN-PLACE SHALL NOT BE EXCEEDED FOOTING / PIER, POURED-IN-PLACE

2" HIGH STRENGTH


NON- SHRINK
HEAVY HEX NUTS GROUT 0' - 6" 0' - 6" ORIG. + 1/2"
CUT ANCHOR BOLTS AND ENLARGE BOLT HOLE TO FIT
1 1/2" TYP. TYP. ROTATE BASE PLATE 45 DEG. MISPLACED ANCHOR BOLT. USE
BASE PLATE, * EPOXY DOWEL NEW RODS WITH ORIG. DIM OVERSIZED WASHER TO
SEE DETAILS SAME DIA. INTO FOOTING WITH ACCOUNT FOR NEW BOLT
9" EMBED MAX LOCATION
6"

0' - 6" 0' - 6"


0' - 4 143/256"

ORIG. + 1/2"
1' - 0"

ORIG. DIM.
COL.

ANCHOR ROD,
SEE DETAILS
COL. COL.
14" TYP

STEEL BASE PLATE


1' - 0" 12"x12"x5/8" BASE PLATE; 3/4" THICK BASE PLATE STEEL COLUMN By Appd YYYY.MM.DD
(4) 5/8" DIA. x14" FOR ANY COLUMN THICKNESS OVER 1/4" Revision
HEADED A.B. STEEL COLUMN
Issue for Bidding & Construction RAS PMR 2017.10.11
STEEL COL.,
SEE PLAN By Appd YYYY.MM.DD
OPTION 3: Issued
BORE OUT EXISTING ANCHOR BOLTS AND EPOXY
ANCHOR ROD DETAIL TYPICAL COLUMN DOWEL NEW ANCHOR BOLTS WITH 12" MIN.
EMBEDMENT. PROVIDE EPOXY PRODUCT TO
* WELD = COLUMN WALL THICKNESS - 1/16" EXCEPT AT 3/16" THICK OPTION 1: OPTION 2: E.O.R. FOR APPROVAL PRIOR TO WORK.
COLUMNS (COLUMN THICKNESS = WELD SIZE) ROTATE BASE PLATE 45 DEGREES INSTALL WITH LARGER ANCHOR BOLT HOLES

E
COL. REMEDIAL ANCHOR BOLT/BASE PLATE DETAIL
2 1" = 1'-0" Permit-Seal
3"x3"x1/2" THICK TRIANGULAR
STIFFENER PLATE, EACH SIDE
2" HIGH STRENGTH
0' - 7" 0' - 7"
NON- SHRINK 1 1/2" TYP. TYP.
HEAVY HEX NUTS GROUT *
BASE PLATE,
SEE DETAILS
0' - 10"
6" 0' - 4 143/256"

1' - 8"
COL.

ANCHOR ROD,
SEE DETAILS
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
18" TYP

0' - 10"

Pearland Independent School District


20"x14"x7/8" BASE PLATE Pearland Junior High West & Sablatura
(6) 7/8" DIA. x18" 1' - 2"
HEADED A.B. STEEL COL., Middle School Additions and
SEE PLAN
Renovations
ANCHOR ROD DETAIL PORTAL FRAME COLUMN Pearland, Texas 77581
- PORTAL FRAME * WELD = COLUMN WALL THICKNESS - 1/16" EXCEPT AT 3/16" THICK Title
COLUMNS (COLUMN THICKNESS = WELD SIZE)
F COLUMN SCHEDULE
TYPICAL COLUMN BASE PLATE DETAILS
1 1" = 1'-0" Project No. Scale
214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:29 PM

S006
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

GRADE BEAM SCHEDULE


BEAM TOP OF SIZE W x H REINFORCING SHEAR REINFORCING
MARK BEAM (INCHES)
ELEVATION
www.stantec.com
BOTT. TOP "C"* "E" AMOUNT SIZE SPACING SHEAR REMARKS / BALANCE REMARKS
A EACH END C/C
Copyright Reserved
GB1 SEE PLAN 20"x30" (4) #6 (2) #7 (2) #7 (2) #7 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
GB2 SEE PLAN 20"x30" (3) #6 (2) #7 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
GB3 SEE PLAN 20"x30" (4) #6 (2) #7 (2) #7 (2) #7 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.
GB4 SEE PLAN 20"x30" (3) #6 (2) #7 (1) #7 (1) #7 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT
Consultants
GB5 SEE PLAN 20"x42" (5) #7 (2) #8 (4) #8 (4) #8 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT
Civil: Stantec
SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT
Landscape: KGA/DeForest, LLC
GB6 SEE PLAN 20"x30" (5) #6 (2) #7 (3) #7 (3) #7 #3 12"
Structural: Stantec
GB7 SEE PLAN 20"x30" (3) #6 (2) #7 (2) #7 (2) #7 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT MEP: Stantec
Information Technology: Stantec
GB8 SEE PLAN 16"x24" (2) #6 (2) #6 #3 12" SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT Food Service: FCA Design
Theatrical Design: Texas Scenic Co.
GB9 SEE PLAN 20"x30" (2) #6 (5) #8 #3 12" SEE PLAN FOR ADD'L SHEAR REINF. AT INTERMEDIATE COLUMNS IF APPLICABLE SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT
Legend
GB10 SEE PLAN 20"x30" (2) #6 (4) #8 #3 12" SEE PLAN FOR ADD'L SHEAR REINF. AT INTERMEDIATE COLUMNS IF APPLICABLE SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT

GB11 SEE PLAN 20"x30" (2) #6 (4) #8 #3 12" SEE PLAN FOR ADD'L SHEAR REINF. AT INTERMEDIATE COLUMNS IF APPLICABLE SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT

GB12 SEE PLAN 20"x36" (3) #6 (6) #8 #3 12" SEE PLAN FOR ADD'L SHEAR REINF. AT INTERMEDIATE COLUMNS IF APPLICABLE SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT

GB13 SEE PLAN 20"x30" (2) #6 (6) #8 #3 12" SEE PLAN FOR ADD'L SHEAR REINF. AT INTERMEDIATE COLUMNS IF APPLICABLE SEE SHEET NOTE #3 FOR ADDITIONAL HORIZONTAL REINFORCEMENT

*"C" BAR REQUIRED ONLY WHERE APPLICABLE I.E. GRADE BEAM END

B
GRADE BEAM SCHEDULE
3 12" = 1'-0"

'E' BAR EACH


AS INDICATED
'X'/4 OR 'Y'/4
'Z' OR 'Y'/4 (USE LARGER)
(USE LARGER) U.N.O. IN BEAM SCHEDULE

2" CLR. 2" CLR.

1 1/2" CLR.
8 3/8"

STANDAR
STANDAR

1' - 0 31/256" 0' - 1121/32"

D HOOK
D HOOK

0" TYP.
0" TYP.

'C' BAR

0" TYP.
TOP BAR
'C' BAR
TOP BAR
7/8"

C
0' - 1 35/128"

BOTTOM BAR Notes


3" CLR. FOR GRADE
BEAMS, 1 1/2" CLR.
STIRRUPS, FOR OTHER BEAMS
SEE SCHED.
FOR SPACING,
USE 90 DEG.
END HOOKS

1/4 1/2 1/4


S1 S2 S1

SPAN 'X' SPAN 'Y' SPAN 'Z'

GENERAL GRADE BEAM


ELEVATION VIEW

SPAN 'X' SPAN 'Y' SPAN 'Z'

D
TOP BAR 'E' BAR 'C' BAR AS REQUIRED
AT BEAM END

8 3/8"
'X'/4 OR 'Y'/4 'X'/4 OR 'Y'/4 'Y'/4 OR 'Z'/4 'Y'/4 OR 'Z'/4

USE LARGER USE LARGER USE LARGER USE LARGER

By Appd YYYY.MM.DD
Revision
'C' BAR AS REQUIRED Issue for Bidding & Construction RAS PMR 2017.10.11
'C' BAR AS REQUIRED TOP BAR 'E' BAR AT BEAM END
By Appd YYYY.MM.DD
AT BEAM END
GENERAL GRADE BEAM Issued

PLAN VIEW (TOP)

1. START STIRRUP SPACING AT 1/2 SCHEDULED SPACING FROM FACE OF SUPPORT.


E 2. ADD (1) #4 LONGITUDINAL WHERE CORNER OF STIRRUP IS VACANT.
3. USE CLOSED STIRRUPS AT (S1) AREA, OPEN STIRRUPS (S2) AREA U.N.O.
4. LOCATION OF REBAR IS ONLY A VISUAL REPRESENTATION TO ALLOW FOR CLARITY. SPACE REBAR ACCORDING TO ACI 318 STANDARDS AND DISPLAYED DIMENSIONS
Permit-Seal

TYPICAL BENDING DIAGRAM FOR BEAMS


1 1 1/2" = 1'-0"

GRADE BEAM SHEET NOTES:


C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
1. SEE PLAN FOR TOP OF GRADE BEAMS SPECIFICALLY AT EXTERIOR GRADE BEAMS AND BRICK Pearland Independent School District
SUPPORT.

2. MINIMUM BAR SPLICE MUST BE CLASS B. Pearland Junior High West & Sablatura
3. FOR CONCRETE BEAMS DEEPER THAN 24", ADDITIONAL CONTINUOUS HORIZONTAL #5 BARS TO BE
Middle School Additions and
PLACED AT EACH FACE OF BEAM AND SPACED NO GREATER THAN 12" VERTICALLY ON CENTER.
Renovations
4. ALL BEAM DIMENSIONS AND REINFORCING REQUIREMENTS ARE MINIMUM REQUIREMENTS. Pearland, Texas 77581
5. TOP OF STEEL BEAMS SHALL ONLY BE SPLICED OVER SUPPORTS. FOR MORE INFORMATION SEE Title
TYPICAL BENDING DIAGRAM.
F
6. STIRRUPS SHALL BE PLACED THROUGHOUT WHOLE LENGTH OF BEAM UNLESS BALANCE STIRRUPS
GRADE BEAM SCHEDULE AND DETAILS
ARE CALLED OUT IN SCHEDULE.

7. BALANCE STIRRUPS SHALL BE PLACED WITHIN CENTER THIRD OF SPAN.


Project No. Scale
214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:30 PM

S007
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

AF.1 AF.9 AC AB

www.stantec.com
30
A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.

10 04 02 10 04 02 10
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
13 Structural: Stantec
MEP: Stantec
15 02 04 02 10 04 03

Information Technology: Stantec


Food Service: FCA Design
26
Theatrical Design: Texas Scenic Co.

Legend

S113
15 02 04 03

C D
23.7

B
15 02

23.5

23.3
E
04 02

05 11 05 11 05 11 05
A
B

22
SABLATURA
MIDDLE SCHOOL

F
18
G
K L M N
H
J P R

PEARLAND WEST
JUNIOR SCHOOL

Notes

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

Permit-Seal
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

E.2 Client/Project

E.1
Pearland Independent School District
UP 2/S118 Pearland Junior High West & Sablatura
Middle School Additions and
E.S E.R E.P E.N Renovations
Pearland, Texas 77581
SMS COMPOSITE FOUNDATION PLAN
1 1/16" = 1'-0"
Title
F SMS OVERALL FOUNDATION PLAN

Project No. Scale


214000507 1/16" = 1'-0"
Revision Drawing No.
10/10/2017 12:00:31 PM

S111
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SA.1 SC.1

www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
20 The Copyrights to all designs and drawings are the property of
S119 Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

S114 Consultants
19
Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend
3/S118
C D

S115 B
SJ.2 SK.2 E
A
B
SABLATURA
MIDDLE SCHOOL
14.8

F
14 13.3
G
13
13.2 K L M N
12.5
S117
12 H
S119 J P R
10

9
Q
8

7
PEARLAND WEST
6 JUNIOR SCHOOL

C S116 5

4
Notes
3

SP
B.1

SA SB SC SD SF SG SH SI SJ SK SL SM SN SO SQ

E.Y

E.HH

E.X

E.W
D
S119
E.V

E.U

4/S118 E.JJ

E.T

E.GG E.FF E.EE E.DD E.CC E.BB E.II E.AA E.Z E.Q

By Appd YYYY.MM.DD
Revision
JHW COMPOSITE FOUNDATION PLAN
1 1" = 30'-0"
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

Permit-Seal
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F JHW OVERALL FOUNDATION PLAN

Project No. Scale


214000507 1" = 30'-0"
Revision Drawing No.
10/10/2017 12:00:34 PM

S112
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

AF.1 AF.9 AC AB

EXISTING
NEW MODIFIED

12' - 5" 12' - 7 1/4" 15' - 8 7/8"

www.stantec.com
1' - 4" EXISTING GRADE BEAM
A AND BELL PIER, TYP.

1' - 4"
30
Copyright Reserved
PIER CENTERLINE The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
10" 23' - 1" 23' - 7" 10' - 10" 20' - 9 7/8" 6' - 3 7/8" 6 3/8" reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
10" 10" authorized by Stantec is forbidden.
T/GB = 99'-6"
30/60 PIER CENTERLINE
30/66 30/54 30/54 30/54 GB9
Consultants

10"
Civil: Stantec

5' - 0"
Landscape: KGA/DeForest, LLC
Structural: Stantec

GB2
GB2
8" LOAD BEARING CMU WALL 8 8
TYP. AREA C, SEE SCHEDULE
MEP: Stantec
12 GB2 S502 S502 Information Technology: Stantec
ON S113 FOR REINFORCEMENT
S502
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

17' - 8"
4
42' - 0"

22' - 7 1/8"

S502 T/GB = 99'-4" Legend

GB2 EXAMPLE LOCATION OF


VMCJ, SEE PLAN NOTES
STRIP FOOTING UNDER ALL INTERIOR GB9 30/60 C D
NON-LOAD BEARING CMU WALL, TYP.

30/66 30/48
B
12
E

13' - 0"
S502
A

GB1
B 6
T/GB = 99'-6"
S502 30/66 30/48 GB9 30/60 SABLATURA
9 2 MIDDLE SCHOOL
26
S502 S503
F
22' - 6"

9' - 9"
S502
STRIP FOOTING UNDER ALL 30/48 GB9 30/60 G
GB1

INTERIOR NON-LOAD
19' - 7"

BEARING CMU WALL, TYP. K L M N


30/66 6
H

9' - 10"
S502

30/66 GB9 30/60


4 J P R
S504
9
23.7
S502
Q
8' - 11"

10' - 5"
22' - 8"
1' - 6"

10' - 4 3/8" 30/66


23.5 30/48 30/48 GB12 30/60
30/42
PEARLAND WEST
2
JUNIOR SCHOOL
23.3 S503
8
6' - 0"

10" 6
C S502 PIER CENTERLINE S501
30/54 30/36
9
S502 Notes
10"

22
30/48
30/60
10" GB2
GB10

26' - 5 5/8"
G
12' - 2 7/8"

B9
8 00°
45.
GB10

GB10

GB10

T/GB = 99'-6" S502

20
'-
22' - 6"

1
30/66

1/
2"
30/54 30/54 30/54 30/54 30/54
NEW

4
6' - 3 7/8"

6' - 3 7/8"
1
GB2
GB10

S504 S505

18
1
MODIFIED

S503
EXISTING

PIER CENTERLINE
12' - 0" 12' - 0 5/8" 11' - 6" 12' - 5" 19' - 11 7/8" 6' - 3 7/8"

T/GB = 99'-4"

SMS FOUNDATION PLAN "C"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

CMU WALL SCHEDULE FOUNDATION LEGEND: FOUNDATION PLAN NOTES:


E = INDICATES LOAD BEARING CMU WALL, SEE SCHEDULE 1. GROUND FLOOR SLAB SHALL BE 5" CONCRETE
EXTERIOR U.N.O. REINFORCED SLAB WITH #4 AT 16" E.W.
NOMINAL CMU
LOCATION LOAD BEARING C/C IN TOP 1/3 OF SLAB.
WIDTH Permit-Seal
CMU REINF. = INDICATES NON-LOAD BEARING CMU WALL, SEE SCHEDULE 2. T/SLAB = 100'-0" U.N.O. TRUE ELEVATION FINISH
AND ARCH FOR LOCATION FLOOR SEE CIVIL.
3. T/GB = 99'-4" UNLESS ALONG EXTERIOR WALL IN
AREA C #6 AT 32" C/C 8" WHICH SEE PLAN AND DETAILS FOR T/GB FOR
MCJ = INDICATES CMU CONTROL JOINTS EXTERIOR WALLS.
AREA F #6 AT 48" C/C 8" 18 / 24 4. FOR STEEL COLUMNS, BOTTOM OF BASEPLATE IS
99'-6"
= INDICATES BELL PIER 5. WHERE NO COLUMN ABOVE, CENTER PIER ON
AREA G LOW #6 AT 48" C/C 8" SCHEDULED GRADE BEAM U.N.O.
6. PROVIDE BOND BEAMS (8"x8" W/ (2) #5 CONT.
HOOKED AT CORNERS) AS NOTED IN DETAILS
AREA G HIGH = INDICATES GRADE BEAM AND AT EXTERIOR CMU WALLS AT 10'-0" C/C MAX
(GYM WALLS #7 AT 48" C/C 12"
7. SLEEVES OR OTHER PENETRATIONS SHALL BE
ONLY) ALLOWED THRU STRUCTURAL MEMBERS ONLY
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

= INDICATES SLAB OVER-POUR WITH PRIOR APPROVAL OF


Client/Project
AREA J #6 AT 48" C/C 8" ARCHITECT/ENGINEER. REQUESTS FOR
APPROVAL SHALL BE SUBMITTED IN WRITING A Pearland Independent School District
T/GB = INDICATES TOP OF GRADE BEAM MINIMUM OF FIVE WORKING DAYS PRIOR TO THE
AREA K #6 AT 48" C/C 8"
8.
CONCRETE POUR.
ALL DEPRESSIONS THAT ARE DIMENSIONED ON Pearland Junior High West & Sablatura
= INDICATES RECESSED SLAB PLAN ARE FOR REFERENCE ONLY. DEPTH OF
DEPRESSIONS ARE REFERENCED FROM FINISH
Middle School Additions and
= CMU WALL DESIGNATION
FLOOR ELEVATION. VERIFY EXACT LOCATION OF
Renovations
CMU WALL SCHEDULE NOTES: WT-X ALL DEPRESSIONS WITH ARCH'L PLANS PRIOR TO
CONSTRUCTION. Pearland, Texas 77581
9. SEE S113 FOR CMU WALL REINFORCEMENT.
1. ALL INTERIOR NON-LOAD BEARING WALL TO BE 8" 10. EXISTING COLUMN GRID LOCATIONS TO BE FIELD
CMU WITH #5 AT 56" C/C = BRACE FRAME VERIFIED BEFORE SETTING NEW FOOTINGS AND Title
F 2. ALL EXTERIOR NON-LOAD BEARING WALL TO BE 8"
CMU WITH #5 AT 32" C/C 11.
COLUMNS.
DEPTH OF BELL PIER = 10'-0" +/-; REFER TO
SMS FOUNDATION PLAN "C"
GEOTECHNICAL REPORT
CJ = INDICATES CONTROL JOINT 12. PROVIDE CONTROL JOINTS IN ALL SLABS, REFER
TO 1/S501. CONTROL JOINT SPACING AT 15'-0"
MAX. CONTRACTOR TO PROVIDE CJ LAYOUT TO Project No. Scale
VMCJ = INDICATES VERTICAL MASONRY CONTROL JOINT ENGINEER FOR APPROVAL. 214000507 As indicated
13. PROVIDE VERTICAL MASONRY CONTROL JOINTS
AT 24'-0" MAX AND 3'-0" FROM
Revision Drawing No.
10/10/2017 12:00:35 PM

CORNERS/INTERSECTIONS. SEE 3/S522.

0 4' 8' 16'

SCALE: 1/8" = 1'-0"


S113
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SA.1 SC.1

PIER CENTERLINE

10" 26' - 1 1/8" 8' - 8 7/8" 18' - 8" 22' - 5 3/8" 4' - 11 3/4" 26' - 1 1/4" 11' - 0"
www.stantec.com
T/GB = 98'-0" TYPICAL
GRADE BEAM STEP, ALONG THIS WALL EXAMPLE LOCATION OF GRADE BEAM STEP,
A SEE 4/S505 GB3 VMCJ, SEE PLAN NOTES SEE 4/S505
30/54 Copyright Reserved
30/54
30/60 30/60 30/60 The Contractor shall verify and be responsible for all dimensions.

10"
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
2 authorized by Stantec is forbidden.
S505
3
GB4
S505
Consultants
Civil: Stantec

GB4
Landscape: KGA/DeForest, LLC

22' - 0"
22' - 4"

7 SEE E6/A715 FOR SHELF DETAIL, SEE E6/A715 FOR SHELF DETAIL, 7 Structural: Stantec
PROVIDE (3) 4"X4"x3/16" TUBE TO PROVIDE (3) 4"X4"x3/16" TUBE TO S502 MEP: Stantec
S502
SUPPORT EACH SHELF SUPPORT EACH SHELF Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.
4"x4"x3/16" HSS TUBE 4"x4"x3/16" HSS TUBE Legend
GB4 TYPICAL AT SHELVES, TYPICAL AT SHELVES, 30/48
30/48 COLUMN TO B/DECK COLUMN TO B/DECK 30/48
10"

RECESSED SLAB AT TOILETS & SHOWERS, PIER CENTERLINE


C D
5' - 0"
5' - 4"

GB3 2
3 SLOPE SLAB TO DRAIN TYP., SEE ARCH
S502
S502 30/66 30/66 B
10"

GB4

30/48
20
9 9
E
1' - 11 1/4"

GB4
S502 S502
A

27' - 9 1/8"
B
STRIP FOOTING UNDER ALL SABLATURA
INTERIOR NON-LOAD MIDDLE SCHOOL
GB4

BEARING CMU WALL, TYP.

F
24' - 6 1/2"

GB4
S502
30/54
G
6
S502 6 11 K L M N
S502
1' - 10 1/4"

S502
30/66 30/66 H
GB4
J P R
19
30/48
10"

7
5' - 4"

5' - 0"
3 RECESSED SLAB AT TOILETS & SHOWERS, RECESSED SLAB AT TOILETS & SHOWERS,
S502
Q

27' - 7"
30/48 S502 SLOPE SLAB TO DRAIN TYP., SEE ARCH SLOPE SLAB TO DRAIN TYP., SEE ARCH
10"

GB4

GB4 PIER CENTERLINE


PEARLAND WEST
12' - 5 1/4"

2
26' - 1" 26' - 7" 26' - 7 1/8" 26' - 0" 5 3/4" JUNIOR SCHOOL
S502 7
GB4

GB6
C S503
30/72 30/72 30/72 30/72 30/72
GRADE BEAM GB3
CHANGE
30/60 Notes
5 7/8"

3 7/8"
-2 7/8" RECESSED SLAB AT GYM FLOOR, SEE DETAILS. 3
PIER CENTERED ON GB5 12" LOAD BEARING CMU WALL, VERIFY SLAB DEPRESSION WITH WOOD FLOOR MANUFACTURER

GB5

GB3
SEE SCHEDULE ON S113 S504
FOR REINFORCEMENT

JHW FOUNDATION PLAN "F"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

FOUNDATION LEGEND: FOUNDATION PLAN NOTES:


= INDICATES LOAD BEARING CMU WALL, SEE SCHEDULE 1. GROUND FLOOR SLAB SHALL BE 5" CONCRETE
U.N.O. REINFORCED SLAB WITH #4 AT 16" E.W.
C/C TOP & BOTT.
E = INDICATES NON-LOAD BEARING CMU WALL, SEE SCHEDULE 2. T/SLAB = 100'-0" U.N.O. TRUE ELEVATION FINISH
AND ARCH FOR LOCATION FLOOR SEE CIVIL.
3. FOR STEEL COLUMNS, BOTTOM OF BASEPLATE IS
99'-6" Permit-Seal
MCJ = INDICATES CMU CONTROL JOINTS 4. WHERE NO COLUMN ABOVE, CENTER PIER ON
18 / 24 SCHEDULED GRADE BEAM U.N.O.
5. T/GB = 99'-4" U.N.O., EXTERIOR GRADE BEAMS
= INDICATES BELL PIER MAY ALTER, SEE PLAN FOR NOTES.
6. PROVIDE BOND BEAMS (8"x8" OR 12"x12"
DEPENDENT ON WALL WIDTH W/ (2) #5 CONT.
HOOKED AT CORNERS) AS NOTED IN DETAILS
= INDICATES GRADE BEAM AND AT EXTERIOR CMU WALLS AT 10'-0" C/C MAX
7. IN RESTROOM AND SHOWERS, SLOPE SLAB TO
DRAINS. COORDINATE WITH ARCHITECTURAL
= INDICATES SLAB OVER-POUR AND PLUMBING
8. SLEEVES OR OTHER PENETRATIONS SHALL BE
ALLOWED THRU STRUCTURAL MEMBERS ONLY
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

T/GB = INDICATES TOP OF GRADE BEAM WITH PRIOR APPROVAL OF Client/Project


ARCHITECT/ENGINEER. REQUESTS FOR
APPROVAL SHALL BE SUBMITTED IN WRITING A Pearland Independent School District
= INDICATES RECESSED SLAB MINIMUM OF FIVE WORKING DAYS PRIOR TO THE
CONCRETE POUR.
9. ALL DEPRESSIONS THAT ARE DIMENSIONED ON Pearland Junior High West & Sablatura
WT-X = CMU WALL DESIGNATION PLAN ARE FOR REFERENCE ONLY. DEPTH OF
DEPRESSIONS ARE REFERENCED FROM FINISH Middle School Additions and
FLOOR ELEVATION. VERIFY EXACT LOCATION OF
ALL DEPRESSIONS WITH ARCH'L PLANS PRIOR TO Renovations
= BRACE FRAME CONSTRUCTION.
10. SEE S113 FOR CMU WALL REINFORCEMENT.
Pearland, Texas 77581
11. EXISTING COLUMN GRID LOCATIONS TO BE FIELD
VERIFIED BEFORE SETTING NEW FOOTINGS AND Title
CJ = INDICATES CONTROL JOINT COLUMNS.
F 12. DEPTH OF BELL PIER = 10'-0" +/-; REFER TO JHW FOUNDATION PLAN "F"
GEOTECHNICAL REPORT.
VMCJ = INDICATES VERTICAL MASONRY CONTROL JOINT 13. PROVIDE CONTROL JOINTS IN ALL SLABS, REFER
TO 1/S501. CONTROL JOINT SPACING AT 15'-0"
MAX. CONTRACTOR TO PROVIDE CJ LAYOUT TO Project No. Scale
ENGINEER FOR APPROVAL.
14. PROVIDE VERTICAL MASONRY CONTROL JOINTS 214000507 As indicated
AT 24'-0" MAX AND 3'-0" FROM
Revision Drawing No.
10/10/2017 12:00:36 PM

CORNERS/INTERSECTIONS. SEE 3/S522.


0 4' 8' 16'

SCALE: 1/8" = 1'-0"


S114
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

PIER CENTERLINE

26' - 1" 26' - 7" 26' - 7 1/8" 26' - 0" 5 3/4"

GB4
GB6
S503 www.stantec.com
30/72 30/72 30/72 30/72 30/72
GRADE BEAM GB3
30/60
A CHANGE

5 7/8"
(2) #4 ADDITIONAL Copyright Reserved
E.W. TOP AND BOTT.

3 7/8"
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
1 -2 7/8" RECESSED SLAB AT GYM FLOOR, SEE DETAILS. 3 The Copyrights to all designs and drawings are the property of
VERIFY SLAB DEPRESSION WITH WOOD FLOOR MANUFACTURER Stantec. Reproduction or use for any purpose other than that
S504 PIER CENTERED ON GB5 12" LOAD BEARING CMU WALL, S504

GB5

GB3
authorized by Stantec is forbidden.
SEE SCHEDULE ON S113

19' - 9"
FOR REINFORCEMENT
5 1/2" DIA. +/- SLEEVE,
23' - 0"

104' - 2 1/4" COORD. WITH VOLLEYBALL Consultants


6 SLEEVE MANUF. Civil: Stantec

23' - 0"
S503 Landscape: KGA/DeForest, LLC
PLAN VIEW Structural: Stantec
GB5
MEP: Stantec
30/60 Information Technology: Stantec
Food Service: FCA Design
30/84 30/84 Theatrical Design: Texas Scenic Co.

SLAB REINF., SEE PLAN NOTES Legend


GB3

8" LOAD BEARING CMU WALL, (2) #4 BARS


SEE SCHEDULE ON S113
2'-0" MIN. LAP LENGTH
C D
FOR REINFORCEMENT

25' - 0"
5
23' - 0"

23' - 0"
135
.00
S503 ° E
A
B

6"
4" 4"
SABLATURA
30/84 12" LOAD BEARING CMU WALL, #4 BAR 2'-0" LENGTH, MIDDLE SCHOOL
SEE SCHEDULE ON S113 30/84 30/60 CENTERED ON POST SLEEVE
FOR REINFORCEMENT 1' - 1 1/2"
11
2
S502 F
S504

VOLLEYBALL INSERT
2 3/4" = 1'-0"
G
7
S502
K L M N
8

114' - 0 1/8"
12" LOAD BEARING CMU WALL,
S503
H

25' - 0"
23' - 0"

23' - 0"
SEE SCHEDULE ON S113 7
FOR REINFORCEMENT J P R
GB5

S503

GB5
30/84 2 30/84 Q
S115 30/60

COORDINATE VOLLEYBALL POST


PEARLAND WEST
LOCATION WITH ARCHITECTURAL JUNIOR SCHOOL
6
C S503

Notes
23' - 0"

23' - 0"

25' - 0"
GB3
30/84
30/84

30/60

5
12" LOAD BEARING CMU WALL, S503
23' - 0"

23' - 1"
SEE SCHEDULE ON S113

20' - 1 1/4"
EXAMPLE LOCATION OF
VMCJ, SEE PLAN NOTES FOR REINFORCEMENT

3
S503
GB6
30/84 30/84 30/84 E 30/72 ?
30/72 GB7
30/60
1' - 0 1/8"

11"
30/72
14 8 7 RECESSED SLAB FOR
GB11

GB11

WOOD FLOORING, SEE


13' - 3 1/4"

S503
GB11

S503 ARCH.
18' - 5 3/4"

18' - 5 3/4"
BELL PIER OFFSET 1'-0 1/8" PLAN

GB7
10 NORTH FROM GRID 14
S504 30/66 30/66 30/66
6
S503
NEW

GB1
30/66 30/66
6' - 10"

6' - 10"

GB11

30/42
1' - 7 1/4"

1' - 8"
13

GB7 By Appd YYYY.MM.DD


7 8" LOAD BEARING CMU WALL, Revision
MODIFIED

GB7
EXISTING

EXISTING GYM WOOD FLOOR


S504 SEE SCHEDULE ON S113
RECESSED SLAB AT TOILETS & SHOWERS, 7
FOR REINFORCEMENT EXAMPLE LOCATION OF Issue for Bidding & Construction RAS PMR 2017.10.11
SLOPE SLAB TO DRAIN TYP., SEE ARCH
VMCJ, SEE PLAN NOTES S502 By Appd YYYY.MM.DD
Issued
1' - 8" 24' - 6" 27' - 4" 17' - 0" 18' - 1 1/8" 11' - 9"
FOUNDATION LEGEND: FOUNDATION PLAN NOTES:
= INDICATES LOAD BEARING CMU WALL, SEE SCHEDULE 1. GROUND FLOOR SLAB SHALL BE 5" CONCRETE
SA SB SC SD SF
U.N.O. REINFORCED SLAB WITH #4 AT 16" E.W.
C/C TOP & BOTT.
E = INDICATES NON-LOAD BEARING CMU WALL, SEE SCHEDULE 2. T/SLAB = 100'-0" U.N.O. TRUE ELEVATION FINISH
AND ARCH FOR LOCATION FLOOR SEE CIVIL.
3. FOR STEEL COLUMNS, BOTTOM OF BASEPLATE IS
JHW FOUNDATION PLAN "G" 99'-6"
Permit-Seal
1 1/8" = 1'-0"
MCJ = INDICATES CMU CONTROL JOINTS 4. WHERE NO COLUMN ABOVE, CENTER PIER ON
18 / 24 SCHEDULED GRADE BEAM U.N.O.
5. T/GB = 99'-4" U.N.O., EXTERIOR GRADE BEAMS
= INDICATES BELL PIER MAY ALTER, SEE PLAN FOR NOTES.
6. PROVIDE BOND BEAMS (8"x8" OR 12"x12"
DEPENDENT ON WALL WIDTH W/ (2) #5 CONT.
HOOKED AT CORNERS) AS NOTED IN DETAILS
= INDICATES GRADE BEAM AND AT EXTERIOR CMU WALLS AT 10'-0" C/C MAX
7. IN RESTROOM AND SHOWERS, SLOPE SLAB TO
DRAINS. COORDINATE WITH ARCHITECTURAL
= INDICATES SLAB OVER-POUR AND PLUMBING
8. SLEEVES OR OTHER PENETRATIONS SHALL BE
ALLOWED THRU STRUCTURAL MEMBERS ONLY
T/GB
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

= INDICATES TOP OF GRADE BEAM WITH PRIOR APPROVAL OF Client/Project


ARCHITECT/ENGINEER. REQUESTS FOR

= INDICATES RECESSED SLAB


APPROVAL SHALL BE SUBMITTED IN WRITING A
MINIMUM OF FIVE WORKING DAYS PRIOR TO THE
Pearland Independent School District
CONCRETE POUR.

= CMU WALL DESIGNATION


9. ALL DEPRESSIONS THAT ARE DIMENSIONED ON
PLAN ARE FOR REFERENCE ONLY. DEPTH OF
Pearland Junior High West & Sablatura
WT-X
DEPRESSIONS ARE REFERENCED FROM FINISH
FLOOR ELEVATION. VERIFY EXACT LOCATION OF
Middle School Additions and
= BRACE FRAME
ALL DEPRESSIONS WITH ARCH'L PLANS PRIOR TO
CONSTRUCTION.
Renovations
10. SEE S113 FOR CMU WALL REINFORCEMENT. Pearland, Texas 77581
11. EXISTING COLUMN GRID LOCATIONS TO BE FIELD
VERIFIED BEFORE SETTING NEW FOOTINGS AND Title
CJ = INDICATES CONTROL JOINT COLUMNS.
F 12. DEPTH OF BELL PIER = 10'-0" +/-; REFER TO JHW FOUNDATION PLAN "G"
GEOTECHNICAL REPORT.
VMCJ = INDICATES VERTICAL MASONRY CONTROL JOINT 13. PROVIDE CONTROL JOINTS IN ALL SLABS, REFER
TO 1/S501. CONTROL JOINT SPACING AT 15'-0"
MAX. CONTRACTOR TO PROVIDE CJ LAYOUT TO
ENGINEER FOR APPROVAL. Project No. Scale
14. PROVIDE VERTICAL MASONRY CONTROL JOINTS 214000507 As indicated
AT 24'-0" MAX AND 3'-0" FROM
CORNERS/INTERSECTIONS. SEE 3/S522. Revision Drawing No.
10/10/2017 12:00:37 PM

0 4' 8' 16'

SCALE: 1/8" = 1'-0" S115


ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

30/42

1' - 8"
13

GB7 www.stantec.com

GB7
13' - 10"
A 7
EXAMPLE LOCATION OF Copyright Reserved
VMCJ, SEE PLAN NOTES S502
GB7 1' - 8" The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.

1' - 8"
The Copyrights to all designs and drawings are the property of
12 Stantec. Reproduction or use for any purpose other than that
30/42 30/42 authorized by Stantec is forbidden.
7
S502
9' - 0"

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
7 Structural: Stantec
S504 MEP: Stantec
30/48 Information Technology: Stantec
30/66 Food Service: FCA Design
GB11 RECESSED SLAB AT TOILETS & SHOWERS, Theatrical Design: Texas Scenic Co.
14' - 0"

9 SLOPE SLAB TO DRAIN TYP., SEE ARCH


1 Legend
S504

GB7
S401
GB3

MODIFIED
EXISTING
C D
GRADE BEAM STEP, 6
GB7

1' - 0 3/4"
30/48 FIELD VERIFY STEP HEIGHT 1' - 8" 1' - 4"
B
5' - 7"

S505
30/66 AND SEE 8/S501
GB11

5' - 11" 11"


10 E
2' - 6"

30/48 30/48 2.13


7
S502
A
B 7

1' - 8"
9 6 30/48 9

9' - 11"
5' - 3"

NEW
GB7 S304
S304 30/48 S504 SABLATURA
9 GB7
30/66 MIDDLE SCHOOL

ME
8 S504 30/54 30/66

FRA
30/66
7 7
GB7
F

PORTAL FRAME
30/66 30/48

TAL
GB13
S502 S501 2' -

GB13
GB11 9" 2

GB12

POR
S401

18' - 10"
RECESSED SLAB AT TOILETS & SHOWERS,
G

PORTAL FRAME
17' - 0"

8" CMU LOAD BEARING SLOPE SLAB TO DRAIN TYP., SEE ARCH
WALL, SEE SCHEDULE ON S113 REFER TO 1/S006 FOR
PORTAL FRAME
K L M N
GB11 BASE PLATE DETAIL
30/48 6
H

3
GB1
6 S503

7
S502
30/48 30/48 30/48 2.12
J P R
30/66 30/48 30/48 30/60
GB8 TYP. UNDER ALL INTERIOR REFER TO 1/S006 FOR

1' - 8"
9' - 8"

NON-LOAD BEARING CMU WALL 5 8 PORTAL FRAME


12' - 2" REFER TO 1/S006 FOR
GB7
S504 S504 BASE PLATE DETAIL Q
30/60
30/66 PORTAL FRAME
9 BASE PLATE DETAIL
6
10 GB12 S502
PEARLAND WEST
6' - 0"

S504
30/66 JUNIOR SCHOOL
5 RECESSED SLAB AT TOILETS & SHOWERS,
SLOPE SLAB TO DRAIN TYP., SEE ARCH
1' - 8"

5 S505 2.11
3' - 8"

C 30/48
30/48
4' - 2"

30/54 9 7 NE
4 S502 S505
W Notes
EX
I
6' - 4" MO STIN
DIF G
IED
6' - 10"
6
5 CONCRETE CURB AT TOILETS,
S503
REFER TO C6/A002
GB7

S505
24' - 8"

30/42

GB7
5
3
S504
5
S505 5
30/66 S502
1 1
30/60 30/48 2 30/48
S532 9 S532
2 GB7 S502

3' - 10"
S502

GB7
1' - 4" 1' - 2"
20' - 4"

EXISTING NEW 5
MODIFIED S502
D
GB7

5
S504
5 5 6
S502 S503 30/42
S502 30/42 30/42
9
1' - 8"

1
S502
30/42
30/42 30/36

1' - 8" GB7


PRE-ENGINEERED CANOPY 3' -
9 1/
BY OTHERS. SUBMIT STRUCTURAL DRAWINGS 4"
AND CALCULATIONS FOR REVIEW, TYP.

18' - 0" 8' - 6" 19' - 6" 6' - 0" 10' - 8" 1' - 8" 5' - 2" 18' - 8" 3' - 8 1/2" 19' - 0 7/8" 19' - 4" 10' - 5 3/4" 4' - 0 1/8"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
SP By Appd YYYY.MM.DD
B.1 Issued
SF SG SH SI SJ SK SL SM SN SO SQ
FOUNDATION LEGEND: FOUNDATION PLAN NOTES:
= INDICATES LOAD BEARING CMU WALL, SEE SCHEDULE 1. GROUND FLOOR SLAB SHALL BE 5" CONCRETE
JHW FOUNDATION PLAN "J" U.N.O. REINFORCED SLAB WITH #4 AT 16" E.W.

E
1 1/8" = 1'-0" = INDICATES NON-LOAD BEARING CMU WALL, SEE SCHEDULE 2.
C/C TOP & BOTT.
T/SLAB = 100'-0" U.N.O. TRUE ELEVATION FINISH
AND ARCH FOR LOCATION FLOOR SEE CIVIL.
3. FOR STEEL COLUMNS, BOTTOM OF BASEPLATE IS
99'-6" Permit-Seal
MCJ = INDICATES CMU CONTROL JOINTS 4. WHERE NO COLUMN ABOVE, CENTER PIER ON
18 / 24 SCHEDULED GRADE BEAM U.N.O.
5. T/GB = 99'-4" U.N.O., EXTERIOR GRADE BEAMS
= INDICATES BELL PIER MAY ALTER, SEE PLAN FOR NOTES.
6. PROVIDE BOND BEAMS (8"x8" OR 12"x12"
DEPENDENT ON WALL WIDTH W/ (2) #5 CONT.
HOOKED AT CORNERS) AS NOTED IN DETAILS
= INDICATES GRADE BEAM AND AT EXTERIOR CMU WALLS AT 10'-0" C/C MAX
7. IN RESTROOM AND SHOWERS, SLOPE SLAB TO
DRAINS. COORDINATE WITH ARCHITECTURAL
= INDICATES SLAB OVER-POUR AND PLUMBING
8. SLEEVES OR OTHER PENETRATIONS SHALL BE
ALLOWED THRU STRUCTURAL MEMBERS ONLY
T/GB
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

= INDICATES TOP OF GRADE BEAM WITH PRIOR APPROVAL OF Client/Project


ARCHITECT/ENGINEER. REQUESTS FOR

= INDICATES RECESSED SLAB


APPROVAL SHALL BE SUBMITTED IN WRITING A
MINIMUM OF FIVE WORKING DAYS PRIOR TO THE
Pearland Independent School District
CONCRETE POUR.

= CMU WALL DESIGNATION


9. ALL DEPRESSIONS THAT ARE DIMENSIONED ON Pearland Junior High West & Sablatura
WT-X PLAN ARE FOR REFERENCE ONLY. DEPTH OF
DEPRESSIONS ARE REFERENCED FROM FINISH Middle School Additions and
FLOOR ELEVATION. VERIFY EXACT LOCATION OF

= BRACE FRAME
ALL DEPRESSIONS WITH ARCH'L PLANS PRIOR TO Renovations
CONSTRUCTION.
10. SEE S113 FOR CMU WALL REINFORCEMENT. Pearland, Texas 77581
11. EXISTING COLUMN GRID LOCATIONS TO BE FIELD
VERIFIED BEFORE SETTING NEW FOOTINGS AND Title
CJ = INDICATES CONTROL JOINT COLUMNS.
F 12. DEPTH OF BELL PIER = 10'-0" +/-; REFER TO JHW FOUNDATION PLAN "J"
GEOTECHNICAL REPORT.
VMCJ = INDICATES VERTICAL MASONRY CONTROL JOINT 13. PROVIDE CONTROL JOINTS IN ALL SLABS, REFER
TO 1/S501. CONTROL JOINT SPACING AT 15'-0"
MAX. CONTRACTOR TO PROVIDE CJ LAYOUT TO
ENGINEER FOR APPROVAL.
Project No. Scale
14. PROVIDE VERTICAL MASONRY CONTROL JOINTS 214000507 As indicated
AT 24'-0" MAX AND 3'-0" FROM
CORNERS/INTERSECTIONS. SEE 3/S522. Revision Drawing No.
10/10/2017 12:00:39 PM

0 4' 8' 16'

SCALE: 1/8" = 1'-0" S116


ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SJ.2 SK.2

8' - 2"

www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
16/48 EXISTING PIER FOUNDATION Landscape: KGA/DeForest, LLC
AND NEW COLUMN, FIELD VERIFY Structural: Stantec
14.8 FOUNDATION LOCATION MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
9' - 0"

Theatrical Design: Texas Scenic Co.

Legend

24' - 8" C D
29' - 0"

B
E
A
B
SABLATURA
6' - 8"

10"x10"x5/8" BASEPLATE
AT THESE COLUMN LOCATIONS MIDDLE SCHOOL
9
13.3
S502 F
4' - 1"

14/40
12/30
13.2
G
EXISTING PIER FOUNDATION
K L M N
20' - 4"
12' - 4"

AND NEW COLUMN, FIELD VERIFY


FOUNDATION LOCATION
H
J P
EXISTING/
MODIFIED

14/36
10"x10"x5/8" BASEPLATE
AT THIS COLUMN LOCATION
R
12.5

6
Q
RECESSED SLAB AT TOILETS & SHOWERS,
SLOPE SLAB TO DRAIN TYP., SEE ARCH S502
NEW

6 PEARLAND WEST
S502 JUNIOR SCHOOL

C 9
33' - 5"

T/GB IN AREA K
100'-3 1/2" TYPICAL S504
Notes
GB8 TYP. UNDER ALL INTERIOR
GB7

NON-LOAD BEARING CMU WALL


7
GB7

S502
T/GB =100'-3 1/2"

GRADE BEAM STEP, GB7


FIELD VERIFY STEP HEIGHT
AND SEE 8/S501

10 9
S504

JHW FOUNDATION PLAN "K"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

E FOUNDATION PLAN NOTES:


FOUNDATION LEGEND: 1. GROUND FLOOR SLAB SHALL BE 5" CONCRETE
U.N.O. REINFORCED SLAB WITH #4 AT 16" E.W.
Permit-Seal
= INDICATES LOAD BEARING CMU WALL, SEE SCHEDULE C/C TOP & BOTT.
2. T/SLAB = 100'-0" U.N.O. TRUE ELEVATION FINISH
FLOOR SEE CIVIL.
= INDICATES NON-LOAD BEARING CMU WALL, SEE SCHEDULE 3. FOR STEEL COLUMNS, BOTTOM OF BASEPLATE IS
AND ARCH FOR LOCATION 99'-6"
4. WHERE NO COLUMN ABOVE, CENTER PIER ON
SCHEDULED GRADE BEAM U.N.O.
MCJ = INDICATES CMU CONTROL JOINTS 5. T/GB = 99'-4" U.N.O., EXTERIOR GRADE BEAMS
18 / 24 MAY ALTER, SEE PLAN FOR NOTES.
6. PROVIDE BOND BEAMS (8"x8" OR 12"x12"
= INDICATES BELL PIER DEPENDENT ON WALL WIDTH W/ (2) #5 CONT.
HOOKED AT CORNERS) AS NOTED IN DETAILS
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

AND AT EXTERIOR CMU WALLS AT 10'-0" C/C MAX Client/Project


7. IN RESTROOM AND SHOWERS, SLOPE SLAB TO
= INDICATES GRADE BEAM DRAINS. COORDINATE WITH ARCHITECTURAL
AND PLUMBING
Pearland Independent School District
8. SLEEVES OR OTHER PENETRATIONS SHALL BE
= INDICATES SLAB OVER-POUR ALLOWED THRU STRUCTURAL MEMBERS ONLY
WITH PRIOR APPROVAL OF
Pearland Junior High West & Sablatura
T/GB = INDICATES TOP OF GRADE BEAM
ARCHITECT/ENGINEER. REQUESTS FOR
APPROVAL SHALL BE SUBMITTED IN WRITING A
Middle School Additions and
MINIMUM OF FIVE WORKING DAYS PRIOR TO THE Renovations
CONCRETE POUR.
= INDICATES RECESSED SLAB 9. ALL DEPRESSIONS THAT ARE DIMENSIONED ON Pearland, Texas 77581
PLAN ARE FOR REFERENCE ONLY. DEPTH OF
DEPRESSIONS ARE REFERENCED FROM FINISH Title
WT-X = CMU WALL DESIGNATION FLOOR ELEVATION. VERIFY EXACT LOCATION OF
F ALL DEPRESSIONS WITH ARCH'L PLANS PRIOR TO JHW FOUNDATION PLAN "K"
CONSTRUCTION.
10. SEE S113 FOR CMU WALL REINFORCEMENT.
= BRACE FRAME 11. EXISTING COLUMN GRID LOCATIONS TO BE FIELD
VERIFIED BEFORE SETTING NEW FOOTINGS AND
COLUMNS.
Project No. Scale
CJ
12. DEPTH OF BELL PIER = 10'-0" +/-; REFER TO 214000507 As indicated
= INDICATES CONTROL JOINT GEOTECHNICAL REPORT.
13. PROVIDE CONTROL JOINTS IN ALL SLABS, REFER Revision Drawing No.
10/10/2017 12:00:40 PM

TO 1/S501. CONTROL JOINT SPACING AT 15'-0"


VMCJ = INDICATES VERTICAL MASONRY CONTROL JOINT MAX. CONTRACTOR TO PROVIDE CJ LAYOUT TO
ENGINEER FOR APPROVAL.
14. PROVIDE VERTICAL MASONRY CONTROL JOINTS
AT 24'-0" MAX AND 3'-0" FROM
CORNERS/INTERSECTIONS. SEE 3/S522.
0 4' 8' 16'
S117
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
18' - 2" Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec

CF3.5
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend

E.Y

CF3.5
REFERENCE D6/AS01 FOR MARQUEE
SIGN DETAILS AND SITE LOCATION
T/CMU WALL VARIES,
SEE ARCH.
B
2
S506

CF3.5 E.HH
E.X
14' - 6"

28' - 7 5/8"

CF3.5
3
S506

CF3.5

E.W

6' - 8 7/8"

18' - 6 3/8"
4
S506

SITE FOUNDATION PLAN - MARQUEE SIGN T/SLAB SEE CIVIL


C 1 1/8" = 1'-0"
Notes
E.V

CF3.5

17' - 5 5/8"
3
S506

CF3.5
CF3.5
EXISTING FOUNDATIONS
SEE 6/S506 FOR DETAIL AT CONCRETE WALL
E.U
E.JJ
T/CMU WALL VARIES, 6' - 8 7/8"
SEE ARCH.
4

15' - 2 3/8"
S506
1' - 1 1/2" 3' - 8 1/2" 1' - 4"

E.2
CF2.5
CF2.5 4
6' - 8"

3' - 8 1/2"

16' - 8"
CF3.5

CF3.5
S506

D E.1
CF2.5

6' - 8 7/8"
CF2.5

CF3.5
CF2.5 E.T
7 7 3
S506 S506 S506
T/CMU WALL VARIES,
11' - 8 5/8" 1' - 6" 12' - 0" 2' - 6" 2' - 2" SEE ARCH.

25' - 0 3/4" 12' - 6 3/8" E.GG E.FF

E.S E.R E.P E.N

SITE FOUNDATION PLAN - SABLATURA ENTRY


2 1/8" = 1'-0"

SITE FOUNDATION PLAN - AUDITORIUM PLAZA Revision By Appd YYYY.MM.DD


4 1/8" = 1'-0"
Issue for Bidding & Construction Author Approver 2017.10.11
By Appd YYYY.MM.DD
Issued
13
'-
6

FOUNDATION PLAN NOTES:


5/

E
8"

4"
1/ CF3.5 1. PROVIDE BOND BEAMS (8"x8" W/ (2) #5 CONT.
' -1 HOOKED AT CORNERS) AT EXTERIOR CMU Permit-Seal
39 1 WALLS AT 10'-0" C/C MAX AND TOP OF WALL.
S506 2. SLEEVES OR OTHER PENETRATIONS SHALL BE
ALLOWED THRU STRUCTURAL MEMBERS ONLY
WITH PRIOR APPROVAL OF
ARCHITECT/ENGINEER. REQUESTS FOR
APPROVAL SHALL BE SUBMITTED IN WRITING A
MINIMUM OF FIVE WORKING DAYS PRIOR TO THE
CONCRETE POUR.
1 3. DEPTH OF BELL PIER = 10'-0" +/-; REFER TO
S506 GEOTECHNICAL REPORT.
4. DEPTH OF STRIP FOOTING = 4'-0" +/-; REFER TO
GEOTECHNICAL REPORT.
5. SEE GEOTECHNICAL REPORT FOR CONCRETE
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

FOOTINGS AND SLAB ON GRADE SUBGRADE Client/Project


T/CMU 8'-0" ABOVE GRADE PREPARATION RECOMMENDATIONS AND
CF3.5 6.
REQUIREMENTS.
SEE ARCHITECTURAL AND CIVIL FOR ADD'L
Pearland Independent School District
1 DIMENSIONS AND INFORMATION.
S506 Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581
CF3.5
REFERENCE C5/AS03 FOR DUMPSTER
ENCLOSURE DETAILS AND SITE LOCATION Title
F SITE FOUNDATION PLANS

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:44 PM

0 4' 8' 16'


SITE FOUNDATION PLAN - DUMPSTER ENCLOSURE
3 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
S118
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

10' - 0" www.stantec.com

A CF3.5
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
6 The Copyrights to all designs and drawings are the property of
S506 Stantec. Reproduction or use for any purpose other than that
T/CMU WLL VARIES, SEE ARCH. authorized by Stantec is forbidden.

16' - 9 1/2"
CF3.5

CF3.5
4 6' - 0" Consultants
S506 Civil: Stantec
Landscape: KGA/DeForest, LLC

16' - 9 1/2"
CF3.5
Structural: Stantec
CF3.5 MEP: Stantec
12' - 8"

Information Technology: Stantec


Food Service: FCA Design
2' - 0" Theatrical Design: Texas Scenic Co.
6 T/CONC. WALL VARIES, SEE ARCH.
S506 Legend

CF3.5

23' - 2"
CF3.5
10' - 8"

6
S506

20' - 8"
CF3.5
B
CF3.5
40' - 8"

6
S506

4 11' - 4"
S506

5' - 0"

T/CMU WLL VARIES, SEE ARCH.

CF3.5

6
S506
25' - 10"

C
CF3.5

Notes

10' - 2"

CF3.5
6
1
S506
S506
CF3.5

1
20' - 5 1/4"

S506
CF3.5

CF3.5 T/CMU WALL 8'-0" ABOVE GRADE


1
S506

13' - 6 5/8"

SITE FOUNDATION PLAN - JHW AREA F


1 1/8" = 1'-0"
Revision By Appd YYYY.MM.DD

Issue for Bidding & Construction Author Approver 2017.10.11


By Appd YYYY.MM.DD
Issued

FOUNDATION PLAN NOTES:


1. PROVIDE BOND BEAMS (8"x8" W/ (2) #5 CONT.
E HOOKED AT CORNERS) AT EXTERIOR CMU
WALLS AT 10'-0" C/C MAX AND TOP OF WALL.
2. SLEEVES OR OTHER PENETRATIONS SHALL BE
ALLOWED THRU STRUCTURAL MEMBERS ONLY
WITH PRIOR APPROVAL OF Permit-Seal
ARCHITECT/ENGINEER. REQUESTS FOR
APPROVAL SHALL BE SUBMITTED IN WRITING A
MINIMUM OF FIVE WORKING DAYS PRIOR TO THE
CONCRETE POUR.
3. DEPTH OF BELL PIER = 10'-0" +/-; REFER TO
GEOTECHNICAL REPORT.
4. DEPTH OF STRIP FOOTING = 4'-0" +/-; REFER TO
GEOTECHNICAL REPORT.
5. SEE GEOTECHNICAL REPORT FOR CONCRETE
FOOTINGS AND SLAB ON GRADE SUBGRADE
PREPARATION RECOMMENDATIONS AND
REQUIREMENTS.
6. SEE ARCHITECTURAL AND CIVIL FOR ADD'L
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
DIMENSIONS AND INFORMATION.
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F SITE FOUNDATION PLANS

Project No. Scale


0 4' 8' 16'
214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:46 PM

SCALE: 1/8" = 1'-0"

S119
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

AF.1 AF.9 AC
AE.4

1' - 0 5/8" 1' - 1 5/8"


46' - 2 5/8" 12' - 7 1/4" 13' - 8 1/2"
10' - 2 3/4"
www.stantec.com

A 30
Copyright Reserved
NEW EXISTING The Contractor shall verify and be responsible for all dimensions.

11' - 0 3/8"
DO NOT scale the drawing - any errors or omissions shall be
4 reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
S301 Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend
30' - 11 5/8"

C D
B
E
T/STEEL = 112' - 3"
3 A
B S512

9 3/8"
S.E.
W12X22 (18) SABLATURA
26
MIDDLE SCHOOL

4 8
F
7
S512 S521

W16X31 (24)
S522
W16X26 (22) G
19' - 7"

NOTE: CONCRETE CURB AROUND PERIMETER


OF PLATFORM SLAB, SEE DETAILS
K L M N

30' - 0"
S511
10
2 H
S301 J P R
W12X19 (28) C=3/4"
23.7
3
S301
8' - 11"

W12X19 (16)
W12X19 (28) C=3/4"
Q
23.5
1' - 6"

W10X15 (6) W10X15 (6)

SPACING TYP.
23.3 PEARLAND WEST

3'-0" BEAM
6"

W10X15 (5)
S.E. JUNIOR SCHOOL
6' - 0"

S.E.
6"
C W10X15 (6)

S.E.
22 Notes
1' - 4 5/8"

9"
1' - 2" 3
STEEL STAIR BY S.E. S512
OTHERS
19' - 9 3/8"
NEW

1' - 4"

18
EXISTING

SMS PLATFORM FRAMING PLAN "C"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

MEZZANINE FLOOR LEGEND: No. OF 3/4" DIAM. X 4 1/2"


PLATFORM FLOOR PLAN NOTES: Permit-Seal
SHEAR STUDS (5) MIN. IF NOT 1. TOP OF CONCRETE FLOOR SHALL BE 112'-8" U.N.O.
= DECK DIRECTION
INDICATED 2. TOP OF STEEL BEAMS SHALL BE 112'-3" U.N.O.
3. FLOOR DECK SHALL BE 2" (2VLI) - 18 GAUGE COMPOSITE METAL DECK
WITH 3" CONC. FOR TOTAL OF 5" THICKNESS WITH 2.9x2.9 WWF IN A 6"x6"
S.E. = SLAB EDGE DIMENSION W12X19 (18) C=3/4" PATTERN.
4. DECK ANGLE SEE DETAILS.
CAMBER 5. REFER TO S511 FOR STANDARD BEAM TO COLUMN CONNECTIONS.
BEAM SIZE
6. ALL FLOOR OPENINGS SHOWN ON PLAN ARE FOR REFERENCE ONLY.
VERIFY EXACT LOCATIONS AND DIMENSIONS WITH ARCHITECTURAL
FLOOR BEAM LEGEND PLANS PRIOR TO CONSTRUCTION.
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F SMS PLATFORM FRAMING PLAN "C"

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:47 PM

0 4' 8' 16'

SCALE: 1/8" = 1'-0" S121


ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

AF.1

46' - 2 5/8" 1' - 0 5/8" 10' - 2 3/4" 27' - 5 1/4"


www.stantec.com

A 4
TYP. CMU LINTEL,
SEE 2/S522 FOR DETAILS Copyright Reserved
T/CMU VARIES, RAKED S301
The Contractor shall verify and be responsible for all dimensions.
CAP OR CMU DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

5' - 4"
30K9 26K7 Consultants
Civil: Stantec
6 Landscape: KGA/DeForest, LLC
3
30K9 S521 26K7
Structural: Stantec
S521 MEP: Stantec
Information Technology: Stantec
30' - 11 5/8"

Food Service: FCA Design

W18X40 C=1"
30K9 26K7 Theatrical Design: Texas Scenic Co.

SPACING TYP.
5'-0" JOIST
Legend
T/STEEL = 123' - 2"
30K9 26K7
T/CMU = 122'-4"
JOIST SEAT DEPTH = 0'-3 1/2"
C D
JOIST SEAT BEARING = 122'-0 1/2"
30K9 26K7

1
B
2
S521 30K9
S512
HSS6X6X1/4 26K7 E
26 A

4' - 3"
B
30K9 26K7
SABLATURA
ROOF SLOPE T/CMU = 124'-4"
MIDDLE SCHOOL
JOIST SEAT DEPTH = 0'-3 1/2"
30K9 1/4" PER 12" 26K7 JOIST SEAT BEARING = 124'-0 1/2"
F

W18X40 C=3/4"

SPACING TYP.
5'-0" JOIST
28' - 6"

30K9 26K7
G
6
2 K L M N
S301
30K9 S511 26K7

H
30K9 26K7
J P R

4' - 3"
30K9 7 HSS6X6X1/4 26K7
23.5
1
S511 Q
8' - 10 5/8"

S521
30K9 26K7
T/CMU VARIES
PEARLAND WEST
26K7 26K7 JUNIOR SCHOOL
W18X40 C=1/2"

SPACING TYP.
5'-0" JOIST
26K7 26K7
Notes
19' - 1"

T/CMU = 122'-7 1/2"


26K7 6 26K7
JOIST SEAT DEPTH = 0'-3 1/2"
JOIST SEAT BEARING = 122'-4" S521

2
26K7 26K7
S521

2' - 4"
T/CMU = VARIES 1 T/CMU VARIES, RAKED
JOIST SEAT DEPTH = N/A
S301 CAP OR CMU
JOIST SEAT BEARING = N/A

SMS ROOF FRAMING PLAN "C"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

E
ROOF FRAMING PLAN LEGEND: ROOF FRAMING NOTES: Permit-Seal
= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK
ATTACHMENT SCHEDULE FOR FASTENING PATTERN 1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
BAR JOIST AS NOTED ON PLAN.
2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
= JOIST BRIDGING, PER SJI AS NOTED ON PLAN.
3. SEE S005 FOR ROOF DECK TYPE.
4. SEE PLAN FOR JOIST SEAT DEPTH.
5. REFER TO SECTIONS FOR DECK EDGES.
= INDICATES ROOF MOUNTED SCREEN WALL 6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
MANUFACTURER RECOMMENDATIONS.
7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
MEET MINIMUM BEARING REQUIREMENTS. INDICATE
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

OFFSET SPACING DURING SHOP DRAWING STAGE TO BE Client/Project


REVIEWED BY ENGINEER.
9. REFER TO MECH'L DWGS FOR CONDITIONS WHERE Pearland Independent School District
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE
GENERAL NOTES FOR BRIDGING ADJUSTMENTS.
10. AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4" Pearland Junior High West & Sablatura
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2";
U.N.O. SEE PLAN FOR ELEVATIONS. Middle School Additions and
11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS Renovations
AND OPENING FRAMING.
Pearland, Texas 77581

Title
F SMS MID ROOF FRAMING PLAN "C"

Project No. Scale


214000507 As indicated
0 4' 8' 16'
Revision Drawing No.
10/10/2017 12:00:48 PM

SCALE: 1/8" = 1'-0"


S122
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SA.1 SC.1

35' - 0 5/8" 41' - 1 1/4" 31' - 3 1/2" 11' - 0"

T/CMU = 113'-4" 6 JOIST SEAT DEPTH =


JOIST SEAT DEPTH = 0'-3 1/2" 0'-3 1/2", TYP. AT LOAD www.stantec.com
S512
JOIST SEAT BEARING = 113'-0 1/2" BEARING CMU WALLS
A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
T/CMU = 113' - 4" DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
PRE-ENGINEERED CANOPY, Stantec. Reproduction or use for any purpose other than that
SEE ARCHITECTURAL authorized by Stantec is forbidden.

22' - 9 1/2" PROVIDE JOIST REINFORCEMENT AT EACH

22' - 0"
SCREEN WALL POST, SEE 2/S532 FOR JOIST 5 Consultants
REINFORCEMENT Civil: Stantec
S512
Landscape: KGA/DeForest, LLC
Structural: Stantec

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6

22K6
JOIST SEAT DEPTH = 0'-3 1/2", TYP. MEP: Stantec
AT LOAD BEARING CMU WALLS Information Technology: Stantec
TYP. CMU LINTEL, SEE 6
2/S522 FOR DETAILS T/CMU = 113' - 4" Food Service: FCA Design
S512 Theatrical Design: Texas Scenic Co.
2
S123
Legend
JOIST SEAT DEPTH = 0'-2 1/2", TYP.
AT STEEL BEAMS
Sim
6' - 6 1/2"

4
6 6

9' - 6"
6

10K1

10K1
S301
2.5K1 S511 7
S511
7 S511 C D
S511 SCREENWALL S511
W18X35 C=1" POSTS, W21X44 C=1-1/4"
20 SEE ARCH.
6 B
W21X44 C=1-1/4" S521

E
T/STEEL = 113' - 1 1/2"
T/CMU = 113'-4"
A
B
JOIST SEAT DEPTH = 0'-3 1/2"
5 JOIST SEAT BEARING = 113'-0 1/2" SABLATURA
S512 MIDDLE SCHOOL
28' - 9 1/2"

24' - 6 1/2"
18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3
F
T/CMU = 113'-4"
JOIST SEAT DEPTH = 0'-3 1/2"
JOIST SEAT BEARING = 113'-0 1/2"
JOIST SEAT DEPTH = 0'-2 1/2", TYP.
AT STEEL BEAMS T/STEEL = 113' - 1 1/2"
5
S512
G
K L M N
W18X35 C=3/4" W21X44 C=1" W21X44 C=1"
6
19
S521
H
2.5K1
J P R
Sim
6' - 6 1/2"

4 SCREEN WALL OUTLINE,


SEE ARCH. FOR LOCATION
S301

Q
18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

21' - 3 5/8"
TYP. CMU LINTEL, SEE
2/S522 FOR DETAILS
12' - 2 1/8"

18K3

2 PEARLAND WEST
4
S302 JUNIOR SCHOOL
S521

C
W10X19
Notes
T/STEEL = 113' - 1 1/2"

T/CMU = SEE HIGH ROOF PLAN


JOIST SEAT DEPTH = 0'-3 1/2"
JOIST SEAT BEARING = 113'-0 1/2"

JHW LOW ROOF FRAMING PLAN "F"


1 1/8" = 1'-0"

2' - 4"

INFILL STUDS,
SEE ARCH.
7' - 0" ABOVE ROOF

SEE ARCH.

STEEL ANGLE BRACE WELDED TO


CLIP ANGLE AND STEEL POST, By Appd YYYY.MM.DD
SEE 12/S511 Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
6" x 6"x1/4" CLIP 7" 2"x8"x1/4" GALVANIZED CHANNEL
Issued
ANGLE WELDED TO
HSS 4"x4"x1/4" THICK STEEL POST BETWEEN UPRIGHTS
45.

SQUARE TUBE
00°

(HEIGHT VARIES)
FLASHING, SEE ARCH.
0' - 8"
1" TYP.

HSS 4"x4"x1/4" THICK


MEMBRANE
SQUARE TUBE
E (HEIGHT VARIES) ROOFING
1' - 0"

LIGHT-WT INSULATING
0' - 8"

CONCRETE ROOFING SYSTEM


ROOF FRAMING PLAN LEGEND: ROOF FRAMING NOTES: Permit-Seal
= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK 1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
1/4" X 8" X8" 3/8" THRU BOLT, EACH ATTACHMENT SCHEDULE FOR FASTENING PATTERN BAR JOIST AS NOTED ON PLAN.
GALVANIZED PLATE SIDE 2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
AS NOTED ON PLAN.
= JOIST BRIDGING, PER SJI 3. SEE S005 FOR ROOF DECK TYPE.
PROVIDE JOIST REINFORCEMENT AT EACH 1/4" X 8" X8" GALVANIZED
REFER TO ARCH. WELD PLATES TO STEEL HSS 4"x4"x1/4" THICK 4. SEE PLAN FOR JOIST SEAT DEPTH.
SCREEN WALL POST, SEE 2/S532 FOR JOIST "SANDWICH" PLATES
JOIST SQUARE TUBE 5. REFER TO SECTIONS FOR DECK EDGES.
REINFORCEMENT. WELD PLATES TO STEEL 6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
(HEIGHT VARIES) = INDICATES ROOF MOUNTED SCREEN WALL
JOIST MANUFACTURER RECOMMENDATIONS.
5"x5"x5/16" ANGLE WELD PLATES TO 7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
ELEVATION PLATE DETAIL WELDED TO JOISTS STEEL ANGLE
SECTION 8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
MEET MINIMUM BEARING REQUIREMENTS. INDICATE
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
IF SCREENWALL SUPPORT IN LINE WITH JOIST, OFFSET SPACING DURING SHOP DRAWING STAGE TO BE
OMIT 5"x5"x5/16" ANGLE, TYP.
9.
REVIEWED BY ENGINEER.
REFER TO MECH'L DWGS FOR CONDITIONS WHERE
Pearland Independent School District
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE
GENERAL NOTES FOR BRIDGING ADJUSTMENTS. Pearland Junior High West & Sablatura
ROOFTOP EQUIPMENT SCREEN - SECTION/ELEVATION 10. AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4"
Middle School Additions and
2 1" = 1'-0"
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2";
U.N.O. SEE PLAN FOR ELEVATIONS.
11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS
Renovations
AND OPENING FRAMING. Pearland, Texas 77581

Title
F JHW LOW ROOF FRAMING PLAN "F"

Project No. Scale


214000507 As indicated
0 4' 8' 16' Revision Drawing No.
10/10/2017 12:00:49 PM

SCALE: 1/8" = 1'-0"


S123
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

18K3
W10X19 www.stantec.com
T/STEEL = 113' - 1 1/2"
A 9
S521 10K1 Copyright Reserved
T/CMU = SEE HIGH ROOF PLAN
JOIST SEAT DEPTH = 0'-3 1/2" The Contractor shall verify and be responsible for all dimensions.
JOIST SEAT BEARING = 113'-0 1/2" 4 DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
S521 The Copyrights to all designs and drawings are the property of
10K1
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.
7
10K1 S303 Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
10K1 Structural: Stantec
MEP: Stantec
Information Technology: Stantec
T/CMU = 113' - 4" Food Service: FCA Design
10K1 Theatrical Design: Texas Scenic Co.

Legend

10K1
C D
10K1 B
E
10K1 1 A
B
S302
SABLATURA
10K1 MIDDLE SCHOOL
T/CMU = 113' - 4"
F
6 10K1
S302
G
115' - 11 3/8"

10K1
K L M N
H
10K1 J P R
JOIST SEAT DEPTH = 0'-3 1/2",
TYP. AT LOAD BEARING CMU
10K1 WALLS
T/CMU = SEE HIGH ROOF PLAN
JOIST SEAT DEPTH = 0'-3 1/2"
Q
JOIST SEAT BEARING = 113'-0 1/2"

10K1
PEARLAND WEST
JUNIOR SCHOOL
10K1
C 9
S521
T/CMU = 113'-4" Notes
10K1 JOIST SEAT DEPTH = 0'-3 1/2"
JOIST SEAT BEARING = 113'-0 1/2"

10K1

10K1

10K1

10K1
T/STEEL = 113' - 1 1/2"
1" EXPANSION JOINT
7
5 S302
S302 W16X26
6 1/2"

14
W12X22 C=1/2" W12X22 C=1/2" W10X15 W12X22 C=3/4" W12X22
T/STEEL = 113' - 4"
D
18' - 5 3/4"

W10X15
W14X34

W10X15
18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3

18K3
Sim
3 7
S302 8 S303
10 1/4"

S511
W12X22
13
W10X15

4 T/CMU = 113' - 4"


S302
1' - 8"
18' - 8 3/4" 24' - 6" 27' - 4" 17' - 0" 18' - 3 5/8" 11' - 6 3/8" By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
SA SB SC SD SF Issued

JHW LOW ROOF FRAMING PLAN "G"


1 1/8" = 1'-0"

ROOF FRAMING PLAN LEGEND: ROOF FRAMING NOTES: Permit-Seal

= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK


1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
ATTACHMENT SCHEDULE FOR FASTENING PATTERN
BAR JOIST AS NOTED ON PLAN.
2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
AS NOTED ON PLAN.
= JOIST BRIDGING, PER SJI 3. SEE S005 FOR ROOF DECK TYPE.
4. SEE PLAN FOR JOIST SEAT DEPTH.
5. REFER TO SECTIONS FOR DECK EDGES.
6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
= INDICATES ROOF MOUNTED SCREEN WALL
MANUFACTURER RECOMMENDATIONS.
7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

MEET MINIMUM BEARING REQUIREMENTS. INDICATE Client/Project


OFFSET SPACING DURING SHOP DRAWING STAGE TO BE
REVIEWED BY ENGINEER. Pearland Independent School District
9. REFER TO MECH'L DWGS FOR CONDITIONS WHERE
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE
GENERAL NOTES FOR BRIDGING ADJUSTMENTS. Pearland Junior High West & Sablatura
10. AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4"
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2"; Middle School Additions and
U.N.O. SEE PLAN FOR ELEVATIONS.
11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND Renovations
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS Pearland, Texas 77581
AND OPENING FRAMING.

Title
F JHW LOW ROOF FRAMING PLAN "G"

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:00:50 PM

0 4' 8' 16'

SCALE: 1/8" = 1'-0"


S124
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

10 1/4"
W12X22
13 www.stantec.com
W10X15
A
8 10K1 9 Copyright Reserved

12' - 11 7/8"
S512 The Contractor shall verify and be responsible for all dimensions.
S511
DO NOT scale the drawing - any errors or omissions shall be
1' - 8" reported to Stantec without delay.

W10X15
10K1 T/STEEL = 113' - 4" The Copyrights to all designs and drawings are the property of

1' - 8"
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

10K1 W10X15
12 Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
24K6 T/STEEL = 113' - 1 1/2" Structural: Stantec
4
MEP: Stantec
S511 Information Technology: Stantec
T/CMU = 113'-4" Food Service: FCA Design
JOIST SEAT DEPTH = 0'-3 1/2" 24K6 Theatrical Design: Texas Scenic Co.
JOIST SEAT BEARING = 113'-0 1/2"
Legend
28' - 7"

24K6
JOIST SEAT DEPTH = 0'-2 1/2",
C

W16X26
TYP. AT STEEL BEAMS
D
24K6 1' - 8"
B
T/CMU = 113' - 4" T/STEEL = 113' - 1 1/2"
9
9
E

1' - 4"
24K6 S512 4
10
T/STEEL = 113' - 4" 1' - 8"
4 S303
S512
A
B S511 W10X15 W12X19 W12X19 W12X19
2' - 6"

SABLATURA

1' - 8"
W16X26 L2-1
24K6 / 2X2 2.13
9 4 -1/2 MIDDLE SCHOOL
X3

1' - 8"
/8

W10X15
L2-1
5' - 3"

S511 /

W10X19
2X2

12K1
24K6 W10X15 10K1 14K1
-1/2
X3 /8 4 F
8 S304
W10X15

0
W12X19
G

W12X26

8X4
16K2
16K2

16K2

16K2

16K2

16K2

16K2

16K2

16K2

16K2
W12X14
24K7 14K1 2

W1
18K4
L2-1
/ 2X2
S401 K L M N

W16X31
-1/2
17' - 0"

5 3 X3 /8

ME
L2-1
S303 / H

FRA
24K7 18K4 14K1 S303 2X2
LINTEL SUPPORT BEAM -1/2
BELOW, SEE SECTION
X3 /8 J P R

TAL
W16X31

POR
T/STEEL = 113' - 4" T/STEEL = 113' - 1 1/2"
24K7 18K4 6 14K1 2.12
W12X19 W14X26 W12X19
7 S511
Q

1' - 8"
24K7 18K4 14K1
10
9' - 8"

JOIST SEAT DEPTH = 0'-2 1/2", 9


TYP. AT STEEL BEAMS S304 S512
PEARLAND WEST

W12X14
24K7 7 18K4 7 14K1 T/STEEL = 113' - 1 1/2"
6 JUNIOR SCHOOL
3' - 0" 3' - 0"

S511 S511
2 24K7 18K4 14K1
6' - 0"

C S303
1

10K1 24K7 18K4 14K1 S303


5 Notes
2.11
3' - 8"

W10X15

T/STEEL = 113' - 1 1/2"


4 W14X26 NE
6 18K4 14K1 W
1' - 8"

S511 EX
I
JOIST DETAILER TO DESIGN MO STIN
DIF G
JOIST FOR 100 LB/FT LOAD AT CURTAINWALL IED
W12X19

18K4 18K4 14K1


6 BEARING, SEE SECTION
W18X35

W18X35
16' - 0"

S303
T/STEEL = 113' - 1 1/2"
T/STEEL = 113' - 4" 18K4 18K4 14K1

W12X14
T/STEEL = 113' - 1 1/2"
T/STEEL = 113' - 1 1/2"
18K4 18K4 14K1
3
4 JOIST SEAT DEPTH = 0'-2 1/2",
18K4 18K4 14K1
8' - 8"

S511 TYP. AT STEEL BEAMS


1' - 8"

18K4 18K4
2
W10X15

18K4 18K4 10K1


W14X22

1' - 8"
D
W14X22

W10X17

9
20' - 4"

18K4 18K4 10K1


S512
PRE-ENGINEERED 1' - 8"
SP
CANOPY STRUCTURE
AND FOUNDATIONS B.1
W10X15

18K4 18K4 10K1


BY OTHERS, TYP. 9
T/STEEL = 113' - 1 1/2"
S512

W10X15 1 W10X15 W10X15


1
S512
4
1' - 8"

S511 5
S304
T/STEEL = 113' - 4"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

18' - 0" 8' - 6" 19' - 6" 6' - 0" 10' - 8" 6' - 10" 18' - 8" 3' - 8 1/2" 19' - 0 7/8" 19' - 4"

E SF SG SH SI SJ SK SL SM SN SO SQ

ROOF FRAMING NOTES: Permit-Seal


JHW LOW ROOF FRAMING PLAN "J" 1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
1 1/8" = 1'-0" BAR JOIST AS NOTED ON PLAN.
2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
AS NOTED ON PLAN.
3. SEE S005 FOR ROOF DECK TYPE.
4. SEE PLAN FOR JOIST SEAT DEPTH.
5. REFER TO SECTIONS FOR DECK EDGES.
6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
MANUFACTURER RECOMMENDATIONS.
7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
MEET MINIMUM BEARING REQUIREMENTS. INDICATE
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

OFFSET SPACING DURING SHOP DRAWING STAGE TO BE Client/Project


REVIEWED BY ENGINEER.
ROOF FRAMING PLAN LEGEND: 9. REFER TO MECH'L DWGS FOR CONDITIONS WHERE Pearland Independent School District
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE
= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK GENERAL NOTES FOR BRIDGING ADJUSTMENTS.
ATTACHMENT SCHEDULE FOR FASTENING PATTERN 10. AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4" Pearland Junior High West & Sablatura
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2";
U.N.O. SEE PLAN FOR ELEVATIONS. Middle School Additions and
= JOIST BRIDGING, PER SJI 11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS Renovations
AND OPENING FRAMING. Pearland, Texas 77581
= INDICATES ROOF MOUNTED SCREEN WALL
Title
F JHW LOW ROOF FRAMING PLAN "J"

Project No. Scale


214000507 As indicated
0 4' 8' 16'
Revision Drawing No.
10/10/2017 12:00:51 PM

SCALE: 1/8" = 1'-0"


S125
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SJ.2 SK.2

www.stantec.com
13' - 2" 8' - 2" 25' - 7 5/8"
A
Copyright Reserved
EXISTING CMU WALL, TYP. EXISTING JOIST, FIELD The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
VERIFY LOCATION
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants

W12X19
Civil: Stantec
14' - 2"

Landscape: KGA/DeForest, LLC


Structural: Stantec
MEP: Stantec
Information Technology: Stantec
NEW STEEL BEAM AND COLUMN Food Service: FCA Design
Theatrical Design: Texas Scenic Co.
14.8
Legend
T/STEEL = 109' - 5 1/2"

W12X19
EXISTING JOIST
D
TO BE SHORED,
TYP. B
T/CMU = 109' - 8"
29' - 0"

E
FIELD VERIFY
A
B
SABLATURA
MIDDLE SCHOOL
T/STEEL = 109' - 5 1/2"

F
W10X19

NEW STEEL BEAM & COLUMNS


13.3
T/STEEL = 109' - 8" G
4' - 1"

W10X15 K L M N
13.2
T/STEEL = 109' - 5 1/2"

H
J P R
W12X19
12' - 4"

12.5
Q
W10X19
2' - 11"

PEARLAND WEST
JUNIOR SCHOOL

Notes

JHW LOW ROOF FRAMING PLAN "K"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

ROOF FRAMING PLAN LEGEND: ROOF FRAMING NOTES: Permit-Seal


= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK 1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
ATTACHMENT SCHEDULE FOR FASTENING PATTERN BAR JOIST AS NOTED ON PLAN.
2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
AS NOTED ON PLAN.
= JOIST BRIDGING, PER SJI 3. SEE S005 FOR ROOF DECK TYPE.
4. SEE PLAN FOR JOIST SEAT DEPTH.
5. REFER TO SECTIONS FOR DECK EDGES.
6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
= INDICATES ROOF MOUNTED SCREEN WALL MANUFACTURER RECOMMENDATIONS.
7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
MEET MINIMUM BEARING REQUIREMENTS. INDICATE
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

OFFSET SPACING DURING SHOP DRAWING STAGE TO BE Client/Project


REVIEWED BY ENGINEER.
9. REFER TO MECH'L DWGS FOR CONDITIONS WHERE Pearland Independent School District
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE
GENERAL NOTES FOR BRIDGING ADJUSTMENTS.
10. AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4" Pearland Junior High West & Sablatura
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2";
U.N.O. SEE PLAN FOR ELEVATIONS. Middle School Additions and
11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS Renovations
AND OPENING FRAMING. Pearland, Texas 77581

Title
F JHW LOW ROOF FRAMING PLAN "K"

Project No. Scale


214000507 As indicated
0 4' 8' 16'
Revision Drawing No.
10/10/2017 12:00:52 PM

SCALE: 1/8" = 1'-0"


S126
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

106' - 1 1/2"

www.stantec.com
52' - 7 1/8"
A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
2 DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
T/CMU VARIES, RAKED CAP RIDGE LINE S302 T/CMU = VARIES
The Copyrights to all designs and drawings are the property of
OR CMU JOIST SEAT DEPTH = N/A Stantec. Reproduction or use for any purpose other than that
JOIST SEAT BEARING = N/A authorized by Stantec is forbidden.
3' - 11 7/8"

Consultants
DBP 73LH 360/180 - J1 Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
DBP 73LH 360/180 - J1 Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend
DBP 73LH 360/180 - J1

C D
DBP 73LH 360/180 - J1
B
E
DBP 73LH 360/180 - J1 A
B
SABLATURA
JOIST BRIDGING PER SJI DBP 73LH 360/180 - J1 MIDDLE SCHOOL
T/CMU = 130' - 0"
F
DBP 73LH 360/180 - J1
G
T/CMU = 130' - 0"
K L M N
DBP 73LH 360/180 - J1

H
J P R
DBP 73LH 360/180 - J1
JOISTS SPACED EVENLY

SLOPE = 1/4" PER 12" SLOPE = 1/4" PER 12" 6


S302
Q
115' - 11 3/8"

DBP 73LH 360/180 - J1

2
S521 PEARLAND WEST
DBP 73LH 360/180 - J1
JUNIOR SCHOOL
T/STEEL = 131' - 1"
C
DBP 73LH 360/180 - J1
T/CMU = 130'-0" Notes
JOIST SEAT DEPTH = 0'-7 1/2"
JOIST SEAT BEARING = 129'-4 1/2" T/CMU = 130'-0"
JOIST SEAT DEPTH = 0'-7 1/2"
DBP 73LH 360/180 - J1 JOIST SEAT BEARING = 129'-4 1/2"

DBP 73LH 360/180 - J1

DBP 73LH 360/180 - J1 IN ADDITION TO BOND BEAM


ELEVATIONS AT 10'-0" MAX, PLACE
BOND BEAM AT 26'-0" AT HIGH GYM WALLS

DBP 73LH 360/180 - J1

IN ADDITION TO BOND BEAM


ELEVATIONS AT 10'-0" MAX, PLACE DBP 73LH 360/180 - J1
BOND BEAM AT 26'-0" AT HIGH
GYM WALLS

DBP 73LH 360/180 - J1


D

DBP 73LH 360/180 - J1 5


3' - 11 5/8"

S302

T/CMU VARIES,
RAKED CAP OR CMU T/CMU = VARIES
JOIST SEAT DEPTH = N/A
JOIST SEAT BEARING = N/A

JHW HIGH ROOF FRAMING AREA G By Appd YYYY.MM.DD


1 1/8" = 1'-0"
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

ROOF FRAMING PLAN LEGEND: ROOF FRAMING NOTES: Permit-Seal


= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK
1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
ATTACHMENT SCHEDULE FOR FASTENING PATTERN
BAR JOIST AS NOTED ON PLAN.
2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
AS NOTED ON PLAN.
= JOIST BRIDGING, PER SJI
3. SEE S005 FOR ROOF DECK TYPE.
4. SEE PLAN FOR JOIST SEAT DEPTH.
5. REFER TO SECTIONS FOR DECK EDGES.
6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
= INDICATES ROOF MOUNTED SCREEN WALL
MANUFACTURER RECOMMENDATIONS.
7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

MEET MINIMUM BEARING REQUIREMENTS. INDICATE Client/Project


OFFSET SPACING DURING SHOP DRAWING STAGE TO BE

9.
REVIEWED BY ENGINEER.
REFER TO MECH'L DWGS FOR CONDITIONS WHERE
Pearland Independent School District
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE

10.
GENERAL NOTES FOR BRIDGING ADJUSTMENTS.
AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4"
Pearland Junior High West & Sablatura
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2";
U.N.O. SEE PLAN FOR ELEVATIONS.
Middle School Additions and
11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS
Renovations
AND OPENING FRAMING. Pearland, Texas 77581

Title
F JHW HIGH ROOF FRAMING PLAN "G"

Project No. Scale


214000507 As indicated
0 4' 8' 16' Revision Drawing No.
10/10/2017 12:00:53 PM

SCALE: 1/8" = 1'-0"


S127
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

www.stantec.com
SL SM
A
5' - 2 1/2" 18' - 8" 5' - 2 1/2" Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
4 reported to Stantec without delay.
T/STEEL = 120' - 7 1/4"
S303 The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

5' - 4 1/2"
W10X15 Consultants
Civil: Stantec
9 Landscape: KGA/DeForest, LLC
12K1 Structural: Stantec
12K1 MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.
12K1

W10X15

W10X15
Legend

W16X26

W16X26
22' - 3"

12K1
3
S303
C D
12K1 T/STEEL = 121' - 1 3/4"
B
7 1
W12X26
E
S304 A
B
12K1
SABLATURA
MIDDLE SCHOOL
W10X15

W10X15
19' - 4"

12K1
F
W12X22

W12X22
1
12K1
S303
T/STEEL = 121' - 5 3/4" G
K L M N
W12X26
SLOPE DOWN

12K1
H
J P R
12K1

Q
W10X15

W12X22

W12X22

W10X15
24' - 8"

12K1

PEARLAND WEST
9
CURTAIN WALL SUPPORT CHANNEL
T/STEEL = 122' - 0 3/4" JUNIOR SCHOOL
S304 12K1
CONT. AT CURTAINWALL BOUNDARY;
C SEE SECTIONS AND ARCH FOR LOCATION
W12X26
2 Notes
C6x8.2 BELOW, SEE SECTION
W10X15
12K1
W16X26

W10 TERMINATES AT W16,


CHANNEL BELOW CONTINUES
W10X15
W10X15

12K1
TO CURTAINWALL EDGE, SEE ARCH.
W16X26
20' - 4"

12K1 STEEL SUPPORTING


JOISTS TO BE 2 1/2"
8
BELOW T/JOIST
S304
12K1
1

12K1
9' - 3"

W10X15

T/STEEL = 122' - 7 7/8"

ENTRY ROOF FRAMING PLAN "J"


1 1/8" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

ROOF FRAMING PLAN LEGEND: ROOF FRAMING NOTES: Permit-Seal


= INDICATES DECK SPAN DIRECTION, SEE ROOF DECK
1. TOP OF CMU WALL AND/OR STEEL BEAM SUPPORTING
ATTACHMENT SCHEDULE FOR FASTENING PATTERN
BAR JOIST AS NOTED ON PLAN.
2. TOP OF STEEL BEAM SUPPORTING ROOF DECK SHALL
AS NOTED ON PLAN.
= JOIST BRIDGING, PER SJI
3. SEE S005 FOR ROOF DECK TYPE.
4. SEE PLAN FOR JOIST SEAT DEPTH.
5. REFER TO SECTIONS FOR DECK EDGES.
6. JOIST FRAMING REQUIRES JOIST BRIDGING PER JOIST
= INDICATES ROOF MOUNTED SCREEN WALL
MANUFACTURER RECOMMENDATIONS.
7. JOIST SPACED EVENLY BETWEEN FRAME BAYS U.N.O.
8. ROOF JOISTS MAY BE OFFSET NO MORE THAN 6" TO
MEET MINIMUM BEARING REQUIREMENTS. INDICATE
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

OFFSET SPACING DURING SHOP DRAWING STAGE TO BE Client/Project


REVIEWED BY ENGINEER.
9. REFER TO MECH'L DWGS FOR CONDITIONS WHERE Pearland Independent School District
MECH'L DUCT RUNS ARE ABOVE BOTTOM OF JOIST. SEE
GENERAL NOTES FOR BRIDGING ADJUSTMENTS.
10. AT STEEL BEAM/COLUMN FRAMING: T/STEEL = 113'-4" Pearland Junior High West & Sablatura
AND AT JOIST SUPPORTING STEEL, T/STEEL = 113'-1 1/2";
U.N.O. SEE PLAN FOR ELEVATIONS. Middle School Additions and
11. SEE MECHANICAL FOR RTU LOCATIONS. SEE 2/S532 AND
3/S532 FOR JOIST REINFORCEMENT AT RTU LOCATIONS Renovations
AND OPENING FRAMING. Pearland, Texas 77581

Title
F JHW ENTRY CANOPY ROOF

Project No. Scale


214000507 As indicated
0 4' 8' 16' Revision Drawing No.
10/10/2017 12:00:54 PM

SCALE: 1/8" = 1'-0"


S128
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

E.GG E.FF E.EE E.DD E.CC E.BB E.II E.AA E.Z E.Q

18' - 5" 18' - 5" 18' - 5" 18' - 5" 11' - 4" 7' - 8" 6' - 6" 17' - 0" 11' - 2"

8 3/8"
E.Y
www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.

17' - 9 5/8"
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
JOIST NOT EFFECTED BY LIGHTING ADDITION, Stantec. Reproduction or use for any purpose other than that
EXCLUDED FOR CLARITY authorized by Stantec is forbidden.

E.HH
Consultants
Civil: Stantec

1' - 0"
Landscape: KGA/DeForest, LLC
E.X Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend

18' - 4"
VERIFY LOCATION OF LIGHTING AND SOUND. IF JOIST REINF.
LOCATION DIFFERS FROM LIGHT/SOUND ADDITIONS NOTIFY E.O.R. C D
B

TOP & BOTTOM CHORD REINFORCEMENT


E.W

IN MIDDLE THIRD OF JOIST, SEE 2/S129


EXISTING STEEL BEAM E
A
B 2
2 S129 SABLATURA

18' - 4"
JOIST NOT EFFECTED BY LIGHTING ADDITION, S129
EXCLUDED FOR CLARITY MIDDLE SCHOOL

E.V
G
2 K L M N
S129

EXISTING STEEL JOIST H


J P R

18' - 4"
CHORD REINF.

SEE 2/S129

1' - 0"
E.U

PEARLAND WEST
E.JJ JUNIOR SCHOOL

17' - 9"
JOIST NOT EFFECTED BY LIGHTING ADDITION, Notes
EXCLUDED FOR CLARITY

E.T

9"
JHW AREA Q ROOF FRAMING
1 1/8" = 1'-0"

D
POINT LOAD

3/16
≥ 6" TYP
SUPPORT ANGLE 3/16
BEYOND

EXISTING JOIST

TYP.
2-12
3" AT PANEL POINT
5" EACH END

By Appd YYYY.MM.DD
Revision
≥ 6"
POINT LOAD Issue for Bidding & Construction Author Approver 2017.10.11
TYP. By Appd YYYY.MM.DD
3/4"Ø A36 ROD 2/3 LENGTH
2-12
Issued
OF JOIST CENTERED ON JOIST REINFORCEMENT
3" AT PANEL POINT
LOAD, TYP.
5" EACH END

ADD 2L 1-1/2"x1-1/2"x3/16" WHEN POINT LOAD IS MORE THAN 6" FROM JOIST
TOP/BOTTOM CHORD PANEL POINT AND POINT LOAD IS GREATER THAN 500#

TOP AND BOTTOM CHORD REINFORCEMENT JOIST REINFORCING SECTION AT AUDITORIUM JOIST REINFORCEMENT NOTES: Permit-Seal
2 3" = 1'-0"
3 1" = 1'-0"
1. CONTRACTOR TO FIELD VERIFY ALL EXISTING
CONDITIONS, DIMENSIONS, AND ELEVATIONS.
2. CONTRACTOR SHALL NOTIFY THE
ARCHITECT/ENGINEER OF ANY DISCREPANCIES FROM
CONDITIONS SHOWN ON THE DRAWINGS PRIOR TO
THE START OF THE WORK.
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F JHW AREA Q AUDITORIUM ROOF
REINFORCEMENT PLAN
Project No. Scale
214000507 As indicated
0 4' 8' 16' Revision Drawing No.
10/10/2017 12:00:54 PM

SCALE: 1/8" = 1'-0"


S129
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

3
S521

www.stantec.com

A SMS & ENTRY ROOF


123' - 2"
CUT BLOCK CMU OR RAKED Copyright Reserved
CAP, SEE DETAILS The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
3
Landscape: KGA/DeForest, LLC
S521
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.
LOAD BEARING CMU WALL,
SEE SCHEDULE ON S113 Legend

2
S521

LOAD BEARING CMU WALL,


SEE SCHEDULE ON S113 LOAD BEARING CMU WALL,
SEE SCHEDULE ON S113

CONCRETE CURB, SEE PLAN


2
S512

2
B/STEEL 113' - 8" CONCRETE PLATFORM
S512
SLAB, SEE PLAN NOTES
FOR REINF.

1' - 0"
S521

PLATFORM
112' - 8"
9
S522

B/STEEL 110' - 0"

C
STEEL BEAM, SEE PLAN Notes
SMS CMU WALL AT EXISTING LOW ROOF (PLAN SOUTH) SMS CMU WALL AT PLATFORM CMU OVERHANG
1 3/4" = 1'-0"
2 3/4" = 1'-0" 4 3/4" = 1'-0"

AF.9

25' - 8"
2
S512

8" 4
S512
6" S.E. CONCRETE CONCRETE PLATFORM 8
CURB SLAB, SEE PLAN NOTES S522 CONCRETE CURB 8"
FOR REINF.

1' - 0"
4"

4"
PLATFORM
D 112' - 8"
5"

6
S521

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

SMS PLATFORM SECTION


3 3/4" = 1'-0"
E

Permit-Seal
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F STRUCTURAL SECTION

Project No. Scale


214000507 3/4" = 1'-0"
Revision Drawing No.
10/10/2017 12:00:55 PM

S301
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

14 13

2' - 0"
9
S511
1' - 1"
3/8" THICK STIFFENER PLATE
SPACED AT 2'-0" C/C 7
6"x4"x3/8" CLIP ANGLE, S512
LONG LEG WELDED TO PLATE www.stantec.com
SPACED AT 2'-0" C/C
LOW ROOF FRAMING
A 113' - 4"
5"x5"x5/16" CONT. ANGLE Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be

1' - 4"
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
LOW ROOF FRAMING authorized by Stantec is forbidden.
113' - 4"
3 Consultants
S521
Civil: Stantec
Landscape: KGA/DeForest, LLC
C15x33.9 WON-DOOR SUPPORT Structural: Stantec
CHANNEL WELDED TO CONT. ANGLE MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend
LOAD BEARING CMU WALL,
SEE SCHEDULE ON S113

HIGH ROOF FRAMING 6


130' - 3" S512
WON DOOR SUPPORT BEAM
7 3/4" = 1'-0"
B
14

1' - 4"
3
LOW ROOF FRAMING
S521
113' - 4"
AREA G LOW ROOF AT EXISTING GYM WALL
4 3/4" = 1'-0"

4' - 0"
HIGH ROOF FRAMING
LOAD BEARING CMU WALL, 130' - 3"
SEE SCHEDULE ON S113
CANOPY BY OTHERS,
SEE ARCH.

2
LOAD BEARING CMU WALL, S521
SEE SCHEDULE ON S113

Notes

2
S522

WINDOW, SEE ARCH.

LOAD BEARING CMU WALL,


SEE SCHEDULE ON S113

LOAD BEARING CMU WALL,


SEE SCHEDULE ON S113

WALL SECTION AT AREA G LOW


1
1' - 4"

3/4" = 1'-0"

LOW ROOF FRAMING SA


113' - 4"

1' - 8"
By Appd YYYY.MM.DD
Revision
4 Issue for Bidding & Construction RAS PMR 2017.10.11
S511
By Appd YYYY.MM.DD
Issued
STEEL JOIST, SEE PLAN 2
S511
SEE ARCH.

E
LOW ROOF FRAMING

SEE ARCH.
SEE ARCH.

113' - 4"
Permit-Seal

LOW ROOF FRAMING LOW ROOF FRAMING


113' - 4" 113' - 4"

CANOPY BY OTHERS,
SEE ARCH.
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
8
S512 Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
2 Renovations
S522
Pearland, Texas 77581

Title
F STRUCTURAL SECTION

Project No. Scale


214000507 3/4" = 1'-0"
AREA F/G GYM WALL AREA G LOW ROOFAT CANOPY AREA G LOW ROOF AT NEW GYM AREA G LOW/HIGH ROOF INTERFACE
2 3 5 6 Revision Drawing No.
10/10/2017 12:00:57 PM

3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0"

S302
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SL
5"x5"x5/16" DECK ANGLE, TYP.
AT ENTRY ROOF 4 5

1' - 8" SIM


ROOF DECK, SEE S005 3/16" FIELD FILLET WELD
4
S511
www.stantec.com

A
6 Copyright Reserved
S512 The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.
LOW ROOF FRAMING
113' - 4"
JOIST AND KICKER Consultants
Civil: Stantec
STUD DETAILER DESIGN FOR LATERAL Landscape: KGA/DeForest, LLC
LOAD OF 120 LB/FT AT HEAD AND SILL 3"x3"x1/4" CLIP ANGLE TO BEAM Structural: Stantec
8" NON-LOAD BEARING CMU,
SEE SCHED. ON S113 MEP: Stantec
CANOPY BY OTHERS, EXISTING GYM WALL
C6X8.2 SPACED AT JOIST/BEAM SPACING Information Technology: Stantec
SEE ARCH. Food Service: FCA Design
6"x6"x5/16" ANGLE, CONT 5/8"Ø SHEAR CONNECTOR Theatrical Design: Texas Scenic Co.
CONT. C6X8.2 CURTAINWALL SUPPORT CHANNEL SPACED EVERY 16" C/C
STEEL JOIST TYP.,
SEE PLAN EXTERIOR BRICK, SEE ARCH. Legend
6" METAL STUD,
4" METAL STUD SEE ARCH. CANTILEVER BEAM BEYOND 7
S512

CONT. C6X8.2 CURTAINWALL SUPPORT CHANNEL

FRAMED STUD BRACING FOR KNEE WALL/SILL KICKER, SEE 12/S511

4"
STUD DETAILER DESIGN FOR LATERAL 2
LOAD OF 120 LB/FT AT HEAD AND SILL S522 HSS 8"x8"x3/8", SEE 4/S532
B FOR BEARING DETAIL 7"X4"X3/8" LINTEL LLH
WELDED TO HSS BEAM
9
ROOF DECK, 8"x8"x1/2" LLH HOT DIP GALV. S531
SEE PLAN NOTES ANGLE, TRIM ANGLE 1/2" MIN.
BACK FROM FACE OF VENEER

SECTION AT LONG SPAN WINDOW


7 3/4" = 1'-0"
C6X8.2 SPACED AT 4'-0" C/C,
5 1/2" INFILL WITH METAL STUD

STEEL JOIST, CONT. JOIST MANUF. TO DESIGN JOIST


SEE PLAN C6x8.2 FOR 100 LB/FT LOAD AT CURTAINWALL
BEARING LOCATION

AREA J LOW ROOF AT ENTRANCE OVERHANG


2 3/4" = 1'-0"

Notes

5"x5"x5/16" DECK ANGLE TYP. ENTRY ROOF

AREA J LOW/ENTRY ROOF INTERFACE I 3"x3"x1/4" CLIP ANGLE


1 3/4" = 1'-0" 3"x3"x1/4" CLIP ANGLE
ROOF DECK, SEE S005
AREA J LOW ROOF AT EXISTING GYM
5 3/4" = 1'-0"

DECK ANGLE, SEE PLAN


SM SN
9 1/2"

ROOF DECK TRIM BEAM 4 5

D STEEL JOIST,
SEE PLAN
1' - 9 3/8"

C6x8.2 SPACED AT
JOIST/BEAM SPACING
STUD DETAILER DESIGN FOR LATERAL
CONT. C6x8.2 CURTAINWALL LOAD OF 120 LB/FT AT HEAD AND SILL
SUPPORT CHANNEL (2) 8x8 BOND BEAMS W/ (2) #5 CONT By Appd YYYY.MM.DD
Revision
CONT. C6x8.2 CURTAINWALL T/STEEL = 113' - 4"
4" METAL STUD SUPPORT CHANNEL Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued
C6x8.2 SPACED AT 4'-0" C/C,
6" METAL STUD INFILL W/ METAL STUD

B/ STEEL 112' - 3 1/2"


(3) 5/8" PL W/ (2) 5/8"x6"
STUD DETAILER DESIGN FOR LATERAL CANTILEVERED BEAM, HEADED STUDS EACH
SEE PLAN
E LOAD OF 120 LB/FT AT HEAD AND SILL
4' - 1 5/8" 2' - 1"
(2) #5 BARS, HOOKED AT
TOP
CONT. C6x8.2 CURTAINWALL Permit-Seal
SUPPORT CHANNEL

2
S512

W12X19 W12X26

ROOF DECK, SEE PLAN


C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
BEAM, SEE PLAN
Pearland Independent School District
8 1/2"

Pearland Junior High West & Sablatura


Middle School Additions and
Renovations
Pearland, Texas 77581
CANTILEVER BEAM @ CMU WALL
6 3/4" = 1'-0" Title
F STRUCTURAL SECTION

Project No. Scale


214000507 3/4" = 1'-0"
AREA J LOW/ENTRY ROOF INTERFACE II AREA J/LOW ROOF INTERFACE III
3 4 Revision Drawing No.
10/10/2017 12:00:58 PM

3/4" = 1'-0" 3/4" = 1'-0"

S303
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SL SM

www.stantec.com

A
3 Copyright Reserved
S304 The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend
C6x8.2 CHANNEL AT EACH BEAM/JOIST

CONT. C6x8.2 CURTAINWALL SUPPORT CHANNEL

4"-18GA KICKERS @ 32" C/C TO BEAM

CURTAIN WALL, SEE ARCH

STEEL COLUMN, SEE COLUMN SCHEDULE


B

CANOPY ENTRY SECTION ENTRY CANOPY


1 3/4" = 1'-0"
2

SM

(3) 3/4"Ø A325 BOLTS

10
3/8" STEEL STIFFENER
PLATE AT EACH CHANNEL
4"x4"x1/4" WELD PL

9"
3"x3"x1/4" STEEL ANGLE
11" WELDED TO JOIST UNDERSIDE
Notes

SEE ARCH.
5"x5"x5/16" DECK ANGLE TYP. ENTRY ROOF 6"x4"x5/16" ANGLE, LLH
W/ HOLES FOR 3/8"Ø THRU BOLTS
NON-LOAD BEARING CMU WALL, 3"x3"x1/4" CLIP ANGLE AT 24" C/C COORD. W/ ARCH.
SEE PLAN AND CMU WALL SCHEDULE
CONT BEAM SEE PLAN KICKER,
ROOF DECK, SEE S005
SEE 12/S511
1/2" THICK CAP PLATE W/ (4) 3/4"Ø BOLTS

45.
C6x8.2 SPACED AT 4'-0" C/C,

00°
9 INFILL W/ 6" METAL STUD
1/2" STIFFENER PL, EA SIDE
S504
L4x4x3/8 x 4 1/2" ANGLE EA SIDE

3"
9 1/2"
TRIM BEAM

5/8"
1/2" STIFFENER PL ON ANGLE, EA SIDE OF COL STEEL COLUMN,
SEE SCHEDULE
STEEL COLUMN, SEE PLAN 7"x4"x3/8" LINTEL LLH
WELDED TO CHANNEL C6x10.5

FOUNDATION 1' - 6 1/4"


100' - 0"

CANOPY ENTRY BEAM CONNECTION


3 1 1/2" = 1'-0" ENTRY ROOF FRONT SECTION AREA J AT STUD WALL/CURTAINWALL
8 3/4" = 1'-0"
10 3/4" = 1'-0"
D

B.1 SP
2
3' - 9 1/4"
METAL DECK, SEE S005
AREA J/AREA K INTERFACE
7 3/4" = 1'-0" STEEL BEAM, SEE PLAN

C6x8.2 SPACED
AT 2'-0" C/C By Appd YYYY.MM.DD
Revision
STEEL JOIST, SEE PLAN
Issue for Bidding & Construction RAS PMR 2017.10.11
CONT. C6x8.2 CURTAINWALL By Appd YYYY.MM.DD
4 Issued
S511 SUPPORT CHANNEL
3/8" THICK
STIFFENER
PLATE
LOAD BEARING CMU WALL,
SEE PLAN AND CMU WALL SCHEDULE
NEW STEEL BEAM, KICKER
SEE PLAN
E 3' - 3 1/8"

VERIFY W/ ARCH.
Permit-Seal
4"x4"x1/4" CONT.
ANGLE 2"x2"x3/16" CLIP ANGLE WELDED
CURTAINWALL,
TO ANGLE SUBSTITUTE JOIST
AND STEEL BEAM SEE ARCH.

2"x2"x1/4" ANGLE METAL DECK, 10


SEE ARCH.

AT 2'-0" C/C SEE S005 S512


9
S504
ANGLE LEG WELDED
TO JOIST 2"
LOW ROOF FRAMING
113' - 4"
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

3" 1' - 0 3/4" Client/Project


FOUNDATION
100' - 0"
Pearland Independent School District
2 1/2"x2 1/2"x1/4"
ANGLE WELDED TO JOIST Pearland Junior High West & Sablatura
STEEL JOIST,
SEE PLAN B/ STEEL 109' - 4" Middle School Additions and
KICKER, SEE STEEL BEAM,
Renovations
12/S511 SEE PLAN Pearland, Texas 77581

Title
F STRUCTURAL SECTION
NON-LOAD BEARING CMU WALL,
SEE SCHEDULE ON S113
Project No. Scale
214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:14 PM

AREA J/P ROOF INTERFACE CORNER WINDOW AREA J AREA J/EXSITING GYM SECTION ENTRY ROOF AT FRONT CURTAINWALL
4 5 6 9
3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0"

S304
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

www.stantec.com

A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
7 The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
S304 authorized by Stantec is forbidden.

Consultants
Civil: Stantec
Landscape: KGA/DeForest, LLC
10
Structural: Stantec
MEP: Stantec
2.13
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

30/66 30/66 Legend

8"
6

2 3/
2
S505 S401

-
30'
EXISTING COLUMN
TO BE REMOVED

WIDE CANTILEVER
GRADE BEAM, GB13

NEW/EXISTING GRADE BEAM


30/60 TIE-IN, SEE X/S5XXX
2.12
30/48

NEW COLUMN
SEE SECTION

C
4"

EXISTING COLUMN AND EXISTING GRADE


Notes
8 3/

BELLED PIER BEAM


-
11'

2.11

SQ SP B.1

JHW FOUNDATION PLAN "J" - AREA J/P INTERFACE


1 1/4" = 1'-0"

2.11 2.12 2.13

11' - 8 3/4" 7' - 7 5/8" 22' - 6 3/4"

ORIGINAL LENGTH OF W12x14


4 SMS & ENTRY ROOF
11 3/8"

1' - 8 3/4"

2' - 2 7/8"

S304 123' - 2" By Appd YYYY.MM.DD


Revision
3' - 8 3/4"

W12X14
Issue for Bidding & Construction Author Approver 2017.10.11
By Appd YYYY.MM.DD
W21X44 Issued

EXISTING BEAM TO
BE SHORTENED
E

Permit-Seal
EXISTING COLUMN NEW COLUMN EXISTING COLUMN AND
TO REMAIN AND BEAM BEAM TO BE REMOVED
EXISTING COLUMN
TO REMAIN
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
NOTE:
Pearland Independent School District
STEEL FABRICATOR SHALL SUBMIT COLUMN
REMOVAL PLAN AND DETAILS TO E.O.R. FOR
APPROVAL Pearland Junior High West & Sablatura
FOUNDATION Middle School Additions and
100' - 0"
Renovations
Pearland, Texas 77581

Title
F LARGE SCALE VIEWS
PLAN AREA J & P INTERFACE
2 1/4" = 1'-0"
Project No. Scale
214000507 1/4" = 1'-0"
Revision Drawing No.
10/10/2017 12:01:14 PM

S401
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

NOTES:
1. GENERAL CONTRACTOR SHALL COORDINATE LOCATION, SIZE, AND
ELEVATION AND SHALL INCLUDE ALL REQUIRED HORIZONTAL
NOTES: PENETRATIONS THROUGH CONCRETE BEAMS IN CONTRACT PRICE,
1. AT CONSTRUCTION JOINTS, BREAK BOND BETWEEN NEW WHETHER SHOWN ON STRUCTURAL DRAWINGS OR NOT.
AND PREVIOUSLY PLACED SLAB BY SPRAYING OR T/8 2. WHERE BEAM PENETRATIONS ARE REQUIRED BUT ARE NOT SPECIFICALLY www.stantec.com

0"
0' - 1"

0"

0' - 1"
0' - 3"

PAINTING EXPOSED SIDES OF JOINT WITH A CURING DETAILED ON THE STRUCTURAL DRAWINGS, CONTRACTOR SHALL SUBMIT
A COMPOUND BONDBREAKER OR FORM OIL. ADDITIONAL DRAWINGS SHOWING DIMENSIONS AND LOCATIONS OF ALL REQUIRED
PROVIDE (2) ADDITIONAL STIRRUPS PENETRATIONS FOR REVIEW AND APPROVAL.
2. AT CONTRACTION (CONTROL) JOINTS, MAKE SAW CUT AS REINFORCEMENT AT EACH PLAN EACH SIDE OF EACH PENETRATION Copyright Reserved
SOON AS IS ABLE TO SUPPORT WEIGHT OF WORKERS AND PENETRATION, REFER TO 3. "D" DENOTES THE DEPTH OF BEAM.
TO MATCH SCHEDULED BEAM The Contractor shall verify and be responsible for all dimensions.

T/4
SAWING EQUIPMENT WITHOUT DAMAGE TO FINISH NOTE 8 4. CLEAR SPACING BETWEEN PENETRATIONS SHALL BE 24" MINIMUM UNLESS

0' - 4"
STIRRUPS DO NOT scale the drawing - any errors or omissions shall be
SURFACE OF SLAB. NOTED OTHERWISE BY THE STRUCTURAL ENGINEER.
REFER TO NOTE 9 reported to Stantec without delay.
REFER TO NOTE 9 BEAM TOP AND BOTTOM 5. PENETRATIONS SHALL BE LOCATED ACCORDING TO THE FOLLOWING The Copyrights to all designs and drawings are the property of
SQUARE OR RECTANGULAR CRITERIA:

T/2
REINFORCEMENT Stantec. Reproduction or use for any purpose other than that

PENETRATION HEIGHT
NOTE: FILL WITH SELF LEVELING 1

0' - 8"
ROUND PENETRATION PENETRATION a. FOR BEAMS NOT SUPPORTING INTERSECTING BEAMS LOCATE authorized by Stantec is forbidden.
CUT JOINTS AS SOON AS CONCRETE HAS PER ASTM C290, TYPES.
PENETRATIONS WITHIN TWO FEET EITHER SIDE OF BEAM MIDSPAN.
HARDENED ENOUGH NOT TO RAVEL DURING GRADE P, CLASS 25
b. FOR BEAMS SUPPORTING INTERSECTING BEAMS CHECK WITH

MINIMUM
CUTTING (TYP. WITHIN 8 HR.) Consultants

T/4

MINIMUM
STRUCTURAL ENGINEER.

0' - 4"

D/3
D/3
REINF., SEE PLAN. 6. PENETRATION WIDTH MUST NOT EXCEED PENETRATION HEIGHT, UNLESS Civil: Stantec
DISCONTINUE AT JOINT NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS. Landscape: KGA/DeForest, LLC
REINF. AT 1/3 DEPTH, CUT EVERY

BEAM DEPTH, D
7. FOR LOCATIONS AND/OR SIZES OF PENETRATIONS NOT CONFORMING TO Structural: Stantec

PENETRATION
KEYED JOINT 1/8" SAW CUT OTHER REBAR PASSING THE ABOVE CRITERIA AND NOT OTHERWISE DETAILED ON THE MEP: Stantec

HEIGHT
THROUGH JOINT STRUCTURAL DRAWINGS, CONTRACTOR SHALL COORDINATE REQUIRED Information Technology: Stantec
SLAB THICKNESS

SLAB THICKNESS
ADDITIONAL REINFORCEMENT WITH THE STRUCTURAL ENGINEER. Food Service: FCA Design
SEE PLAN FOR

SEE PLAN FOR


8. PROVIDE THE FOLLOWING REINFORCEMENT AT EACH SLEEVE, UNLESS Theatrical Design: Texas Scenic Co.
NOTED OTHERWISE ON THE STRUCTURAL DRAWINGS:

T/4

MINIMUM
1-#5 TOP AND BOTTOM AT BEAMS WITH WIDTHS LESS THAN 9". Legend

MINIMUM
T

T
2-#5 TOP AND BOTTOM AT BEAMS WITH 2-LEG STIRRUPS.

D/3

D/3
4-#5 TOP AND BOTTOM AT BEAMS WITH 4-LEG STIRRUPS.
"N"-#5 TOP AND BOTTOM AT BEAMS WITH "N"-LEG STIRRUPS.
9. PROVIDE ADDITIONAL STIRRUPS ABOVE AND BELOW PENETRATIONS AT
SPACING NOT TO EXCEED ONE THIRD OF THE SCHEDULED STIRRUP
2" TYPICAL ADDITIONAL 2" TYPICAL SPACING, UNLESS DETAILED OTHERWISE ON THE STRUCTURAL
REINFORCEMENT AT DRAWINGS.
1 1/2" CLEAR 1 1/2" CLEAR
EACH PENETRATION, 10. SCHEDULED BEAM STIRRUPS NOT SHOWN FOR CLARITY.
2' - 0" MINIMUM 0' - 8"

REFER TO NOTE 8 1' - 0"


2' - 0" MINIMUM
TYPICAL TYPICAL
COMPACT SUBGRADE COMPACT SUBGRADE PENETRATION WIDTH, PENETRATION WIDTH,
REFER TO NOTE 6 ELEVATION REFER TO NOTE 6
B CJ (CONSTRUCTION JOINT) CJ (CONTROL JOINT)

SLAB-ON-GRADE JOINT DETAILS HORIZONTAL PENETRATION IN CONCRETE BEAM


1 1" = 1'-0"
2 3/4" = 1'-0"

SEE PLAN

CONC. SLAB-ON

SEE PLAN
#4 CONT. GRADE, SEE PLAN #4 x 12" LONG AT 18" C/C CENTERED
IN SLAB, EPOXY DOWEL 6" INTO EXISTING SLAB

T/SLAB

SEE PLAN
SEE PLAN

T
SEE PLAN
C
T x 1.5

CORNER BARS T & B @ TWO OUTSIDE


Notes
BARS OF INTERIOR BEAM. (SEE
SCHEDULE BELOW FOR LENGTH OF
EACH LEG)

6" 6"
T-INTERSECTION W/ CONTROL JOINT
4 ADD'L STIRRUPS
SAME SIZE & TYPE STAIR STRINGER
AS SHOWN IN BY OTHERS
SCHEDULE
SEE PLAN
D/3 D/3 D/3

CORNER BARS T & B @ OUTSIDE BARS


ONLY. (SEE SCHEDULE BELOW FOR L3x3x1/4 x 5" WITH (1) 5/8" DIA.
CONC. SLAB-ON x (4" MIN. EMBED DEPTH) EXP.
D

LENGTH OF EACH LEG)


1' - 6"

SEE PLAN
#4 CONT. GRADE, SEE PLAN #4 x 12" LONG AT 18" C/C CENTERED ANCHOR
IN SLAB, EPOXY DOWEL 6" INTO EXISTING SLAB

CORNER
T/SLAB REF.

SEE PLAN
BEAM REINF CONT
CONC. SLAB-ON-GRADE,
THROUGH EL. SEE PLAN SEE PLAN

T
CONSTRUCTION 3 1/2" DEEP SHEAR KEY
JOINT T/SLAB REF.
LENGTH = BEAM WIDTH - 6"
SEE PLAN

SEE PLAN
T x 1.5

1' - 0"
ELEVATION
SCHEDULE
1
#3 - 1'-4" #4 - 1'-10" #5 - 2'-3" #6 - 2'-10" 1
NOTE: CONSTRUCTION JOINT SHALL BE LOCATED IN THE
MIDDLE THIRD OF THE SPAN BETWEEN SUPPORTS - DO NOT #4 BAR 12" LONG SPACED
D AT 12" C/C W/ (2) CONT. #4 BARS 1' - 0"
LOCATE A BEAM CONSTRUCTION JOINT IN THE END SPAN #7 - 3'-2" #8 - 3'-9" #9 - 4'-9" #10 - 6'-1"
LENGTH OF STAIR BASE
W/O CONTROL JOINT
BEAM CONSTRUCTION JOINT BEAM CORNER BARS SLAB RECESS DETAILS STAIR BASE
3 1/2" = 1'-0"
4 3/4" = 1'-0"
5 1" = 1'-0"
6 1" = 1'-0"

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
IMMEDIATELY BACKFILL THE GRADE
Issued
WIDTH TO MATCH WIDTH OF GRADE
BEAM BEFORE PONDING WATER CAN
BEAM
OCCUR. BACKFILL WITH ONSITE CLAY
SLAB REINF., SEE PLAN MATERIALS, HAND-TAMPED IN 8" LIFTS
TO 92% OF ASTM D698, @ A MINIMUM T/GB
OF +3% ABOVE THE OPTIMUM
#4 AT 12" C/C SEE PLAN
(1) #4 CONT. TYP. MOISTURE CONTENT DETERMINED BY
THAT TEST. STANDARD PROCTOR AND
E DEVELOP TOP BARS IN STEP BEAM IF
HIGHER.
SLOPE SCHEDULED, PROVIDE (3) #5 x 6'-0" FROM
#4 AT 16" C/C x 2'-0" INTO STEP EACH DIRECTION IF TOP BARS NOT
T/SLAB
UPPER SLAB SCHEDULED
SEE PLAN
Permit-Seal

CONT. KEYWAY T/GB


24" MIN. SEE PLAN

T/SLAB
VERT BARS: MATCH STIRRUP BAR
SEE PLAN SIZE SCHEDULED IN GRADE BEAM
NO LESS THAN (4) #6 E.F.

EXTERIOR GRADE
BEAM
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
LIMIT OF EXCAVATION
EQ. GRADE BEAM DEPTH CONCRETE GRADE BEAM
AND REINFORCING, SEE
Pearland Independent School District
PLAN AND SCHEDULE
Pearland Junior High West & Sablatura
MINOR SLAB STEP DETAIL (2-STEP MAX) EXTERIOR BACKFILL DETAIL STEPPED GRADE BEAM Middle School Additions and
7 1" = 1'-0"
8 3/4" = 1'-0"
9 1" = 1'-0" Renovations
Pearland, Texas 77581

Title
F SLAB AND FOUNDATION DETAILS

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:15 PM

S501
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

KK

PROVIDE 4 - #6 DOWELS x5'-

BOTTOM OF
0" W/ 135 DEGREE HK

FND BEAM
AT GRADE BEAM EXTEND
PIER REINFORCING TO
TOP OF PLINTH

www.stantec.com

A
Copyright Reserved
NOTE: The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
PROVIDE EXTRA
reported to Stantec without delay.
TIE @ 2" TOP The Copyrights to all designs and drawings are the property of
BRICK TO REST ON TOP OF Stantec. Reproduction or use for any purpose other than that
SLAB AT INSET ENTRY WAY authorized by Stantec is forbidden.

SEE PLAN EXTEND TOP BARS


TYP PIER REINF (U.N.O.) SEE PLAN EXTEND TOP BARS Consultants
OR 6'-0" MIN. INTO SLAB 3'-0" MIN. SEE PLAN EXTEND TOP BARS Civil: Stantec
OR 6'-0" MIN. MIN. 6'-0" INTO SLAB
Landscape: KGA/DeForest, LLC

3" TY
SHAFT VERT OR 6'-0" MINIMUM INTO SLAB MIN. 3'-0"

C P)
TIES #4 AT 12" TOP & Structural: Stantec
(
LR
DIA (IH) REINF BRICK LEDGE
BOTT. C/C E.W. MEP: Stantec
BEYOND SEE PLAN FOR REINF.
#4 AT 12" TOP & Information Technology: Stantec
#4 AT 12"
4 - #3 @ 5" OC TOP SLOPE 1/4" E.W. BOTT. C/C E.W. Food Service: FCA Design
18" 6 - #5 #3 DOWEL CENTERED SEE PLAN SEE PLAN
#3 @ 10" OC 2" KEYWAY Theatrical Design: Texas Scenic Co.
IN SLAB, SPACED AT 12" C/C PER FOOT FOR REINF. SLOPE 1/4" FOR REINF.
TIES #3 SMOOTH DOWEL 16" LONG,
4 - #3 @ 6" OC TOP T/SLAB CENTERED IN SLAB, SPACED PER FOOT T/SLAB Legend
PER SCHEDULE 24" 7 - #6 SLOPE 1/4"

6"
#3 @ 12" OC SEE PLAN AT 12" C/C
PLAN T/SLAB SEE PLAN

5"

5"
6"
8"
PER FOOT

8"

8"
SEE PLAN

5"
4 - #3 @ 7" OC TOP

6"
30" 8 - #7
#3 @ 14" OC

8"
SEE PLAN & SCHEDULE

SEE PLAN & SCHEDULE


GRADE BEAM DEPTH

GRADE BEAM DEPTH


SEE PLAN & SCHEDULE
4 - #4 @ 8" OC TOP

GRADE BEAM DEPTH


36" 9 - #8
#4 @ 16" OC EXTERIOR SLAB, SEE
GRADE BEAMS WITH GEOTECHNICAL
COORDINATE LENGTHENING PIER AT

CIVIL DRAWINGS
GRADE PER SOILS REPORT (U.N.O.)

4 - #4 @ 9" OC TOP EXTERIOR SLAB, SEE


ENGINEER. REFER TO NOTE ON

42" 11 - #9
#4 @ 18" OC CIVIL DRAWINGS
KK

B 4 - #4 @ 9" OC TOP
6" GRADE BEAM SCHEDULE

48" 13 - #9
#4 @ 18" OC
10'-0" BELOW EXISTING

#4 DOWEL AT 24" C/C,


HOOKED INTO SLAB 3'-0" MIN.
30.0
BOT OF PIER ELEV

BEAM WIDTH BEAM WIDTH


BEAM WIDTH
SEE PLAN SEE PLAN
SEE PLAN

EXTERIOR AT DOORS - EXTENDED SLAB SMS - EXTERIOR AT DOORS EXTENDED SLAB EXTERIOR AT DOORS - SIDEWALK OVERLAY
3 4 2
0' - 4"

3/4" = 1'-0" 3/4" = 1'-0" 3/4" = 1'-0"


CLR
3"

NOTE:
PROVIDE EXTRA
SEE PLAN FOR
TIE @ 2" BOT
SHAFT AND BELL
SIZES

DRILLED PIERS
1 1/2" = 1'-0"

COL
C 1' - 8"

U.N.O. Notes
SEE

ARCH. SEE ARCH.


TOP SLAB REINF., SEE ARCH.
SEE PLAN

BRICK VENEER, 7 1/4" CMU WALL


MTL STUD WALL, SEE
SEE ARCH. U.N.O. REINF., SEE CMU WALL REINF., SEE
SXXX FOR DETAILS
SCHED. ON #4 DOWEL AT 24" C/C, SCHED. ON S113
S113 HOOKED INTO SLAB MIN. 3'-0" 6 3/8"
BRICK, SEE ARCH. U.N.O.
#4 DOWEL AT 24" C/C, HOOKED
BRICK, SEE ARCH. INTO SLAB MIN. 3'-0"
SEE PLAN & ARCH FOR NOTE: CMU DOWEL MAY BE POST INSTALLED w/ SLAB REINF., SEE PLAN
EXACT LOCATION OF WALL EPOXY. 10" MINIMUM EMBEDMENT REQUIRED. NOTES
SLAB REINF., SEE PLAN
T/SLAB NOTES
SEE PLAN EXTERIOR GRADE,
5"

T/SLAB
8"

SEE CIVIL EXTERIOR GRADE,


T/GRADE BEAM MASONRY DWL TO MATCH SEE PLAN

5"
WALL REINF SIZE & SPACING. SEE CIVIL T/SLAB

8"
SEE CMU WALL SCHED.
SEE PLAN HOOK INTO STRIP FOOTING FOR REINFORCEMENT T/GRADE BEAM SEE PLAN

5"
SEE PLAN & SCHEDULE

6"
GRADE BEAM DEPTH

SEE PLAN T/GRADE BEAM

SEE PLAN & SCHEDULE


SEE PLAN

GRADE BEAM DEPTH


CONTROL JOINT TYPICAL AT EITHER

SEE PLAN & SCHEDULE


STARTER COURSE AS

GRADE BEAM DEPTH


SIDE OF STRIP FOOTING
REQ'D

T/SLAB
D SEE PLAN
5"
1' - 0"

(2) #5 CONT. LW,


#5 AT 12" C/C S.W.
BEAM WIDTH

SEE PLAN BEAM WIDTH


1' - 4"
BEAM WIDTH
SEE PLAN
SEE PLAN

EXTERIOR GRADE BEAM AT STUD WALL INTERIOR STRIP FOOTING AT CMU WALL EXTERIOR GRADE BEAM AT CMU WALL SMS - EXTERIOR GRADE BEAM AT CMU WALL
5 3/4" = 1'-0"
6 3/4" = 1'-0"
7 3/4" = 1'-0"
8 3/4" = 1'-0"
By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
SEE ARCH. Issued
COL SEE ARCH.

7 1/4" CMU WALL


BELL PIER BELOW, SEE PLAN U.N.O. REINF., SEE CMU WALL REINF.,
6 3/8"
PLAN #4 DOWEL AT 24" C/C SEE SHED. ON S113
U.N.O.
BRICK, SEE ARCH.
E 16"x16" +/- BLOCKOUT, BRICK, SEE ARCH. #4 DOWEL AT 24" C/C, HOOKED
14"x14" +/- BLOCKOUT FOR 10" BASEPLATES INTO SLAB MIN. 3'-0"
1' - 4"+/- BLOCKOUT SLAB REINF., SEE PLAN
STEEL COLUMN
NOTES SLAB REINF., SEE PLAN Permit-Seal
10 AND BASEPLATE, NOTES
EXTERIOR GRADE,
S502 CJ SEE PLAN EXTERIOR GRADE, SEE CIVIL
T/SLAB
SEE CIVIL T/SLAB
SEE PLAN

5"
SLAB-ON-GRADE OR SEE PLAN

8"

5"

6"
CIVIL EXTERIOR SLAB, SEE PLAN T/GRADE BEAM T/GRADE BEAM
CJ CJ
COL SEE PLAN SEE PLAN

SEE PLAN & SCHEDULE

SEE PLAN & SCHEDULE


T/SLAB
GRADE BEAM DEPTH

GRADE BEAM DEPTH


SEE PLAN
5"

8"

CJ
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
3"

Pearland Independent School District


C
LE
AR

(2) #4 CORNER BARS


M

Pearland Junior High West & Sablatura


9" MIN.

IN
.

BELL PIER,
SEE PLAN Middle School Additions and
BELL PIER, SEE PLAN BELL PIER, SEE PLAN Renovations
Pearland, Texas 77581

Title
F FOUNDATION DETAILS
COLUMN/PIER INTERSECTION COLUMN/PIER/GRADE BEAM INTERSECTION PLAN VIEW
9 3/4" = 1'-0"
10 1" = 1'-0" BEAM WIDTH BEAM WIDTH
Project No. Scale
SEE PLAN SEE PLAN
214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:16 PM

EXTERIOR GRADE BEAM/PIER AT CMU WALL SMS - EXTERIOR GRADE BEAM/PIER AT CMU WALL
11 3/4" = 1'-0"
12 3/4" = 1'-0"

S502
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SEE PLAN SEE PLAN SEE PLAN SEE PLAN SEE PLAN

6 1/4"
6 1/4" 10 10
S502 S502
1' - 4" 1' - 4"

BLOCKOUT BLOCKOUT www.stantec.com


#4 AT 24" C/C HOOKED INTO
CMU WALL, #4 AT 24" C/C HOOKED INTO
SLAB MIN. 3'-0" STEEL COLUMN IF STEEL COLUMN IF
A SEE SCHED. CMU WALL, SLAB MIN. 3'-0"
ON S113 APPLICABLE, SEE PLAN APPLICABLE, SEE PLAN
SEE SCHED. Copyright Reserved
SLAB REINF., ON S113 SLAB REINF.,
The Contractor shall verify and be responsible for all dimensions.
SEE PLAN SEE PLAN DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
T/SLAB T/SLAB Stantec. Reproduction or use for any purpose other than that
SEE PLAN authorized by Stantec is forbidden.

5"

5"
8"

8"
T/GRADE BEAM T/GRADE BEAM U.N.O. Consultants
SEE PLAN Civil: Stantec

CANTILEVER GB DEPTH
SEE PLAN & SCHEDULE

SEE PLAN & SCHEDULE

SEE PLAN & SCHEDULE


Landscape: KGA/DeForest, LLC
GRADE BEAM DEPTH

GRADE BEAM DEPTH


Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend

BEAM WIDTH BEAM WIDTH

SEE PLAN SEE PLAN

BELL PIER, BELL PIER, BELL PIER, BELL PIER,


SEE PLAN SEE PLAN SEE PLAN SEE PLAN

SMS - GRADE BEAM ADJACENT TO EXISTING STRUCTURE I SMS - GRADE BEAM ADJACENT TO EXISTING STRUCTURE II
1 3/4" = 1'-0"
2 3/4" = 1'-0"

NOTE: CMU DOWEL MAY BE POST INSTALLED W/


EPOXY. 10" MINIMUM EMBEDMENT REQUIRED.

8" 5 1/8" SEE PLAN FOR EXACT SEE PLAN FOR EXACT NOTE: CMU DOWEL MAY BE POST INSTALLED W/
LOCATION OF WALL LOCATION OF WALL EPOXY. 10" MINIMUM EMBEDMENT REQUIRED.

NO CMU AT SIM
MASONRY DWL TO MATCH WALL REINF
STEEL COLUMN, SIZE & SPACING. SEE PLAN FOR REINF. MASONRY DWL TO 6 1/4"
SEE PLAN MATCH WALL REINF CMU WALL MAY BE STARTED NOTE: CMU DOWEL MAY BE POST INSTALLED W/
SEE PLAN FOR EXACT
SIZE & SPACING. SEE DIRECTLY ON GRADE BEAM EPOXY. 10" MINIMUM EMBEDMENT REQUIRED.
STARTER COURSE AS REQ'D LOCATION OF WALL
PLAN FOR REINF.
C
MASONRY DWL TO MATCH
(2) #5 CONT CONTROL JOINT AT SLAB THICKNESS WALL REINF SIZE & SPACING.
RECESSED GYM FLOOR, SEE DETAIL STARTER COURSE CHANGE, SEE 1/S501 Notes
SEE PLAN FOR REINF.
5/S501 AND ARCHITECTURAL AS REQ'D
6" CMU WALL W/ #5 AT 56" C/C
STARTER COURSE
2 7/8"

T/SLAB T/SLAB AS REQ'D


SEE PLAN SEE PLAN

5"
RECESSED GYM FLOOR, 1' - 2"
8"

8"
5"

T/GRADE BEAM T/GRADE BEAM SEE DETAIL 5/S501 AND


ARCHITECTURAL
SEE PLAN SEE PLAN
SEE PLAN & SCHEDULE

SEE PLAN & SCHEDULE

2 7/8"
GRADE BEAM DEPTH

GRADE BEAM DEPTH


T/SLAB
SEE PLAN

5"

8"
5"
T/GRADE BEAM
GRADE BEAM BEYOND SEE PLAN

SEE PLAN & SCHEDULE


GRADE BEAM DEPTH
(2) #5 CONT
8" 8"
24"

24"

#4 @ 12" OC #4 @ 12" OC

(2) #5 CONT
BELL PIER, SEE PLAN BELL PIER, SEE PLAN
NOTE: 8"
CMU WALL SHOWN FOR

24"
REPRESENTATION ONLY #4 @ 12" OC
DO NOT SCALE.
GRADE BEAM BEYOND
BEAM WIDTH 9"
D
NOTE: SEE PLAN
CMU WALL SHOWN FOR
BEAM WIDTH REPRESENTATION ONLY
DO NOT SCALE.
SEE PLAN

INTERIOR BEAM/PIER/COLUMN AT CMU WALL INTERIOR BEAM/PIER AT CMU WALL WIDE INTERIOR BEAM AT CMU WALL
3 3/4" = 1'-0"
4 3/4" = 1'-0"
5 3/4" = 1'-0"

SEE PLAN FOR


WALL LOCATION SEE ARCH. 5 1/8"
By Appd YYYY.MM.DD
Revision
CMU WALL
MASONRY DWL TO MATCH REINF., SEE
Issue for Bidding & Construction RAS PMR 2017.10.11
SLAB REINF., SEE PLAN WALL REINF SIZE & SPACING. SCHED. ON
#4 DOWELS AT 24" C/C, HOOKED By Appd YYYY.MM.DD
SEE PLAN FOR REINF. S113 Issued
36" INTO SLAB MIN. 3'-0"
24"

#5 @ 16" C/C
STARTER COURSE BRICK, SEE ARCH.
AS REQ'D CMU WALL MAY BE STARTED
DIRECTLY ON GRADE BEAM
RECESSED GYM FLOOR.
RECESSED GYM FLOOR, SEE DETAIL SLAB REINF., SEE PLAN
EXPANSION MATERIAL CONTROL JOINT AT SLAB THICKNESS
5/S501 AND ARCHITECTURAL NOTES
E CHANGE, SEE 1/S501
2 7/8"

2 7/8"
EXTERIOR PAVEMENT EXTERIOR GRADE,
T/SLAB T/SLAB
SEE CIVIL
T/SLAB SEE PLAN Permit-Seal
5"

SEE PLAN

5 1/8"
8"

SEE PLAN
5"

5"
5"

T/GRADE BEAM
8"

T/GRADE BEAM
T/GRADE BEAM SEE PLAN SEE PLAN

SEE PLAN & SCHEDULE


SEE PLAN & SCHEDULE

SEE PLAN

GRADE BEAM DEPTH


GRADE BEAM DEPTH
SEE PLAN & SCHEDULE
GRADE BEAM DEPTH

(2) #5 CONT

8"
24"

#4 @ 12" OC
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project

BEAM WIDTH
Pearland Independent School District
BEAM WIDTH
BEAM WIDTH
SEE PLAN
SEE PLAN
SEE PLAN Pearland Junior High West & Sablatura
Middle School Additions and
EXTERIOR GRADE BEAM AT WINDOW INTERIOR BEAM AT GYM WALL EXTERIOR GRADE BEAM AT GYM WALL Renovations
6 3/4" = 1'-0"
7 3/4" = 1'-0"
8 3/4" = 1'-0"
Pearland, Texas 77581

Title
F FOUNDATION DETAILS

Project No. Scale


214000507 3/4" = 1'-0"
Revision Drawing No.
10/10/2017 12:01:17 PM

S503
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

WALL CENTERED ON
SEE ARCH. 5 1/8" 6 1/4"
BRICK LEDGE 36" GRADE BEAM, SEE PLAN

24"
BEYOND #4 @ 12" OC FOR WALL LOCATION
CMU WALL
SEE PLAN EXTEND TOP BARS MASONRY DWL TO MATCH
REINF., SEE #4 DOWELS AT 24" C/C, HOOKED WALL REINF SIZE & SPACING.
OR 6'-0" MIN. INTO SLAB MIN. 3'-0" SCHED. ON INTO SLAB 3'-0" MIN.
RECESSED GYM SLAB, SEE PLAN FOR REINF.
S113
REINF. SEE PLAN
BRICK, SEE ARCH.
STARTER COURSE www.stantec.com
#4 AT 12" TOP & AS REQ'D CMU WALL MAY BE STARTED
A BOTT. C/C E.W. RECESSED GYM FLOOR. DIRECTLY ON GRADE BEAM
SLAB REINF., SEE PLAN Copyright Reserved

2 7/8"
RECESSED GYM FLOOR, SEE DETAIL CMU WALL CENTERED ON
NOTES GB, SEE SCHEDULE ON S113 The Contractor shall verify and be responsible for all dimensions.
SLOPE 1/4" 5/S501 AND ARCHITECTURAL
T/SLAB

2 7/8"
DO NOT scale the drawing - any errors or omissions shall be
PER FOOT EXTERIOR GRADE, reported to Stantec without delay.

2 7/8"
SEE PLAN SEE CIVIL T/SLAB

6"
T/SLAB The Copyrights to all designs and drawings are the property of

8"
EXISTING STRUCTURE,

5"
SEE PLAN Stantec. Reproduction or use for any purpose other than that
T/GRADE BEAM

5 1/8"
SEE PLAN FIELD VERIFY LOCATION

5"
authorized by Stantec is forbidden.

5"

8"
SEE PLAN T/GRADE BEAM

5"
6 1/4" 6 1/4"
8"

T/GRADE BEAM #4 AT 24" C/C HOOKED INTO

SEE PLAN & SCHEDULE


SEE PLAN

GRADE BEAM DEPTH


SLAB MIN. 3'-0" Consultants

SEE PLAN & SCHEDULE


SEE PLAN

GRADE BEAM DEPTH

SEE PLAN & SCHEDULE


Civil: Stantec

GRADE BEAM DEPTH


T/SLAB Landscape: KGA/DeForest, LLC
Structural: Stantec
SEE PLAN MEP: Stantec

5"
8"
Information Technology: Stantec
T/GRADE BEAM
Food Service: FCA Design
(2) #5 CONT SEE PLAN Theatrical Design: Texas Scenic Co.

SEE PLAN & SCHEDULE


GRADE BEAM DEPTH
8"
Legend

24"
BEAM WIDTH #4 @ 12" OC

SEE PLAN
BELL PIER, SEE PLAN
EXTERIOR GRADE BEAM AT GYM DOOR BELL PIER, SEE PLAN
1 3/4" = 1'-0"

2 1/4" BEAM WIDTH


B
SEE PLAN
BEAM WIDTH BEAM WIDTH

SEE PLAN SEE PLAN

EXTERIOR GRADE BEAM/PIER AT GYM WALL INTERIOR BEAM/PIER AT GYM WALL SMS - GRADE BEAM ADJACENT TO EXISTING AT WALL
2 3/4" = 1'-0"
3 3/4" = 1'-0"
4 3/4" = 1'-0"

COL

1' - 8"

U.N.O.
SEE

ARCH. 6
TOP SLAB REINF., S504 SEE PLAN SEE PLAN
SEE PLAN
MTL STUD WALL
BRICK VENEER,
SEE ARCH.
STEEL COLUMN,
SEE SCHEDULE ON S006
CMU WALL,
SEE PLAN

EXTERIOR FACE OF SLAB REINF.,


T/SLAB GRADE BEAM SEE PLAN
C SEE PLAN
EDGE OF SLAB
5"

1' - 0" 1' - 0"


8"

T/SLAB
T/GRADE BEAM Notes
SEE PLAN

5"
SEE PLAN
SEE PLAN

8"
SEE PLAN & SCHEDULE

#5 AT 12" C/C T/GRADE BEAM

1' - 1"
EXTENDED INTO . SEE PLAN

2' - 11"
IN
BEAM DEPTH

SEE PLAN & SCHEDULE


GRADE BEAM
M

GRADE BEAM DEPTH


R
EA
CL

1' - 0"
#5 BAR AT 2' - 8"
3"

12" C/C

INTERIOR FACE
OF GRADE BEAM BELOW

EDGE OF WIDE
GRADE BEAM BEYOND GRADE BEAM BELOW
(2) #4 BARS AT EACH SIDE
.
IN
"M

BELL PIER, SEE PLAN OF COLUMN BLOCKOUT AT BEAM WIDTH


12

EACH CORNER
SEE PLAN

BELL PIER, BELL PIER,


SEE PLAN SEE PLAN

D
EXTERIOR GRADE BEAM/PIER AT STUD WALL EXTERIOR COLUMN BLOCKOUT GRADE BEAM ADJACENT TO EXISTING STRUCTURE I
5 3/4" = 1'-0"
6 1/2" = 1'-0"
7 3/4" = 1'-0"

10" SEE PLAN SEE PLAN SEE PLAN


By Appd YYYY.MM.DD
Revision
10 10
Issue for Bidding & Construction Author Approver 2017.10.11
S502 S502
1' - 4" 1' - 4" By Appd YYYY.MM.DD
Issued
BLOCKOUT BLOCKOUT

STEEL COLUMN IF STEEL COLUMN IF


APPLICABLE, SEE PLAN APPLICABLE, SEE PLAN
SLAB REINF., COL
SEE PLAN CMU WALL
REINF., SEE SEE PLAN EXTEND TOP BARS
E
PLAN #5 DOWEL AT 16" C/C
T/SLAB OR 6'-0" MIN. INTO SLAB MIN. 3'-0"
EXISTING STRUCTURE,
FIELD VERIFY LOCATION SLAB REINF., SEE PLAN
5"

Permit-Seal
8"

SLAB REINF., SEE PLAN BRICK LEDGE


T/GRADE BEAM U.N.O. 36"
NOTES BEYOND

24"
#4 AT 12" TOP & #5 @ 12" OC
BOTT. C/C E.W.
SEE PLAN & SCHEDULE
GRADE BEAM DEPTH

T/SLAB
SLOPE 1/4" T/SLAB
SEE PLAN

5"
PER FOOT SEE PLAN

5"
8"

8"
T/GRADE BEAM
T/GRADE BEAM
SEE PLAN
SEE PLAN

SEE PLAN & SCHEDULE

8"

SEE PLAN & SCHEDULE


GRADE BEAM DEPTH
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project

BEAM DEPTH
Pearland Independent School District
BEAM WIDTH #4 AT 12" C/C
SEE PLAN Pearland Junior High West & Sablatura
#5 AT 12" C/C
BELL PIER, BELL PIER, Middle School Additions and
SEE PLAN SEE PLAN
Renovations
BEAM WIDTH
BEAM WIDTH WIDE GRADE Pearland, Texas 77581
BEAM SEE PLAN
SEE PLAN SEE PLAN
Title
F FOUNDATION DETAILS
GRADE BEAM ADJACENT TO EXISTING STRUCTURE II GRADE BEAM AT BOUNDARY WALL EXTERIOR WIDE GRADE BEAM AT DOOR
8 3/4" = 1'-0"
9 3/4" = 1'-0"
10 3/4" = 1'-0"
Project No. Scale
214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:18 PM

S504
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SEE ARCH. 5 1/8" SEE ARCH. 5 1/8"

7 1/4" CMU WALL


7 1/4" CMU WALL REINF., SEE
REINF., SEE SCHED. ON #4 DOWEL AT 24" C/C, HOOKED www.stantec.com
EXPANSION MATERIAL 7 3/4" SCHED. ON #4 DOWEL AT 24" C/C, HOOKED S113 INTO SLAB MIN. 3'-0"
BRICK, SEE ARCH.
A BRICK, SEE ARCH. S113 INTO SLAB MIN. 3'-0"
FIELD VERIFY Copyright Reserved
SLAB REINF., SEE PLAN The Contractor shall verify and be responsible for all dimensions.
16" LONG #3 SMOOTH DOWEL CENTERED SLAB REINF., SEE PLAN NOTES DO NOT scale the drawing - any errors or omissions shall be
IN SLAB SPACED AT 12" C/C NOTES reported to Stantec without delay.
SLAB REINF. SEE PLAN
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
T/SLAB authorized by Stantec is forbidden.
EXISTING STRUCTURE, T/SLAB
FIELD VERIFY LOCATION #4 AT 24" C/C HOOKED INTO SEE PLAN

5"

8"
SLAB MIN. 3'-0" SEE PLAN

5"
Consultants

8"
T/SLAB Civil: Stantec
Landscape: KGA/DeForest, LLC
SEE PLAN EXTERIOR GRADE,

5"
Structural: Stantec

1' - 4"
8"
EXTERIOR GRADE, SEE CIVIL MEP: Stantec

1' - 4"
T/GRADE BEAM SEE CIVIL CONCRETE STEM Information Technology: Stantec
SEE PLAN WALL Food Service: FCA Design
T/GRADE BEAM

SEE PLAN & SCHEDULE


GRADE BEAM DEPTH
T/GRADE BEAM Theatrical Design: Texas Scenic Co.
SEE PLAN

SEE PLAN & SCHEDULE


SEE PLAN Legend

GRADE BEAM DEPTH


SEE PLAN & SCHEDULE
GRADE BEAM DEPTH
2 1/4" BEAM WIDTH

B SEE PLAN
BEAM WIDTH BELL PIER, SEE PLAN

SEE PLAN

SMS - GRADE BEAM ADJACENT TO EXISTING AT WALL DEEP EXTERIOR GRADE BEAM AT CMU WALL
1 3/4" = 1'-0"
2 3/4" = 1'-0"

BEAM WIDTH

SEE PLAN

DEEP EXTERIOR GRADE BEAM/PIER AT CMU WALL


3 3/4" = 1'-0"

CONCRETE SLAB,
SEE PLAN NOTES

C T/GRADE BEAM
SEE PLAN Notes

SEE PLAN FOR EXACT


LOCATION OF WALL
(4) #7 E.F. VERT. HOOKED
WITH #3 AT 8" C/C CMU WALL CENTERED METAL STUD WALL
OVER GRADE BEAM
EXPANSION MATERIAL
MASONRY DWL TO
MATCH WALL REINF
SIZE & SPACING. SEE
PLAN FOR REINF. 16" LONG #3 SMOOTH DOWEL
WIDTH OF GRADE BEAM #3 TIES AT 6" C/C CENTERED IN SLAB SPACED
CONCRETE CURB AT 12" C/C SLAB REINF. SEE PLAN
T/GRADE BEAM W/ (1) #4 CONT. & CONTROL JOINT AT SLAB THICKNESS
#4 HOOKED INTO SLAB CHANGE, SEE 1/S501
SEE PLAN EXISTING STRUCTURE,
AT 16" C/C
FIELD VERIFY LOCATION
T/SLAB
SEE PLAN

5"
T/SLAB
SEE PLAN

5"
1' - 0"
(2) #5 CONT. LW,
#5 AT 12" C/C S.W.
BELL PIER

GRADE BEAM STEP AT PIER INTERIOR STRIP FOOTING AT CURB/WALL TIE-IN AT EXISTING SLAB
4 3/4" = 1'-0"
5 3/4" = 1'-0"
6 3/4" = 1'-0"

By Appd YYYY.MM.DD
Revision
SLAB REINF., SEE PLAN
36" Issue for Bidding & Construction Author Approver 2017.10.11
24"

#5 @ 16" C/C By Appd YYYY.MM.DD


Issued

EXPANSION MATERIAL

EXTERIOR PAVEMENT
E T/SLAB
SEE PLAN
5"

8"

T/GRADE BEAM 1' - 4"+/- BLOCKOUT Permit-Seal


SEE PLAN
STEEL COLUMN, SEE PLAN
SEE PLAN & SCHEDULE

10
GRADE BEAM DEPTH

S502
4' - 6"

#3 SMOOTH DOWEL 16" LONG,


CENTERED IN SLAB AT 12" C/C SLAB-ON-GRADE, SEE PLAN
FIELD VERIFY

T/SLAB
SEE PLAN
5"

8"
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project

BELL PIER, SEE PLAN Pearland Independent School District


Pearland Junior High West & Sablatura
EXISTING BELL PIER, Middle School Additions and
3/4"Ø EPOXY ANCHORS EMBEDDED SEE PLAN
MINIMUM 14" INTO PIER Renovations
Pearland, Texas 77581
BEAM WIDTH
Title
SEE PLAN
F FOUNDATION DETAILS
EXTERIOR GRADE BEAM/PIER AT WINDOW COLUMN/PIER INTERSECTION
7 3/4" = 1'-0"
8 3/4" = 1'-0" Project No. Scale
214000507 3/4" = 1'-0"
Revision Drawing No.
10/10/2017 12:01:19 PM

S505
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SEE ARCH.
SEE ARCH.
CONCRETE SLAB,
SEE CIVIL
T/WALL SEE ARCH.

8" CMU WALL W/ #5 AT 48", www.stantec.com

6"
CENTERED ON FOOTING. FULLY T/SLAB
A GROUT CMU BELOW GRADE SEE ARCH. FOR VARIES SEE CIVIL
BRICK, SEE ARCH. 30/36 BELL PIER, CAP DETAIL
EXPANSION MATERIAL Copyright Reserved
10'-0" MINIMUM DEPTH,
The Contractor shall verify and be responsible for all dimensions.
EXTERIOR SLAB, SEE CIVIL SEE 1/S502 DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
SUPPORT POST BY The Copyrights to all designs and drawings are the property of
SIGN MANUFACTURER BRICK, SEE ARCH. 8" CMU WALL W/ #5 AT 32",
EXTERIOR GRADE, Stantec. Reproduction or use for any purpose other than that
SEE CIVIL CENTERED ON FOOTING. authorized by Stantec is forbidden.
T/SLAB FULLY GROUT CMU BELOW
SEE CIVIL GRADE
Consultants
EXTERIOR GRADE, Civil: Stantec
SEE CIVIL Landscape: KGA/DeForest, LLC
Structural: Stantec

SIGN MANUF.
MEP: Stantec

TO VERIFY
LAP LENGTH
30" MIN.
Information Technology: Stantec
OPTIONAL GROUTED Food Service: FCA Design
CMU TO GRADE Theatrical Design: Texas Scenic Co.

Legend

LAP LENGTH
T/FOOTING OPTIONAL GROUTED

30" MIN.
-4'-0" BELOW GRADE CMU TO GRADE

1' - 2"
T/FOOTING
(5) #5 CONT. L.W. AND -4'-0" BELOW GRADE
3' - 6" SIGN MANUF.
#5 AT 12" C/C S.W. TOP & BOTT.

1' - 2"
TO VERIFY

(5) #5 CONT. L.W. AND

B EXTERIOR STRIP FOOTING AT DUMPSTER ENCLOSURE MARQUEE SIGN FOUNDATION #5 AT 12" C/C S.W. TOP & BOTT.
1 3/4" = 1'-0"
2 3/4" = 1'-0"
3' - 6"

EXTERIOR STRIP FOOTING AT ELEVATED SIDEWALK


3 3/4" = 1'-0"

#4 @ 10" C/C E.W.


#3 SMOOTH DOWEL 16" LONG, 30FT. LIGHT POLE AND ANCHORAGE
EXP. JOINT MATERIAL SPACED AT 12" C/C GREASED 8" WIDE TURN DOWN x 14" MIN. BY OTHERS, SEE ELECTRICAL
AT ONE END WITH (2) #5 CONT. AND #4 AT 14"
C/C VERT. (HOOKED INTO
EXTERIOR
FOOTING IF APPLICABLE)
SLAB, SEE CIVIL
T/SLAB

6"
SEE ARCH

SEE CIVIL (1) #4 W/ 2 1/2" COVER TYP.


SEE ARCH
1' - 4"

EXP. JOINT MATERIAL


EXPANSION MATERIAL

CONCRETE PAVEMENT
OR SLAB, SEE CIVIL (3) #3 AT 3" SPACING, CONCRETE SLAB,
REMAINDER AT 12" SEE CIVIL DRAWINGS
MAXIMUM

SEE ARCH.
T/SLAB PROVIDE VERTICAL CONTROL JOINTS
C T/SLAB
N.

15'-0" MAX AND 3'-0" FROM CORNERS


MI

SEE CIVL VARIES SEE CIVIL


1' - 2"
6"

Notes
(8) #6 VERTICAL

#3 SMOOTH DOWEL 16" LONG, #5 AT 16" C/C HORIZ.


WELL COMPACTED FILL
SPACED AT 12" C/C GREASED & #5 AT 12" C/C VERTICAL
8" CONC. WALL,
AT ONE END CENTERED ON
FOOTING
STAIR ON GRADE DETAIL

13' - 0"
4 1/2" = 1'-0"

EXTERIOR GRADE,
SEE CIVIL

30" MINIMUM

LAP LENGTH
MINIMUM

4'-0"
EXPANSION MATERIAL T/FOOTING
-4'-0" BELOW GRADE

1' - 2"
CONCRETE SLAB,
SEE CIVIL DRAWINGS
SEE ARCH.

(5) #5 CONT. L.W. AND


PROVIDE VERTICAL CONTROL JOINTS #5 AT 12" C/C S.W. TOP & BOTT.
15'-0" MAX AND 3'-0" FROM CORNERS T/SLAB 3' - 6"
VARIES SEE CIVIL
D
2' - 6"
EXTERIOR STRIP FOOTING AT CONCRETE WALL
#5 AT 16" C/C HORIZ. 6 3/4" = 1'-0"
& #5 AT 12" C/C VERTICAL
8" CONC. WALL, LIGHT POLE FOUNDATION
CENTERED ON
FOOTING
5 1/2" = 1'-0"

EXTERIOR GRADE,
SEE CIVIL
LAP LENGTH
30" MINIMUM
MINIMUM

4'-0"

By Appd YYYY.MM.DD
T/FOOTING Revision
-4'-0" BELOW GRADE
Issue for Bidding & Construction Author Approver 2017.10.11
1' - 2"

By Appd YYYY.MM.DD
Issued
(4) #5 CONT. L.W. AND
#5 AT 12" C/C S.W. TOP & BOTT.
2' - 6"

E SMS - EXTERIOR STRIP FOOTING AT CONCRETE WALL


7 3/4" = 1'-0"
Permit-Seal
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F SITE FOUNDATION DETAILS

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:20 PM

S506
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

(2) COURSES FULLY GROUTED COL.


3/8" STIFFENER PLATE TYP. AT LINTEL
OPEN BOTTOM LINTEL UNITS OR
BEAMS OVER COLUMNS
STRETCHER COURSES WITH 1/2
COL. OF WEB CUT OUT
NOTES: www.stantec.com
STEEL BEAM, SEE PLAN
COORD. REINF. W/ SECTIONS SEE PLAN
1. ALL EXPANSION ANCHORS NOTED AS 6" 129' -8 1/4" +/- METAL ROOF
A (TYP), SEE SCHEDULE FOR VERT.
REINFORCING REFER TO EMBEDMENT LENGTH. COORD WITH BLOCKING DECK, SEE PLAN Copyright Reserved

1" MIN.
VENEER, SEE ARCH. The Contractor shall verify and be responsible for all dimensions.
6"x4"x5/16" CONT. ANGLE, LLH DO NOT scale the drawing - any errors or omissions shall be
3/8" STIFFENER AT 36" C/C W/ HOLES FOR 3/8" DIA. THRU BOLTS reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
AT 24" C/C COORD WITH ARCH Stantec. Reproduction or use for any purpose other than that
8"x8"x1/2" LLH WITH 3/4"x6" EXP.
ANCHORS AT 24" C/C HOT DIP GALV. authorized by Stantec is forbidden.
ANGLE (TRIM ANGLE 1/2" MIN. BACK
FROM FACE OF VENEER IF APPLICABLE Consultants
5"x5"x5/16" CONT. ANGLE
Civil: Stantec
0' - 0 1/2"

SEE ARCH.
10"x10"x5/8" COLUMN Landscape: KGA/DeForest, LLC

B/ANGLE
CAP PLATE W/ (4) 3/4" Structural: Stantec
DIA. BOLTS BEAM, SEE PLAN MEP: Stantec
METAL ROOF DECK, SEE PLAN Information Technology: Stantec
BAR JOIST, SEE PLAN Food Service: FCA Design
Theatrical Design: Texas Scenic Co.
STEEL COLUMN, SEE PLAN
JOIST BRIDGING Legend
PER SJI

3"x3"x1/4" CONT. ANGLE


WITH 5/8"x6" EXP. BOLTS
BETWEEN EACH JOIST

BEAM OVER COL. CONN. BRICK SUPPORT OVER ROOF DECK BEARING END
1 1" = 1'-0"
2 1" = 1'-0"
3 1" = 1'-0"
COL.
B
6"x4"x5/16" CONT. ANGLE, LLH
W/ HOLES FOR 3/8" DIA.
THRU BOLTS AT 24" C/C "X"
COORD WITH ARCH SEE PLAN COL.

T/ANGLE
+1'-1" T/JOIST 129' -8 1/4" +/- SEE PLAN
METAL ROOF
COORD WITH BLOCKING DECK, SEE PLAN
2"x2"x1/4" ANGLE METAL ROOF
AT 2'-0" C/C METAL ROOF DECK, SEE PLAN
DECK, SEE PLAN 6"x4"x5/16" CONT. ANGLE, LLH
W/ HOLES FOR 3/8" DIA. THRU
BOLTS AT 24" C/C COORD
WITH ARCH

JOIST SEAT TYP.


STEEL BEAM, 5"x5"x5/16" CONT. ANGLE
X"x6"x5/16" BENT SEE PLAN
CONT. PLATE

BEAM, SEE PLAN


NON-LOAD BEARING BAR JOIST, SEE PLAN BAR JOIST, SEE PLAN
CMU OR METAL STUD, CENTER OF JOIST BEARING
SEE ARCH. BAR JOIST, SEE PLAN
CENTER OF BEAM, OFFSET
JOIST BRIDGING ANGLE BOTTOM CHORD JOIST IN PLAN AS NEEDED
PER SJI BRACE AT MIDDLE JOIST IN KICKER, SEE 12/S511
C GIRDER SPAN. SEE 12/S511
5"x5"x5/16" CONT. ANGLE FOR SIZING. BEAM, SEE PLAN
WELDED TO BEAM AND Notes
1' - 0 3/4" (2) #10 SCREWS AT EACH STUD
OR (1) 3/4"x6" EXP. ANCHOR AT 24" C/C
CONFIRM W/ ARCH. AT CMU WALL
DECK BEARING END WITH PLATE JOIST BEAM BEARING JOIST BEARING AT INT. BEAM
4 1" = 1'-0"
5 1" = 1'-0"
6 1" = 1'-0"

COL.
DECK EDGE ANGLE,
5"x5"x5/16" DECK ANGLE
2' - 0"
COL. 18 GA. DECK STRIP WITH #10 TEK 20"x6"x5/16" BENT PLATE
METAL ROOF 1' - 8" METAL ROOF
SCREWS AT 8" C/C E.S. METAL ROOF DECK,
DECK, SEE PLAN DECK, SEE PLAN
SEE PLAN
2 1/2"x 2 1/2"x1/4"
CONT. ANGLE

1"

JOIST SEAT TYP.


T/JOIST BEARING
EL. SEE PLAN
JOIST SEAT (TYP.)

JOIST (SEE PLAN)


D
2"x2"x3/16" ANGLE
BRACE

10"x10"x1/2" COL. CAP BAR JOIST, SEE PLAN


PLATE. BAR JOIST, SEE PLAN
STEEL BEAM, SEE PLAN
COLUMN,
SEE PLAN ANGLE BOTTOM CHORD
BRACE AT MIDDLE JOIST IN
GIRDER SPAN. SEE 12/S511
FOR SIZING.

JOIST BEARING AT INT. COLUMN ROOF DECK TRANSITION ROOF EXP. JOINT DETAIL
7 1" = 1'-0"
8 1" = 1'-0"
9 1" = 1'-0"
By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
SINGLE PLATE Issued
3" MAX 0' - 1 1/2" MIN
1/4" THICKNESS, TYP
TYPICAL
0' - 3"
TYP

E COL

MISCELLANEOUS STEEL
BRACING SCHEDULE
Permit-Seal
STUD, SEE PLAN CONCRETE DECK, BRACE MAX
SEE PLAN FOR SIZE LENGTH
REINF.
1 1/2"x1 1/2"x3/16" 3'-0"
SNUG-TIGHTENED BOLTED COPE
T/CONC CONNECTION USING
2"x2"x3/16" 4'-6"
3/4"Ø A325 BOLTS IN HORIZONTAL
SEE PLAN
SHORT-SLOTTED HOLES IN
PLATE. 2 1/2"x2 1/2"x3/16" 6'-0"

3"x3"x3/16" 7'-6"
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

NOTES: Client/Project
SHEAR TAB BEAM-GIRDER STANDARD CONNECTIONS 1. PROVIDE 3/16" FILLET WELD AT ALL TOP Pearland Independent School District
BEAM MIN. # OF PLATE SIZE OF FILLET CONNECTION CONNECTIONS (WELD ENTIRE PERIMETER).

SHEAR PLATE BY STEEL


SIZE BOLTS THICKNESS WELD 'W' STRENGTH (LFRD)
2. MEMBERS SHOWN IN THIS TABLE SHALL Pearland Junior High West & Sablatura
FABRICATOR, SEE PLAN W8 2 1/4 3/16 24.5K NOT OVERRIDE STEEL BRACING SIZES
STEEL BEAM SEE PLAN W10 3 1/4 3/16 38.3K EXPLICITLY STATED IN SECTIONS & Middle School Additions and
W12 3 1/4 3/16 38.3K DETAILS.
W14 4 1/4 3/16 52.2K
Renovations
W16 5 1/4 3/16 65.2K Pearland, Texas 77581
W18 5 1/4 3/16 65.2K
TYPICAL BEAM TO BEAM CONNECTION STEEL BRACING SCHEDULE Title
10 12
F 1" = 1'-0" 1" = 1'-0"
STEEL FRAMING DETAILS
NOTES:
1. TYPICAL BEAM TO BEAM AND BEAM TO COLUMN CONNECTION.
Project No. Scale
2. SINGLE PLATE SHEAR CONNECTIONS PER AISC LRFD.
214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:21 PM

SHEAR TAB CONNECTION SCHEDULE


11 3/4" = 1'-0"

S511
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

COL.

"X" SEE PLAN


COL. (2) COURSES FULLY GROUTED SEE PLAN
10"x10"x1/2" COL. STEEL BEAM, AT LINTEL
CAP PLATE SEE PLAN 8" CONCRETE CURB
OPEN BOTTOM LINTEL UNITS OR
STRETCHER COURSES WITH 1/2
T/CURB = 113'-0" METAL DECK,
OF WEB CUT OUT
NOTES: SEE PLAN NOTES
COORD. REINF. W/ SECTIONS T/FLOOR = 112'-8" www.stantec.com
(TYP), SEE SCHEDULE FOR VERT. 1. ALL EXPANSION ANCHORS NOTED AS 6"
REINFORCING REFER TO EMBEDMENT LENGTH.
A

1" MIN.
VENEER, SEE ARCH. Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
3/8" STIFFENER AT 36" C/C DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
8"x8"x1/2" LLH WITH 3/4"x6" EXP. The Copyrights to all designs and drawings are the property of
ANCHORS AT 24" C/C HOT DIP GALV. X"x6"x5/16" CONT. Stantec. Reproduction or use for any purpose other than that
ANGLE (TRIM ANGLE 1/2" MIN. BACK B/ANGLE STEEL BEAM, SEE PLAN authorized by Stantec is forbidden.
STEEL TAB CONN. BY BENT PLATE
STEEL FABRICATOR. FROM FACE OF VENEER IF APPLICABLE
SEE SECTION
DESIGN FOR NO LESS Consultants
THAN 6 KIPS, SEE PLAN 0' - 0 1/2" BEAM, SEE PLAN Civil: Stantec
FOR BEAM REACTIONS
STEEL COL., Landscape: KGA/DeForest, LLC
SEE PLAN Structural: Stantec
MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
Theatrical Design: Texas Scenic Co.

Legend

TYPICAL ROOF BEAM TO COL. CONN. BRICK SUPPORT OVER EXISTING ROOF DECK BEARING END AT PLATFORM
1 1" = 1'-0"
2 1" = 1'-0"
3 1" = 1'-0"

COL. 6"x4"x5/16" CONT. ANGLE, LLH,


W/ HOLES FOR 3/8" DIA. THRU
"X" BOLTS AT 24" C/C COORD
CONCRETE CURB WITH ARCH
B 6"x4"x5/16" CONT. ANGLE,
SEE PLAN LLH, W/ HOLES FOR 3/8" DIA.
THRU BOLTS AT 24" C/C L2x2x1/4 STEEL
8" ANGLE AT 2'-0" C/C
COORD WITH ARCH
T/CURB = 113'-0" METAL DECK, SEE
PLAN NOTES
T/FLOOR = 112'-8"

T/ANGLE 5"x5"5/16" CONT. ANGLE


T/ANGLE
WITH 5/8"x6" EXP. BOLTS
+1'-3" T/JOIST +1'-3" T/JOIST BETWEEN EACH JOIST
L2x2x1/4 STEEL 5"x5"x5/16" CONT. ANGLE
X"x5"x5/16" CONT. ANGLE AT 2'-0" C/C
BENT PLATE METAL DECK, SEE PLAN
METAL DECK, SEE PLAN NOTES

T/CMU 1/2" T/CMU T/JOIST


SEE PLAN BOND BEAM, SEE PLAN SEE PLAN 1/2" SEE PLAN
STEEL BEAM, SEE PLAN JOIST SEAT BEARING
JOIST, SEE PLAN SEE PLAN JOIST (SEE PLAN)
BEAM, SEE PLAN
8"x5"x1/2" EMBED PLATE JOIST BRIDGING,
WITH (2) 5/8"x6" LONG SEE PLAN NOTES

5" MIN.
1/2"x4"x1'-0" BEARING PLATE
STUDS AT 24" C/C WITH (2) 1/2" DIA. x 6" STUDS

(2) 8" BOND BEAM WITH (2) #5


HALF BLOCK AS NEEDED CONT. HOOKED AT CORNERS AT
ALL JOIST BEARING LOCATIONS
GROUT CELLS AT ANCHOR
C
DECK BEAM BEARING AT PLATFORM LOCATIONS (1) 8" BOND BEAM WITH (2) #5
4 1" = 1'-0"
CONT. HOOKED AT CORNERS AT
Notes
L4x4x1/4 x0'-6" W/ (2) 5/8" DIA. x 6" ALL JOIST BEARING LOCATIONS,
EXP. ANCHORS IF APPLICABLE SEE NOTES

CMU, SEE PLAN FOR


6"x4"x5/16" CONT. ANGLE, LLH REQUIREMENTS T/BEAM BEAM
SEE FOUNDATION PLAN NOTES

KICKER ANGLE AT EACH JOIST TO


5"x5"5/16" CONT. ANGLE WITH 5/8"x6" 2ND PANEL POINT. SEE 12/S511
T/ANGLE EXP. BOLTS BETWEEN EACH JOIST FOR SIZING.
+1'-3" T/JOIST
4"x4"x5/16"x7" ANGLE WITH (2)
3/4"x6" EXP. ANCHORS EMBED
6" APART
METAL DECK, SEE PLAN NOTES

T/CMU T/JOIST
SEE PLAN 1/2" SEE PLAN CMU TALL PARALLEL TO ROOF JOISTS CMU TALL PERPENDICULAR TO ROOF JOISTS
JOIST SEAT BEARING 5 1" = 1'-0"
6 1" = 1'-0"
SEE PLAN JOIST (SEE PLAN)

1/2"x4"x1'-0" BEARING PLATE


WITH (2) 1/2" DIA. x 6" STUDS COL.

D
(2) 8" BOND BEAM WITH (2) #5 COL.
CONT. HOOKED AT CORNERS AT
ALL JOIST BEARING LOCATIONS
"X"
SEE PLAN
(1) 8" BOND BEAM WITH (2) #5 T/ANGLE
CONT. HOOKED AT CORNERS AT +1'-3" T/JOIST T/ANGLE
ALL JOIST BEARING LOCATIONS +1'-1" T/JOIST
METAL ROOF METAL ROOF
6"x4"x5/16" CONT. ANGLE, LLH DECK, SEE PLAN DECK, SEE PLAN
6"x4"x5/16" CONT. ANGLE, LLH
W/ HOLES FOR 3/8" DIA. THRU BOLTS
T/BOND BEAM
AT 24" C/C COORD WITH ARCH
SEE FOUNDATION PLAN NOTES 2"x2"x1/4" ANGLE AT 2'-0" C/C

2"x2"x1/4" ANGLE
5"x5"x5/16" CONT. ANGLE AT 2'-0" C/C
JOIST SEAT TYP.

KICKER ANGLE AT EACH JOIST TO

JOIST SEAT
SEE PLAN
By Appd YYYY.MM.DD
2ND PANEL POINT. SEE 12/S511 Revision
FOR SIZING. 5"x5"x5/16" DECK ANGLE
Issue for Bidding & Construction RAS PMR 2017.10.11
4"x4"x5/16"x7" ANGLE WITH (2)
3/4"x6" EXP. ANCHORS EMBED By Appd YYYY.MM.DD
Issued
6" APART

BEAM, SEE PLAN

CMU PERPENDICULAR TO ROOF JOISTS AT EXIST. GYM BAR JOIST, SEE PLAN NON-LOAD BEARING
CMU OR METAL STUD,
BAR JOIST, SEE PLAN
7 1" = 1'-0" SEE ARCH.
E ANGLE BOTTOM CHORD STEEL BEAM, ANGLE BOTTOM CHORD
BRACE AT MIDDLE JOIST IN SEE PLAN BRACE AT MIDDLE JOIST IN
GIRDER SPAN. SEE 12/S511 GIRDER SPAN. SEE 12/S511
FOR SIZING. FOR SIZING.
Permit-Seal
1' - 0 3/4"

CONFIRM W/ ARCH. 5"x5"x5/16" CONT. ANGLE


JOIST BEAM BEARING AT INT. WALL WELDED TO BEAM AND
8 1" = 1'-0"
(2) #10 SCREWS AT EACH STUD
OR (1) 3/4"x6" EXP. ANCHOR AT 24" C/C
AT CMU WALL

JOIST BEAM BEARING AT JOIST EXT.


COL.
9 1" = 1'-0"

A A STEEL COLUMN,
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

SEE PLAN Client/Project

WT6x11 STEEL LINTEL, SEE SECTION DETAILS Pearland Independent School District
AND 2/S522
COL.

STEEL COLUMN,
3/4"Ø ERECTION Pearland Junior High West & Sablatura
SEE PLAN
BOLT
Middle School Additions and
WT6x11 Renovations
B/ANGLE
SEE ARCH
Pearland, Texas 77581
CORNER OR STRUCTURE
Title
F 1/4 STEEL PLATE, WELDED STEEL FRAMING DETAILS
TO WT AND LINTEL

1/4 STEEL PLATE, WELDED 3/4"Ø ERECTION BOLT


TO WT AND LINTEL
Project No. Scale
SECTION A-A 214000507 1" = 1'-0"
Revision Drawing No.
10/10/2017 12:01:22 PM

LINTEL SUPPORT AT CORNER WINDOW


10 1" = 1'-0"
S512
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

6"x4"x5/16" CONT. ANGLE,


LLH, W/ HOLES FOR 3/8" DIA.
THRU BOLTS AT 24" C/C
COORD WITH ARCH
6"x4"x5/16" CONT. ANGLE,
6"x4"x5/16" CONT. ANGLE, LLH, W/ HOLES FOR 3/8" DIA.
LLH, W/ HOLES FOR 3/8" DIA. THRU BOLTS AT 24" C/C
THRU BOLTS AT 24" C/C COORD WITH ARCH
COORD WITH ARCH
5"x5"5/16" CONT. ANGLE WITH 5/8"x6"
EXP. BOLTS BETWEEN EACH JOIST 6" MIN. CONC. RAKE
BEAM W/ (2) #5 CONT.,
CONTRACTOR OPTION TO USE 5"x5"x5/16" CONT. ANGLE www.stantec.com
5"x5"x5/16" CONT. ANGLE CMU BOND BEAM
METAL DECK, SEE S005
A METAL DECK, SEE S005 T/ANGLE
T/ANGLE T/ANGLE Copyright Reserved
METAL DECK, SEE PLAN NOTES +0'-5" T/JOIST
+0'-5" T/JOIST +0'-5" T/JOIST The Contractor shall verify and be responsible for all dimensions.
T/CMU
T/CMU 1/2" T/CMU T/JOIST DO NOT scale the drawing - any errors or omissions shall be
VARIES BOND BEAM, SEE PLAN NOTES reported to Stantec without delay.
SEE PLAN BOND BEAM, SEE PLAN NOTES SEE PLAN 1/2" SEE PLAN The Copyrights to all designs and drawings are the property of
JOIST SEAT BEARING Stantec. Reproduction or use for any purpose other than that
JOIST, SEE PLAN
JOIST, SEE PLAN SEE PLAN authorized by Stantec is forbidden.
JOIST (SEE PLAN)
8"x5"x1/2" EMBED PLATE JOIST BRIDGING,
8"x5"x1/2" EMBED PLATE JOIST BRIDGING, WITH (2) 5/8"x6" LONG SEE PLAN NOTES Consultants

5" MIN.
WITH (2) 5/8"x6" LONG SEE PLAN NOTES 1/2"x4"x1'-0" BEARING PLATE STUDS AT 24" C/C

5" MIN.
STUDS AT 24" C/C WITH (2) 1/2" DIA. x 6" STUDS Civil: Stantec
Landscape: KGA/DeForest, LLC
Structural: Stantec
(2) 8" BOND BEAM WITH (2) #5 HALF BLOCK AS NEEDED MEP: Stantec
HALF BLOCK AS NEEDED CONT. HOOKED AT CORNERS AT Information Technology: Stantec
ALL JOIST BEARING LOCATIONS Food Service: FCA Design
GROUT CELLS AT ANCHOR Theatrical Design: Texas Scenic Co.
GROUT CELLS AT ANCHOR LOCATIONS
LOCATIONS (1) 8" BOND BEAM WITH (2) #5 Legend
CONT. HOOKED AT CORNERS AT L4x4x1/4 x0'-6" W/ (2) 5/8" DIA. x 6"
EXP. ANCHORS CMU, SEE SCHED. FOR
L4x4x1/4 x0'-6" W/ (2) 5/8" DIA. x 6" CMU, SEE SCHED. FOR ALL JOIST BEARING LOCATIONS,
REQUIREMENTS
EXP. ANCHORS REQUIREMENTS IF REQUIRED SEE PLAN
(1) 8" BOND BEAM WITH (2) #5
CONT. HOOKED AT CORNERS AT
ALL JOIST BEARING LOCATIONS IF
(1) 8" BOND BEAM WITH (2) #5 T/BEAM BEAM REQUIRED, SEE PLAN
CONT. HOOKED AT CORNERS AT
SEE FOUNDATION PLAN NOTES T/BOND BEAM
ALL JOIST BEARING LOCATIONS,
IF REQUIRED SEE PLAN SEE FOUNDATION PLAN NOTES
KICKER ANGLE AT EACH JOIST TO 2ND
KICKER ANGLE AT EACH JOIST TO 2ND KICKER ANGLE AT EACH JOIST TO PANEL POINT. SEE 12/S511 FOR SIZING.
PANEL POINT. SEE 12/S511 FOR SIZING. 2ND PANEL POINT. SEE 12/S511
B FOR SIZING.

4"x4"x5/16"x7" ANGLE WITH (2)


4"x4"x5/16"x7" ANGLE WITH (2)
3/4"x6" EXP. ANCHORS EMBED
3/4"x6" EXP. ANCHORS EMBED
6" APART
4"x4"x5/16"x7" ANGLE WITH (2) 6" APART
3/4"x6" EXP. ANCHORS EMBED
6" APART
CMU PERPENDICULAR TO ROOF JOISTS W/ RAKE CAP - CONTRACTOR
CMU PARALLEL TO ROOF JOISTS CMU PERPENDICULAR TO ROOF JOISTS OPTION
1 1" = 1'-0"
2 1" = 1'-0"
3 1" = 1'-0"

METAL ROOF DECK,


SEE PLAN
TYP.
18 GA. DECK STRIP WITH #10 TEK
SCREWS AT 8" C/C E.S.
3/16 2 - 30
MAX
5"x3"x1/2"x6" EACH SIDE LLV
WITH 2 /12" SLOTTED HOLES
GROUT POCKET OR
ENCASE IN CONCRETE
COPING SCHEDULE
(BEAM BEARING ANGLES OR BEAM DEPTH DEPTH (D)
AFTER BEAM INSTALLED
3 1/2"x 3 1/2"x1/4" APPROVED EQUAL)
12" 8"
CONT. ANGLE
6" MIN. 16" 11"

8" MIN.
D D
18" 12"
T/BEAM 21" 14"
T/JOIST BEARING
SEE PLAN CORNER BEAM CONN.
EL. SEE PLAN 1/2" MIN. 24" 16" MAX LOAD 8 KIPS
JOIST (SEE PLAN)

D
3/8" STIFFENERS

C STEEL BEAM, SEE PLAN


BEAM BEARING
SEE COPING SCHEDULE
Notes

0' - 5" MIN.


AT INTERSECTING WALL

COPED STEEL BEAM, SEE PLAN


(2) #5 x 4'-0" INTO GROUTED
CELLS (2) 3/4" DIA. TREADED BOLTS
WELDED TO BEARING PLATE
(6"+6")x 28"x1/2" PLATE WITH
8" MIN. DEEP x 24" CONC. (6) 6" HEADED STUDS
5/8"x7"x12" BEARING PLATE WITH (3) 3/4"
BEARING WITH (2) #5 CONT. DIA. x 8" LONG HEADED STUDS STAGGERED
(HOOK IF AT CORNER)

D-D PLAN VIEW


CMU ROOF DECK TRANSITION STEEL BEAM POCKET - PARALLEL TO CORNER OR END
4 1" = 1'-0"
5 1" = 1'-0"

(1) #6 VERT. MIN.


WALL REINFORCING BEYOND
7"xX"x1/2" PLATE WITH (X) 5/8" STUD SCHEDULE
DIA. x 6" HEADED STUDS # OF HEADED STUDS MAX ALLOWABLE X
GROUT POCKET OR 1' - 4" +/- (1 COLUMN) SHEAR (KIPS)
D ENCASE IN PEAROCK
5"x3"x1/2"x6" EACH SIDE LLV SHOP SHEAR PLATE SIZED BY
CONCRETE AFTER BEAM
WELDED (BEAM BEARING ANGLES STEEL FABRICATOR 4 ≤5 20"
INSTALLED
8" MIN.

OR APPROVED EQUAL) A
GROUT POCKET AFTER
INSTALLATION
5 <7 26"
8" MIN.

C C
6" MIN. 6 <9 32"
3/8" STIFFENERS T/BEAM
T/BEAM
SEE PLAN

0' - 6" 0' - 6" 0' - 6"


1/2" MIN. SEE PLAN
INTERSECTING WALL,
D

IF APPLICABLE
1/4

X
1/4 BEAM BEARING SEE NOTE 1
SEE COPING SCHEDULE (1) #5 MIN. EACH CELL
U.N.O.. ON PLAN OR
ELEVATIONS
8" MIN. x 24" CONC. (3,500 PSI)
BEARING WITH (2) #5 CONT.
(HOOK IF AT CORNER)
A
COPED STEEL BEAM,
COPING SCHEDULE STEEL BEAM, SEE PLAN PROVIDE (4) HOLES IN PLATE
Revision By Appd YYYY.MM.DD
BEAM DEPTH DEPTH (D) FOR 1/4" TAPCONS FOR
SEE PLAN PLATE INSTALLATION
12" 8" Issue for Bidding & Construction RAS PMR 2017.10.11
FULLY GROUTED CMU
WITH MIN. (1) #5 VERT. AT By Appd YYYY.MM.DD
5/8"x6"x12" BEARING 16" 11" Issued
EACH CELL PLATE WITH (3) 3/4"
DIA. x 8" LONG 18" 12"
3/8 C-C PLAN VIEW
NOTE 1: IF BOLTS DO NOT ALIGN IT IS
HEADED STUDS 21" 14" ACCEPTABLE TO PROVIDE 1/4" FILLET
WELD AROUND IN LIEU OF BOLTS.
24" 16"
A-A BEAM POCKET
E
STEEL BEAM POCKET - PERPENDICULAR STEEL BEAM TO PLATE AT PARALLEL CMU - MAX 9 KIPS
6 1" = 1'-0"
7 1" = 1'-0"
Permit-Seal

WALL REINFORCING BEYOND NOTE 1: IF BOLTS DO NOT ALIGN IT IS CELLS GROUTED SOLID WALL REINFORCING MAY CONTINUE BY
ACCEPTABLE TO PROVIDE 1/4" ADJACENT TO PLATE POCKET IF REQUIRED, AVOID SPLICING AT
0' - 1"

FILLET WELD AROUND IN LIEU OF 0' - 1" 0' - 6" 0' - 1" JOIST BEARING LOCATIONS
8"x26"x1/2" PLATE BOLTS.
PROVIDE POCKET IN WALL IF CMU
SHEAR PLATE SIZED BY CONTINUES BEFORE SETTING JOIST
0' - 8"

STEEL FABRICATOR
3"x3"x1/4" CONT. ANGLE WITH
B 5/8"x6" EXP. BOLTS BETWEEN
T/BEAM EACH JOIST
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
0' - 8"

SEE PLAN
X

3/16 METAL ROOF DECK Pearland Independent School District


GROUTED POCKET
Pearland Junior High West & Sablatura
0' - 8"

SEE NOTE 1 Middle School Additions and


FULLY GROUTED CMU
WITH MIN. (1) #5 VERT. AT
STUD SCHEDULE JOIST SEAT BEARING
Renovations
GROUT SOLID

0' - 1"

EACH CELL TOTAL # OF HEADED MAX ALLOWABLE X SEE PLAN


Pearland, Texas 77581
10" MIN.

B STUDS (2 COLUMNS) SHEAR (KIPS)

STEEL BEAM, SEE PLAN 8 TOTAL < 10 26" Title


F 1/2"x6"x1'-0" BEARING PLATE WITH
(2) 1/2" DIA. x 6" STUDS, CENTERED JOIST (SEE PLAN)
MASONRY DETAILS
1/2"x8"xX" BEARING PLATE WITH IN BLOCK
(#) 5/8" DIA. x 6" LONG HEADED
STUDS PROVIDE (4) HOLES FOR
1/4"x2" TAPCONS 8" BOND BEAM WITH (2) #5 CONT. Project No. Scale
HOOKED AT CORNERS AT ALL
JOIST BEARING LOCATIONS 214000507 1" = 1'-0"

B-B BEAM PLATE Revision Drawing No.


10/10/2017 12:01:23 PM

8
STEEL BEAM TO PLATE AT PERPENDICULAR CMU - MAX 10 KIPS
1" = 1'-0"
9
CMU PERPENDICULAR TO ROOF JOISTS AT NON COURSING
1" = 1'-0"
S521
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

SCHEDULED WALL
HOOK INTO JAM REINF. HOOKED AT TOP
BOND BEAM, SEE PLAN FOR AMOUNT CELL OR CONTINUE OF OPENING #5 AT 48"
AND REINF. ONTO ADJACENT C/C MIN. U.N.O. CMU LINTEL/JAMB SCHEDULE
OPENING HEADER
MAX OPENING LOCATION WIDTH 1) MIN. DEPTH OF 2) HORIZONTAL BOTT. 3) MIN. ADJACENT FULLY
SPAN FULL REINF. U.N.O. (1 HORIZ.) GROUTED CELLS AND REINF.
PLACE METAL LATH OR WIRE GROUTED CELLS PER COURSE (1 VERT.) PER CELL U.N.O.
SCREEN OVER CORES NOT TO OPEN BOTTOM LINTEL UNITS OR
www.stantec.com

OF LINTEL TO BE GROUTED SOLID


BE FILLED (SHEET METAL AND STRETCHER COURSES WITH 1/2
FELT PROHIBITED) OF WEB CUT OUT ≤ 4'-4" TYP. 8" 8" (1) #5 BOTT. 8" #5

SEE SCHEDULE FOR DEPTH


A
4'-4" < OPNG. ≤ 6'-4" TYP. 8" 16" (1) #5 BOTT. 16" (2) #5 Copyright Reserved
COORD. REINF. W/ SECTIONS

1)
The Contractor shall verify and be responsible for all dimensions.
(TYP), SEE SCHEDULE FOR VERT. DO NOT scale the drawing - any errors or omissions shall be
VERTICAL REINFORCING W/MATCHING 6'-4" < OPNG. ≤ 8'-4" TYP. 8" 24" (2) #5 BOTT. 16" (2) #6
REINFORCING reported to Stantec without delay.
DOWELS IN FOUNDATION, SEE PLAN
The Copyrights to all designs and drawings are the property of
FOR SIZE AND LOCATION

6" MIN.
8'-4" < OPNG. ≤ 10'-8" TYP. 8" 32" (2) #5 BOTT. 16" (2) #6 Stantec. Reproduction or use for any purpose other than that
TYP. "U" LINTEL UNIT, OPEN authorized by Stantec is forbidden.
CELLED BOTTOM BLOCK SHALL
NOT BE USED
2)
Consultants
9 GA MIN. HORIZ. JOINT REINF @ 16" O.C. Civil: Stantec
STARTING AT FIRST COURSE ABOVE VENEER, SEE ARCH.
Landscape: KGA/DeForest, LLC
FOUNDATION. LAP SPLICES 6". USE PREFAB. 3) Structural: Stantec
L'S AND T'S AT WALL INTERSECTIONS EXPANSION ANCHOR, IF APPLICABLE MEP: Stantec
WIDTH
Information Technology: Stantec
Food Service: FCA Design
HOT DIP GALV. ANGLE, SEE SCHEDULE Theatrical Design: Texas Scenic Co.
GROUT REINF. CELLS AND (TRIM ANGLE 1/2" MIN. BACK FROM FACE (1) #5 HORIZ. IN BOND
CONSOLIDATE GROUT IN 5 FT. LIFTS OF VENEER IF APPLICABLE) BEAM TYP. Legend

PLACE MORTAR ACROSS WEBS


ADJACENT TO FILLED CELLS SEE SCHEDULE FOR BOTT. REINF. NOTES:
RUN 16" BEYOND OPENING
1. #6 VERT. SHALL START ABOVE FOOTING WITH A MINIMUM LAP LENGTH OF 30".

CMU OPENING CMU PILASTER 2. VERIFY ALL CMU OPENINGS W/ ARCHITECT DWG'S.

3. ALL CMU LINTEL BEAMS ABOVE BOTTOM COURSE SHALL BE CONSTRUCTED OF


ASTM C.90 C.M.U.'S TYPICAL CMU LINTEL DETAIL
OPEN BOTTOM LINTEL UNITS, OR STRETCHER COURSES WITH 1/2 WEB CUT OUT.
(U.N.O. ON PLANS)
B 4. COORDINATE W/ SECTIONS, DETAILS, & GENERAL NOTES.

BRICK STEEL ANGLE LINTEL SCHEDULE 5. PRE-CAST CONCRETE LINTEL MAY BE USED IN LIEU OF LINTEL BLOCK.
FOUNDATION OR THICKENED SLAB
6. REFER TO PLANS FOR FULLY GROUTED AREAS.
MAX OPENING SPAN SIZE ATTACHMENT (IF APPLICABLE)

0'-0" ≤ 7'-6" 7"x4"x3/8" LLH N/A LOOSE LAID

7'-6" ≤ 12'-0" 8"x6"x1/2" LLH OR 8"x8"x1/2" 3/4" DIA. x 6" EXP. ANCHOR AT 36" C/C,
(TRIM OFF 1" HORIZ.) U.N.O.

SET FIRST COURSE IN FULL


MORTAR BEDDING NOTES:

1. ALL BRICK SUPPORT ANGLES SHALL BE HOT DIP GALVANIZED.


CLEAN OUT OPENINGS AT GROUT
FILLED CELL LOCATIONS ONLY IF
LIFT EXCEEDS 5'-0". REFERENCE
ACI 530.1 FOR MAX GROUT LIFT
HEIGHTS

TYPICAL MASONRY WALL CONSTRUCTION CMU & BRICK LINTEL SCHEDULE


1 2
3/16" = 1'-0" 1" = 1'-0"
C

Notes

CONTINUE VMCJ THROUGH BOND


BEAM AT ALL AREAS WHERE CMU IS
EXPOSED TO VIEW

BEND PILASTER REINF. 90°


0' - 0 171/256"

3/8"
SEALANT, COORD.. W/ ARCH.
2 #5 VERT. EA.
SIDE U.N.O. CONTROL JOINT KEY, COORD. T
W/ ARCH.

DIAMETER + 1/16"

4 #5 (MIN. U.N.O.)
3 #5 MIN. U.N.O. 2 #5 MIN. U.N.O. 5/16" SCREWS

OF LINTEL TO BE GROUTED SOLID


VMCJ

5/8 IN. MIN OR T/2 MAX

SEE SCHEDULE FOR DEPTH


PLAN
STEEL STUD BACKUP BRICK TIES
OPEN BOTTOM LINTEL UNITS OR
TYPICAL 16" DEEP BOND NOTE: ADJUST CONTROL JOINT STRETCHER COURSES WITH 1/2
BEAM IF INDICATED ON LOCATIONS TO PROVIDE MINIMUM OF WEB CUT OUT
D T
PLANS OF 16" CLEAR OF OPENINGS (TYP)
9 GA. HORIZ.

6" MIN.
9 GA. HORIZ. JOINT JOINT REINF. 2"x2"x1/4 ANGLE WELDED TO
9 GA. HORIZ. JOINT REINF. LINTEL SPACED AT 18" C/C W/
REINF. TYP., U.N.O. TYP., U.N.O. TYP., U.N.O. (2) 5/8"x6" EXPANSION ANCHORS
TYP. CORNER TYP. END (U.N.O.) INTERSECTION LIMIT TO 1/2"
TYP. "U" LINTEL UNIT, OPEN
CELLED BOTTOM BLOCK SHALL

5"
5/8 IN. MIN NOT BE USED

8"
NOTE: OR T/2 MAX
NOTE:
VMCJ

LINTEL -
TIE DIAMETER VENEER, SEE ARCH.
FOR JOINTS AT VENEER, COORDINATE W/ ARCH.
MINIMUM REINFORCING SHOWN APPLIES UNLESS + 1/16"
DRAWINGS. SECTION
SHOWN OTHERWISE ON PLANS OR SECTIONS. MASONRY BACKUP - LADDER TYPE
TERMINATE VMCJ BELOW ALL BOND BEAMS.
PLASTER SOFFIT, SEE ARCH.
PROVIDE VMCJ AT MAXIMUM. 25'-0" IF NOT USE BAR POSITIONERS 8"x6"x1/2" LLV HOT DIP GALV. ANGLE,
LOCATED ON PLAN. (TRIM ANGLE 1/2" MIN. BACK FROM FACE
ALL MASONRY TIES, SCREWS, BOLTS, AND ACCESSORIES
SHALL BE CONSTRUCTED USING CORROSION RESISTANT OF VENEER IF APPLICABLE) By Appd YYYY.MM.DD
DO NOT INTERLOCK LOAD BEARING AND NON-LOAD BEARING WALLS. Revision
MATERIALS, SEE SPECIFICATIONS SEE SCHEDULE FOR BOTT. REINF.
ELEVATION RUN 16" BEYOND OPENING Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued
TYPICAL VMCJ DETAILS TYPICAL CMU DETAILS TYPICAL VENEER TIE DETAILS LINTEL AT OVERHANG/PLASTER CEILING
3 4 5 9 1" = 1'-0"
3/4" = 1'-0" 1" = 1'-0" 3/4" = 1'-0"

E
PROVIDE TYPICAL WALL REINFORCEMENT CONCRETE SLAB METAL DECK
IN CELL NEXT TO PILASTER (EACH SIDE) Permit-Seal
METAL DECK AND
T/SLAB FLOOR SYSTEM
WALL REINFORCEMENT PER PLAN FOR SEE PLAN
SIZE AND SPACING, PLACE
CONTINUOUS THROUGH ALL BOND
BEAMS GROUT SOLID FULL HEIGHT

PILASTER TIES PER PLAN FOR STEEL BEAM, SEE PLAN


SIZE AND SPACING TYP.
3/16 CONT.
CMU PILASTER PER
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

PLAN FOR LOCATIONS Client/Project


6"x3"x1/2" PLATE WITH (2) 1/2" DIA. x 6"
STUDS AND L3"x3"x3/8"x6" CLIP ANGLE
STEEL BEAM,
SEE PLAN
Pearland Independent School District
PILASTER REINFORCEMENT
PER PLAN FOR AMOUNT AND ANGLE EVERY 10 FT, TYP. SEE 12/S511
FOR SIZING.
Pearland Junior High West & Sablatura
SIZE
Middle School Additions and
HORIZONTAL WALL REINFORCEMENT PER TYP. TYP.
PLAN FOR SIZE AND SPACING
CMU, SEE SCHEDULE
ON S113 FOR REINF.
3/16 CONT. L8x6x3/8 x 0'-6" WITH
(2) 5/8" DIA. x 6" EXP. ANCHORS W/
3/16 Renovations
SLOTTED HOLES AT 10' MAX Pearland, Texas 77581
#9 WIRE X 1'-4" AT EACH HORIZONTAL 8" BOND BEAM WITH (2) # 5 CONT. TOP OF WALL. BOND 8" BOND BEAM WITH (2) #5
WALL JOINT REINF. BEAM ONE COURSE BELOW STEEL BEAM CONT. TOP OF WALL Title
CMU WALL SEE
F NOTE: ANY SPLICE (1) #5 BAR AT WALL ENDS AND WALL OPENINGS SCHEDULE ON S113 MASONRY DETAILS
SHALL BE 48 BAR PLACED CONTINUOUS THROUGH ALL BOND BEAMS
DIAMETERS FLOOR TO FLOOR

Project No. Scale


214000507 As indicated
REINFORCED MASONRY WALL REINFORCING CMU PARALLEL TO FLOOR BEAM CMU PERPENDICULAR TO FLOOR BEAM
6 7 8 Revision Drawing No.
10/10/2017 12:01:24 PM

1" = 1'-0" 1" = 1'-0" 1" = 1'-0"

S522
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

BRIDGECLIP BC600 BY THE STEEL


FULL HEIGHT JAMB STUDS, NETWORK OR EQUAL @ SPLICE JOINTS
STEEL BEAM SEE METAL STUD WALL SCH. W/ (2) HILTI KWIK-PRO#10-16 HWH #2
POINT SELF-DRILLING SCREWS

SEE SCHED.
METAL STUD WALL SCHEDULE
THICKNESS:
GA., SEE SCHEDULE

6"
LOCATION WALL LOCATION STUDS OR JAMB SIZE AND SPACING

6"
Fy = 33 KSI MIN.

1' - 0 19/256"

1' - 0 153/256"
www.stantec.com
F.F. - ROOF TYPICAL WALL 600S137 - 43 (18GA.) @ 16" C/C
A F.F. - ROOF WALL CORNERS 600S137 - 43 (18GA.) @ 16" C/C
Copyright Reserved
JAMB STUD SINGLE DOORS 600S200 - 43 (18GA.) E.S. The Contractor shall verify and be responsible for all dimensions.
BRIDGEBAR 75 BY THE
JAMB STUD DOUBLE DOORS 6'-4" OR LESS 600S200 - 54 (16GA.) E.S. SEE SCHED. STEEL NETWORK OR
DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
SEE SCHED. SECURE TRACK TO STEEL #10 SCREWS, EA. SIDE,
EQUAL @ 5'-0" MAX The Copyrights to all designs and drawings are the property of
JAMB STUD WINDOW 4'-0" OR LESS 600S200 - 43 (18GA.) E.S. BM. WITH FASTENERS AT EA, STUD (TYP)
CRIPPLE STUD Stantec. Reproduction or use for any purpose other than that
STUD TRACK EACH STUD authorized by Stantec is forbidden.
JAMB STUD LOUVER ≤ 12'-0" (2) 600S200 - 54 (16GA.) E.S.
CLASS "A" CLASS "A"
STUD Consultants
LIGHT GAUGE STUDS & TRACK SECTION PROPERTIES Civil: Stantec
NOTES: 2"x2"x16 GA. CLIP ANGLE Landscape: KGA/DeForest, LLC
1/2" LESS THAN STUD Structural: Stantec
1. CORNER LOCATION INDICATES REF TO WIND PRESSURE DIAGRAM FOR A ZONE. WIDTH W/ (3) #10 SCREWS MEP: Stantec
2. SEE TYPICAL WALL SECTIONS FOR ADDITIONAL INFO ON BRACING AT GABLES WHERE ADDITIONAL SUPPORT IS REQUIRED. NOTE: DO NOT USE SLIDE TRACK EA. LEG TOP & BOTTOM Information Technology: Stantec
CONNECTIONS TO BOTTOM OF BEAM TYPICAL WALL STUDS Food Service: FCA Design
PER PLAN
Theatrical Design: Texas Scenic Co.

Legend
METAL STUD WALL SCHEDULE STUD TO BEAM SILL TRACK CONNECTION TYPICAL WALL BRIDGING DETAIL
1 3 4 5
3/4" = 1'-0" 1" = 1'-0" 1" = 1'-0" 3/4" = 1'-0"

TYP. SPACING 8" TYP. 8" TYP. TYP. SPACING


PER SCHEDULE PER SCHEDULE

B
JAMB STUDS
SEE SCHEDULE

18 GA. MIN. TYP. STUDS PER SCHED.


TRACK CLOSER

FULL HEIGHT JAMB STUDS, SEE


METAL STUD WALL SCH.
JAMB STUDS
JAMB STUDS
JAMB STUDS CLIP ANGLE AT SINGLE OPNGS.: 4"x4"x14-GA.
x1" LESS THAN STUD WIDTH, W/ (3) #12
SCREWS AT JAMB AND (3) HILTI KWIK- CON II
1/4"x2 1/4" AT SLAB OR APPROVED EQUAL.
NOTE:
OPEN SAME CONNECTIONS
CLIP ANGLE AT DOUBLE OPNGS.: 6"x6"x14-GA. B/OPENING
APPLY AT WINDOW
x1" LESS THAN STUD WIDTH, W/ (4) #12 SEE ARCH.
OPENINGS
SCREWS AT JAMB AND (4) HILTI KWIK- CON II
6" TRACK TO MATCH GA. OF
1/4"x2 1/4" AT SLAB OR APPROVED EQUAL.
JAMB STUDS

OPEN 6" METAL STUD WALL,


C OPEN GAUGE AND SPACING TO
RUNNER TRACK MATCH
Notes
6" METAL STUD, SEE
SCHEDULE

4" BRICK VENEER

SINGLE DOOR SINGLE WINDOW DOUBLE DOOR

WALL OPENING DETAILS DOOR JAMB ANCHORAGE VENEER ANGLE SUPPORT BELOW OPENING
2 6 1" = 1'-0"
7
3/4" = 1'-0" 1" = 1'-0"

SECTION OF 18 GA. MIN. RUNNER TRACK,


6" LONG SECTION OF STUD LENGTH 1 1/4" LESS THAN HEADER DEPTH,
ATTACHED TO JAMB W/ (4) (6) #10 SCREWS TO JAMB AND (3) #10
FULL HEIGHT JAMB STUDS, SCREWS TO HEADER EA. FLANGE
#10 SCREWS
SEE METAL STUD WALL SCH.
D FULL HEIGHT JAMB STUDS,
CRIPPLE STUD SEE METAL STUD WALL SCH.
OPNG. SIDE OF JAMB W/ TRACK
(1) #10 SCREW EA. CRIPPLE STUD
ATTACHED W/ #10 SCREWS AT
FLANGE, TYP.
16" C/C EA. FLANGE
(1) #10 SCREW EA. FLANGE, TYP.

ATTACH EA. TRACK TO TRACK, SIZE AND GAUGE TO


(1) UNPUNCHED STUD CAPPED W/ STUD W/ (2) #10 SCREWS MATCH STUDS SHOWN IN
(2) TRACKS, SIZE AND GAUGE TO AT 16" C/C METAL STUD WALL SCH.
HEADER
MATCH STUDS SHOWN IN METAL CONNECTION
STUD WALL SCH. ATTACH EA. TRACK TO STUD
VENEER, METAL STUD,
CAP TOP AND EA. W/ (2) #10 SCREWS AT 16" C/C
SEE ARCH. SEE SCHEDULE
SIDE OF OPNG. W/ 10
GA. TRACK MIN.
CAP TOP AND EA.
2"x2"x16-GA. CLIP ANGLE SIDE OF OPNG. W/ 10
1/2" LESS THAN STUD GALV. 8"x6"x3/8" LLV LOOSE LAID NOTE 2: (2) #10 SCREWS AT
GA. TRACK MIN. ANGLE IF UNDER ≤ 5'-10", TYPICAL EACH STUD IF OVER 6'-0"
WIDTH W/ (3) #10 2"x2"x16 GA. CLIP ANGLE (2) UNPUNCHED STUDS, SIZE AND By Appd YYYY.MM.DD
SCREWS EA. LEG 1/2" LESS THAN STUD GAUGE TO MATCH STUDS SHOWN IN
ALL OPENINGS WITH SCREW OPENING WITH 1" 18-GA. x Revision
HOLES IF OVER 5'-10" OPENING, 20" COIL STRAP WITH (5) #8
WIDTH W/ (3) #10 SCREWS METAL STUD WALL SCHEDULE
SEE NOTE 2. 8" MIN. BEARING ON SCREWS TO STUD Issue for Bidding & Construction RAS PMR 2017.10.11
EA. LEG TOP & BOTTOM
ADJACENT VENEER
By Appd YYYY.MM.DD
Issued
LAY-IN HEADER BOXED HEADER AT LOAD-BEARING OPENINGS, AND AT T/OPENING
NON-LOAD BEARING DOUBLE OPENINGS 5'-10" OR SEE ARCH.
LARGER SEE ARCH.

E
HEADER OPENING DETAILS VENEER ANGLE SUPPORT OVER OPENING
8 3/4" = 1'-0"
9
1" = 1'-0" Permit-Seal

(4) HILTI KWIK-CON II 1/4"x2 L6"x6"x0'-6" 14-GA. CLIP


1/4" FASTENERS OR ANGLE
APPROVED EQUAL

(3) HILTI KWIK-CON II (2)HILTI KWIK-CON II 1/4"


(4)#12 SCREWS
EXTERIOR LIGHT GAUGE FRAMING NOTES:
x2 1/4" FASTENERS OR
APPROVED EQUAL
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

(3) #12 SCREWS 1. WHERE PRODUCTS ARE SHOWN, IT IS FOR THE PURPOSE OF ESTABLISHING THE REQUIRED Client/Project
EDGE OF OPENING PROPERTIES, STRENGTH, STIFFNESS OR OTHER QUALITIES AND IS NOT TO RESTRICT EQUIVALENT
PRODUCTS BY OTHER MANUFACTURERS. Pearland Independent School District
CONT. TRACK #12 SCREWS EA SIDE 2. SUBMIT COMPLETE DATA ON ALL PRODUCTS, LIGHT GAUGE STUDS, MANUF.'S STANDARD DETAILS,
EACH STUD (TYP) DOUBLE DOOR MANUF.'S TEST DATA ON ALL FASTENERS WITH VERIFIED TEST CAPACITIES, ALLOWABLE AND ULTIMATE. Pearland Junior High West & Sablatura
L4"x4"x0'-6" 14-GA.
CLIP ANGLE (4) HILTI KWIK-CON II 1/4"x2 L6"x6"x0'-6" 14-GA. CLIP 3. TRACK CLASS SHALL MATCH STUD CLASS, I.E. USE 18-GA. STUDS W/ 18-GA. TRACK. Middle School Additions and
SINGLE WINDOW
1/4" FASTENERS OR
APPROVED EQUAL
ANGLE
4. WALL STUDS SHALL INCLUDE HORIZONTAL WALL BRACING AT VERTICAL CENTERS AS STANDARD WITH Renovations
THE MANUFACTURER OR 48" O.C. MIN.
Pearland, Texas 77581
5. ALL STUDS SHALL INCLUDE MANUF.'S STANDARD CONNECTION TO STEEL BEAMS WITH A MINIMUM LATERAL CAPACITY
(3) #12 SCREWS OF 800 LBS/STUD OR A MIN. ULTIMATE CAPACITY OF 1800 LBS/STUD. NO VERTICAL SLIP CONNECTIONS ARE REQUIRED Title
AT FLOOR OR ROOF LEVELS.
F METAL FRAMING SECTIONS AND
EDGE OF OPENING 6. COMPONENT WIND ZONES AND PRESSURES ARE SHOWN ON DRAWING S-002 & S-052.
DETAILS
7. EXTERIOR WALL STUD SYSTEMS SHALL COMPLY WITH THE REQUIREMENTS OF COLD-FORMED STEEL
SINGLE DOOR FRAMING, PER SPECIFICATION SECTION. Project No. Scale
214000507 As indicated
TRACK/CONCRETE ANCHORAGE Revision Drawing No.
10
10/10/2017 12:01:25 PM

3/4" = 1'-0"

S531
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

COL.

6 1/4" BRACE FRAME WIDTH = 14'-9.5"

STEEL BEAM, SEE PLAN MINIMUM 1'-8"x1'-8" 14 GA. GUSSET


PLATE W/ (30) #12 SCREWS IN
STUD FRAMING AND (16) #12 5/8" SHEAR STUD
T/STEEL SCREWS IN FLAT STRAP SPACED 16" C/C
CUT OPEN TOP OF HSS TO
SEE PLAN www.stantec.com
ALLOW PASSAGE OF REBAR
AND GROUT
A
Copyright Reserved
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
TOP TRACK W/ reported to Stantec without delay.
(2) #12 SCREWS The Copyrights to all designs and drawings are the property of
AT 12" C/C Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.
HSS 8"x8"x1/4" SQUARE TUBE LINTEL
SUPPORT BEAM

2" M
Consultants

IN .
MINIMUM 6" WIDE 12 GA. FLAT STRAP Civil: Stantec
(BOTH SIDES OF WALL) SLIT BOTTOM OF HSS TO ALLOW Landscape: KGA/DeForest, LLC
W/ (2) #12 SCREWS AT EA. PASSAGE OF REBAR MINIMUM 16" ADJACENT FULLY GROUTED Structural: Stantec
STUD/STRAP INTERSECTION CELLS W/ (2) #6 PER CELL EACH SIDE OF OPENING MEP: Stantec
Information Technology: Stantec
Food Service: FCA Design
MTL. STUD FRAMING,
Theatrical Design: Texas Scenic Co.
SEE S595
(2) MTL. STUDS Legend
BACK-TO-BACK
HSS BEARING ON CMU AT LINTEL
4 1" = 1'-0"

B HOLDDOWN, TO BE SPECIFIED BY HOLDDOWN, TO BE SPECIFIED BY


DELEGATED ENGINEER AND PROVIDED DELEGATED ENGINEER AND PROVIDED
TO E.O.R. FOR APPROVAL TO E.O.R. FOR APPROVAL
GROUT ACCESS HOLES

SEE SCHEDULE FOR DEPTH OF


LINTEL TO BE GROUTED SOLID
8" OR 12" CMU

VERTICAL REINF., SEE SCHEDULE

10'-0" MINIMUM WIDTH


HORIZ. SAWCUTS TO ADD
REINFORCEMENT
CMU TO REMAIN

BRACING ELEVATION DETAIL CMU TO BE REMOVED


1 1/2" = 1'-0"
SEE SCHEDULE FOR ADDED
REINFORCEMENT
SEE PLAN ONCE HEADER AND JAMBS
ARE REINFORCED AND
GROUTED SOLID

POINT LOAD Notes

3/16
≥ 6" TYP NEW CMU WALL OPENING SCHEDULE
SUPPORT ANGLE 3/16
BEYOND MAX OPENING MAX DEPTH OF FULLY ADDED VERTICAL REINF. & ADDED HORIZONTAL REINF. MIN. BEARING ON
SPAN WIDTH GROUTED CELLS SPACING U.N.O. ADJACENT FULLY
HOOKED TOP & BOTT. GROUTED CELLS

4'-0" 8" 16" N/A (1) #5 IN (2) CELLS 8"

8'-0" 8" 32" N/A (2) #5 IN (2) CELLS 16"

NOTES:

1. VERIFY ALL CMU OPENINGS W/ ARCHITECT DWG'S.


≥ 6"
POINT LOAD

EXISTING CMU WALL OPENING DETAIL


JOIST REINFORCEMENT 5 1" = 1'-0"

ADD 2L 1-1/2"x1-1/2"x3/16" WHEN POINT LOAD IS MORE THAN 6" FROM JOIST
TOP/BOTTOM CHORD PANEL POINT AND POINT LOAD IS GREATER THAN 500#
D

JOIST REINFORCING SECTION


2 1" = 1'-0"

TOP FLANGE OF JOIST


COORDINATE SIZE AND
LOCATION OF OPENING
WITH GENERAL
CONTRACTOR
By Appd YYYY.MM.DD
Revision
1/4
L4
x4 5" CLR. OF JOIST
x 3x x5
/16
Issue for Bidding & Construction Author Approver 2017.10.11
L3 By Appd YYYY.MM.DD
L3x3x1/4 Issued

1/4
x 3x
L3

L4
x4
E x5
/16

3/16 3
Permit-Seal
JOIST

2-12
NOTE:
- DETAIL FOR JOIST SPACING UP TO 6'-0" OC. TYP.
- CHICAGO CLAMP CO'S FRAMING CLAMP SYSTEM 3/16 3
MAY BE SUBSTITUTED.

TYPICAL WELDED ANGLE FRAME AT STEEL JOISTS


C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

3 Client/Project
3/4" = 1'-0"
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F MISC. FRAMING DETAILS

Project No. Scale


214000507 As indicated
Revision Drawing No.
10/10/2017 12:01:25 PM

S532
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

STEEL BEAM SCHEDULE STEEL JOIST SCHEDULE STEEL JOIST SCHEDULE STEEL JOIST SCHEDULE

Structural Structural Structural Structural


Type Usage Length W Tons Type Usage Length WJ Tons Type Usage Length WJ Tons Type Usage Length WJ Tons

W18X40 Girder 30' - 7 40 0.61 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 18K4 Joist 25' - 7" 7.2 0.09
127/128" 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 18K4 Joist 25' - 7" 7.2 0.09
W18X40 Girder 28' - 4 40 0.57 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 18K4 Joist 25' - 7" 7.2 0.09 www.stantec.com
121/128" 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05
A
W18X40 Girder 27' - 8 89/128" 40 0.55 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05 Copyright Reserved
W12X22 Girder 25' - 6" 22 0.28 30K9 Joist 45' - 10 3/4" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05
The Contractor shall verify and be responsible for all dimensions.
DO NOT scale the drawing - any errors or omissions shall be
W16X31 Girder 19' - 4 29/128" 31 0.30 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05 reported to Stantec without delay.
The Copyrights to all designs and drawings are the property of
W12X19 Girder 10' - 5" 19 0.10 30K9 Joist 45' - 10 3/4" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05 Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.
W10X15 Girder 12' - 8 15 0.10 30K9 Joist 45' - 10 5/8" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05
173/256"
30K9 Joist 45' - 10 3/4" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05 Consultants
W10X15 Girder 6' - 0" 15 0.05
30K9 Joist 45' - 10 11/16" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05 Civil: Stantec
W10X15 Girder 13' - 4 5/8" 15 0.10 Landscape: KGA/DeForest, LLC
30K9 Joist 45' - 10 11/16" 13.4 0.31 18K3 Joist 19' - 3 1/16" 6.6 0.06 12K1 Joist 18' - 8" 5 0.05 Structural: Stantec
W18X35 Girder 35' - 0 11/64" 35 0.61
26K7 Joist 35' - 6 1/4" 10.9 0.19 18K3 Joist 24' - 6 1/2" 6.6 0.08 12K1 Joist 18' - 8" 5 0.05 MEP: Stantec
W21X44 Girder 41' - 0" 44 0.90 Information Technology: Stantec
26K7 Joist 35' - 6 1/4" 10.9 0.19 16K2 Joist 24' - 10" 5.5 0.07 12K1 Joist 18' - 8" 5 0.05 Food Service: FCA Design
W21X44 Girder 41' - 9 37/64" 44 0.92
26K7 Joist 35' - 6 1/4" 10.9 0.19 16K2 Joist 24' - 10" 5.5 0.07 12K1 Joist 18' - 8" 5 0.05 Theatrical Design: Texas Scenic Co.
W10X19 Girder 12' - 5 7/8" 19 0.12
26K7 Joist 38' - 5 1/2" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 12K1 Joist 18' - 8" 5 0.05 Legend
W12X22 Girder 24' - 5 5/8" 22 0.27
26K7 Joist 38' - 5 1/2" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 12K1 Joist 18' - 8" 5 0.05
W12X22 Girder 27' - 4 1/4" 22 0.30
26K7 Joist 38' - 5 3/16" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 26K7 Joist 35' - 6 1/4" 10.9 0.19
W10X15 Girder 17' - 0 3/8" 15 0.13
26K7 Joist 38' - 5 3/16" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 26K7 Joist 38' - 5 3/16" 10.9 0.21
W12X22 Girder 29' - 7 3/4" 22 0.33
26K7 Joist 38' - 5 3/16" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 18K3 Joist 12' - 4 1/8" 6.6 0.04
W10X15 Girder 11' - 10 3/16" 15 0.09
26K7 Joist 38' - 5 1/16" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X19 Girder 19' - 8" 19 0.19
26K7 Joist 38' - 5 1/16" 10.9 0.21 16K2 Joist 24' - 10" 5.5 0.07 18K3 Joist 21' - 3 7/16" 6.6 0.07
W10X15 Girder 13' - 11" 15 0.10
26K7 Joist 38' - 5 1/16" 10.9 0.21 14K1 Joist 17' - 6" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W10X15 Girder 17' - 11" 15 0.13
B 26K7 Joist 38' - 5 1/16" 10.9 0.21 14K1 Joist 17' - 6" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W16X26 Girder 36' - 4 1/4" 26 0.47
26K7 Joist 38' - 5 1/16" 10.9 0.21 14K1 Joist 17' - 6" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W10X15 Girder 19' - 6 3/8" 15 0.15
26K7 Joist 38' - 5 3/16" 10.9 0.21 14K1 Joist 17' - 5 3/8" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W10X15 Girder 5' - 4" 15 0.04
26K7 Joist 38' - 5 3/16" 10.9 0.21 10K1 Joist 10' - 7 3/8" 5 0.03 18K3 Joist 21' - 3 7/16" 6.6 0.07
W16X26 Girder 23' - 6 1/16" 26 0.31
26K7 Joist 38' - 5 3/16" 10.9 0.21 10K1 Joist 10' - 7 3/8" 5 0.03 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X19 Girder 19' - 0 7/8" 19 0.18
26K7 Joist 38' - 5 3/16" 10.9 0.21 10K1 Joist 10' - 7 3/8" 5 0.03 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X19 Girder 19' - 4" 19 0.18
26K7 Joist 38' - 5 3/16" 10.9 0.21 14K1 Joist 17' - 6" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X19 Girder 19' - 6 7/32" 19 0.19
10K1 Joist 15' - 10" 5 0.04 14K1 Joist 17' - 5 3/8" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W18X40 Girder 26' - 5 1/8" 40 0.53
10K1 Joist 15' - 10" 5 0.04 14K1 Joist 17' - 5 3/8" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W14X26 Girder 19' - 4" 26 0.25
10K1 Joist 15' - 10" 5 0.04 14K1 Joist 17' - 6" 5.2 0.05 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X22 Girder 19' - 4 1/64" 22 0.21
10K1 Joist 12' - 6" 5 0.03 10K1 Joist 11' - 8 13/16" 5 0.03 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X26 Girder 28' - 9" 26 0.37
10K1 Joist 12' - 6" 5 0.03 24K7 Joist 26' - 7" 10.1 0.13 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X22 Girder 19' - 4 1/64" 22 0.21
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X22 Girder 24' - 8 13/128" 22 0.27
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10 18K3 Joist 21' - 3 7/16" 6.6 0.07
W16X26 Girder 20' - 4 41/256" 26 0.26
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10 18K3 Joist 21' - 3 7/16" 6.6 0.07
W16X26 Girder 20' - 4 21/128" 26 0.26
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X22 Girder 24' - 8 11/128" 22 0.27
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10 18K3 Joist 21' - 3 7/16" 6.6 0.07
W12X26 Girder 28' - 10" 26 0.37
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W10X17 Girder 20' - 4" 17 0.17 360/180
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 26' - 7" 7.2 0.10
W10X15 Girder 25' - 7" 15 0.19 DBP 73LH Joist 105' - 1 7/8" 40 2.10
10K1 Joist 12' - 6" 5 0.03 14K1 Joist 17' - 5 3/8" 5.2 0.05
W10X15 Girder 26' - 4 7/8" 15 0.20 360/180
10K1 Joist 12' - 6" 5 0.03 14K1 Joist 17' - 5 3/8" 5.2 0.05
C W14X22 Girder 29' - 0" 22 0.32 DBP 73LH Joist 105' - 1 7/8" 40 2.10
10K1 Joist 12' - 6" 5 0.03 14K1 Joist 17' - 5 3/8" 5.2 0.05
W14X22 Girder 20' - 4" 22 0.22 360/180
10K1 Joist 12' - 6" 5 0.03 14K1 Joist 17' - 5 3/8" 5.2 0.05 Notes
W16X31 Girder 26' - 8" 31 0.41 DBP 73LH Joist 105' - 1 7/8" 40 2.10
10K1 Joist 12' - 6" 5 0.03 24K7 Joist 38' - 3 15/16" 10.1 0.19 360/180
W16X31 Girder 32' - 0 33/128" 31 0.50
10K1 Joist 12' - 6" 5 0.03 24K7 Joist 38' - 3 15/16" 10.1 0.19
W18X35 Girder 34' - 2 3/4" 35 0.60 DBP 73LH Joist 105' - 1 7/8" 40 2.10
10K1 Joist 12' - 6" 5 0.03 24K7 Joist 38' - 3 15/16" 10.1 0.19 360/180
W18X35 Girder 34' - 2 3/4" 35 0.60
10K1 Joist 12' - 6" 5 0.03 18K4 Joist 25' - 6 13/16" 7.2 0.09 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W14X34 Girder 19' - 3 1/16" 34 0.33
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 13/16" 7.2 0.09 360/180
W10X15 Girder 18' - 5 7/8" 15 0.14
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 13/16" 7.2 0.09 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W12X26 Girder 28' - 9" 26 0.37 360/180
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 13/16" 7.2 0.09
W16X26 Girder 26' - 1 11/128" 26 0.34
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 13/16" 7.2 0.09 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W16X26 Girder 26' - 1 7/64" 26 0.34 360/180
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 3/8" 7.2 0.09
W10X15 Girder 10' - 7 3/8" 15 0.08 DBP 73LH Joist 105' - 1 7/8" 40 2.10
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 3/8" 7.2 0.09
W12X14 Girder 22' - 3 7/8" 14 0.16 360/180
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 3/8" 7.2 0.09
W10X15 Girder 20' - 4" 15 0.15 DBP 73LH Joist 105' - 1 7/8" 40 2.10
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 3/8" 7.2 0.09
W10X15 Girder 17' - 3 3/8" 15 0.13 360/180
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 6 3/8" 7.2 0.09
W12X14 Girder 24' - 8" 14 0.17 DBP 73LH Joist 105' - 1 7/8" 40 2.10
18K3 Joist 24' - 6 1/2" 6.6 0.08 18K4 Joist 25' - 7" 7.2 0.09 360/180
W12X14 Girder 19' - 4 1/8" 14 0.14
18K3 Joist 24' - 6 1/2" 6.6 0.08 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W10X15 Girder 4' - 10 1/2" 15 0.04
18K3 Joist 24' - 6 1/2" 6.6 0.08 360/180
W14X26 Girder 11' - 8 13/16" 26 0.15
18K3 Joist 24' - 6 1/2" 6.6 0.08 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W10X15 Girder 8' - 8" 15 0.07
18K3 Joist 24' - 6 1/2" 6.6 0.08 360/180
D W12X19 Girder 22' - 4" 19 0.21
18K3 Joist 24' - 6 1/2" 6.6 0.08 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W12X26 Girder 2' - 6 19/256" 26 0.03 360/180
18K3 Joist 24' - 6 1/2" 6.6 0.08
W10X15 Girder 3' - 8 1/2" 15 0.03 DBP 73LH Joist 105' - 1 7/8" 40 2.10
18K3 Joist 24' - 6 1/2" 6.6 0.08
W10X15 Girder 26' - 10 1/4" 15 0.20 360/180
18K3 Joist 24' - 6 1/2" 6.6 0.08
W10X15 Girder 26' - 10 3/4" 15 0.20 DBP 73LH Joist 105' - 1 7/8" 40 2.10
18K3 Joist 24' - 6 1/2" 6.6 0.08
W10X15 Girder 24' - 6 15 0.18 360/180
139/256" 18K3 Joist 24' - 6 1/2" 6.6 0.08
DBP 73LH Joist 105' - 1 7/8" 40 2.10
22K6 Joist 22' - 1 7/8" 9.2 0.10 360/180
W10X15 Girder 24' - 6 15 0.18
139/256" 22K6 Joist 31' - 2 3/16" 9.2 0.14 DBP 73LH Joist 105' - 1 7/8" 40 2.10
W10X15 Girder 19' - 4 1/32" 15 0.15 22K6 Joist 31' - 2 3/16" 9.2 0.14 360/180
W10X15 Girder 24' - 7 15 0.18 22K6 Joist 31' - 2 3/16" 9.2 0.14 DBP 73LH Joist 105' - 1 7/8" 40 2.10
235/256" 22K6 Joist 31' - 2 3/16" 9.2 0.14 360/180
W10X15 Girder 19' - 4 1/64" 15 0.15 22K6 Joist 31' - 2 3/16" 9.2 0.14 26K7 Joist 38' - 5 1/16" 10.9 0.21
W10X15 Girder 24' - 8 11/128" 15 0.19 22K6 Joist 31' - 2 3/16" 9.2 0.14 30K9 Joist 45' - 10 3/4" 13.4 0.31 Revision By Appd YYYY.MM.DD

W10X15 Girder 20' - 2 35/64" 15 0.15 22K6 Joist 31' - 2 3/16" 9.2 0.14 22K6 Joist 31' - 2 3/16" 9.2 0.14
Issue for Bidding & Construction RAS PMR 2017.10.11
W10X15 Girder 20' - 4 7/128" 15 0.15 22K6 Joist 31' - 2 3/16" 9.2 0.14 18K3 Joist 24' - 6 1/2" 6.6 0.08 By Appd YYYY.MM.DD
W18X35 Girder 34' - 8 13/16" 35 0.61 22K6 Joist 31' - 2 3/16" 9.2 0.14 18K3 Joist 21' - 3 7/16" 6.6 0.07 Issued
W21X44 Girder 41' - 3 23/64" 44 0.91 22K6 Joist 31' - 2 3/16" 9.2 0.14 2L2X2X3/8 Joist 1' - 9 3/16"
W21X44 Girder 41' - 9 37/64" 44 0.92 22K6 Joist 31' - 2 3/16" 9.2 0.14 18K3 Joist 19' - 3 1/16" 6.6 0.06
Grand total: 77 21.54 22K6 Joist 31' - 2 3/16" 9.2 0.14 18K3 Joist 19' - 3 1/16" 6.6 0.06
22K6 Joist 31' - 2 3/16" 9.2 0.14 18K3 Joist 19' - 3 1/16" 6.6 0.06
E 22K6 Joist 31' - 2 3/16" 9.2 0.14 18K3 Joist 19' - 4 1/16" 6.6 0.06 STEEL ESTIMATE NOTES.
22K6 Joist 31' - 2 3/16" 9.2 0.14 10K1 Joist 11' - 8 13/16" 5 0.03
1. STEEL ESTIMATES ARE PROCESSED FROM MODEL AND INCLUDE
22K6 Joist 31' - 2 3/16" 9.2 0.14 18K4 Joist 26' - 7" 7.2 0.10 MOST MAJOR FRAMING ELEMENTS. Permit-Seal
22K6 Joist 31' - 2 3/16" 9.2 0.14 18K4 Joist 25' - 6 3/8" 7.2 0.09 2. NOTE INCLUDED IS ESTIMATE: DECK ANGLES, RIDGE PLATES,
BRIDGING, CONNECTIONS, ECT.
22K6 Joist 31' - 2 3/16" 9.2 0.14 18K4 Joist 26' - 7" 7.2 0.10 3. JOIST WEIGHTS ARE FROM STANDARD SJI TABLES, TONNAGE FORM
JOIST MANUFACTURE MAY BE MORE OR LESS.
10K1 Joist 11' - 8 13/16" 5 0.03 14K1 Joist 17' - 5 3/8" 5.2 0.05 4. ESTIMATE OF PROBABLE CAUSE IS MEANT TO BE A HELPFUL TOOL IN
10K1 Joist 11' - 8 13/16" 5 0.03 24K7 Joist 38' - 3 15/16" 10.1 0.19 PROVIDING BIDS NOTE AN OFFICIAL ESTIMATED OR BILL OF
MATERIAL. FABRICATOR VERIFY FINAL ESTIMATE.
24K6 Joist 29' - 7 13/16" 9.7 0.14 18K4 Joist 25' - 6 13/16" 7.2 0.09 5. ADD 15% TO STEEL TONNAGE TOTAL FOR STEEL FRAMING PRICING.
24K6 Joist 29' - 7 13/16" 9.7 0.14 W16X26 Joist 12' - 6"
24K6 Joist 29' - 7 13/16" 9.7 0.14 16K2 Joist 24' - 9 15/16" 5.5 0.07
24K6 Joist 29' - 7 13/16" 9.7 0.14 12K1 Joist 11' - 7 5/16" 5 0.03
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
24K6 Joist 29' - 7 13/16" 9.7 0.14 W12X19 Joist 22' - 9 3/8"
24K6 Joist 29' - 7 13/16" 9.7 0.14 Grand total: 245 63.19 Pearland Independent School District
24K6 Joist 29' - 7 13/16" 9.7 0.14
24K7 Joist 38' - 3 15/16" 10.1 0.19 Pearland Junior High West & Sablatura
24K7 Joist 38' - 3 15/16" 10.1 0.19 Middle School Additions and
18K3 Joist 19' - 4 1/16" 6.6 0.06 Renovations
18K3 Joist 19' - 3 1/16" 6.6 0.06 Pearland, Texas 77581
18K3 Joist 19' - 3 1/16" 6.6 0.06
18K3 Joist 19' - 3 1/16" 6.6 0.06 Title
F 18K3 Joist 19' - 3 1/16" 6.6 0.06 BEAM AND JOIST TAKE OFFS

Project No. Scale


214000507
Revision Drawing No.
10/10/2017 12:01:27 PM

S601
ORIGINAL SHEET - ARCH E1 (30"x42")
1 2 3 4 5 6 7 8

STEEL COLUMN TONAGE EST. STEEL MISCELLANEOUS SCHEDULE


Type Length W Tons Structural
Type Usage Length W Tons
HSS6X6X1/4 23' - 10" 19 0.23
HSS6X6X1/4 23' - 10" 19 0.23 2L2X2X3/8 Other 1' - 10 3/16" 9.3 0.01
HSS5X5X1/4 12' - 11" 15.6 0.10 C6X8.2 Other 25' - 10 7/8" 8.2 0.11
www.stantec.com
HSS4X4X1/4 12' - 11" 12.2 0.08 C6X8.2 Other 25' - 10 7/8" 8.2 0.11
A C6X8.2 Other 52' - 10" 8.2 0.22
HSS4X4X1/4 12' - 11" 12.2 0.08 Copyright Reserved
HSS4X4X1/4 12' - 11" 12.2 0.08 HSS2-1/2X2-1/2 Other 3' - 4 1/128" 7.08 0.01 The Contractor shall verify and be responsible for all dimensions.
HSS6X6X1/4 12' - 11" 19 0.12 X1/4 DO NOT scale the drawing - any errors or omissions shall be
reported to Stantec without delay.
HSS6X6X3/8 13' - 9 1/2" 27.4 0.19 HSS2-1/2X2-1/2 Other 3' - 4" 7.08 0.01 The Copyrights to all designs and drawings are the property of
X1/4 Stantec. Reproduction or use for any purpose other than that
HSS6X6X3/16 13' - 9 1/2" 14.5 0.10 authorized by Stantec is forbidden.
HSS8X8X3/8 Other 16' - 9" 37.6 0.31
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08
L2-1/2X2-1/2X3/ Other 4' - 6 95/256" 5.9 0.01 Consultants
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 8 Civil: Stantec
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 Landscape: KGA/DeForest, LLC
L2-1/2X2-1/2X3/ Other 5' - 8 187/256" 5.9 0.02 Structural: Stantec
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 8 MEP: Stantec
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 L2-1/2X2-1/2X3/ Other 6' - 11 3/32" 5.9 0.02 Information Technology: Stantec
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 Food Service: FCA Design
8
Theatrical Design: Texas Scenic Co.
HSS4X4X1/4 14' - 0" 12.2 0.09 L2-1/2X2-1/2X3/ Other 8' - 1 117/256" 5.9 0.02
8 Legend
HSS5X5X1/4 13' - 9 1/2" 15.6 0.11
HSS5X5X1/4 14' - 0" 15.6 0.11 L2-1/2X2-1/2X3/ Other 4' - 2 93/256" 5.9 0.01
HSS4X4X1/4 14' - 0" 12.2 0.09 8
HSS4X4X1/4 14' - 0" 12.2 0.09 L2-1/2X2-1/2X3/ Other 5' - 4 93/128" 5.9 0.02
8
HSS5X5X1/4 20' - 2 1/8" 15.6 0.16
L2-1/2X2-1/2X3/ Other 6' - 7 23/256" 5.9 0.02
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08
8
HSS6X6X3/8 13' - 9 1/2" 27.4 0.19
W10X15 Other 13' - 4 5/8" 15 0.10
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08
W10X15 Other 25' - 1 13/16" 15 0.19
B HSS4X4X1/4 13' - 9 1/2" 12.2 0.08
W10X15 Other 18' - 5 15 0.14
HSS6X6X3/8 13' - 9 1/2" 27.4 0.19 207/256"
HSS6X6X3/8 13' - 9 1/2" 27.4 0.19 W10X15 Other 18' - 8" 15 0.14
HSS6X0.375 20' - 9 22.5 0.23 W10X19 Other 5' - 11 13/16" 19 0.06
149/256"
W10X19 Other 3' - 4 13/16" 19 0.03
HSS5X0.250 20' - 11 12.7 0.13
W10X19 Other 22' - 3" 19 0.21
3/4"
W12X14 Other 11' - 8 47/64" 14 0.08
HSS5X0.250 21' - 6 3/4" 12.7 0.14
W12X19 Other 25' - 11 13/16" 19 0.25
HSS5X0.250 21' - 11 12.7 0.14
7/8" W12X19 Other 16' - 8 9/16" 19 0.16
HSS5X5X1/4 14' - 0" 15.6 0.11 W12X19 Other 14' - 7 13/16" 19 0.14
HSS5X0.250 20' - 11 12.7 0.13 W12X19 Other 12' - 4" 19 0.12
3/4" W12X19 Other 25' - 11 13/16" 19 0.25
HSS5X0.250 21' - 6 3/4" 12.7 0.14 W12X19 Other 10' - 5 97/128" 19 0.10
HSS4X4X1/4 14' - 0" 12.2 0.09 W12X22 Other 3' - 9" 22 0.04
HSS4X4X1/4 14' - 0" 12.2 0.09 W12X22 Other 3' - 9" 22 0.04
HSS4X4X1/4 14' - 0" 12.2 0.09 W16X26 Other 25' - 11 13/16" 26 0.34
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 W16X26 Other 18' - 0 26 0.23
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08 183/256"
HSS5X0.250 20' - 9 12.7 0.13 W16X36 Other 74' - 3" 36 1.34
149/256" W16X36 Other 74' - 3" 36 1.34
C HSS5X5X1/4 13' - 9 1/2" 15.6 0.11 W16X36 Other 57' - 0" 36 1.03
HSS6X6X3/16 13' - 9 1/2" 14.5 0.10 W21X44 Other 30' - 2 45/128" 44 0.66
Notes
HSS6X6X3/16 13' - 9 1/2" 14.5 0.10 Grand total: 36 7.88
HSS5X5X1/4 13' - 9 1/2" 15.6 0.11
HSS5X0.250 21' - 11 12.7 0.14
7/8"
HSS4X4X1/4 20' - 2 1/8" 12.2 0.12
HSS6X6X3/16 14' - 0" 14.5 0.10
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08
HSS4X4X1/4 13' - 9 1/2" 12.2 0.08
HSS4X4X1/4 8' - 8 1/2" 12.2 0.05
HSS4X4X1/4 8' - 8 1/2" 12.2 0.05
HSS4X4X1/4 8' - 8 1/2" 12.2 0.05
HSS4X4X1/4 8' - 8 1/2" 12.2 0.05
HSS5X5X3/16 22' - 1 1/4" 12 0.13
HSS6X6X3/8 14' - 0" 27.4 0.19
Grand total: 55 6.22

By Appd YYYY.MM.DD
Revision
Issue for Bidding & Construction RAS PMR 2017.10.11
By Appd YYYY.MM.DD
Issued

E STEEL ESTIMATE NOTES.

1. STEEL ESTIMATES ARE PROCESSED FROM MODEL AND INCLUDE


MOST MAJOR FRAMING ELEMENTS. Permit-Seal
2. NOTE INCLUDED IS ESTIMATE: DECK ANGLES, RIDGE PLATES,
BRIDGING, CONNECTIONS, ECT.
3. JOIST WEIGHTS ARE FROM STANDARD SJI TABLES, TONNAGE FORM
JOIST MANUFACTURE MAY BE MORE OR LESS.
4. ESTIMATE OF PROBABLE CAUSE IS MEANT TO BE A HELPFUL TOOL IN
PROVIDING BIDS NOTE AN OFFICIAL ESTIMATED OR BILL OF
MATERIAL. FABRICATOR VERIFY FINAL ESTIMATE.
5. ADD 15% TO STEEL TONNAGE TOTAL FOR STEEL FRAMING PRICING.
C:\Users\Public\Documents\Local_Revit_Files\STN_STRUC_214000507_RVT_17_rspivey.rvt

Client/Project
Pearland Independent School District
Pearland Junior High West & Sablatura
Middle School Additions and
Renovations
Pearland, Texas 77581

Title
F COLUMN AND BRACE STEEL TAKE OFFS

Project No. Scale


214000507
Revision Drawing No.
10/10/2017 12:01:28 PM

S602
ORIGINAL SHEET - ARCH E1 (30"x42")