Sei sulla pagina 1di 11

Republic of the Philippines

Province of PAMPANGA
Municipality of Floridablanca
BARANGAY __________________

BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT COMMITTEE (BDRRMC)

DISASTER RISK REDUCTION MANAGEMENT (DRRM) and CLIMATE CHANGE ADAPTATION (CCA) PLAN
2018-2020

I. VISION
To make our community an environment-friendly and habitable barangay, disaster
resilient, adaptive to climate change and a safe place to live in with the sustained
partnership with the people’s organization, civil society and non-government
organization.

II. OBJECTIVE
The BDRRMC shall conduct risk assessment in order to identify the hazards that may
affect the barangay, analyse and evaluate the risk associated with that hazard and
determine appropriate ways to lessen the adverse impacts of the hazards and the
possibility of disaster

III. GENERAL INFORMATION


1. Total Population _____________________________
2. No. of Families _____________________________
3. Presence of Creeks/ Rivers (pls. check) Yes ____ No ______
4. Presence of Mountains (pls. check) Yes ____ No ______
5. Presence of :
a.) Barangay Hall Yes ____ No ______
b.) Health Center Yes ____ No ______
6. Presence of School/s (pls. check) Yes ____ No ______

IV. BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT COMMITTEE

Chairman : - PUNONG BARANGAY

1. PLANS AND OPERATION - ___________________________


Punong Barangay

2. COMMUNICATION AND WARNING - ___________________________


Barangay Tanod

: ___________________________
Bantay Bayan Member

3. TRANSPORTATION - ___________________________
Barangay Kagawad

: ___________________________
Jeepney /Tricycle Drivers Association
(Name of Member / Name of Association)

4. RESCUE AND OPERATION - ___________________________


Barangay Kagawad

: ___________________________
Bantay Bayan Member

: ___________________________
People’s Organization
(Name of Member / Name of Association)
5. EVACUATION - ___________________________
Barangay Kagawad

: ___________________________
Bantay Bayan Member

: ___________________________
School Principal/ Teacher

6. RELIEF OPERATION - ___________________________


Barangay Kagawad

: ___________________________
Day Care Worker

: ___________________________
Purok Chairman

7. HEALTH AND MEDICAL - ___________________________


Barangay Kagawad

: ___________________________
BHW

8. DAMAGE ASSESSMENT AND - ___________________________


ENGINEERING
Barangay Kagawad

: ___________________________
NGO/ People’s Organization

9. FIRE BRIGADE - ___________________________


Barangay Kagawad

10. RESOURCE MANAGEMENT - ___________________________


Barangay Treasurer

V. EARLY WARNING SYSTEM

SIGNAL NO. 1 - Use of megaphone, sound system or ringing of church bells


twice
SIGNAL NO. 2 - Use of siren or ringing of church bells but with intervals (TIME
TO PACK THINGS AND GO TO HIGHER GROUNDS)
SIGNAL NO. 3 - Continues siren, ringing of church bells without intervals (TIME
TO ABANDON THE PLACE)
VI. EVACUATION CENTER

NAME OF EVACUATION CAPACITY CONDITION


CENTER Families/ Individuals (With rooms, lights, CR,
water, blankets, pillows,
mats)

NAME OF EVACUATION CAPACITY CONDITION


CENTER Families/ Individuals (With rooms, lights, CR,
water, blankets, pillows,
mats)
VII. INVENTORY OF AVAILABLE RESOURCES

A. Rescue Equipments (Specify number/ capacity)


1.
2.
3.
4.
5.
6.
B. Service Vehicle
1.
2.
3.
4.
C. Rescue Equipments (Specify number/ capacity)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
D. Relief Supplies/ Goods
1.
2.
3.
4.
VIII. EMERGENCY CONTACT NUMBERS

In case of emergency, the following hotline numbers may be contacted :


1. Barangay Hall - _________________________
2. Punong Barangay - _________________________
3. Barangay Operation and Rescue Center - _________________________
4. Barangay Kagawad (Peace and Order) - _________________________
5. Chief Tanod - _________________________
6. Municipal Operation Center - __________497-0698________
7. PNP (City/ Mun.) - ______ 970-1291________
8. Fire Station (City/ Mun.) - __09338649938 (Fire Marshall)_
9. MDRRMO - _______09465530910________
10. MCH - ________970-0488___________
11. SFELAPCO - ________970-1315___________

IX. PROGRAMS, PROJECT AND ACTIVITIES (see attached matrix)

Prepared by:

___________________________
Barangay Secretary, BDRRMC

Approved:

Punong Barangay
BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT (BDRRM) AND CLIMATE CHANGE ADAPTATION (CCA) PLAN
CY 2018-2020
PROVINCE: PAMPANGA
MUNICIPALITY: FLORIDABLANCA
BARANGAY: DAMPE

TYPE HAZARD: FIRE


ROOT CAUSE TRIGGERING FACTORS DISASTER RISK REDUCTION ACTIVITIES

1. 1. Populated areas presence of informal  Narrow Roads & Street


settlers

2. Residential house built with light  Sub- standard used-lights  Safety Box
combustible materials

3. Electrical short circuit  Faulty E-Wiring  Monthly Monitoring

2.
4. Unattended lighted candles and mosquito  Self-Negligence  Awareness
coil

5. Overhead Appliances  Negligence  Awareness


6. Grass Fire and fumes  Negligence  Regular Grass Cutting

7. LPG tanks Explosion  Leakage  Properly done the regulator


 Fire extinguisher available at the house
 Fire Exit
TYPE HAZARD: EARTHQUAKE

ROOT CAUSE TRIGGERING FACTORS DISASTER RISK REDUCTION ACTIVITIES

SHAKING  SUB-STANDARD BUILDING MATERIALS  QUARTERLY EARTHQUAKE DRILL

TYPE HAZARD: FLOOD

ROOT CAUSE TRIGGERING FACTORS DISASTER RISK REDUCTION ACTIVITIES

TYPHOONS DURING RAINY SEASON  ASSORTED GARBAGE-WASTE MATERIALS  REGULAR CLEANING


 TIPS IN RIVER CREEKS
C  DE-CLOGGING THRU CASH FOR WORK AND FOOD
CLOGGED WATERWAYS & PRESENCE OF  RISING FLOOD WATER DUE TO CLOGGING AND FOR WORK
INFORMAL SETTLERS ENCROACHMEN  REMOVAL OF INFORMAL SETTLERS
 VOLUMINOUS FLOODWATER COMING FROM  REPAIR OF CRITICAL CURVES & DIKES, IEC
ERODED CRITICAL CURVES & ERODED PORAC RIVER
BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT (BDRRM) AND CLIMATE CHANGE ADAPTATION (CCA) PLAN
CY 2018-2020
PROVINCE: PAMPANGA
MUNICIPALITY: FLORIDABLANCA
BARANGAY: DAMPE
PROJECT/ACTIVITIES OUTPUT INDICATOR TARGET FINANCIAL PERIOD OF
REQUIREMEN IMPLEMENTATION
TS
PREVENTION AND MITIGATION:

3. 1. Attendance to Disaster  No. of BDRRMC attended the briefing 15 BDRRMC Members ______________ EO 2nd Quarter Annually
Preparedness  No. of Brgy. Volunteers attended the briefing
4. Briefing

2. Strengthening Institution and  BDRRMC organized 1 - 1st Quarter 2019


Organization  Disaster Teams Organized 1 -
 Search and Rescue Team 1 -
 Evacuation Team 1 -
 Medical Team 1 -
 Relief Operation Team 1 -
 Evacuation Management Team 3 -
 Stockpiling and Logistical Team 1 -
 Peace and Order Team 3 -

3. Legislation  Enacted Ordinances/ Resolutions in support of 1 - 4th Quarter of 2018 & 2020
Disaster Preparedness

4. Engineering Works  Constructed Engineering works on bridges/ All Brgy. Facilities - 2nd-3rd Quarter Annually
foot bridges
 Spurdiking/ sandbagging -
 Embankments -
 Desilting and clearing of canals -

5.
6. 5. Building Design and  Construction of barangay facilities conformed All Brgy. Facilities ______________ 2nd-3rd Quarter Annually
Construction with Standard Building Design

6. Strengthening Community  Provide funds for supplemental feeding Below 6 yrs. Old - 2nd-3rd Quarter of 2018-2020
Health

7. Literacy Program (Public  Conducted for a on Disaster Preparedness All Assembly Members - 1st and 2nd Semester
Awareness)  Provide funds for IEC Materials ______________ Assembly Meeting 2018-
2020

8.Relocation to Safer Location  Conducted masterlisting of vulnerable sector All Vulnerable Sector - 1st Quarter Annually
prone to disaster

9. Risk Assessment  Conducted hazard assessment per Purok/ Sitio Barangay wide - 1st Quarter Annually
 Prepared Hazard Maps - 1st Quarter Annually
 Prepared Historical Profile of Hazard - 1st Quarter Annually

10. Risk Reduction Planning  Conducted Vulnerability and Capacity Planning Barangay wide _____________ 1st Quarter Annually
 Formulated BDRRM Plan and Budget 1 BDRRM Plan & Budget - 2nd Quarter 2019
BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT (BDRRM) AND CLIMATE CHANGE ADAPTATION (CCA) PLAN
CY 2018-2020
PROVINCE: PAMPANGA
MUNICIPALITY: FLORIDABLANCA
BARANGAY: DAMPE
PROJECT/ACTIVITIES OUTPUT INDICATOR TARGET FINANCIAL PERIOD OF
REQUIREMEN IMPLEMENTATION
TS
Preparedness:

7. 1. Setting Up Systems for Early  Designed Early Warning Systems 1 - 1st Quarter 2018
Warning

2. Evacuation Drill  Evacuation Plan Prepared addressing the 1 - 1st Quarter Annually
Particular Needs of Women and Other
Vulnerable Sector

3. Training on First Aid  Identified list of volunteers/ trainees to 1 - 1st Quarter Annually
undergo training on First Aid
 First Aid Kit secured 1 -

4. Training on Evacuation Center  Identified Responsible person that includes 1 - 2nd Quarter Annually
Management women to be Evacuation Managers
 Volunteers attended briefing on Evacuation 1 -
Center Management
8.
9. 5. Training on Emergency  Barangay Officials attended on emergency 1 ______________ 2ndQuarter Annually
Operations Center Management center operations
6. Strengthening Coordination and  Inventoried contact numbers of key plaers in 1 - 1st Quarter Annually
Institutional Arrangements case of disaster
 Established standard Procedure on 1 -
communication flow

7. Stockpiles and Logistics  Organized team for stockpiling and logistics 1 - 1stQuarter Annually
 Necessary goods and logistics Relief Goods, etc. _____________ 2nd Quarter Annually
readied/purchased in preparation for disasters

8.Contingency Planning  Barangay Officials and volunteers identified to BDRRMC & Volunteers - 1st- 2nd Quarter Annually
undergo workshop on Contingency Planning
 Barangay officials and volunteers attended BDRRMC & Volunteers - 1st – 2nd Quarter Annually
Contingency Planning Workshop
 Contingency Plan formulated 1 Contingency Plan - 3rd Quarter 2018
BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT (BDRRM) AND CLIMATE CHANGE ADAPTATION (CCA) PLAN
CY 2018-2020
PROVINCE: PAMPANGA
MUNICIPALITY: FLORIDABLANCA
BARANGAY: DAMPE
PROJECT/ACTIVITIES OUTPUT INDICATOR TARGET FINANCIAL PERIOD OF
REQUIREMEN IMPLEMENTATION
TS
EMERGENCY RESPONSE:
 Barangay officials and volunteers identified to ______________
10. 1. Search and Rescue form part of the Rescue and Search Team 10 Person 1st Quarter Annually
 Search and Rescue standard procedure -
formulated 1 -
 Standard Search and Rescue procedure 1
executed during disaster

2. Medical Services (First Aid)  First Aid Kit made available during disaster 1 __________ 2nd- 3rd Quarter Annually
 Team of First Aiders able to perform under 3 Teams -
disaster pressure

3. Evacuation  Evacuation Plan executed 1 - ANA


 Evacuation centers activated - ANA

4. Evacuation Management  Evacuation Center Managers able to perform - ANA


their responsibilities
11.
12. 5. Damage Needs Capacity  Barangay officials and volunteers able to come 1 - ANA
Assessment up with damage needs capacity assessment
 Accurate data reported to the authorities for 1 - ANA
immediate damage control
6. Immediate Repair of Barangay  Barangay officials and volunteers able to ____________ During/After Calamities or
Facilities and Services respond to the repairs of basic facilities and Disaster
services

7. Relief Delivery  Relief Goods made available Stockpile relief goods, - During/After Calamities or
etc. Disaster

8.Clearing Debris  Barangay officials and volunteers able to carry All streets and - During/After Calamities or
out clearing operations so as not to impede thoroughfares Disaster
emergencies

9. Psycho-Social Counselling &  Psycho-Social counselling and stress debriefing Victims of calamities/ - During/After Calamities or
Stress Debriefing performed to prevent hystericals and Disaster Disaster
depressions
PROJECT/ACTIVITIES OUTPUT INDICATOR TARGET FINANCIAL PERIOD OF
REQUIREMEN IMPLEMENTATION
TS
RECOVERY AND
REHABILITATION:
 Rebuild and Address roots causes of All Barangay Facilities, - 1st Quarter Annually
13. 1. Reconstruction (building back vulnerability Services and victims of
better) calamities or disasters

Prepared by: Approved:

BARANGAY DISASTER RISK REDUCTION MANAGEMENT COMMITTEE HON. ROY D. GARCIA


Punong Barangay

Potrebbero piacerti anche