Tank # 28 D and 28 E Fabrication schedule at Kizad by Aarya ENGG
Activity 28 D (Tk3) Target date 28 E (Tk4) Target date
Completion of Bottom Plate Completed Completed Completion of 4th Shell Course Completed Completed Completion of Roof Assembly 8-Aug 10-Aug Completion of 3rd shell course 10-Aug 13-Aug Completion of 2nd shell course 13-Aug 16-Aug Completion of 1st shell course 16-Aug 19-Aug Completion of sheel course welding to 17-Aug 20-Aug Bottom Welding of Trunnions 20-Aug 23-Aug Welding of pad plates to shell 21-Aug 24-Aug Welding of Nozzles to shell 24-Aug 27-Aug Wedling of Nozzles to roof 24-Aug 27-Aug Welding of All the Secondary Cleats 27-Aug 29-Aug Fixing of all piping 29-Aug 31-Aug Final Dimension 31-Aug 02-Sept. Hydro test 02-Sept. 04-Sept. Touch up, Mid-coat and top coat 7-Sep 9-Sep painting, Assembly of Handrails, staircase etc 7-Sep 9-Sep by Aarya ENGG Remarks
The Rudiments Of Practical Bricklaying - In Six Sections: General Principles Of Bricklaying, Arch Drawing, Cutting, And Setting, Different Kinds Of Pointing, Paving, Tiling, Materials, Slating, And Plastering, Practical Geometry Mensuration