YANBU 2 POWER AND WATER PROJECT

Power & Water Production Facilities


Daily Check list

No Check list Description

1 MCC Panels

2 Switch Gear Panels

3 Battery Bank

4 Capacitor bank

5 UPS Panel & DC Charger

6 ESP Transformer control Panel

7 ESP Transformer Rectifier

8 Power Transformer
9 Generator

10 Emergency Diesel Generator

11 Excitation System

12 Generator Protection Panel

13

14
YANBU 2 POWER AND WATER PROJECT
Power & Water Production Facilities
Daily Routine Parameter Checklist for M
System no. :

NoITEM 1 2 3 4 5 6 7 8 9 10 11
1 Visual Inspection
Check healthines of Pilot lamp & meters
2 (Replace if found faulty)
Check the position of Selector switch
{ S43 LR (cos) } is Remote / Local)
3 (Should be maintained with
Remote)
Breaker indication lamp status.
4 (G-Open, R- close, Y- Fault)

Check the ABB Relay {F01(MCR) } indication


5 status. (Ready, incomer, Tie, Remote
indications glowing is normal)
Check the selector switch { S43MA(cos)}
6 position Auto /Manual.
(Should be maintained Auto)
Check the selector switch { S52(TSS)}
(position Trip-1/Trip-2/Trip-tie)
7 (Normally keep with Trip-
Tie)
Check the status of indication lamp of F74
8 (TCS)
(normally Red lamp is glowing)

Check Result :
Date Item No Description


Satisfied

X Not-Satisfied N/A Not Applicable


ER PROJECT
acilities
Checklist for MCC p[anels
Location :

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Action Plan

Checked by: Name

Signature & Date


YANBU 2 POWER AND WATER PROJECT
Power & Water Production Facilities
Daily Routine Parameter Checklist for Gen
Tag No. : System no. : Generator #21

No ITEM 1 2 3 4 5 6 7 8 9 10 11

Visual inspection of Generator (any


1 abnormal of noise,Vibration, etc) D

Check the proper running Status of


2 cooling fan at collector end D

3 Watch Collector air temperature D

Shaft grounding Copper braid


4 cleanliness Status W

Check the Sparking Brushes on


5 collector ring W
Air cleaning of Brushes & Collector
6 ring M

Cleanliness Status of Air filters at


7 collector compatment. M

To replace the worn out Brushes


8 (maintain more than 1/8 (3.18MM) CI
above top of Brush Holder)

Check the temperature at Brush and M


9 armature ring side

Note : D-Daily, W- Weekly, M- Monthly, CI- Combustion


Check Result :
Date Item No Description


Satisfied

X Not-Satisfied N/A Not Applicable


ER PROJECT
acilities
Checklist for Generator
Generator #21 Location : STG #21

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Action Plan

Checked by: Name

Signature & Date


YANBU 2 POWER AND WATER PROJECT
Power & Water Production Facilities
Daily Routine Parameter Checklist for Gen
Tag No. : System no. : Generator #22

No ITEM 1 2 3 4 5 6 7 8 9 10 11

Visual inspection of Generator (any


1 abnormal of noise,Vibration, etc) D

Check the proper running Status of


2 cooling fan at collector end D

3 Watch Collector air temperature D

Shaft grounding Copper braid


4 cleanliness Status W

Check the Sparking Brushes on


5 collector ring W
Air cleaning of Brushes & Collector
6 ring M

Cleanliness Status of Air filters at


7 collector compatment. M

To replace the worn out Brushes


8 (maintain more than 1/8 (3.18mm) CI
above top of Brush Holder)

Check the temperature at Brush and M


9 armature ring side (Deg C)

Note : D-Daily, W- Weekly, M- Monthly, CI- Combustion

Check Result :
Date Item No Description


Satisfied

X Not-Satisfied N/A Not Applicable


ER PROJECT
acilities
Checklist for Generator
Generator #22 Location : STG #22

12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Action Plan

Checked by: Name

Signature & Date