CONCRETE POURING REQUEST Project Logo

Project Contractor
Location Supplier
Date Control No

GENERAL INFORMATION
Structure Reference Drawing/No
Area Concrete Strength/Max.
Grid Line Size of Agg.

Indicate Method of pourin (e.g. pumpcrete,direct pouring,chute,backhoe)

Work Description Trade Contractor General Contractor GERI Remarks


Line & Grade
Reinforcing bars
Structural embedments
Architectural embed/Block-out
Electrical Rough-ins/Block-out
Auxialliary Rough-ins/Block-out
Fire Protection Rough-ins/Block out
Mechanical/HVAC Rough-ins/Block out
Sanitary /Plumbing Rough-ins/Block-out
STP/WTP Works
Safety Provisions
Surface Preparation
Cleanliness

POURING STATISTICS
Scheduled Pouring Date : Actual Pouring Date :
Scheduled Pouring Time : Actual Pouring Time :
Estimated Volume(cu.m) : Actual Volume(cu.m) :
Supplier : Equipment :
Manpower :indicate figure and job work(2 mason,1 labor)

REMARKS:

NOTE:
Approval of the request does not relieve the contractor from complying with the contract documents

Requested by: Noted by: Recommending Approval by: Noted by:

Name: Name: Name: Name:


Position: Project Engineer Position: Project In-Charge Position: PMD Position: PMD
Inspected by:
Name: Name:
Position: QA/QC Engineer Position: QC
Project Logo

Remarks

ure and job work(2 mason,1 labor)

Position: PMD
FORMWORKS STRIPPING REQUEST Project Logo

Project : Date of Request :


Location : Control No. :
Owner :

GENERAL INFORMATION
Structure : Type of Forms Used :
Area : Age of Concrete :
Grid Line : Date of Removal :
Date Poured : Concrete Strength/Max. :
Size of Agg :

PRE-STRIPPING CHECKLIST
WORK DISCIPLINE REMARKS
General Contractor
REMOVAL OF FORMS ASEC

Member designation
Pile cap side forms
Footing tie-beam side forms
Retaining wall/shear wall forms/enclosure
Column enclosure/pedestal side forms
Beams & girders side forms
Beams & girders bottom forms
Slab bottom forms
Beam stair side and soffit forms

PROJECT MANAGER'S COMMENT

Requested by: Noted by: Recommending Approval by: Noted by:

Name: Name: Name: Name:


Position: Project Engineer Position: Project In-Charge Position: PMD Position: PMD

Inspected by:
Name: Name:
Position: QA/QC Engineer Position: QC
Project Logo

REMARKS

Position: PMD
FORM ENCLOSURE Project Logo

Project : Date :
Location : Control No. :
Owner :

GENERAL INFORMATION
Type of Work : Grid Line :
Area : Reference Drawing/No :

STRUCTURAL/ARCHITECTURAL
TRADES INVOLVED Trade Contractor General Contractor Remarks/Date
Architectural
Structural
Electrical
Auxiliary
Sanitary/Plumbing
Mechanical
Fire Protection
Line and Grade
Safety
GERI REMARKS SIGN
ARCHITECTURAL

STRUCTURAL

ELECTRICAL

AUXILIARY

SANITARY/PLUMBING

MECHANICAL

Requested by: Noted by: Recommending Approval by: Noted by:

Name: Name: Name: Name:


Position: Project Engineer Position: Project In-Charge Position: PMD Position: PMD

Inspected by:
Name: Name:
Position: QA/QC Engineer Position: QC
Project Logo

Remarks/Date

DATE

Position: PMD