REPLY OF THE EDS FOR GROUP HOUSING PROJECT SITE NO.

1 “HERO
HOMES” LOCATED AT SECTOR-88, DISTT. SAS NAGAR (MOHALI), PUNJAB
BY M/S. HERO REALTY PVT. LTD.
AS PER CHECK LIST of SEIAA, PUNJAB FOR BUILDING, CONSTRUCTION,
TOWNSHIP AND AREA DEVELOPMENT PROJECTS

SI. Description Remarks as


Reply of EDS
No. in EDS
1. Properly filled Form 1 & 1A Not Form I & IA are enclosed
Submitted with the application.
2. (a) In case(s) where land has already been Submitted. Allotment letter along with
purchased/acquired: Physical Possession are
Proof of ownership of land enclosed as Annexure 1.
(b) In case where land is yet to be
purchased/acquired:
Proof of ownership of land (existing owner)
such as copy of latest Jamabandi (not more
than one month old) and credible document
showing status of land acquisition w.r.t.
project site as prescribed in OM dated
07.10.2014 issued by MoEF)
3. Copy of Master Plan of the area showing land Submitted Master Plan of SAS Nagar
use pattern of the proposed site/certificate showing project site is
from Competent Authority intimating land enclosed as Drawing 1.
use pattern of the project site as per proposals
of Master Plan of the area.
4. Layout plan duly approved by the Submitted. Conceptual Plan of the
Competent Authority / Conceptual plan of project is enclosed as
the project. Drawing 2.
5. Topographical map of the area showing Submitted. Toposheet showing project
Contour Plan. In case of Area Development site is enclosed with the
Projects, the Contour Plan should reflect the application. Contour Plan is
true existing physical features of the site and enclosed as Drawing 3.
may be prepared by the project proponent
w.r.t. some permanent reference marks.
6. Status of construction, if any, along with Submitted. No construction has been
photographs from all the four sides. done at site; site
photographs are enclosed
as Annexure 2.
7. 500 meter radius map of the area from Not Google image showing
periphery of project site clearly indicating Submitted. project site & surroundings
the various industries (specifically red within 500 m is enclosed as
category industries) and structures lying in Drawing 4.
the area.
8. Location plan showing the exact location of Only parking Location plan showing the
the project site w.r.t. some permanent / space and features such as: Location
important features of the area and site plan Fire fighting of Solid waste segregation
of the project showing the following: equipment area, Green belt, surface
i) Location of STP marked on Parking, RWH and water
ii) Solid waste storage area layout but recharge pits, First aid
iii) Green belt rest of points room, Tubewells, DG Sets
iv) Parking space not marked. and Transformer is
v) RWH and water recharge pits enclosed as Drawing 2.
vi) Fire fighting equipment layout STP of GMADA will be
vii) First aid room used to treatment of
viii) Location of Tubewells wastewater. Also, fire
ix) DG Sets and Transformers fighting layout is enclosed
x) Any other utilities as Drawing 9.
9. Permission of Competent Authority for;
a) Water and Sewerage connection (a) Submitted (a) Allotment letter
A letter from concerned Local Body / indicates that water &
Authority giving details about existing status sewerage connection will
of sewer connectivity and availability of be provided by GMADA.
water supply in the area and acceptance of
Local Body for taking the quantity of
sewage to be generated by the proposed
project and providing the water supply.
Existing position of public sewer and water
supply line duly marked on the layout map /
plan.
b) Collection of Solid waste (b) Not (b) GMADA will be
Submitted. responsible for collection
of solid waste; permission
for the same is enclosed as
Annexure 15.
10. Water balance chart for summer, rainy and Not Water Balance Diagrams
winter seasons indicating critical submitted for different seasons i.e.
requirements Summer, Winter &
Monsoon season are shown
in Conceptual Plan Page
Nos. 6 to 8 as Figure No. 2
to 4 respectively.
11. Availability of adequate land for use of - Wastewater generated from
treated sewage and plantation. the project will be treated
in STP of GMADA.
12. Analysis reports of ambient air, ground water Not Field data sheets along with
and noise levels from NABL/MoEF Submitted lab reports are enclosed as
Accredited laboratories as per detail below: Annexure 13 & 14
respectively.
(i) The field data sheets as prescribed by
SEIAA, Punjab which are available on the Layout map showing the
official website of SEIAA, Punjab along with location of sampling is
exact location of sampling / monitoring point enclosed as Drawing 5.
marked on the layout map should be filled at
the time of sample collection/monitoring by
the Lab and should be attached with the
water, air, noise & soil monitoring reports.

(ii) Water, air, noise & soil monitoring


reports more than 6 months old or prior to
date of signing of consent letters/agreement
with the land owner shall not be accepted
w.e.f. June, 1st 2015 onwards.

(iii) Atleast one groundwater sample from


the shallow / first aquifer and in case
groundwater is to be abstracted for drinking
purposes then atleast one groundwater sample
from the said aquifer should be monitored
and reports be attached accordingly.
13. Quantification of energy saved and renewable Submitted Quantification of energy
energy devices used. saved is enclosed as
Annexure 11.
14. Drawing showing plumbing systems for use Not Schematic drawing of the
of fresh, treated and hot water Submitted Tower T1 & T9 showing
fresh, treated & hot water is
enclosed as Drawing 6.
15. Construction schedule (PERT/CPM Chart) Submitted PERT Chart is enclosed as
Annexure 8.
16. Undertaking(s) for; Submitted Affidavit for the same is
a) Constitution of Environment Monitoring enclosed as Annexure 5.
Cell.
b) Use of ready mix concrete or use of fly ash
during construction.
c) To provide Fire Fighting System.
d) To provide wind breaking curtains and
water sprinkling system to minimize dust
emissions during construction phase.
e) To provide adequate safety measures for
the construction workers during the
construction phase.
17. Environmental Management Plan Submitted Environment Management
indicating the following: Plan mentioning the
a) All mitigation measures for each item- Mitigation measures along
wise activity to be undertaken during the with compliance of various
construction, operation and the entire life regulations is enclosed with
cycle to minimize adverse environmental the application.
impacts as a result of the activities of the
project. Mr. Yogesh Verma of M/s.
b) Compliance of various environmental Hero Realty Pvt. Ltd. will
regulations. be responsible for
c) Steps to be taken in case of emergency implementation of EMP for
such as accidents at the site including fire. 5 years and after that the
d) For how long period the project proponent welfare society of "Hero
will be responsible for implementation of Homes" will be responsible
EMP and the name of the person(s) for the same.
responsible for implementation of EMP.
e) Capital & recurring cost for the EMP per Capital & recurring cost for
year and the details of funds for the same. the EMP per year is given
f) Name of the individual persons / in Table 1 Page No. 5 of
organization, who will be responsible for EMP.
implementation of EMP after the lapse of the
period for which the project proponent is
responsible.
18. Corporate Social Responsibility indicating Submitted Rs. 3 Cr. will be spent in
various activities to be undertaken, but amount developing the park.
provisions of funds for the same, the period to be spent in
for which the same is to be implemented and developing
the person(s) responsible for the park not
implementation of the same. mentioned.
19. Traffic Circulation System and connectivity Not Traffic circulation plan of
with a view to ensure adequate parking, Submitted surface & basement is
conflict free movements, Energy efficient enclosed as Drawing 7.
Public Transport.
20. Disaster/Risk Assessment and Management Submitted Risk Assessment is
Plan enclosed with the
application.
21. Copy of Memorandum of Article & Submitted Copy of Memorandum of
Association / partnership deed / undertaking Article & Association is
of sole proprietorship / list of Directors and enclosed as Annexure 6.
names of other persons responsible for
managing the day-to-day affairs of the
project.
22. In case of expansion projects, compliance Not This point is not applicable
report of earlier granted environmental Submitted as fresh application has
clearance conditions verified by Northern been filed for the
Regional Office of Ministry of Environment, Environmental Clearance.
Forests & Climate Change, Chandigarh.
23. Copy of presentation to be made before the Submitted Agreed
SEAC at the time of appraisal in PDF format
having size less than 25 MB.
24. Further, the project proponent is required to - Opinion from Deputy
submit the documentary proof to the effect Conservator of Forests &
that there is no Wildlife Sanctuary and Bird Chief Wildlife Warden
Sanctuary within the radius of 10 kms from along with marked
the project site. In case, these are within 10 toposheet mentioning
kms radius then, the project proponent will distance is enclosed as
submit acknowledgement and copy of the Annexure 16 which
application submitted to the concerned DFO indicates that no wildlife
(Wildlife) for obtaining permission from the Sanctuary and bird
NBWL.
sanctuary lies within 10 km
of project site. Thus,
NBWL clearance is not
reqd.
ANNEXURE-1
SITE PHOTOGRAPHS OF “HERO HOMES”
ANNEXURE-3
ANNEXURE-4
ANNEXURE-5
ANNEXURE-6
ANNEXURE-7
ANNEXURE-8

MASTER CONSTRUCTION SCHEDULE FOR HERO HOMES, MOHALI - PHASE I

ID Task Name Duration Start Finish Q3 '15 Q2 '16 Q1 '17 Q4 '17 Q3 '18 Q2 '19 Q1 '20 Q4 '20
S J M S J M S J M S J M S J M S J M
1 Hero Homes, Mohali 1617 days 01/01/16 30/04/21

2 Pre-Construction Stage & Tender Management 918 days 01/01/16 05/02/19

3 Consultant's Appointment 0 days 01/01/16 01/01/16 01/01

13 Concept Design 0 days 01/01/16 01/01/16 01/01

15 Preliminary Design development 48 days 01/01/16 26/02/16

44 Design Basis Report (DBR) 15 days 12/02/16 29/02/16

48 Detail design development 147 days 19/01/16 12/07/16

77 Statutory Approvals at Pre - Construction Stage 0 days 15/02/16 15/02/16 15/02

87 Detailed Cost Estimate/ Project Budget 30 days 11/01/16 15/02/16

90 Tender Document (Tender drwg/ BOQ/ specs etc.) 177 days 04/02/16 07/09/16

131 Award of Works 697 days 01/02/16 06/06/18

210 BOI Procurement - MEP Services Works 343 days 12/12/17 05/02/19

275 Construction Stage 1508 days 12/03/16 02/03/21

276 Handing Over of Site/ Issue of Work Order to Civil 0 days 12/03/16 12/03/16 12/03
Contractor
277 Mobilization of Resources 12 days 14/03/16 26/03/16

278 Site Survey 12 days 14/03/16 26/03/16

279 Cleaning, Barricading, Feeder Pillars, Signages in & 10 days 19/03/16 30/03/16
near construction area
280 Start of Construction Works 0 days 31/03/16 31/03/16 31/03

281 Phase - I 1492 days 01/04/16 02/03/21

282 Cluster - 1 875 days 01/04/16 13/03/19

283 Tower T3 (G+14) 815 days 01/04/16 02/01/19

833 Tower T4 (G+14) 815 days 25/04/16 25/01/19

1383 Tower T5 (G+14) 815 days 24/05/16 23/02/19

1933 Tower T6 (G+14) 815 days 10/06/16 13/03/19

Page 1 of 4
MASTER CONSTRUCTION SCHEDULE FOR HERO HOMES, MOHALI - PHASE I

ID Task Name Duration Start Finish Q3 '15 Q2 '16 Q1 '17 Q4 '17 Q3 '18 Q2 '19 Q1 '20 Q4 '20
S J M S J M S J M S J M S J M S J M
2483 Completion of Cluster - 1 0 days 13/03/19 13/03/19 13/03

2484 Cluster - 2 1492 days 01/04/16 02/03/21

2485 Tower T2 (G+24) 1126 days 01/04/16 31/12/19

3340 Tower T1 (G+24) 1276 days 23/12/16 02/03/21

4195 Tower T9 (G+24) 1276 days 23/12/16 02/03/21

5050 Tower T7 (G+14) 815 days 02/01/17 20/09/19

5600 Tower T8 (G+14) 815 days 02/01/17 20/09/19

6150 Completion of Cluster - 2 0 days 02/03/21 02/03/21 02/03

6151 Non-Tower & Podium Area 332 days 04/11/16 23/12/17

6188 Completion of Non-Tower & Podium Area 0 days 23/12/17 23/12/17 23/12

6189 Club House (Extension) 274 days 03/01/18 08/12/18

6256 Completion of Club House(Extension) 0 days 08/12/18 08/12/18 08/12

6257 Swimming Pool 215 days 17/04/18 08/01/19

6270 Completion of Swimming Pool 0 days 08/01/19 08/01/19 08/01

6271 Commercial Shopping Complex 224 days 03/01/18 04/10/18

6336 Completion of Shopping Complex 0 days 04/10/18 04/10/18 04/10

6337 External Development & Services (Cluster -1) 278 days 27/01/18 05/01/19

6404 Completion of External Development & 0 days 05/01/19 05/01/19 05/01


Services(Cluster -1)
6405 External Development & Services (Cluster -2) 348 days 08/03/19 16/04/20

6469 Completion of External Development & Services 0 days 16/04/20 16/04/20 16/04
(Cluster -2)
6470 Utilities 870 days 05/04/16 11/03/19

6539 Completion of Utilities 0 days 11/03/19 11/03/19 11/03

6540 Post- Construction Stage 51 days 03/03/21 30/04/21

6541 Final Testing & Commissioning 35 days 03/03/21 12/04/21

Page 2 of 4
MASTER CONSTRUCTION SCHEDULE FOR HERO HOMES, MOHALI - PHASE I

ID Task Name Duration Start Finish Q3 '15 Q2 '16 Q1 '17 Q4 '17 Q3 '18 Q2 '19 Q1 '20 Q4 '20
S J M S J M S J M S J M S J M S J M
6542 De-Snagging 30 days 20/03/21 23/04/21

6543 Cleaning 20 days 08/04/21 30/04/21

6544 Taking Over of Site 0 days 30/04/21 30/04/21 30/04

Page 3 of 4
MASTER CONSTRUCTION SCHEDULE FOR HERO HOMES, MOHALI - PHASE I

Task External Tasks Manual Task Finish-only Manual Progress

Project: AWHO, WAGHOLI AT PUNE Split External Milestone Duration-only Deadline Baseline Summary
Start Date : 01/01/16 Milestone Inactive Task Manual Summary Rollup Critical Slack
Finish Date: 30/04/21
Summary Inactive Milestone Manual Summary Critical Split
Project Summary Inactive Summary Start-only Progress

Page 4 of 4
ANNEXURE-9

DEMOGRAPHIC DETAILS

MOHALI:
DISTRICT AT GLANCE

th District
S.A.S. Nagar District has been carved out of areas falling in Ropar and Patiala Districtofas 18
th April
Punjab on 14 , 2006. Because of its contiguous with the union territory of Chandigarh.
e district has
Th
been formed to achieve growth of development as this area is emerging as major I.T.hub of Nothern I
The district includes Mohali, Kharar and Dera Bassi Teshils. It is located
North East
in part
the of u
Pnjab.
And is part of Patialasion
divi The District includes 414 villages. The important township in the district are
Kharar, Kurali, Mohali, Zirakpur & Dera Bassi. Kharar tehsil is the largest administrative unit of the
district with 154 villages followed by Dera Bassi Tehsil
villages.
with 44

GEOGRAPHICAL AREA:

The district is spreaderov


geographical area of 1092.64
sq. kms. The rural area
constitutes1021.77
sq.kms. as compared to urban area of 70.87 sq.kms.

POPULATION

As per statistical abstract of the Punjab


2011the popula
tion of the district
is 9,94,628
out of which the rural
population is50017&
4 population of urban area
544611.
is The male population of the district
529253is
out of which rural male population
240984
is whereas urban male population
288269
is . The tota
l female
population of the district
465375
is out of which the rural female population
209033
is whereas urban
females are
256342
. The S.C. population of the district
216231
is out of which rural S.C. population is
132713& S.C. in urban area
83518.
is

EDUCATION INTITUTIONS

Mohali District has emerged as a major center of technical education. There are 8 engineering colle
which offer variety of technical course. The Punjab School Education
also operating
Board is in the district.
NIPER: A pioneer tute
insti of pharmaceutical & education research is situated at Mohali.
Educational Institutions in the District

Nursing College 4
Colleges of Engineering and Architect 4
Govt. S
r. Sec. Schools 29
Govt. High Schools 50
Govt. Primary Schools 434

HEALTH SERVICES

There are numberrenowed


of hospitals in the district which are equipped with latest technical know how
The FORTIS Hospital is one of its kinds with multi specialty facilities.

SPORTS

World class CRICKET STADIUM of international fame is situated at Mohaliurnaments


International
areto
held from time to time and the people get an opportunity to watch the international cricket in action.

MISCELLANEOUS

District Mohali is emergingnas


I.T aHub of North India. Some big companies like QUARCKS DELL & TCS
is already in busines
s and having its establishments whereas others are in the process for opening the
offices.

Community Development Blocks in the District

KHARAR BLOCK

This block consists of 154 villages and 2 towns namely S.A.S. Nagar and Kharar
-inhabite
and there
d 4 un
villages. As per
2011census the total population of the block is 369798. The rural population of the block
196044 out of which there are 106688 males and 89356 females. The total S.C. Population in the rura
is 55544.

The block is having total


area of 411.32 sq.kms. Out of which the rural area covers 383.26 sq.kms.
Under the service area approach, all the villages
beenhave
allocated among 17 branches of commercial
banks and 4 branches of RPBs. There are Total 86 branches are functioning
e block which
in thcomprises
of 57 commercial banks, 13 private banks. 11 Coop. Banks, 4 Punjab Gramin Banks & 1 Agricult
Development bank. S.A.S. Nagar has emerged as a Industrial Focal Point and designated as District
Quarter. It has become a satelli
te town of Chandigarh and has registered a fast rate of growth.

MAJRI BLOCK

Majri Block comprises of 116 villages out of which 1 village


-inhabited.
is unThis block forms part of Kharar
sub division. The total population of the block is 111598
2011census.
as per The population in rural area is
88551, out of which 47892 aremales and 40659 are female. The S.C. population in rural area is rural
is 25531. Kurali is the only town in the block and has population of 23047. This block is spread ove
area 274.84 sq.kms. The block comes under dark category. All the villages numbering 116 have b
allocated among 8 branches of commercial banks and one branch of P.G.B.. There are 16 branc
operating in this block which comprises of 9 branches ofl commercia
banks. 1 Pvt. Sector Bank, One
branch of PGB and SAS Nagar central
-operative
co bank is having 5 branches.

Due to certain incentives being initiated- by


Govt.
themany large and small scales industrial units have
been established around Kurali.

DERA B
ASSI BLOCK

This block consists of 144 villages and 2 towns namely Zirakpur and Dera Bassi and
- there are 6
inhabited villages. As 2011census
per the total population of the block is 216921. The rural population of
the block is 170192 out of whichare
there
93116 males and 77076 females. The total S.C. population lin
the rural area is 48683.

This block is having total area of 406.48 sq.kms. Out of which the rural area covers 371.17 sq.kms.
Dera Bassi block has a good number of small scale units.
al paints,
ChemicSteel tubes, plywood,
handlooms and kntting of daris are some of the industries which have koffered good employment
number of persons. The soil of the block is sandy to sandy loam

There are total 25 branches are functioning in theich


block
comprises
wh of 19 commercial banks, 1 private
banks, 3 coop. banks, 1 Malwa Gramin Bank & 1 agricultural development bank.

(Source:Census of India 2011)


ANNEXURE-10
ANNEXURE-11

ENERGY SAVINGS

SI. No. ENERGY SAVING CAN BE ACHIEVED ENERGY SAVED (in %)


DUE TO FOLLOWING:-
1. Use of CFL Lamps instead of GLS Lamps for 3 3.22%
BHK Flat
2. Use of CFL Lamps instead of GLS Lamps for 3 1.60%
BHK + Servant Flat
3. Use of CFL Lamps instead of GLS Lamps for 0.88%
Pent House
4. Use of CFL Lamps instead Of GLS Lamps for 2 2.05%
BHK + Servant Flat
5. Use of CFL Lamps instead of GLS Lamps for 4 2.27%
BHK (A) Flat
6. Use of CFL Lamps instead of GLS Lamps for 4 2.25%
BHK (B) Flat
7. Use of CFL Lamps instead of GLS Lamps For 2 0.91%
BHK Flat
8. Use of CFL Lamps instead of GLS Lamps for 2.38%
Common Area
9. Use of 30% Solar Light 0.23%

TOTAL (I+II+III+IV+V+VI+VII+VIII+IX) 15.79%


ANNEXURE-12
Annexure-13
Annexure-14
ANNEXURE-15
ANNEXURE-16
Scanned by CamScanner
DRAWING-1

KURALI NAYAGAON

MULLANPUR

KHARAR

2 2
SAS NAGAR

NH
ZIRAKPUR

NH
21
MULLANPUR PR 4 BANUR
DERA BASSI

CHANDIGARH

HANDICRAFT
ZIRAKPUR SAS NAGAR BOUNDARY (GIS)

OTHER LOCAL PLANNING AREA


PR

CENTRE
6

RESIDENTIAL

U FLORAL
MILE PR 5 MIX USE 1

L MIX USE 2
O RAE
FL MIL
COMMERCIAL
RESERVE SITE
(AIRPORT

PUR
EXPANSION) W WHOLESALE CENTRE
AL

I RAK
L ORLE E EXPO
F MI

TO Z
56-A 56 49 INDUSTRY - TECHNOLOGY AND R & D
55 54 53 52 51 50 48 RESERVE SITE
122 (AIRPORT INDUSTRY AND WAREHOUSE
EXPANSION)
INSTITUTION
RESERVE SITE
(AIRPORT FOREST & OPEN SPACE
E EXPANSION) 7
123
PR PARK

5 58
PR 57 59 60 61 62 63 64 65 RURAL SPORTS & RECREATION
121 & AGRICULTURE
USE FLORAL MILE

120 WATER BODY


U 124 SUBSTATION
STP
R BT RIVER RESERVE
125 66-B
ROAD
127
118 119 73 72 71 70 69 66 AIRPORT FACILITIES
68 67 66-A
TRANSPORTATION
126 TO DERABASSI
RAILWAY

U UTILITY
2 1
NH PR 11 RESERVE SITE

TO ROPAR 74-A 74 75 76 77 78 79 80 81 82 82-A RURAL & AGRICULTURE


117
NH 21 EXISTING / APPROVED DEVELOPMENT
STP
EXISTING BUILT UP
RURAL
& AGRICULTURE EXISTING VILLAGE
GOLF USE PR 8
95 COURSE
EXISTING 132Kv LINES
NH 92 91 90 89 88 86 85 83 83-A
87 84
EXISTING 220Kv LINES

KHARAR 116 92-A

TO SIRHIND
93 95 96

TIALA
115 101-B
U 100
94 97 98 99

O PA
H 64 T
101 PR 12 PROJECT TITLE :
114 107
106 MASTER PLAN

N
TO LUDHIANA 113 105
112 PROPOSED STP DEVELOPMENT FOR
BT 104 / LANDFILL SITE
W GREATER MOHALI REGION

SERY
111
BT

NUR
103 TT

T
108

PLAN
110 102 102-A CLIENT :

WRO RE
OM
SHO ICULTU
109

T
GREATER MOHALI AREA

HOR
DEVELOPMENT AUTHORITY (GMADA)
MD
RA

CONSULTANT FOR MASTER PLAN :

JURONG Consultants Pte Ltd


(a member of JURONG International)
8 Jurong Town Hall Road
#08-00 THE JTC SUMMIT
TO TEPLA Singapore 609434
BANUR
2A

SHEET TITLE :
SH 1

SAS NAGAR PLANNING AREA


PR
1-G OVERALL LAND USE (YR 2031)
MAD
9

AE
XPR
PR

ESS PLANNER : SEETOH K C / RISHIBA PURI


WA
Y CHECKED : RISHIBA PURI APPROVED : SEETOH K C

DRAWN : SITI KHALID

SCALE : 1 : 25 000 (AO) DATE : 05 DECEMBER 2008

VERSION : 3 (PHASE 2 - NOVEMBER 2008)


TO SIRHIND
PLAN : SAS NAGAR OVERALL LAND USE PLAN

TO PATIALA 0.5 1.0 1.5 2.0 2.5 Km


DRAWING-2
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT DRAWING-3

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

396.1890

X=20241.3277 Y=10183.6286

X=19889.1330
Y=10151.6110
WA
LL

438.9579
439.0260
100
'W
IDE
RO
AD

189.00

OTHER'S
WA

PROPERTY 396.1890
LL

LEGEND
1 BOUNDARY WALL

2 METALLED ROAD

3 BLOCK

4 KATCHA ROAD

5 GROUND LEVEL

6 OHSR

LL 7 ELETRIC POLE EP

WA 8 TREE

9 CANAL

10 CONTOUR

Note:-

LL
WA

AREA = 18.5 ACRES

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


DRAWING-4
Drawing-5
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT LEGEND-: DRAWING-6
PROJECT TITLE :

MOTORIZED VALVE RESIDENTIAL GROUP HOUSING


VALVE SITE-1, HERO HOMES,
DWS DOMESTIC WATER SUPPLY SECTOR- 88, SAS NAGAR,
FWS FLUSHING WATER SUPPLY PUNJAB
HWS HOT WATER SUPPLY

F IRE
LIF T-3
1950X2800

KEY PLAN TOWER T-1, T-9

SHAFT - 5 SHAFT - 4 SHAFT - 3 SHAFT - 2 SHAFT -1 SHAFT - 6 SHAFT - 7 SHAFT - 8 SHAFT - 9 SHAFT - 10 SHAFT - 11 SHAFT - 12 SHAFT - 13 SHAFT - 14 SHAFT - 15 SHAFT - 16

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

KEY PLAN N
STRUCTURAL ENGINEER :

Email: tpcconsultants@gmail.com

MEP CONSULTANTS :

PHASE-1, NEAR BIKANERWALA,


New Delhi-110028
India+91 11 45054718, +91 11 41414735
LANDSCAPE CONSULTANTS :

DESIGN ARCHITECT:-

STATUS :

SUBMISSION DRAWING

Plumbing and Fire Suppression Consultants


C P Vidya and Associates
CPA 312A, UNITECH ARCADIA, SOUTH CITY-II,
SECTOR-49,NEAR PARK HOSPITAL(GURGAON)
Haryana-122018 (INDIA)
Email :- cpvidyaassociates@gmail.com

DRAWING TITLE :

TOWER-1 & TOWER-9 (WATER SUPPLY SCHEMATIC)

SCALE :- NTS @A1 DATED :


DWG NO.
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
DRAWING-7
PROJECT :
RESIDENTIAL GROUP HOUSING
SITE -1 , HERO HOMES
SECTOR - 88 , SAS NAGAR ,
PUNJAB
CLIENT'S NAME:-
M/S HERO REALTY Pvt. Ltd.
E-2,QUTAB HOTEL COMPLEX,
AREA- 365478.35 sq.ft. SHAHEED JEET SINGH MARG
NEW DELHI -110016

REFERENCES
SITE LINE

RAMP OUT
SLOPE 1:10
RAMP IN
IN OUT

GMADA ALLOTMENT LETTER :


MEMO NO. 31342
DATED AUGUST 3 , 2015
DN T = 12"
R = 6"
W = 5'-0"

STAIR DOWN
TO BASEMENT 40'-0"WIDE ROAD

N
80'-0"WIDE ROAD

KEY PLAN
OUT IN IN OUT

STRUCTURAL ENGINEER:
2 500 WIDE ROL LING S HUTTER 2 500 WIDE ROL LING S HUTTER

TECHNICAL PROJECTS CONSULTANTS


SLOPE 1:10

SLOPE 1:10
RAMP OUT

RAMP OUT
RAMP IN

RAMP IN
PUMP ROOM

2 500 WIDE ROL LING S HUTTER

LIF T-1 LIF T-2


6'434 " X9'1081" 6'434 " X9'10 18"

7' WIDE LIF T LO BBY


MH MH

LANDSCAPE CONSULTANTS :

DOM. WA TE R TANK-1
WATE R DEPTH 3 .5M.

WATE R DEPTH 3 .5M.


FIRE WA TE R TANK-1

DOM. WA TE R TANK-2

WATE R DEPTH 3 .5M.


RAW WATER TANK-2
WATE R DEPTH 3 .5M.
WATE R DEPTH 3 .5M.

WATE R DEPTH 3 .5M.


RAW WATER TANK-1
FIRE WA TE R TANK-2
A REA . 7 8.6 sq .mt

A REA . 4 8.6 sq .mt

A REA . 4 8.6 sq .mt


A REA . 4 8.6 sq .mt

A REA . 4 8.6 sq .mt


A REA . 7 8.6 sq .mt
CAP. 2 75 KL

CAP. 1 70 KL

CAP. 1 70 KL
CAP. 1 70 KL

CAP. 1 70 KL
CAP. 2 75 KL
MH MH

*NOTE- FIRE ESCAPE CIRCLE RADIUS IS 45 M( 147'-6").

M/S HERO REALTY Pvt. Ltd.

MOEF-05
DRAWING-7
PROJECT :
RESIDENTIAL GROUP HOUSING
SITE -1 , HERO HOMES
SECTOR - 88 , SAS NAGAR ,
PUNJAB
CLIENT'S NAME:-
M/S HERO REALTY Pvt. Ltd.
E-2,QUTAB HOTEL COMPLEX,
SHAHEED JEET SINGH MARG
NEW DELHI -110016

REFERENCES
SITE LINE

ZONING LINE

BASEMENT EXTENT (proposed)

BASEMENT EXTENT(future expansion)

PARKING

FIRE TENDER PATH

SERVICES AT LOWER LEVEL

COMMERCIAL
+308.580 40'-0" wide road

R O A D
GMADA ALLOTMENT LETTER :
+307.258
MEMO NO. 31342

20'
1203
24'6" WIDE ROAD
24'6" WIDE ROAD 48638.04 SQ.FT +307.50 DATED AUGUST 3 , 2015
+308.50
1202 9173 SQ.FT
150'

150'
3395.33 SQ.FT 40'-0"WIDE ROAD

1201 CONVENIENT
SHOPPING (4023.41 SQFT.)
G+2 FLOORS G
1200 +309.00
UNORGANIZED PARK
GREEN AREA
UNORGANIZED PARK
GREEN AREA
OG-2
34921.21 SFT
N

'G'
'G'

OG-1
9108.29 SFT

1199 ORGANIZED PARK


GREEN AREA
100'-0" wide sector road

80'-0"WIDE ROAD
OG-5

W I D E
UNORGANIZED PARK
GREEN AREA
KID'S POOL 4843.55 SFT
35'-0" wide service road

OG-4 POOL
7268.99 SFT
1198 KEY PLAN

24'6" WIDE ROAD


UNORGANIZED PARK
30' GREEN AREA
35'-0" wide service road

OG-3
3400.82 SFT
UNORGANIZED PARK ORGANIZED PARK
GREEN AREA GREEN AREA
1197 OG-5
4241.22 SFT UNORGANIZED PARK
GREEN AREA
OG-6
16224.45 SFT
STRUCTURAL ENGINEER:
OG-6
26563.04 SFT

TECHNICAL PROJECTS CONSULTANTS

PURAB APARTMENT
24'6" WIDE ROAD
620'

+308.50

STAIR DOWN
Sector - 89

TO BASEMENT
19'8" WIDE ROAD ORGANIZED PARK
GREEN AREA
1196

OG-7
15155.00 SFT
ORGANIZED PARK
GREEN AREA

1 0 0' - 0"
OG-4
44314.18 SFT
+308.00 LANDSCAPE CONSULTANTS :
ORGANIZED PARK
GREEN AREA
OG-8
8038.50 SFT
1175

ORGANIZED PARK
GREEN AREA
OG-9
30' 4887.03SFT
'G'

27'-2" 30'
18207.53 SQ.FT

2885.69 SQ.FT

1143 G+24 FLOORS G+24 FLOORS 20'


150'

G+14 FLOORS G+14 FLOORS

1142 +308.50 24'6" WIDE ROAD 15087.77 SQ.FT +307.50


24'6" WIDE ROAD 16096.34 SQ.FT
+308.50
30'

30'
1141
1140
+307.693 435'
'G'
1299'-621" 'G'
435' +306.651
35'-0" wide service road

1139 80'-0" wide road


M/S HERO REALTY Pvt. Ltd.
1138

1137

1136
Green Park
Commercial Commercial
1135
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT DRAWING-8 PROJECT :
RESIDENTIAL GROUP HOUSING
SITE -1 , HERO HOMES
SHURB LEGEND
Distance Distance
PARK TREE LEGEND
SECTOR - 88 , SAS NAGAR ,
S.no. Species No. of shurbs S.no. Species No. of shurbs

1 Tabernaemontana coronaria
(in meter)

@1.20 m C/C 126 13 Jasminum sambac


(in meter)

@0.90 m C/C 126


S.no. Species Distance
(in meter)
@3.0 m C/C
No. of tree
GREEN AREA DETAIL PUNJAB
1 Plumeria alba 88

2 Ficus panda @0.90 m C/C 126 14 Hibiscus hybrid @0.60 m C/C 126
Plumeria rubra @3.0 m C/C 87
Hamila patens @0.90 m C/C 126
2
% ACRES SQM SQFT CLIENT'S NAME:-
3 126 15 Ixora hybrid @0.60 m C/C
Michelia champaca @3.0 m C/C 93
Galphimia gracilis @0.60 m C/C
4 Bauhinia tomentosa @1.20 m C/C 126 16 126

126
3 Ficus lyrata @3.0 m C/C 25 SITE AREA 18.49 ACRES 74826.2565 SQM 805429.825 SQ FT M/S HERO REALTY Pvt. Ltd.
5 Nerium oleander pink @1.20 m C/C 126 17 Plumbagoo capensis @0.60 m C/C

6 Caesalbinia pulcherrima @1.20 m C/C 126 18 Murraya exotica @0.60 m C/C 126
4 Cassia fistula @3.0 m C/C 132 E-2,QUTAB HOTEL COMPLEX,
5 PERMISSIBLE ORGANISED GREEN AREA 15% 11223.938 SQM 120814.5 SQFT
Acacia auriculiformis @3.0 m C/C 30
7 Tabernaenontana divaricata @0.45 m C/C 126 19 Lantana Depressa @0.60 m C/C 126

Erythrina blackii
SHAHEED JEET SINGH MARG
Cassia biflora @1.20 m C/C 126 @3.0 m C/C
8 126 20 Clerodendron inermii @0.45 m C/C 6 23
PROPOSED ORGANISED GREEN AREA 17.5% 13095.739 SQM 140962.5 SQFT
9 Tecoma gaudichaudi @1.20 m C/C 126 21 Ficus longisland @0.45 m C/C 126 7 Cassia nodosa @3.0 m C/C 50
NEW DELHI -110016
10 Calliandra haematocephala @1.20 m C/C 126 22 Bougainvillea shubra @0.60 m C/C 126 PERMISSIBLE UNORGANISED GREEN AREA 10% 7482.626 SQM 80542.98 SQFT

11

12
Cestrum nocturnum

Bambusa ventrlcosa
@0.90 m C/C

@1.20 m C/C
126

126
23

24
Bougainvillea thimma

Jatropha panduraefulia
@0.60 m C/C

@1.20 m C/C
126

126
TOTAL 528

PROPOSED UNORGANISED GREEN AREA 10.62% 7943.475 SQM 85503.57 SQFT REFERENCES
13 Jasminum sambac @0.90 m C/C 126 TOTAL 3024 BOUNDARY WALL TREE LEGEND

S.no. Species Distance


(in meter)
No. of tree SITE LINE
AVENUE TREE LEGEND 01 Grevillea robusta (Siver oak) @3.0 m C/C 132

S.no. Species Distance No. of tree 02 Casuarina equisetifolia @3.0 m C/C 61


(in meter)
ZONING LINE
03 Ficus benjamina @2.0 m C/C 166
1 Mimusops elengi @6.0 m C/C 28
04 Polyalthia longifolia (Pendula) @2.0 m C/C 54

2 Jacaranda minosifolia @6.0 m C/C 07


TOTAL 413 BASEMENT EXTENT

3 Peltophorum ferrugineum @6.0 m C/C 07 EXISTING TREES LEGEND


PARKING
S.no. Trees
Plumeria rubra @3.0 m C/C 12
4 01 Trees retained

5
Ficus lyrata @3.0 m C/C 13 02 Trees not retained FIRE TENDER PATH
03 Trees berore transplantation

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


TOTAL 67
04 Trees after transplantation
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

SERVICES AT LOWER LEVEL

GMADA ALLOTMENT LETTER :


MEMO NO. 31342
DATED AUGUST 3 , 2015
40'-0"WIDE ROAD

N
80'-0"WIDE ROAD

KEY PLAN

STRUCTURAL ENGINEER:
TECHNICAL PROJECTS CONSULTANTS

LANDSCAPE CONSULTANTS :

M/S HERO REALTY Pvt. Ltd.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT DRAWING-9

PROJECT TITLE :

RESIDENTIAL GROUP HOUSING


SITE-1, HERO HOMES,
SECTOR- 88, SAS NAGAR,
PUNJAB

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

KEY PLAN N
STRUCTURAL ENGINEER :

Email: tpcconsultants@gmail.com

MEP CONSULTANTS :

PHASE-1, NEAR BIKANERWALA,


New Delhi-110028
India+91 11 45054718, +91 11 41414735
LANDSCAPE CONSULTANTS :

DESIGN ARCHITECT:-

STATUS :

SUBMISSION DRAWING

Plumbing and Fire Suppression Consultants


C P Vidya and Associates
CPA 312A, UNITECH ARCADIA, SOUTH CITY-II,
SECTOR-49,NEAR PARK HOSPITAL(GURGAON)
Haryana-122018 (INDIA)
Email :- cpvidyaassociates@gmail.com

DRAWING TITLE :

SCALE :- NTS @A1 DATED :


DWG NO.

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


Document of Consultant
LIST ‘A’
1. Accredited Consultants - 92
• Consultants with Accreditation - 26

S. N. Name State/ City


1. Asian Consulting Engineers Pvt. Ltd. Delhi
2. B. S. Envi-Tech Pvt. Ltd. Hyderabad
3. Bhagavathi Ana Lab Hyderabad
4. Cholamandalam MS Risk Services Chennai
5. Consulting Engineering Services (India) Private Limited New Delhi
6. EMTRC Consultants Private Limited Delhi
7. Engineers India Limited Gurgaon
8. Envirotech East Pvt. Ltd. Kolkata
9. En-vision Enviro Engineers Pvt. Ltd. Surat
10. EQMS India Pvt. Ltd. Delhi
11. ERM India Private Limited Gurgaon
12. Ghosh, Bose and Associates Pvt. Ltd. Kolkata
13. Grass Roots Research & Creation India (P) Ltd. New Delhi
14. Hubert Enviro Care Systems (P) Ltd. Chennai
15. JM Environet Pvt. Ltd. Gurgaon
16. Kadam Environmental Consultants Vadodra
17. Kalyani Laboratories Bhubaneshwar
18. Mecon Limited Ranchi
19. Pioneer Enviro Laboratories and Consultants Pvt. Ltd. Hyderabad
20. Ramans Consultancy Services Pvt. Ltd. Ahmedabad
21. Ramky Enviro Engineers Limited Hyderabad
22. RS Envirolink Technologies Pvt. Ltd. Gurgaon
23. S. S. Environics (India) Pvt. Ltd. Bhubaneshwar
24. Senes Consultants India Pvt. Ltd. Noida
25. Team Labs and Consultants Hyderabad
26. Voyants Solutions Pvt. Ltd. Gurgaon

• Consultants with provisional Accreditation - 66

S. N. Name State/ City


1. ABC Environ Solutions Pvt. Ltd. Chennai
2. Anacon Laboratories Pvt. Ltd. Nagpur
3. Anand Consultants Ahmedabad
4. Apex Mintech Consultants Udaipur
5. Bhagwati Enviro Care Pvt. Ltd. Ahmedabad
6. Centre for Envotech and Management Consultancy Private Limited Bhubaneshwar
7. Consulting Engineers Group Ltd. Jaipur
8. Creative Engineers & Consultants Chennai
9. Creative Enviro Services Bhopal
10. Desein Private Limited New Delhi
11. Detox Corporation Pvt. Ltd. Surat
12. Development Consultants Private Limited Kolkata
13. Earthcare Labs Private Limited Nagpur
14. Eco Chem Sales and Service Surat
15. Eco Laboratories and Consultants Mohali
16. Ecomen Laboratories Pvt. Ltd. Lucknow
17. Enkay Group Jaipur
18. ENV Developmental Assistance Systems (I) Pvt. Ltd. Lucknow
S. N. Name State/ City
19. Enviro Techno Consult Nagpur
20. Envirocare Consultants (I) Pvt. Ltd. Baroda
21. Environ India Kolkata
22. Environment Protection and Training Research Institute Hyderabad
23. Environmental Engineers & Consultants Pvt. Ltd. New Delhi
24. ENVOMIN Consultant (Pvt.) Ltd. Bhubaneshwar
25. Geomin Consultants Pvt. Limited Bhubaneshwar
26. GIS Enabled Environment & Neo-Graphic Centre Ghaziabad
27. Global Enviro Labs Hyderabad
28. Global Experts (A Techno-Enviro Consultant) Bhubaneshwar
29. Green Chem Solutions Pvt. Ltd. Chennai
30. Holtec Consulting Private Limited Gurgaon
31. Idma Laboratories Limited Panchkula, Haryana
32. Intercontinental Consultants and Technocrats Pvt. Ltd. New Delhi
33. Kirloskar Consultants Limited Pune
34. L & T – RAMBOLL Consulting Engineers Limited Andhra Pradesh
35. LEA Associates South Asia Pvt. Ltd. New Delhi
36. M. N. Dastur and Company (Pvt.) Ltd. Kolkata
37. M/s Padmaja Aerobiologicals Pvt. Ltd. Navi Mumbai
38. M/s Visiontek Consultancy Services Pvt. Ltd. Bhubaneshwar
39. Mantec Consultants Pvt. Ltd. Delhi
40. Mineral Engineering Services Karnataka
41. Mineviron Systems Pvt. Ltd., Nagpur
42. MITCON Consultancy Services Ltd. Pune
43. Mott Mac Donald Pvt. Ltd. Ahmedabad
44. National Environmental Engineering Research Institute Nagpur
45. Perfact Enviro Solutions Pvt. Ltd. Delhi
46. Pollution Control Research Institute Haridwar
47. Pragathi Labs & Consultants Pvt. Ltd. Secunderabad
48. Projects & Development India Limited Noida
49. Pure Enviro Engineers Pvt. Ltd. Chennai
50. RITES Limited Gurgaon
51. San Envirotech Pvt. Ltd. Ahmedabad
52. SECON Private limited Bangalore
53. SGS India Pvt. Ltd Gurgaon
54. Khammam, Andhra
Singareni Collieries Company Limited
Pradesh
55. SMEC India Private Limited Gurgaon
56. SV Enviro Labs & Consultants Vishakapatnam
57. TATA Consulting Engineers Limited Mumbai
58. Ultra-Tech Environmental Consultancy and Laboratory Thane
59. UniStar Environment & Research Labs Pvt. Ltd. Vapi, Gujarat
60. Vimta Labs Limited Hyderabad
61. VITYA Consultants Pvt. Ltd. Secunderabad
62. WAPCOS Limited Gurgaon
63. Wolkem Consultancy Services Udaipur
64. Det Norske Veritas AS Hyderabad
65. Enviro Analyst & Engineers Pvt. Ltd. Mumbai
66. Environmental, Mine Plan & Resource Evaluation Solutions Chennai
LIST ‘B’

2. Applications under processing (eligible applications) - 110


• Assessment completed, ready for being put up to AC - 17

S. N. Name State/ City


1. Amba Recycler Private Limited Chennai
2. CTRAN Consulting Private Limited Bhubaneswar
3. E. C. Engineers (Environmental Consultants) Jaipur
4. Envisafe Environmental Consultants Ahmedabad
5. Garden City Environmental Services Bangalore
6. In Situ Enviro Care Bhopal
7. Louis Berger Consulting Pvt. Ltd. Gurgaon
8. Richardson & Cruddas Chennai
9. SAI Consulting Engineers Pvt. Ltd. Ahmedabad
10. Saitech Research & Development Organization Kolhapur
11. SPAN Consultants Pvt. Ltd. Noida
12. Srushti Sewa Nagpur
13. Superintendence Company of India Pvt. Ltd. Kolkata
14. T.R. Associates Ahmedabad
15. Vasantdada Sugar Institute. Pune
16. Water and Waste Water Research Center Sangli
17. Yogiraja Industrial Consultants Pune

• At Stage III (Document Assessment completed,


Office Assessment to be done) - 24

S. N. Name State/ City


1. Ace Engineers & Consultants Patiala
2. Aditya Environmental Services Pvt. Ltd. Mumbai
3. Agricultural finance corporation Ltd. Mumbai
4. Aquatech Enviro Engineers Bangalore
5. Central Road Research Institute(CRRI) New Delhi
6. Deccan Consulting Engineers Private Limited Delhi
7. Eco Services India Private Limited Chennai
8. Egis India Consulting Engineers Pvt. Ltd. Faridabad
9. ENPRO Enviro Tech & Engineers Pvt. Ltd. Surat
10. Enviro Care India (P) Ltd. Madurai
11. Greentech Environmental Engineer and Consultants Guwahati
12. JB Enviro Consultants Pvt. Ltd. Kolkata
13. M/S Indus Technical and Financial Consultants Ltd. Raipur
14. M/s Udaipur Min-Tech Pvt. Ltd. Udaipur
15. Mahabal Enviro Engineers Pvt. Ltd. Thane
16. Min Mec Consultancy Pvt. Ltd. New Delhi
17. Mitra S. K. Private Limited Kolkata
18. Pacific Scientific Consultancy Pvt. Ltd. Kolkata
19. Prakriti Consultants Services Lucknow
20. R. K. Consultants Jodhpur
21. Sawen Consultancy Services Lucknow
22. Siddhi Consultants Ankleshwar
23. Sri Sai Manasa Nature Tech Pvt. Ltd. Hyderabad
24. Sun Consultancy and Services Bhubaneshwar
• Stage II (Document assessment in process) - 57

S. N. Name State/ City


1. Aarvee associates architects engineers & consultants Pvt. Ltd. Hyderabad
2. Action for Ecology, Environment, Energy and Management Rishikesh
3. AECOM India Private Limited Gurgaon
4. Building Environment Pvt. Ltd. Navi Mumbai
5. C. E. Testing company Pvt. Ltd. Kolkata
6. Central Mine Planning & Design Institute Limited Ranchi
7. Centre for Environment Health & Safety, Annamalai
Tamilnadu
University
8. Centre for Interdisciplinary Studies Of Mountain & Hill
Delhi
Environment University Of Delhi(CISMHE)
9. Centre For Sustainable Development Hooghly
10. Centre of Mining Environment, Department of Environmental
Dhanbad
Science and Engineering
11. Century Consulting Engineers Chandigarh
12. Chaitanya Projects Consultancy Pvt. Ltd Ghaziabad
13. Chilworth Technology Pvt. Ltd. New Delhi
14. D.Y. Patil College of Engineering Pune
15. DHI India Water & Environment Pvt. Ltd. New Delhi
16. Eco Care Burdwan,West Bengal
17. Energy Infratech Pvt. Ltd. Gurgaon
18. En-Geo Consultancy & Research Centre(ENGECORC) Guwahati
19. Enviro Care Engineers & Consultant Surat
20. Environment & Power Technologies Private Limited Bangalore
21. Environmental System Consultants & Ambiente Lab Solutions
Chennai
Pvt. Ltd.
22. Epsilon Projects Pvt. Ltd. Lucknow
23. Gadark Lab Pvt. Ltd. Mumbai
24. Gherzi Eastern Limited New Delhi
25. K. R. S Enterprises Banglore
26. KKB Envirocare Consultants PVT. LTD. Hyderabad
27. Madhya Pradesh State Forest Research Institute Jabalpur
28. N. K. Buildcon Pvt. Ltd. Jaipur
29. National Institute for Interdisciplinary Science & Technology
Thiruvananthapuram
(NIIST)
30. Oasis Environmental Foundation Pune
31. Octagon Consultancy Services Kolkata
32. Pollution & Ecology Control Services Nagpur
33. Prakruti Environmental Engineers Vadodara
34. Precitech Laboratories Vapi
35. Ramji Mine Envirotech Jaipur
36. S G M Corporate Consultants Pvt. Ltd. Pune
37. S. N.Hirpara Surat
38. SA Infrastructure Consultants Pvt. Ltd Ghaziabad
39. School of Water Resources Engineering, Jadavpur University Kolkata
40. Science and Technology Park Pune
41. Shiva Test House Patna
42. Shivalik Solid Waste Management Limited Solan
43. SMS Envocare Ltd. Pune
44. Spectro Analytical Labs Limited New Delhi
45. Team Institute of Science & Technology Pvt. Ltd. Jaipur
46. Technoenviron Consultants Maharashtra
47. Terracon Ecotech Private Limited Mumbai
48. Tetra Tech India Limited New Delhi
49. Keonjhar,
Thriveni Consultancy Services
Odisha
50. Transit Surveys Karnataka
S. N. Name State/ City
51. Trio-Chem Techno- Legal Services Pvt. Ltd. Pune
52. V R Enviro Engineers Chennai
53. Vison Labs Hyderabad
54. Vogue Construction and Consultancy Services Private Limited New Delhi
55. Waste Encare (India) Pvt. Ltd. Thane
56. Weston Solutions (India) Pvt. Ltd. Hyderabad
57. Wilbur Smith Associates Private Limited Bangalore

• Stage I (Completeness of Application - response received


against NABET query, being verified) - 12

S. No. Name State/ City


1. Consafe Science India Hyderabad
2. CPTL Envirotech Designers & Pollution Control Consultants Chandigarh
3. Galaxy Envirotech Pvt. Ltd. New Delhi
4. GLOBAL Environment & Mining Services Hospet, Karnatka
5. Gondwana Geotech Services Pvt. Ltd. Ranchi
6. MSV International Inc. Gurgaon
7. Pollution and Project Consultants Kolkata
8. Rightsource Industrial Solutions Pvt. Ltd. Hyderabad
9. SD Engineering Services Pvt. Ltd. Aurangabad
10. SEE Tech Solutions Pvt. Ltd. Nagpur
11. Sky Lab Analytical Laboratory Thane
12. Sophisticated Industrial Materials analytic Labs Pvt. Ltd. New Delhi
LIST ‘B’

3. Ineligible Applications - 39
S. N. Name State/ City
1. A & N Technologies Bangalore
2. Akshar Consultant Gujarat
3. Aquagreen Engineering Management Pvt. Ltd. New Delhi

4. ASCENSO Management and Consulting Services Pvt. Ltd. New Delhi


5. Bombay Natural history Society Mumbai
6. Brigade Enterprises Limited Bangalore
7. C.P. Consultants Private Limited New Delhi
8. Central Institute of Mining and Fuel Research Dhanbad
9. Crystal Consultant Ranchi
10. Eco Care Engineering Pvt. Ltd. Chennai
11. Engineering & Technological Services Delhi
12. Enviroaid Consultants Gwalior
13. Environmental Research and Services (India) Pvt. Ltd. Bhubaneswar
14. Excel Enviro Tech Ahmedabad
15. Fine Envirotech Engineers Mumbai
16. Hydro ChemTech Chennai
17. Ind Tech House Consult New Delhi
18. India Glycols Limited Kashipur, Uttarakhand
19. Integrated Techno-Legal Consultants Mumbai
20. IRG Systems South Asia Pvt. Ltd. New Delhi
21. Jain Mining and Technical Consultants Udaipur
22. Krishna Gangaa Enviro System Pvt. Ltd. Nagpur
23. LION Engineering Consultants Bhopal
24. Lotus Environments Pune
25. Mechatronics Systems Pvt. Ltd. Pune
26. Metro Enviro-Chem Associates Ahmedabad
27. MNEC Consultants Pvt. Ltd. Nagpur
28. N H Consulting Pvt. Ltd. New Delhi
29. National Institute of Ocean Technology Chennai
30. National Institute of Oceanography Goa
31. Oil and Natural Gas Corporation New Delhi
32. Paryavaran Labs (India) Limited Hyderabad
33. Remedy Environmental Consultants Bellary
34. Royal Environment Auditing & Consultancy Services Rajkot
35. S Pradhan Bhubaneshwar
36. Sadekar Enviro Engineers Pvt. Ltd. Goa
37. Shri Environmental Technology Institute New Delhi
38. Vasudev Associates Ahmedabad
39. Zomah Engineers Consultants Pvt. Ltd. New Delhi
LIST ‘C’

4. Applications not accepted/ rejected/ withdrawn - 24


S. N. Name State/ City
1. Metamorphosis Bangalore

2. Environmental Health And Safety Consultants Private Bangalore


Limited
3. M/s Pragathi Labs and Consultants Pvt. Ltd.
(Original application withdrawn, revised application received Secunderabad
assessed and provisionally accredited)
4.
Dehradun
Indian Council of Forestry Research and Education
5. Earth and Environment Bhubaneshwar
6. Green Circle, Inc. Vadodra
7. M/s Aqua-Air Environmental Engineers Pvt. Ltd. Surat
8. Indomer Coastal Hydraulics (P) Ltd. Chennai
9. Mantras Resources (Environmental Division) Nashik
10. EST Consultants (P) Ltd. New Delhi
11. Scott Wilson India Pvt. Ltd. New Delhi
12. International Testing Centre Panchkula
13. ECO-CARE Solutions (Environmental Consultants &
Vadodra
Engineers)
14. SEAMAK HITECH PRODUCTS Bangalore
15. Jyoti Om Chemical Research Centre Private Limited Ankleshwar
16. Clean Technologies Bangalore
17. AET Infrastructure Environmental Services New Delhi
18. Betterworld Enviro Consultants Faridabad
19. Centre for Climate change & Environmental Advisory
Hyderabad
Services
20. Ecotech Services Inc. Faridabad
21. SOWiL Limited Noida
22. Techno Analytical Kolkata
23. Gujarat Mineral Research & Industrial Consultancy Society
Ahmedabad
(GMRICS)
24. Enpro Techno Solutions Chennai
LIST ‘D’

5. Applications received after Sept., 2010 - 48


Application
No. (as recd Name State/ City
in NABET)
266 Pridhvi Envirotech (P ) Limited Hyderabad
267 Shriram Institute for Industrial Research New Delhi
268 Gem Solutions Bangalore
269 Swasti Enviro Solutions Pvt. Ltd. Chennai
270 Powertec Engineering Pvt. Ltd. New Delhi
271 Enviro Solutions & Services Tamilnadu
272 Clean Enviro Projects Consultancy Pvt. Ltd. Valsad, Gujarat
273 Alfa Enviro Systems Chennai
274 CPTL Engineers & Consultants, INC. Chandigarh
275 Viraj Envirozing India Private Limited Pune
276 Naik Environment reaearch institute limited (NERIL) Pune
277 Guru Enviro Udyog Chennai
278 Center for Environmental Studies Chennai
279 STUP Consultants Pvt. Ltd. Kolkata
280 Institute of Environment and Hazardous Material Management Bangalore
281* Metamorphosis Bangalore
282 Mahindra Consulting Engineers Ltd. Chennai
283 EIA Project, Gauhati University Guwahati
284 Institute for Catchment Studies and Environmental Management- ICSEM Bangalore
285* Green Circle, Inc. Vadodra
286 Nature Care Bhubaneshwar
287 Surya Envirotech Nagpur
288* Environmental Health And Safety Consultants Private Limited Bangalore
289 Gujarat Institute of Desert Ecology Gujarat
290 Horizon Services Pune
291 ENSYS Technologies (I) Pvt. Ltd. Chennai
292 Environmental Technologies Services Organisation Faridabad
293 Institute of Ocean Management, Anna University Chennai
294 Department of Forestry, H. N. B. Garhwal University Srinagar
Burdwan (West
295 Dust Devils Overseas & Company
Bengal)
296 Evapo Tech Technical Services & Consultants Patiala
297 University of Kashmir Srinagar
298 Equinox Environments (India) Private Limited Maharashtra
299 VK :e environmental Pune
300 Pavan & Co. Ahmedabad
301 University of Jammu Jammu
302 Creative Research Group Kolkata
303 Sainath Envirotech Tuticorin
304 Halcrow Consulting India Pvt. Ltd. Noida
305 Envirochem Laboratories (P) Ltd. Thrissur, Kerala
306 Palle Consultants Private Limited Hyderabad
307 Global Environmental Systems Bangalore
308 National Council for Cement and Building Materials Ballabgarh
309 Feedback Ventures Pvt. Ltd. (FVPL) Gurgaon
310 Anant Advisory Noida
311* Indian Council of Forestry Research & Education Dehradun
312* Mantras Resources (Engineers and Environmental Consultants) Nashik
313* Clean Technologies Bangalore
* Re-applied (their original applications were not accepted/rejected/withdrawn, earlier)