YANBU 2 POWER AND WATER PROJECT
Power & Water Production Facilities
Daily Routine Parameter Checklist for M
System no. :
NoITEM 1 2 3 4 5 6 7 8 9 10 11
1 Visual Inspection
Check healthines of Pilot lamp & meters
2 (Replace if found faulty)
Check the position of Selector switch
{ S43 LR (cos) } is Remote / Local)
3 (Should be maintained with
Remote)
Breaker indication lamp status.
4 (G-Open, R- close, Y- Fault)
Check Result :
Date Item No Description
√
Satisfied
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Action Plan
No ITEM 1 2 3 4 5 6 7 8 9 10 11
√
Satisfied
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Action Plan
No ITEM 1 2 3 4 5 6 7 8 9 10 11
Check Result :
Date Item No Description
√
Satisfied
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Action Plan