Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
3
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Table of Contents
Revision History .......................................................................................................................................... 2
Table of Contents ........................................................................................................................................ 4
List of Tables ............................................................................................................................................... 8
1.0 SCOPE ............................................................................................................................................... 9
1.1 General ........................................................................................................................................... 9
1.2 Application ...................................................................................................................................... 9
1.3 Responsibilities ............................................................................................................................. 10
2.0 APPLICABLE CODES, REGULATIONS, SPECIFICATIONS, AND STANDARDS ...................... 11
2.1 Company / Industry Specifications ............................................................................................... 11
2.2 Applicable Codes/Regulations Government Regulations............................................................. 11
2.3 Other Regulations, Codes, and Standards ‒ Canada. ................................................................. 11
2.4 Conflict between Specifications, Codes, and Standards. ............................................................. 12
2.5 Piping Classes .............................................................................................................................. 12
3.0 DEVIATIONS and/or VARIANCES ................................................................................................. 13
3.1 Overview ....................................................................................................................................... 13
4.0 TERMS AND DEFINITIONS ............................................................................................................ 13
4.1 Overview ....................................................................................................................................... 13
4.2 Language Use .............................................................................................................................. 13
4.3 Terminology .................................................................................................................................. 14
5.0 DESIGN AND CONSTRUCTION DETAILS .................................................................................... 15
5.1 Pressure ....................................................................................................................................... 15
5.1.1 Design Pressure .................................................................................................................... 15
5.1.2 Pipe Pressure Control and Overpressure Protection ............................................................ 16
5.1.3 Thermal Relief Valve (TRV) Design ...................................................................................... 17
5.2 Design Temperature ..................................................................................................................... 17
5.2.1 General .................................................................................................................................. 17
5.2.2 Maximum Design Temperature ............................................................................................. 17
5.2.3 Minimum Design Temperature .............................................................................................. 17
5.3 Material Manufacturing Standards ................................................................................................ 18
5.4 Notch Toughness Requirements .................................................................................................. 18
5.5 Line Sizing .................................................................................................................................... 19
5.6 Piping and Tubing Wall Thickness ............................................................................................... 19
5.7 Bends ............................................................................................................................................ 20
5.7.1 Induction Bends ..................................................................................................................... 20
5.7.2 Shop Pipe Bends ................................................................................................................... 20
4
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
6
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
7
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
List of Tables
8
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
1.0 SCOPE
1.1 General
1.1.1 This specification covers the requirements for material selection and piping design used
in Pembina Pipelines ( from now on, Pembina) facility piping systems, in the following
services as defined in CSA Z662 “Oil and Gas Pipeline Systems”, ABSA ,and in Section 2.2
of this specification:
• Low Vapour Pressure (LVP) sweet liquid
• High Vapour Pressure (HVP) sweet liquid
• Sweet Hydrocarbon Vapour (SHV)
• Sour Service Hydrocarbon Vapour (SSHV)
1.1.2 Materials for pipelines are included under this specification, in Attachment A
1.1.3 Mechanical fabrication, installation, testing and construction quality assurance/ quality
control are not covered in this specification.
1.2 Application
1.2.1 This specification applies to Pembina’s facilities including LACT, valve assemblies,
compressor stations, crude midstream processing facilities, pump stations, and
assemblies including pig traps and block valves. It does not apply to pipelines. Pipelines
are covered by Pembina’s pipeline specifications. At the time of issue, it does not apply
to the Gas Services Business Unit (GBU) or the Natural Gas Liquids Business Unit (NBU)
processing facilities.
1.2.2 The Spec break from Pembina’s pipeline specifications to the facility piping specification
shall generally occur after the riser. Although this specification applies to all above
grade piping, it also applies to underground piping within facilities and assemblies. Spec
break between pipeline specifications and the facility piping specification shall be shown
on the drawings.
1.2.3 For SHV piping low temperature materials are specified due to the outside use and that
the piping will not be insulated. If the SHV piping is used inside a heated or insulated
enclosure, regular materials can be used.
1.2.4 Tables 1.2.1 shall be used in determining specification requirements
9
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
M ATERIAL
DESIGN
INSTALLATION TYPE DESIGNATION SPEC *
CODE
CSA ASME
LVP PUMP STATION, STORAGE
ASME ASME AP1, BP1, CP1, DP1, EP1, FP1
FACILITY, L.A.C.T.**
LVP/HVP TRAP CSA CSA AP6, BP6, CP6, DP6, EP6, FP6
LVP TREATING FACILITY ASME ASME AP1, BP1, CP1, DP1, EP1, FP1
HVP PUMP STATION, STORAGE
ASME ASME AP2, BP2, CP2, DP2, EP2, FP2
FACILITY, L.A.C.T.
SHV – COMPRESSOR,
MEASUREMENT, STORAGE, ASME ASME AP1, BP1, CP1, DP1, EP1, FP1
PROCESSING
SHV - TRAP CSA CSA AP6, BP6, CP6, DP6, EP6, FP6
UTILITY SERVICE ASME ASME AP20, BP20, CP20, DP20
SSHV CSA CSA AP7, BP7, CP7, DP7, EP7, FP7
WET INSTRUMENT AIR ASME ASME AP22
DRY INSTRUMENT AIR ASME ASME AP21
BREATHING AIR ASME ASME AP23
SOUR/ CORROSIVE FLUIDS ASME ASME AP3, BP3, CP3, DP3, EP3, FP3
1.3 Responsibilities
1.3.1 The Engineer is responsible for determining whether piping falls within the scope of this
specification.
1.3.2 The Engineer is responsible for establishing and specifying the piping design parameters
including flows, pressures, temperatures, and fluid properties.
1.3.3 The Engineer is responsible for ensuring testing requirements are established, collecting
required documentation, ensuring compliance with applicable codes, standards and
regulatory requirements, and any other requirements in accordance with this
specification and good engineering judgment.
10
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
11
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Figure 2.1.1
Facility Limits
Default Piping Code = ASME B31,3
Exceptions noted in Table 1.2.1
12
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
3.1 Overview
3.1.1 The piping fabricator shall design, manufacture and test such parts in accordance with
these specifications. . The piping fabricator shall submit in writing deviations request to
the Pembina Pipelines or its representative. Failure to provide deviation requests in a
timely manner is solely at the risk of the requestor.
3.1.2 Requests for exceptions and deviations (with comments, justifications and data sheets)
shall be submitted at the time of quotation and shall be resolved prior to proceeding
with further consideration of the proposal or award of order.
3.1.3 Shop and manufacturing requests for deviations which may arise after placement of
order, during the design, quality planning, manufacturing and/or test phases shall follow
Pembina Pipeline’s Management of Change (MOC) process.
3.1.4 Site construction, operations and maintenance requests for deviations shall follow the
Company MOC process.
3.1.5 NOTE: Typical deviation requests requiring approval are items such as, but not limited
to, deviations from (i) specifications or design, (ii) quality plan, (iii) control logic or
philosophy, (iv) approved drawings (v) drawings issued for construction (vi) specified
material properties (vii) defined installation, operation or maintenance practices or
procedures.
4.1 Overview
4.1.1 The Company has defined certain terms to ensure correct interpretation; where such
terms (or their derivatives) appear throughout this specification.
13
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
4.3 Terminology
Term Definition
Acid Gas Natural gas which contains significant amounts of Hydrogen
Sulphide(H2S) or Carbon Dioxide(CO2) or similar
contaminants
Boiler Condensate Found in boiler systems where the steam cools and
condenses resulting in boiler condensate
De-mineralized or De-Ionized water A type of purified water with mineral ions such as sodium,
calcium, iron copper, chloride and bromide are removed.
Dry Inert Gases Gases with a low oxygen content that are used for purging and
cleaning piping and vessels such as nitrogen
Glycols Fluids used in plants and pipelines for anti-freeze and
coolants, de-icing, dehydration of gases and hydraulic fluids
High Vapour Pressure (HVP) Hydrocarbons or hydrocarbon mixtures in the liquid or quasi-
liquid state with a Reid Vapour Pressure greater than 110 kPa
o
absolute at 38 C.
Low Vapour Pressure (LVP) Hydrocarbons or hydrocarbon mixtures in the liquid or quasi-
liquid state with a Reid Vapour Pressure less than 110 kPa
o
absolute at 38 C.
Hot Oil Heat transfer fluid designed specifically for use in thermal
heating systems
Hydrocarbons Consist of gases and liquids associated with the petroleum
industry. Examples: natural gas, condensates, oils, oil
emulsion, HPV
Lube / Seal Oil Liquids utilized for lubrication and sealing of rotating machinery
Oil / Gas Effluent Oil, gas, and water in any combination produced from one or
more oil wells or recombined oil well fluids that may have been
separated in passing through surface facilities
Potable Water Water of sufficiently high quality that can be consumed with
low risk to immediate or long term health
Pressure Relief Valve (PRV) A Safety device that relieves over pressure in a vessel or
piping
Pressure Safety Valve (PSV) Includes Pressure Relief Valve (PRV) and Thermal Relief
Valve (TRV). Purpose is to permit controlled release of
pressure at a prescribed set point for vessels and piping.
14
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Sour / Corrosive Fluids Fluids which contain Hydrogen Sulphide (H2S) or Carbon
Dioxide (CO2) and any other corrosive contaminates
Sour Service Natural Gas (SSHV) Sour service refers to a service in which combinations of the
Hydrogen Sulphide (H2S) content in the gas phase of the
pipeline substance and the Maximum Operating Pressure
(MOP) of the pipeline exceed that specified in the Canadian
Standard Association (CSA) Standard CSA Z662: Oil and Gas
Pipeline Systems.
Sweet Hydrocarbon Vapour (SHV) Natural gas
5.1 Pressure
5.1.1 Design Pressure
5.1.1.1 The designated Design Pressure of any piping system shall be at least 10% or 175kPa
(whichever is greater) more than the maximum operating pressure of the system.
The Design Pressure should not be less than that of any connected equipment.
5.1.1.2 The design pressure for lines containing liquefied gases (propane, butane, and
similar products) shall be at least equal to the full pressure rating of the flange
pressure class that meets the system requirements.
5.1.1.3 Where the designated Design Pressure is less than 350 kPag, the piping system shall
be mechanically capable of containing an internal pressure of at least 350 kPag in
the corroded condition.
5.1.1.4 If piping systems are registered with jurisdictional authorities, only those piping
systems with designated Design Pressures greater than 103.4 kPag and containing
expansible fluids shall be registered. Only the Designated Design Pressures shall be
used for piping registration. The minimum required internal pressure capability of
350 kPag shall not be used a basis for piping registration.
5.1.1.5 All systems operating below atmospheric pressure shall be designed for full vacuum.
5.1.1.6 For centrifugal pump discharge piping, the design pressure shall not be less than the
greatest of the following:
• 1.25 times the rated pump differential plus the maximum operating or relief
pressure at the pump suction;
• 1.1 times rated pump discharge pressure (gauge);
• Normal pump discharge pressure plus 175 kPa;
• Maximum pump discharge or stalling pressure (when known) plus maximum
pump suction pressure.
15
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.1.1.7 Pump suction piping - including any valves or other components - shall not be
smaller than the pump suction connection.
5.1.1.8 For centrifugal compressor discharge piping, the design pressure shall not be less
than the greater of the following:
• The sum of the surge differential pressure of the compressor plus the normal
pressure at the compression suction, where the normal compressor suction
pressure is based on the operating pressure of the equipment from which the
compressor is taking suction, or
• The design differential pressure of the compressor plus the maximum pressure
at the compressor suction, where the maximum pressure at the compressor
suction is the design pressure of the suction equipment less the suction line
pressure drop at the maximum design flow rate;
• Where the compressor is equipped with a variable speed drive, the surge
differential pressure and the design differential pressure (as used in the above
clause) shall based on the compressor performance curve for 105% RPM;
• For piping systems exposed to pulsating pressure conditions such as those
associated with reciprocating pumps and compressors, the design pressure shall
be at least 15% or 210 kPa (whichever is greater) more than the expected peak
operating pressure of the system, except that the pressure rating of the piping
system need not exceed that of the connection integral to the compressor or
pump producing the pulsation.
5.1.1.9 Pressure drops and velocities in compressor piping shall not exceed the compressor
manufacturer’s or packager’s recommendations. Where conflicts exist between
pressure drop and velocity criteria, velocity shall generally govern over pressure loss,
subject to this specification.
5.1.1.10 Compressor discharge piping size shall be limited by the more restrictive of a
maximum allowable pressure drop of 20 kPa/100m, maximum velocity of 18 – 24
m/s, or noise control requirements.
5.1.1.11 Automated bypass valves and piping shall be sized for make-up requirements only,
with valve trim size minimised for control purposes.
5.1.1.12 The size of compressor suction piping shall be determined in accordance with the
compressor manufacturer’s recommendations but shall not be smaller than the
compressor inlet connection.
5.1.2 Pipe Pressure Control and Overpressure Protection
5.1.2.1 Pipe pressure control and overpressure protection shall be in accordance with EG
3.6, “Pressure Control and Overpressure Protection”.
16
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
17
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
-29°C, or
Un-Insulated Piping in Heated 5°C below the minimum mean metal temperature expected
Enclosures during normal operation, whichever is less
Un-Insulated Piping Located Outdoors
-45°C or
Un-Insulated Piping in 5°C below the minimum mean metal temperature expected
during normal operation, whichever is less
Un-Heated Enclosures
5.2.3.2 Unless otherwise supported by calculation and except for relief valve piping, the
minimum mean metal temperature for normal operation shall be considered to be:
5.2.3.3 Unless otherwise supported by calculation, the minimum design temperature for
relief valve discharge piping shall not be warmer than either -29°C or the minimum
design temperature of the relief valve inlet piping, whichever is less.
5.2.3.4 Where piping will be hydrotested outdoors, the minimum design temperature shall
be selected with consideration to the potential ambient temperature range at the
time of hydrotest. The minimum design temperature for such piping should not be
warmer than -29°C.
18
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
19
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.6.2 Actual pipe wall thickness and component ratings utilized shall be based on calculations
by the Engineer in accordance with this specification and the governing design code or
standard to accommodate the loads. Wall thickness calculations shall include provision
for joint efficiency, corrosion allowance, threading or groove allowances, any other
applicable mechanical allowances, and temperature de-rating. Manufacturing tolerance
shall be included when required by the governing design code or standard.
5.6.3 The calculated required wall thickness for stainless steel tubing manufactured to ASTM
A269 shall include allowance for manufacturing tolerances for wall thicknesses in excess
of 0.083”.
5.7 Bends
5.7.1 Induction Bends
5.7.1.1 Induction bends should be manufactured as per the Pembina Engineering Standard
Specification “ESS 2.28 Induction Bends from Steel Pipe”.
5.7.2 Shop Pipe Bends
5.7.2.1 Shop pipe bends are to have a centerline radius of 15D or larger, where D is the
nominal pipe size of the pipe prior to bending.
5.7.3 Field Pipe Bends
5.7.3.1 Field pipe bends are to have a centerline radius of 20D or larger, where D is the
nominal pipe size of the pipe prior to bending.
5.7.4 Hot Pipe Bends
5.7.4.1 Hot pipe bends are to have a centerline radius of 5D or larger, where D is the
nominal pipe size of the pipe prior to bending.
5.7.4.2 Note: If pigging is required, check minimum radius required for pigging before
choosing radius of bend.
20
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.8.2.2 Where possible, directional changes in flow shall be minimized on both suction and
discharge piping for reciprocating pumps. Any necessary turns should be
accomplished with long radius or sweep elbows.
5.8.2.3 Suction piping diameter for reciprocating pump should be at least one pipe size
larger than the suction connection of the pump with the use of an eccentric type
reducer at the pump connection with the flat side up.
5.8.2.4 Pump suction piping, including any valves or other components, shall not be smaller
than the pump suction connection.
5.8.2.5 For positive displacement pumps the upstream piping shall be one pipe diameter
larger than the pump suction connection.
5.8.2.6 The Engineer shall investigate the potential for piping pulsation adjacent to
reciprocating pumps. Consideration shall be given to the use of in-line stabilizers
and dampeners. In the event that in-line stabilizers and dampeners are not required
at the anticipated initial operating conditions, sufficient space shall be left in the
piping for the addition of in-line stabilizers and dampeners in the event that
operating conditions change in the future.
5.8.2.7 A minimum straight pipe length of 5 pipe diameters shall be used upstream and 10
pipe diameters shall be used downstream of all pumps.
5.8.2.8 For pump suction piping, Net Positive Suction Head Available (NPSHA) should be at
least 25% greater than Net Positive Suction Head Required (NPSHR). Subject to
Corporation approval, NPSHA values less than 25% greater than NPSHR may be
acceptable. NPSHA values equal to or less than NPSHR are not acceptable. NPSHA
calculations for reciprocating pumps shall include acceleration head loss, without
credit for any suction stabilization devices on the pump inlet.
5.8.2.9 Pump suction piping pressure drop shall also satisfy the following criteria:
ΔP ≤ 0.005*ρ
Where: ΔP = pressure drop in kPa/100m
ρ = fluid density in kg/m3
5.8.2.10 Flowing pressure loss in pump suction and discharge piping should not exceed the
following:
21
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.8.2.11 Velocities for pump piping should not exceed the values listed below; pump
discharge velocities should generally not exceed 3 times the suction velocity for light
hydrocarbons and water.
22
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Gravity Flow 4
(total ∆P ≤ 90% of Available Liquid
Head)
5.8.3.2 The recommended minimum velocity for liquid lines is 0.9 m/s, except for gravity
flow or pump suction. Actual minimum velocities shall be adjusted based on fluid
viscosity, fluid density, particle size, and particle density to prevent or minimize
solids deposition and corrosion.
5.8.3.3 Recommended general velocities for single phase liquid lines are listed below.
5.8.3.4 The maximum liquid velocity in piping transporting liquid from one pressure vessel
to another via pressure differential shall not exceed 4 m/s.
5.8.3.5 The design velocities for corrosive liquids including sour water, sour glycols, amine
and caustic in internally bare steel lines, shall be selected to mitigate excessive
corrosion and/or erosion.
5.8.4 Reciprocating Compressor Piping
5.8.4.1 Pressure drops and velocities in compressor piping shall not exceed the maximum
set out below. Where conflicts exist between pressure drop and velocity criteria,
velocity shall generally govern over pressure loss, subject to the compressor
manufacturer’s or packager’s recommendations.
23
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.8.4.2 Compressor discharge piping size shall be limited by the more restrictive of a
maximum allowable pressure drop of 20 kPa/100m, maximum velocity of 18 – 24
m/s, or noise control requirements.
5.8.4.3 Automated bypass valves and piping shall be sized for make-up requirements only,
with valve trim size minimized for control purposes.
5.8.4.4 The size of compressor suction piping shall be determined in accordance with the
compressor manufacturer’s recommendations but shall not be smaller than the
compressor inlet connection. For reciprocating compressors, suction velocities and
pressure loss should not exceed the following:
5.8.5.3 Design velocities for vapours and gases shall be appropriate for the intended service.
Recommended velocities based on 0.6 SG gas at 15 to 204 °C are provided below:
24
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
25
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.10.8 Piping shall not generally be supported from other piping except that piping 60mm (2
NPS) and smaller may be supported or suspended from piping 168mm (6 NPS) and
larger provided:
• Provision of independent supports is impractical (as judged by the Manager, Technical
Services) or would impair operational or routine maintenance access to equipment,
valves or controls
• Provisions have been made for differential expansion or deflection and the loads
imposed by the supported piping
• Neither the smaller nor larger piping is in cyclic, vibrating, or pulsating service
• Support spacing shall limit pipe sag or deflection to the lesser of:
• 12.7 mm between supports, or
• That required to ensure drainage, or
• That required to prevent combined stresses in excess of allowable stress levels
5.10.9 Table 5.10.2 may be used as a general guideline for maximum un-supported pipe span.
The listed span values correspond to straight run pipe with more than two supports
between endpoints. For other piping configurations, approximate allowable spans may
be estimated by multiplying the values in Table 5.10.2 by the factors provided in Table
5.10.3.
5.10.10 Pipe spans shall be adjusted as necessary to accommodate any additional weight
loads including but not limited to insulation, valves, meters, controls, or external loads
such as seismic or wind loads.
5.10.11 Spacing for pipe supports carrying multiple pipe lines shall be a maximum of
6000 mm.
5.10.12 Weight calculations for piping containing gas or vapour under normal operating
conditions shall take into consideration the weight of liquid under hydrostatic test
conditions
5.10.13 Tubing support spacing for straight run tubing shall be no greater than 1300mm
for 1/4” tubing, 1600mm for 3/8” tubing, and 1900mm for 1/2” tubing. Maximum
support spacing shall be reduced by a factor of 0.65 for any tubing runs other than
straight runs. Support spacing shall be adjusted to support the weight, operation, or in-
situ maintenance of any valves or controls installed in the tubing run.
5.10.14 Tubing shall not be supported directly on or from conduit or ladders.
5.10.15 Dead legs in piping are not accepted.
5.10.16 If corrugated or bellows type expansion joints are used, anchors and guides shall
be designed and located to force expansion movement into the joint, and designed to
withstand a force equal to 150% of the force determined from the flexibility analysis,
including any coincident pressure or weight loads.
26
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.10.17 Dummy pipe supports may be utilized for butt welded carbon steel piping not
subject to vibration or pulsation. All vertical dummy pipe supports – and any capped
horizontal dummy supports - shall be provided with 6mm diameter telltale holes.
Dimensional limitations for Dummy Supports are as follows:
5.10.18 Horizontal dummy supports shall extend a minimum of 250mm past the
centerline of their support point. Maximum length noted above for horizontal supports
is the distance from supported piping to the support point. If Dummy Leg length is
greater than 1800mm, minimum size for the Dummy Leg shall be line size. Dummy Leg
wall thickness shall be based on supported loads but shall be no less than
Schedule/Extra Heavy.
5.10.19 Pipe supports shall be designed for un-insulated metallic piping to rest directly
on the support, except that sliding supports / shoes shall be provided where excessive
wear due to thermal movement may occur, or where corrosion may occur at a support
due to condensation forming on the piping.
5.10.20 Pipe support shoes shall be provided for insulated, lined, or clad metallic piping,
and all non-metallic piping.
5.10.21 All clamped pipe shoes shall be designed to ensure resultant reactions & bearing
stresses are within allowable stress limits.
5.10.22 Structural welding on pressure piping is not permitted.
5.10.23 If the piping system is subject to shock loads, hangar designs shall include
provisions for shock absorbing devices.
5.10.24 Hangar rods shall be subject to tensile loading only; where lateral loads or axial
movement is anticipated, linkage shall be provided to permit hangar to swing.
5.10.25 Hangars shall be designed so that hangars cannot be disengaged by pipe
movement.
5.10.26 Control valve stations subject to vibration shall not be supported by hangars or
jacks. There shall be rigid supports at each end of such control valve stations.
27
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
28
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
29
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
L1 L3
L1 L2
L4 L5
L4
H4
H5
Case 5b
Allowable L5 = L1 x 0.6
L5=L +L
30
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
31
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Table 5.11.1: Threaded Pipe Design Maximum Allowable Threaded Pipe Size and Pressure
Maximum
Allowable Maximum
Fluid Service Fluids / Piping Systems
Threaded Pipe Pressure
Size
Multi-phase Oil Well Effluent
89 mm
Produced Oil (≤77°C)
Normal Multi-phase Gas Well Effluent
Sweet Natural Gas
60 mm
Liquid Hydrocarbons (≤93°C)
Produced Water
Atmospheric equipment drain, vent, or service
Normal, Utility connection piping that does not connect to a 114 mm 103 kPag
closed system
5.12.2 Every pipe containing a flow meter shall be provided with two sample connections and
shall provide samples from the middle of the main run of pipe. Sample connections shall
be suitable for use of an insertion probe or quill.
5.12.3 In situations where the pressure is not easily reduced (e.g. pipelines) double valve
sample connections (using a 1” root valve and ½” needle valve for regulation) and are to
be installed such that flow to instruments will not be disrupted during sampling.
5.12.4 Except for connections integral to components or equipment, the minimum size for
instrument, vent, drain, sample or chemical injection connections on piping shall be 27
mm.
32
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
T R R O O O O O O O O O O O O O O 3/4
T R R* O O O O O O O O O O O O O 1
T R R O O O O O O O O O O O O 1 1/2
T R R O O O O O O O O O O O 2
T R R O O O O O O O O O O 3
T R R R O O O O O O O 6
NOTES: T R R R R O O O O O 8
T Straight Tee T R R R R R O O O 10
R Reducing Tee T R R R R R R O 12
T R R R R R 16
T R R R R 18
T R R R 20
T R R 24
T R 30
T 36
*Weldolet, threadolet or sockolet shall be accepted for PN 20 and PN 50 piping systems only.
Reducing tee shall be used for PN 100 piping system
33
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
T R R O O O O O O O O O O O O O O 3/4
T R R* O O O O O O O O O O O O O 1
T R R O O O O O O O O O O O O 1 1/2
T R R O O O O O O O O O O O 2
T R R O O O O O O O O O O 3
T R R R R R R R R R R 6
NOTES: T R R R R R R R R R 8
T Straight Tee T R R R R R R R R 10
R Reducing Tee T R R R R R R R 12
O Weldolet, Threadolet, or Sockolet T R R R R R R 14
T R R R R R 16
T R R R R 18
T R R R 20
T R R 24
T R 30
T 36
*Weldolet, threadolet or sockolet shall be accepted for PN 20 and PN 50 piping systems only.
Reducing tee shall be used for PN 100 piping systems.
34
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
35
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.16.5 Below grade pressure piping shall have a minimum depth of cover of 1.8 m in high traffic
areas and 1.2 m in low traffic areas.
5.16.6 Below grade drain non-pressure piping shall have a minimum depth of cover of 0.5 m.
5.16.7 Hex head bushings are not permitted for a change of one NPS size. Swages shall be used
for a change of one NPS size and are preferred for changes of more than one NPS size.
5.16.8 All Pembina facility piping systems shall be electrically isolated (for cathodic protection)
from pipelines and from third party piping systems. As well, where feasible, buried
sumps and pipe supports shall be electrically isolated from piping.
5.16.9 Check valves shall be installed downstream of pumps in a manner to prevent backwards
flow through the pump. Piping to be configured to allow check valves to be isolated by
pump isolation valves. Check valves shall adhere to the guidelines for check valves
outlined in Table 5.20.1 Recommended Valves Table.
5.16.10 Permanent in-line strainers shall be installed on the inlet piping to all meters.
Strainers shall be utilized on the suction piping of all pumps.
5.16.11 Welds for threadolet and/or sockolet fittings shall be a minimum of 150 mm
from center of adjacent girth welds.
5.16.12 Threadolets and sockolets on pipe NPS 4 and smaller shall be separated by a
minimum of 150mm along the pipe axis. Threadolets and sockolets on NPS 6 pipe may
be separated by less than 150 mm along the pipe axis provided they are 180° apart.
Threadolets and sockolets on NPS 8 and larger pipe may be separated by less than
150mm along the pipe axis provided they are 90° or more apart.
5.16.13 Structural welding on pressure piping is not permitted.
5.16.14 Sufficient plain pipe spacers (pipe pups) shall be provided in all piping runs to
allow for future modification to the piping. These modifications may include changes in
equipment dimensions and valve and other piping component dimensions.
5.16.15 The installation of O’lets on fittings is not permitted unless approved by
Manager, Technical Services.
5.16.16 The use of unregistered fittings (this includes field fabricated wyes or laterals) is
not permitted. All fittings used must have a Canadian Registration Number (CRN) valid
in the province where the fittings will be installed and must be approved for the
intended service.
5.16.17 The use of crosses is permitted where there is insufficient room for two tees, but
piping containing a cross must be stress analyzed.
5.16.18 Short radius elbows shall generally not be used. An exception is made for
replacement of existing short radius elbows or cases where a piping modification can
only be made economically by the use of short radius elbows.
36
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.16.19 Piping design shall consider stud and nut removal from flange connections and
nozzle connections (i.e. flanges shall be installed to allow complete removal of studs,
from either side.
5.16.20 For above-ground piping, minimum pipe size shall be 27mm except that:
• For vibrating, pulsating, or cyclic services, the minimum pipe size shall be 33 mm;
• For underground piping, minimum pipe size shall be 48 mm for metallic piping and 60
mm for non-metallic piping.
5.16.21 The minimum pipe size for extended process and utility piping runs in pipe-racks
shall be 60mm.
5.16.22 Metallic piping 60mm and larger shall generally be of butt welded construction.
5.16.23 Piping design shall include the following minimum corrosion allowances unless
otherwise required by service conditions or specified by Pembina.
5.18.2 NDE testing shall be performed in accordance with applicable CSA & ASME codes.
5.20 Valves
5.20.1 All valves shall be in accordance with Pembina’s Engineering Specifications “ESS 3.35
Gate Valves”, and “ESS 3.37 Ball Valves”.
5.20.2 All liquid service valves shall be ported for liquid service.
5.20.3 In no case shall a block valve that is commissioned into service and is open to
atmosphere be left open without a blind flange or threaded seal plug.
5.20.4 Block valves used to isolate workers from pipeline pressure shall be double block and
bleed valves as per Alberta OH&S requirements (two independent seals against
upstream pressure).
5.20.5 Main pig trap valve, pig trap kicker (side) valve, and pig trap bypass valve shall be double
block and bleed valves as per Alberta OH&S requirements (two independent seals
against upstream pressure).
5.20.6 Block valve located between the meter prover connections is to be double block and
bleed as per the API definition (seals against upstream or downstream pressure).
5.20.7 NPT valves in drain systems shall be full port.
5.20.8 Drain valves in the vertical position shall be installed with the handle horizontal in the
closed position; and up in the open position.
38
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Note 1: Valve manufacturers may change the specification for a particular valve at any
time without notifying potential purchasers. The above valve information should be used only
as a guide. The specifications of valves must be confirmed prior to purchase to ensure they are
suitable for the intended service conditions.
39
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Note 2: Double Block and Bleed refers to the requirements of Alberta Occupational
Health and Safety for double valves at pig traps.
5.21 Minimum & Standard Ratings for NPT and Socket-weld Items
Table 5.21.1: Minimum & Standard Ratings for NPT and Socket-weld Items
Normal Service Sour Service Utility Services
Item Type Piping Minimum Standard Minimum Standard Minimum Standard
Pressure
Class
CWP @ 38 CWP @ 38 CWP @ 38 CWP @ CWP @ CWP @
A ( < 103 C C C 38 C 38 C 38 C
Ball kpag) 500 1500 1500 2000 500 1500
Valves A ( > 103 1500 2000 2000 2000 1000 1500
(Ratings kpag) 1000 1500
are CWP B 1500 2000 2000 2000
ratings at C 2000 3000 2000 3000
38 C) D 3000 4000 3000 4000
E 4000 6000 4000 6000
F 6000 6000 6000 6000
Gate, A ( < 103 CWP > 300 API 800 API 800 CWP > API 800
Globe, kpag) 300 API 800
Check A ( > 103 API 800 API 800 API 800 API 800
Valves kpag) API 800
& B API 800 API 800
Strainers C API 800 API 800
D ASME ASME
1500 1500
E ASME ASME
1500 1500
F ASME ASME
2500 2500
5.22 Tubing
5.22.1 Instrument, pump and equipment tubing shall be annealed seamless tubing ASTM A269
stainless steel grade 316. Wall thickness for tubing shall be as described in Piping
Material Tables. Material hardness shall be Rb80 or less. Tubing shall be free of
40
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
scratches and suitable for bending and flaring. Tubing with visible scratches, particularly
in the ferrule sealing surfaces, shall be rejected.
5.22.2 Fittings shall be type 316 stainless steel “Swagelok” fittings.
5.22.3 When using tubing with outside diameter greater than ½”, a hydraulic swaging unit and
a bender (either bench-top or electric) should be used to ensure the proper fitting seal
and correct radius bends are achieved. Refer to manufacturer’s specifications and
guidelines for correct installation.
5.22.4 Instrument tubing shall include all tubing to static instrumentation, including but not
limited to; pressure transmitters, gauges, instruments, meters, regulators, and similar
services. For applications where flowing product is to samplers and chromatographs,
tubing sizes shall be limited to 3 mm (1/4”) through 12.7 mm (1/2”) O.D.
5.22.5 Tubing shall be supported throughout its length in raceways, channel ducts, metal trays,
and/or structural steel angles, with no unsupported length greater than 1000 mm. All
instrument valves should be restrained and supported to ensure that the operation of a
valve does not transmit stress to the tubing & fittings.
5.22.6 To determine tightness of nuts on ferrules, gap inspection gauges shall be used, were
practical. In lieu of gauges, when installing the tubing into a Swagelok fitting, make sure
the tubing rests firmly on the shoulder of the fitting and the nut is hand tight. While
holding the fitting body steady with a back-up wrench, tighten the nut to Swagelok
specifications.
5.22.7 Changes in direction of tubing shall be made with bends wherever practical. No bends
are permitted within 1.25 tubing diameters of tubing fitting nut.
5.22.8 Coupled joints in runs shall be kept to a minimum.
5.22.9 The numbers of fittings used shall be kept to a practical minimum. Dead legs shall not
be permitted unless required for future expansion within 12 months from initial in-
service date.
5.22.10 Tubing sizes shall be specified using imperial dimensions.
5.22.11 Tubing smaller than 1/4” OD shall not be used.
5.22.12 1/4” OD tubing is permissible only for individual supply or control signal lines to
pneumatic instruments, and shall not be used in services susceptible to fouling.
5.22.13 Tubing larger than 1/4” OD may be used in lieu of pipe for auxiliary services
(hydraulics, lube oil, seal oil, coolants) and chemical injection.
5.22.14 Tubing used for instrument vents or drains, sampling lines, and Instrument
sensing, control, or supply lines shall be no larger than 1/2” OD. Piping shall be used if
larger tubing sizes are required for these services.
41
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.22.15 Subject to Corporation approval, tubing may be used in lieu of pipe where
minimum flow velocity or fluid service requirements render minimum allowable pipe
sizes un-useable or impractical.
5.22.16 Tubing shall not be used for drain, vent, supply or distribution headers.
5.23 Bolting
5.23.1 Only studs and nuts of the correct material and grade shall be used. Each stud bolt and
nut shall be legibly stamped with its ASTM material grade.
5.23.2 Studs shall be ¼” longer than shown in standard tables for stud length and shall be
threaded for the full length.
5.23.3 Only bolting and nuts that comply with ASME B16.5 shall be used to joint flanges. No
structural bolting is allowed.
5.23.4 Gasket seating, target, and maximum torque values shall be determined and
documented for the following bolted joints:
• Joints with 1” and larger studs where the joint is either exposed to temperatures greater
than 350°C, or is in temperature-cyclic service, or is a joint that has not been pressure
tested that is connected to rotating equipment or heat exchangers;
• Joints with stud size larger than 22mm (1-1/4”) in piping rated higher than ASME 150
Class; such joints include the following flanged connections:
Table 5.23.1: Bolting per Pipe Size
ASME Class Pipe Size (mm OD)
300 610 and larger
600 356 and larger
900 219 and larger
1500 168 and larger
• Wherever hydraulic tensioning or elongation methods are planned for bolted joints,
target and maximum bolt stress and elongation values shall be determined and
documented.
5.23.5 Determination of torque, stress, and/or elongation values shall consider:
• The stud material, installation and service conditions, and lubrication,
• Flange material & design limits,
• The gasket manufacturer’s recommendations for minimum and maximum gasket
compression stress, and
• Where the bolted joint is at the connection to components or equipment, the
component or equipment manufacturer’s recommendations for stress or torque values
5.24 Gaskets
5.24.1 Gasket Description: (most applications/ including risers)
42
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
5.24.2 Gaskets RF 3.2 mm, Flexitallic CGI, Spiral Wound c/w 316SS Inner Ring & CS or 316SS
(stainless steel specs) Outer Ring – 316SS/ Flexible Graphite.
6.1 General
6.1.1 The Company shall be notified five working days in advance of fabrication start and two
days in advance of welding, heat treatment, welding procedure qualification,
hydrostatic testing and final inspection.
6.1.2 The Supplier shall bear full responsibility for the conformity of its supply to all
requirements of this specification. The Supplier shall, for this purpose, take all necessary
measures, making use of suitable means, devices and qualified personnel, enabling him
to ensure permanent and effective control at each stage of manufacture.
6.2 Inspection
6.2.1 The Supplier shops shall make copies of their Quality Assurance program available for
the Company’s review.
6.2.2 The Supplier shall make all quality assurance data, material and test certificates and
procedures and qualification records, radiographs and all other documentation required
for inspection. The Supplier shall provide free access to the work being inspected.
6.2.3 All internal parts shall be suitably supported or braced for transportation. Loose parts
shall be packed and tagged to avoid loss during shipping and storage.
6.2.4 All flanged connections shall have covers installed for shipping. All threaded connections
shall have bar stock plugs installed.
6.2.5 Free access shall be allowed to the Inspector at all times during manufacture and
testing. A suitable working area shall be reserved for him at the end of the production
43
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
line or at any other agreed location so that he can carry out his own inspections on the
finished pipes.
6.2.6 The Supplier shall develop a Inspection Test Plan for approval by the Company and shall
carry out all inspections and tests required by this specification.
6.2.7 All inspections carried out by the Supplier during manufacturing shall form the subject
of constantly updated reports. These reports shall be available for consultation by the
Inspector at any time.
6.2.8 If during the main production, more than 5% of the pipes are rejected in any day's
production or re-routed for repairs or re-processing, then the Inspector shall have the
right to ask the Supplier to increase his Quality Control Programmer to an appropriate
level and to maintain it until the causes of defective quality are identified and
eliminated. Where above rate attains 10%, the Inspector may require the main
production to be stopped.
6.2.9 Only pipes fully meeting the requirements of this specification shall be presented to the
Inspector for final acceptance.
6.2.10 All visual inspection, dimensional inspection and Non-Destructive inspection procedures
shall have prior approval of the inspector Qualification records shall be established by
the Supplier, duly reviewed and signed by the Inspector and filed in the final
documentation turned over by the supplier.
6.2.11 The Company’s appointed inspector might audit any of the following areas at his
discretion:
• suitable methods of marking and segregating the Company’s supplied materials
• welder certification and testing procedures;
• NDE procedures and proposed Sub-contractors;
• hydrostatic testing procedures;
• fabricators QC manual and procedures
6.2.12 The inspectors shall have full access to all relevant documents and activities during the
Fabricator's working hours. The Supplier shall provide three days notice prior to testing,
to allow client sufficient time to schedule witness testing activities. Inspector to provide
shipping release upon satisfactory completion of all deficiencies prior to shipping.
6.3 Tests
6.3.1 Non-destructive examination requirements and acceptance criteria shall be as required
by Code and the Company’s specifications.
6.3.2 All pressure piping shall be hydrotested per ASME B31.3. A pressure and temperature
recorder shall be used on all hydrotests that are not witnessed by the assigned
inspector. The pressure and temperature recorder must be checked and certified by a
competent instrument company one week prior to its use.
44
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
6.3.3 All hydrostatic tests shall be held for at least one hour per inch of shelf thickness (one
hour minimum). After completion of successful hydrotest vessels shall be thoroughly
cleaned and dried. Pneumatic testing shall not be permitted.
6.3.4 Hydrostatic testing of vessels to ASME Section VIII Div 1 and Section 1 (latest editions)
and Alberta Boilers Safety Association requirements.
7.1 General
7.1.1 The Supplier shall prepare modules for shipment as follows:
• Complete all instructions shown on structural, piping, electrical layouts, piping, electrical
and instrumentation drawings.
• Remove all instruments or internals and protect for shipping purposes.
• Any instruments, light bulbs, pendant fixtures, fire eyes, gas heads, or other
components shipped loose shall be suitably crated for shipment and shall be clearly
tagged as to their intended location. All items shipped loose must accompany the
package.
7.1.2 No components shall be shipped loose unless components have been previously
installed on package to ensure correct fit-up and subsequently removed.
7.1.3 The Supplier shall supply and install packing, closures and protective covers for the
protection of installed materials during transportation. This shall include as a minimum
the following items:
• wooden or plastic covers for open flanges, butt-weld valves, and exterior junction
boxes;
• plastic caps on open pipe and tracer ends;
• plugs or caps for threaded ends of pipe and conduit;
• Protection of windows.
7.1.4 Provide temporary blocking, bracing, tie down or other suitable supports for
components which could be damaged during transportation due to their flexible nature.
7.1.5 A final check shall be made prior to transportation to ensure that all structural and flange
bolts are tight.
7.1.6 The Supplier shall load the package onto a truck for shipment and shall ensure it is
adequately supported. Preparation for shipment is the responsibility of the Supplier
c/w itemized list for all ship loose items contained within the package. Off-loading by
Others. The Supplier is to notify the assigned inspector of the shipping time and date.
7.1.7 After the completed package is loaded and prior to it leaving the fabrication yard, it
will be inspected by the Company or its representative.
45
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
8.1 General
8.1.1 For each pipe, the Supplier shall submit for the Company review printed and/or reproducible
copies of design and fabrication documents and subsequent revisions. These documents include
at least the following:
8.1.1.1 The Outline and assembly drawings shall show all design basis and data as listed hereafter:
• Applicable Code including edition and addenda
• Applicable Company specifications
• Maximum Service Pressure (MSP)
• Maximum and minimum Service Temperatures (MST and mST)
• Design pressure(s)
• Design temperature(s)
• Other loadings
• Corrosion allowance
• Joint efficiency
• Insulation
• Materials specifications
• Post Weld Heat Treatment (PWHT)
• Hydrostatic test pressure
• Lifting weight
• Operating weight
• Hydrostatic test weight.
8.1.1.2 These Welding documents shall include as a minimum:
• Weld map
• Welding Procedures Specifications (WPS)
• Procedures Qualification Records (PQR).
8.1.1.3 The Fabrication procedures shall include as a minimum:
• Forming procedures for shell plates and heads
• Post weld heat treatment procedure
• NDT procedures
• Pressure test procedures.
8.1.1.4 Manufacturer data report
• In case of stamped vessels, the Manufacturer data report must be signed by the ASME
• Authorized Inspector and must be issued to the COMPANY during the final testing and
inspection of the vessels
• Tube metal temperature
8.1.1.5 The following calculations shall be submitted:
46
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Carbon Steel Normal ASME 150 1.5 -45 to 204 ASME B31.3
AP1
Fluids / Services
Sweet Fluids
Oil / Gas Well Effluent, Hydrocarbons (except HVP), Methanol, Chemicals, Amines @ < 60C, Glycols, Dry Inert Gases
Joint NDE: Pressure Test: PWHT: Branch Table:
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 3,103
27 – 48 NPT / SW S/80
60 – 73 NPT / BW S/80
ASME ASTM A-333-Gr6
Pipe 89 – 114 NPT/BW S/STD 32
B36.10M Smls
168 – 610 BW S/STD
27 – 48 RFSW
Flanges ASME B16.5 150 CL ASTM A-350-LF2 CL1 13, 19
60 – 610 RFWN
47
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Orifice
ASME B16.36 33 – 324 RFWN 300 CL ASTM A-350-LF2 CL1 16, 19
Flanges
Threadolets,
MSS SP-97 27 – 48 NPT / SW 3000 CL ASTM A-350-LF2 CL1
Sockolets
Spectacle
ASME B16.48 27 – 324 RF 150 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind ASME B16.48 356 – 610 RF 150 CL ASTM A516 GR. 70N 19
ASME
Studs 27 – 610 RFF NA ASTM A320 GR. L7
B18.2.1
Nuts ASME
27 – 610 RFF NA ASTM A194 GR. 7
B18.2.2
48
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping and branch connections are permitted for instrumentation, sampling, chemical
injection, and maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less
(Refer to ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. 60mm and larger plugs to be bull plugs.
32. Refer to EG 3.10 section 4.11 for restrictions on threaded piping 60mm and larger
49
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Carbon Steel Normal ASME 150 1.5 -45 to 200 ASME B31.3
AP2
Fluids / Services
Sweet Fluids
Liquid Hydrocarbons (RVP>110 kPa @ 38 C)
27 – 48 SW S/80
60 - 73 BW S/80
Orifice
ASME B16.36 33 – 324 RFWN 300 CL ASTM A-350-LF2 CL1 16, 19
Flanges
50
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Spectacle
ASME B16.48 27– 324 RF 150 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 – 762 RF 150 CL ASTM A516 GR. 70N 19
& Spacer
51
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping is permitted after isolation for instrumentation, sampling, chemical injection, and
maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less
(Refer to ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. 60mm and larger plugs to be bull plugs.
52
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Sour ASME 150 3.0 -45 to 204 ASME B31.3 AP3
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 3,103
27 - 48 SW S/80
ASME
Pipe 60 - 73 BW S/80 ASTM A-333-Gr6 Smls 11, 23
B36.10M
89 - 610 BW S/STD
Flanges 27 - 48 RFSW
ASME B16.5 150 CL ASTM A-350-LF2 CL1 13, 19, 23
60 - 610 RFWN
Blind Flanges ASME B16.5 27 - 610 RF 150 CL ASTM A-350-LF2 CL1 19, 23
53
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Nipples ASME
27 - 48 SW S/160 ASTM A-333-Gr6 Smls 21, 23
B36.10M
Weldolets Match
MSS SP-97 60 - 219 BW Branch ASTM A-350-LF2 CL1 13, 23
Pipe
Spectacle
ASME B16.48 27 - 324 RF 150 CL ASTM A516 GR. 70N 19, 23
Blind
Paddle Blind
ASME B16.48 356 - 610 RF 150 CL ASTM A516 GR. 70N 19, 23
& Spacer
316SS/ Flexible
Graphite
Gaskets ASME B16.20 27 - 610 RF 150 CL Spiral Wound c/w 316 23
SS Inner & CS Outer
Ring
Notes:
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required on welding piping:
a. wherever weld size or pipe thickness is greater than 19mm, or
b. in MEA or rich amine service, or
c. where the maximum operating pressure is greater than 435kpag and either
54
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
55
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Stainless Steel Utility ASME 150 0 -45 to 204 ASME B31.3 AP20
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 3,396
27 - 48 NPT S/80S
27 – 48 SW S/80S
ASME ASTM A-312 TP316
Pipe
B36.19M Smls
60 - 73 BW S/80S
89 – 324 BW S/STD
Flanges 27 - 48 RFSW
ASME B16.5 150 CL ASTM A-182 F316 13, 19
60 - 324 RFWN
Orifice
ASME B16.36 33 – 324 RFWN 300 CL ASTM A-182 F316 13, 16, 19
Flanges
56
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Threadolets
MSS SP-97 27 – 48 NPT/SW 3000 CL ASTM A-182 F316 13
Sockolets
Weldolets Match
MSS SP-97 60 - 114 BW ASTM A-182 F316 13
Branch Pipe
Spectacle
ASME B16.48 27 – 324 RF 150 CL ASTM A-240 T316 19
Blind
Plugs ASTM-A182-F316
ASME B16.11 27 – 48 NPT 20, 31
316SS/ Flexible
Graphite
Gaskets ASME B16.20 27 – 324 RF 150 CL 19
Spiral Wound c/w 316
SS Inner & Outer Ring
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
57
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
8. Welding of non-pressure retaining attachments to piping is prohibited without prior approval of
Pembina.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. Plugs 60mm and larger to be bull plugs.
58
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Utility ASME 150 0 -45 to 186 ASME B31.3 AP21
Fluids / Services
Non-Corrosive Fluids
Dry Instrument Air / Utility Air, Lubricants & Hydraulic Fluids, Coolants, Vents (excluding pressure relief vents), Drains
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 1,706
27 - 48 NPT / SW S/80
60 - 73 NPT / BW S/80
Pipe ASME B36.10M ASTM A-333-Gr6 Smls 33
89 - 168 NPT / BW S/STD
Flanges 27 - 48 RFSW
ASME B16.5 150 CL ASTM A-350-LF2 CL1 13, 19
60 – 610 RFWN
Orifice
ASME B16.36 33 - 324 RFWN 300 CL ASTM A-350-LF2 CL1 13, 16, 19
Flanges
59
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Match
Weldolets MSS SP-97 60 – 219 BW ASTM A-350-LF2 CL1 13
Branch Pipe
Spectacle
ASME B16.48 27 - 324 RF 150 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 - 610 RF 150 CL ASTM A516 GR. 70N 19
& Spacer
60
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Minimum Pressure Testing Requirements are as follows:
61
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 1,706
Flanges 27 - 48
ASTM A-105,
ASME B16.5 RF NPT 150 CL 13, 19
Galvanized
60 – 114
Orifice
ASME B16.36 33 - 114 RF NPT 300 CL Not Permitted
Flanges
62
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
Air
Design Pressure ≤ 103 kPag Pneumatic Leak Test @ 103 kPag
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
63
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
13. Bore for BW fittings and flanges to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. Plugs 60mm and larger to be bull plugs.
64
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Stainless Steel Utility ASME 150 0 -45 to 204 ASME B31.3 AP23
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 3,396
27 - 48 NPT S/80S
27 – 48 SW S/80S
ASME ASTM A-312 TP316
Pipe
B36.19M Smls
60 BW S/80S
89 – 324 BW STD
Flanges ASME B16.5 27 – 324 RFWN 150 CL ASTM A-182 F316 13, 19
Blind Flanges ASME B16.5 27 – 324 RF 150 CL ASTM A-182 F316 13, 19
Orifice
ASME B16.36 33 – 324 RFWN 300 CL ASTM A-182 F316 13, 16, 19
Flanges
65
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Threadolets
MSS SP-97 27 – 48 NPT/SW 3000 CL ASTM A-182 F316 13
Sockolets
Weldolets Match
MSS SP-97 60 - 114 BW ASTM A-182 F316 13
Branch Pipe
Spectacle
ASME B16.48 27 – 324 RF 150 CL ASTM A-240 T316 19
Blind
Notes:
66
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Air
Design Pressure ≤ 103 kPag Pneumatic Leak Test @ 103 kPag
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
13. Bore for BW fittings and flanges to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. Plugs 60mm and larger to be bull plugs.
67
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 300 1.5 -45 to 371 ASME B31.3 BP1
Fluids / Services
Sweet Fluids
Oil / Gas Well Effluent, Hydrocarbons (except HVP), Methanol, Chemicals, Amines @ < 60C, Glycols, Dry Inert Gases
Minimum Hydrotest Pressure (kPag) 7,653 7,033 6,774 6,567 6,621 6,815 6,692 6,644
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 7,998
27 NPT S/160
33 - 48 NPT S/80
27 - 48 SW S/80
60 BW / NPT S/80
ASME ASTM A-333-Gr6
Pipe 33
B36.10M Smls
89 NPT S/80
89 - 356 BW S/STD
Flanges ASME B16.5 27 -48 RFSW 300 CL ASTM A-350-LF2 CL1 13, 19
68
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
60 - 610 RFWN
Orifice
ASME B16.36 33 - 324 RFWN 300 CL ASTM A-350-LF2 CL1 13, 16, 19
Flanges
Threadolets
MSS SP-97 27 - 48 NPT / SW 3000 CL ASTM A-350-LF2 CL1 20, 33
& Sockolets
Match
Weldolets MSS SP-97 60 - 219 BW Branch ASTM A-350-LF2 CL1 13
Pipe
Spectacle
ASME B16.48 27 - 324 RF 300 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 - 610 RF 300 CL ASTM A516 GR. 70N 19
& Spacer
27 - 48
NPT ASTM-A-350LF2-CL1 20, 31
Plugs ASME B16.11 60 - 89
316SS/ Flexible
Graphite
Gaskets
ASME B16.20 27 -610 RF 300 CL Spiral Wound c/w 316 19
SS Inner & CS Outer
Ring
69
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping and branch connections are permitted for instrumentation, sampling, chemical
injection, and maintenance vents and drains
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less
(Refer to ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. 60mm and larger plugs to be bull plugs.
33. Refer to EG 3.10 section 4.11 for restrictions on threaded piping 60mm and larger.
70
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 300 1.5 -45 to 230 ASME B31.3 BP2
Fluids / Services
Sweet Fluids
Liquid Hydrocarbons (RVP>110 kPa @ 38 C)
Max Design Pressure (kPag) 5,102 4,688 4,516 4,378 4,171 3,930 3,792 3,654
Min Hydrotest Pressure 7,653 7,033 6,774 4,378 6,621 6,815 6,692 6,644
(kPag)
27 - 48 SW S/80
60 BW S/80
71
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Blind
ASME B16.5 27 – 762 RF 300 CL ASTM A-350-LF2 CL1 19
Flanges
Orifice
ASME B16.36 33 – 324 RFWN 300 CL ASTM A-350-LF2 CL1 13, 16, 19
Flanges
Fittings 27 – 48 SW 3000 CL
ASME B16.11 ASTM A-350-LF2 CL1
13
60 - 762 BW Match Pipe
ASME B16.9 ASTM A-420-WPL6
Spectacle
ASME B16.48 27– 324 RF 300 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 – 762 RF 300 CL ASTM A516 GR. 70N 19
& Spacer
72
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping is permitted after isolation for instrumentation, sampling, chemical injection, and
maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less
(Refer to ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. 60mm and larger plugs to be bull plugs.
73
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Sour ASME 300 3.0 -45 to 260 ASME B31.3 BP3
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 7,998
27 SW S/160
33 – 48 SW S/80
ASME
Pipe 60 BW S/80 ASTM A-333-Gr6 Smls 11, 23
B36.10M
89 – 273 BW S/STD
Flanges 27 – 48 RFSW
ASME B16.5 300 CL ASTM A-350-LF2 CL1 13, 19, 23
60 – 610 RFWN
Blind Flanges ASME B16.5 27 – 610 RF 300 CL ASTM A-350-LF2 CL1 19, 23
74
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Fittings 27 SW 6000 CL
ASME B16.11 ASTM A-350-LF2 CL1
33 – 48 SW 3000 CL 13, 23
Nipples ASME
27 – 48 SW S/160 ASTM A-333-Gr6 Smls 21, 23
B36.10M
Weldolets Match
MSS SP-97 60 – 219 BW Branch ASTM A-350-LF2 CL1 13, 23
Pipe
Spectacle
ASME B16.48 27 – 324 RF 300 CL ASTM A516 GR. 70N 19, 23
Blind
Paddle Blind
ASME B16.48 356 – 610 RF 300 CL ASTM A516 GR. 70N 19, 23
& Spacer
75
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required on welding piping:
a. wherever weld size or pipe thickness is greater than 19mm, or
b. in MEA or rich amine service, or
c. where the maximum operating pressure is greater than 435kpag and either
i. the piping is in vibrating or cyclic service, or
ii. the Weld Procedure Qualification Hardness exceed HV5 248 (weld, HAZ, base metal)
and the H2S partial pressure is greater than 70 kPa, or the H2S content is greater than
5%, or water H2S content is greater than 100 ppm.
PWHT is required on socket-welded piping:
a. wherever weld size is greater than 13mm, or
b. where the maximum operating pressure is greater than 435kpag and either
i. the Weld Procedure Qualification Hardness exceed HV5 248 (weld, HAZ, base metal),
or
ii. the piping is in vibrating or cyclic service.
10. Threaded piping is permitted only if H2S content is less than 1% and H2S partial pressure is less
than 35 kPa at operating pressure. Threaded branch connections are permitted only if H2S partial
pressure is less than 700 kPa at operating pressure, and only for instrumentation, sampling,
chemical injection, or maintenance vents and drains
11. Piping for Glycol and Amine Service shall be welded except that 33 mm and smaller branch
connections for instrumentation, sampling, chemical injection, and maintenance vents and drains
may be threaded if the partial pressure of H2S is less than 700 kPa at operating pressure
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
23. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22. All
carbon steel components shall meet the requirements of ISO 15156-2 for SSC Region 3. Any
stainless steel components shall meet the requirements of ISO 15156-3.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
76
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Stainless Steel Utility ASME 300 0 -45 to 371 ASME B31.3 BP20
Fluids / Services
Minimum Hydrotest Pressure (kPag) 7,446 8,549 7,722 7,359 7,395 7,300 7,266 7,360
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, and fittings 8894
27 – 48 SW S/80S
89 - 324 BW S/40S
Flanges 27 – 48 RFSW
ASME B16.5 300 CL ASTM A-182 F316 13, 19
60 – 324 RFWN
Blind Flanges ASME B16.5 27 – 324 RF 300 CL ASTM A-182 F316 13, 19
77
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Weldolets Match
MSS SP-97 60 – 114 BW ASTM A-182 F316 13
Branch Pipe
Spectacle
ASME B16.48 27 – 324 RF 300 CL ASTM A-240 T316 19
Blind
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
13. Bore for BW fittings and flanges to match connected pipe schedule.
78
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
15. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
16. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
17. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
18. Greasing or doping of flange seating surfaces is prohibited.
19. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
20. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples. Pipe nipples shall be S/XXH in cyclic or vibratory service
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
79
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 600 1.5 -45 to 371 ASME B31.3 CP1
Fluids / Services
Sweet Fluids
Oil / Gas Well Effluent, Hydrocarbons (except HVP), Methanol, Chemicals, Amines @ < 60C, Glycols, Dry Inert Gases
Minimum Hydrotest Pressure (kPag) 15,306 14,065 13,548 13,083 13,188 13,570 13,384 13,288
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 15,996
27 - 48 NPT S/160
ASME
27 - 48 SW S/80 ASTM A-333-Gr6 Smls
B36.10M
Pipe
60 - 610 BW S/80
Flanges 27 – 48 RFSW
ASME B16.5 600 CL ASTM A-350-LF2-CL1 13, 19
60 - 610 RFWN
Orifice
ASME B16.36 33 -324 RFWN 600 CL ASTM A-350-LF2-CL1 13, 16, 19
Flanges
80
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Weldolets Match
MSS SP-97 60 - 219 BW Branch ASTM A-350-LF2-CL1 13
Pipe
Spectacle
ASME B16.48 27 -324 RF 600 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 - 610 RF 600 CL ASTM A516 GR. 70N 19
& Spacer
81
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping and branch connections are permitted for instrumentation, sampling, chemical
injection, and maintenance vents and drains
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less
(Refer to ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. 60mm and larger plugs to be bull plugs.
82
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 600 1.5 -45 to 230 ASME B31.3 CP2
Fluids / Services
Sweet Fluids
Max Design Pressure (kPag) 10,204 9,377 9,032 8,722 8,308 7,826 7,584 7,308
Min Hydrotest Pressure (kPag) 15,306 14,065 13,548 13,083 13,188 13,570 13,384 13,288
27 - 48 SW S/80
ASME
Pipe 60 - 610 BW S/80 ASTM A-333-Gr6 Smls
B36.10M
660 – 762 BW Calculate
Blind
ASME B16.5 27 – 762 RF 600 CL ASTM A-350-LF2 CL1 19
Flanges
Orifice
ASME B16.36 33 – 324 RFWN 600 CL ASTM A-350-LF2 CL1 13, 19
Flanges
83
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Fittings
ASME B16.9 60- 762 BW Match Pipe ASTM-A-420-WPL 6
ASTM A -333- GR 6
60 BW Match Pipe
Smls
3000 CL
(Run ≤ 219)
ASTM A-350-LF2 CL1 10, 13
Sockolets SW
MSS SP-97
27 – 48 6000 CL
SW
(Run ≥ 273)
Weldolets
MSS SP-97 Match Branch
60 - 219 BW ASTM A-350-LF2 CL1 13
Pipe
Spectacle
ASME B16.48 27– 324 RF 600 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RF 600 CL ASTM A516 GR. 70N 19
& Spacer
84
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping is permitted after isolation for instrumentation, sampling, chemical injection, and
maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less
(Refer to ASME B31.3 Para 345.4.2).
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head. 60mm and larger plugs to be bull plugs.
85
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Sour ASME 600 3.0 -45 to 260 ASME B31.3 CP3
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 15,996
27 - 48 SW S/160
ASME
60.3 BW S/160 ASTM A-333-Gr6 Smls 10, 11, 23
B36.10M
Pipe 89 - 610 BW S/80
Flanges 27 - 48 RFSW
ASME B16.5 600 CL ASTM A-350-LF2 CL1 13, 19, 23
60 - 610 RFWN
Blind Flanges ASME B16.5 27 - 610 RF 600 CL ASTM A-350-LF2 CL1 19, 23
86
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Nipples ASME
27 - 48 SW S/XXH ASTM A-333-Gr6 Smls 21, 23
B36.10M
Weldolets Match
MSS SP-97 60 - 219 BW Branch ASTM A-350-LF2 CL1 13, 23
Pipe
Spectacle
ASME B16.48 27 - 324 RF 600 CL ASTM A516 GR. 70N 19, 23
Blind
Paddle Blind
ASME B16.48 356 - 610 RF 600 CL ASTM A516 GR. 70N 19, 23
& Spacer
87
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required on welding piping:
a. wherever weld size or pipe thickness is greater than 19mm, or
b. in MEA or rich amine service, or
c. where the maximum operating pressure is greater than 435kpag and either
i. the piping is in vibrating or cyclic service, or
ii. the Weld Procedure Qualification Hardness exceed HV5 248 (weld, HAZ, base metal)
and the H2S partial pressure is greater than 70 kPa, or the H2S content is greater than
5%, or water H2S content is greater than 100 ppm.
PWHT is required on socket-welded piping:
a. wherever weld size is greater than 13mm, or
b. where the maximum operating pressure is greater than 435kpag and either
i. the Weld Procedure Qualification Hardness exceed HV5 248 (weld, HAZ, base metal),
or
ii. the piping is in vibrating or cyclic service.
11. Piping for Glycol and Amine Service shall be welded except that 33 mm.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
23. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22. All
carbon steel components shall meet the requirements of ISO 15156-2 for SSC Region 3. Any
stainless steel components shall meet the requirements of ISO 15156-3.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
88
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Stainless Steel Utility ASME 600 0.0 -45 to 371 ASME B31.3 CP20
Fluids / Services
Minimum Hydrotest Pressure (kPag) 14,893 17,099 15,444 14,647 14,714 14,601 14,615 14,720
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 17,788
27 – 48 NPT / SW S/80S
60 BW S/80S
ASME ASTM A-312 TP316
Pipe
B36.10M 89 -114 BW S/40S Smls
Blind Flanges ASME B16.5 27 – 324 RF 600 CL ASTM A-182 F316 16, 19
89
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Nipples ASME
27 - 48 NPT / SW S/160S ASTM A-312 TP316 20, 21
B36.10M
Threadolets
MSS SP-97 33 – 48 NPT/SW 3000 CL ASTM A-182 F316 13
Sockolets
Weldolets Match
MSS SP-97 60 -114 BW ASTM A-182 F316 13
Branch Pipe
Spectacle
ASME B16.48 27– 324 RF 600 CL ASTM A-240 T316 19
Blind
Notes:
3. NDE shall be increased to the following in cyclic or vibratory service:
• SW Joints 100% MPI
• BW Joints 100% Radiography
• All 100% Visual
90
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples. Pipe nipples shall be S/XXH in cyclic or vibratory service
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
91
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 900 1.5 -45 to 371 ASME B31.3 DP1
Fluids / Services
Sweet Fluids
Oil / Gas Well Effluent, Hydrocarbons (except HVP), Methanol, Chemicals, Amines @ < 60C, Glycols, Dry Inert Gases
Minimum Hydrotest Pressure (kPag) 22,960 21,046 20,322 19,650 19,809 20,385 20,076 19,932
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 23,994
27 - 48 NPT S/160
27 - 48 SW S/80
ASME
Pipe ASTM A-333-Gr6 Smls
B36.10M
60 - 89 BW S/80
Flanges 27 - 48 RTJSW
ASME B16.5 900 CL ASTM A-350-LF2 CL1 13, 19
60 - 610 RTJWN
Blind Flanges ASME B16.5 27 - 610 RTJ 900 CL ASTM A-350-LF2 CL1 19
Orifice
ASME B16.36 33 - 324 RTJWN 900 CL ASTM A-350-LF2 CL1 13, 16, 19
Flanges
92
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Threadolets
& MSS SP-97 27 – 48 NPT/SW 6000 CL ASTM A-350-LF2 CL1
Sockolets
Weldolets Match
MSS SP-97 60 - 114 BW Branch ASTM A-350-LF2 CL1 13
Pipe
Spectacle
ASME B16.48 27 -324 RTJ 900 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 - 610 RTJ 900 CL ASTM A516 GR. 70N 19
& Spacer
1/4” 0.035”
93
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Maximum Design Pressures listed are based on ASME 900 CPL flange rating for flange materials
listed, but may vary from ASME B16.5 listed values.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping and branch connections are permitted for instrumentation, sampling, chemical
injection, and maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
94
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 900 1.5 -45 to 371 ASME B31.3 DP2
Fluids / Services
Sweet Fluids
Liquid Hydrocarbons ( RVP > 110 kPa @ 38 C)
Min Hydrotest Pressure (kPag) 22,960 21,046 20,322 19,650 19,809 20,385 20,076 19,932
27 - 48 SW S/80
Blind
ASME B16.5 27 – 610 RTJ 900 CL ASTM A-350-LF2 CL1 19
Flanges
Orifice
ASME B16.36 33 – 324 RTJWN 900 CL ASTM A-350-LF2 CL1 13,16,19
Flanges
95
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Spectacle ASME B16.48 27– 324 RTJ 900 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 900 CL ASTM A516 GR. 70N 19
& Spacer
1/2” PE 0.065”
96
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Maximum Design Pressures listed are based on ASME 900 CPL flange rating for flange
materials listed, but may vary from ASME B16.5 listed values.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping is permitted after isolation for instrumentation, sampling, chemical injection, and
maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
97
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Sour ASME 900 3.0 -45 to 260 ASME B31.3 DP3
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 23,994
27 – 48 SW S/160
ASME
Pipe 60 – 89 BW S/160 ASTM A-333-Gr6 Smls 11, 23
B36.10M
Flanges 27 – 48 RTJSW
ASME B16.5 900 CL ASTM A-350-LF2 CL1 13, 19, 23
60 – 610 RTJWN
Blind Flanges ASME B16.5 27 – 610 RTJ 900 CL ASTM A-350-LF2 CL1 19, 23
98
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Nipples ASME
27 - 48 SW S/XXH ASTM A-333-Gr6 Smls 21, 23
B36.10M
Weldolets Match
MSS SP-97 60 - 114 BW Branch ASTM A-350-LF2 CL1 13, 23
Pipe
Spectacle
ASME B16.48 27 - 324 RTJ 900 CL ASTM A516 GR. 70N 19, 23
Blind
Paddle Blind
ASME B16.48 356 - 610 RTJ 900 CL ASTM A516 GR. 70N 19, 23
& Spacer
1/2” 0.065”
Notes:
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required on welding piping:
a. wherever weld size or pipe thickness is greater than 19mm, or
99
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
100
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Stainless Steel Utility ASME 900 0.0 -45 to 371 ASME B31.3 DP20
Fluids / Services
Minimum Hydrotest Pressure (kPag) 22,339 25,648 23,166 22,006 22,109 21,982 21,882 22,080
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 26,683
27 – 48 NPT S/160
Flanges 27 – 48 RTJSW
ASME B16.5 900 CL ASTM A-182 F316 13, 19
60 – 324 RTJWN
Blind Flanges ASME B16.5 27 – 324 RTJ 900 CL ASTM A-182 F316 16, 19
101
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
ASTM A-312-TP316
60 BW
Smls
Threadolets
MSS SP-97 27 – 48 NPT/SW 6000 CL ASTM A-182 F316 13
Sockolets
Weldolets Match
MSS SP-97 60 - 114 BW ASTM A-182 F316 13
Branch Pipe
Spectacle
ASME B16.48 26.7– 323.9 RTJ 900 CL ASTM A-240 T316 19
Blind
1/2” 0.065”
102
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples. Pipe nipples shall be S/XXH in cyclic or vibratory service
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
103
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 1500 1.5 -45 to 371 ASME B31.3 EP1
Fluids / Services
Sweet Fluids
Oil / Gas Well Effluent, Hydrocarbons (except HVP), Methanol, Chemicals, Amines @ < 60C, Glycols, Dry Inert Gases
Minimum Hydrotest Pressure (kPag) 38,318 35,112 33,819 32,785 32,996 33,956 33,399 33,283
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 40,041
27 - 48 SW S/160
60 - 114 BW S/160
ASME ASTM-A-333-Gr6
Pipe 1,10
B36.10M Smls
168 BW S/XXH
Flanges 27 - 48 RTJSW
ASME B16.5 1500 CL ASTM A-350-LF2 CL1 13, 19
60 - 610 RTJWN
Blind Flanges ASME B16.5 27 - 610 RTJ 1500 CL ASTM A-350-LF2 CL1 19
Orifice
ASME B16.36 33 – 324 RTJWN 1500 CL ASTM A-350-LF2 CL1 13, 16, 19
Flanges
104
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Threadolets
MSS SP-97 27 - 48 NPT/SW 6000 CL ASTM A-350-LF2 CL1 40
& Sockolets
Weldolets Match
MSS SP-97 60 - 114 BW ASTM A-350-LF2 CL1 13
Branch Pipe
Spectacle
ASME B16.48 27 -324 RTJ 1500 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 - 610 RTJ 1500 CL ASTM A516 GR. 70N 19
& Spacer
0.035”
Tubing 1/4”
PE Annealed 316SS Smls 7
ASTM A269 3/8” 0.049”
1/2” 0.065”
105
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Maximum Design Pressures listed are based on ASME 1500 CPL flange rating for flange materials
listed, but may vary from ASME B16.5 listed values.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping and branch connections are permitted for instrumentation, sampling, chemical
injection, and maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
22. No threaded branch connections may be permanently attached to welded piping.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
40. Threadolets and Sockolets per MSS SP-97 are permitted only for run pipes with wall thickness less
than or equal to S/160.
106
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Carbon Steel Normal ASME 1500 1.5 -45 to 371 ASME B31.3 EP2
Fluids / Services
Sweet Fluids
Liquid Hydrocarbons (RVP > 110 kPa @ 38 C)
Max Design Pressure (kPag) 25,545 23,408 22,546 21,856 20,788 19,581 18,926 18,306
Min Hydrotest Pressure 38,318 35,112 33,819 32,785 32,996 33,956 33,399 33,283
(kPag)
27 - 48 SW S/160
60 - 114 BW S/160
107
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
ASTM A-350-LF2-CL1
27 – 48 SW Match Pipe or
ASTM A-333-Gr6 Smls
Swages MSS SP-95
60 BW Match Pipe ASTM A-333-Gr6 Smls
Spectacle
ASME B16.48 27– 324 RTJ 1500 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 1500 CL ASTM A516 GR. 70N 19
& Spacer
1/2” PE 0.065”
108
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Maximum Design Pressures listed are based on ASME 1500 CPL flange rating for flange materials
listed, but may vary from ASME B16.5 listed values.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds.
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded except that 33 mm and smaller
threaded piping is permitted after isolation for instrumentation, sampling, chemical injection, and
maintenance vents and drains.
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples.
22. No threaded branch connections may be permanently attached to welded piping.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
40. Sockolets per MSS SP-97 are permitted only for run pipes with wall thickness less than or equal to
S/160.
109
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Sour ASME 1500 3.0 -45 to 260 ASME B31.3 EP3
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 40,041
27 - 48 SW S/XXH
Pipe ASME
60 - 168 BW S/XXH ASTM A-333 Gr6 Smls 11, 23
B36.10M
219 – 610 BW Calculate
Flanges 27 - 48 RTJSW
ASME B16.5 1500 CL ASTM A-350-LF2 CL1 13, 19, 23
60 – 610 RTJWN
Blind Flanges ASME B16.5 27 – 610 RTJ 1500 CL ASTM A-350-LF2 CL1 19, 23
110
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Nipples ASME
27 - 48 SW S/XXH ASTM A-333 Gr6 Smls 21, 23
B36.10M
Sockolets
MSS-SP-97 27-48 SW 9000CL ASTM-A-350-LF2 CL1
Weldolets Match
MSS-SP-97 60-114 BW ASTM-A-350-LF2 CL1 13
Branch Pipe
Spectacle
ASME B16.48 27– 324 RTJ 1500 CL ASTM A516 GR. 70N 19, 23
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 1500 CL ASTM A516 GR. 70N 19, 23
& Spacer
0.035”
1/4”
Tubing PE Annealed 316SS Smls 7, 23
ASTM A269 3/8” 0.049”
1/2” 0.065”
111
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required on welding piping:
a. wherever weld size or pipe thickness is greater than 19mm, or
b. in MEA or rich amine service, or
c. where the maximum operating pressure is greater than 435kpag and either
i. the piping is in vibrating or cyclic service, or
ii. the Weld Procedure Qualification Hardness exceed HV5 248 (weld, HAZ, base metal)
and the H2S partial pressure is greater than 70 kPa, or the H2S content is greater than
5%, or water H2S content is greater than 100 ppm.
PWHT is required on socket-welded piping:
a. wherever weld size is greater than 13mm, or
b. where the maximum operating pressure is greater than 435kpag and either
i. the Weld Procedure Qualification Hardness exceed HV5 248 (weld, HAZ, base metal),
or
ii. the piping is in vibrating or cyclic service.
11. Piping for Glycol and Amine Service shall be welded
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
18. Minimum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples.
23. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22. All
carbon steel components shall meet the requirements of ISO 15156-2 for SSC Region 3. Any
stainless steel components shall meet the requirements of ISO 15156-3.
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
112
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Normal ASME 2500 1.5 -45 to 371 ASME B31.3 FP1
Fluids / Services
Sweet Fluids
Oil / Gas Well Effluent, Hydrocarbons, Methanol, Chemicals, Amines @ < 60C, Glycols, Dry Inert Gases
Minimum Hydrotest Pressure (kPag) 63,813 58,486 56,367 54,609 56,994 56,553 55,665 55,471
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 64,569
27 - 48 SW S/XXH
ASME ASTM A-333-Gr6
1,10, 23
Pipe B36.10M Smls
60 - 610 BW Calculated
Flanges 27 - 48 RTJSW
ASME B16.5 2500 CL ASTM A-350-LF2 CL1 13, 19
60 - 610 RTJWN
Blind
ASME B16.5 27 - 610 RTJ 2500 CL ASTM A-350-LF2 CL1 19
Flanges
Orifice
ASME B16.36 33 – 324 RTJWN 2500 CL ASTM A-350-LF2 CL1 13, 16, 19
Flanges
113
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Spectacle
ASME B16.48 27 -324 RTJ 2500 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 - 610 RTJ 2500 CL ASTM A516 GR. 70N 19
& Spacer
3/8”
PE 0.083” Annealed 316SS Smls 7
Tubing ASTM A269 1/2”
316SS w/ 316SS
Tubing Per Tubing Compression 7
Ferrules
Fittings
114
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1 Maximum Design Pressures listed are for ASME 2500 CL flange rating for flange materials listed.
Useable Maximum Allowable Design Pressure is generally limited by pipe rating for this pressure
class. Maximum Allowable Design Pressures for maximum pipe thicknesses listed in ASME B36.10M.
Actual Design Pressures and required pipe wall thickness intended to be used to be calculated and
confirmed by piping designer or engineer.
7 Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing. Applicable
only for pressure tests conducted below 38 C, and is subject to reduction based on limitations of any
valves, controls, equipment, and/or vessels connected to the piping system during hydrotest.
18. Maximum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and dope
is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are not
considered pipe nipples.
22. No threaded branch connections may be permanently attached to piping.
23. All SW joints to be welded both inside and outside
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head
115
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Carbon Steel Sour ASME 2500 3.0 -45 to 260 ASME B31.3 FP2
Fluids / Services
Maximum Hydrotest Pressure (kPag) for listed pipe, flanges, fittings 66,569
27 - 33 SW S/XXH
ASME
Pipe 48 SW Calculate ASTM A-333 Gr6 Smls 1,10, 23
B36.10M
60 - 610 BW Calculate
Flanges 27 - 48 RTJSW
ASME B16.5 2500 CL ASTM A-350-LF2 CL1 13, 19, 23
60 – 610 RTJWN
Blind Flanges ASME B16.5 27 – 610 RTJ 2500 CL ASTM A-350-LF2 CL1 19, 23
116
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Nipples ASME
27 - 48 SW S/XXH ASTM A-333 Gr6 Smls 23
B36.10M
Spectacle
ASME B16.48 27– 324 RTJ 2500 CL ASTM A516 GR. 70N 19, 23
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 2500 CL ASTM A516 GR. 70N 19, 23
& Spacer
3/8”
Tubing
ASTM A269 PE 0.083” Annealed 316SS Smls 7, 23
1/2”
117
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1 Maximum Design Pressures listed are for ASME 2500 CL flange rating for flange materials listed.
Useable Maximum Allowable Design Pressure is generally limited by pipe rating for this pressure
class. Maximum Allowable Design Pressures for maximum pipe thicknesses listed in ASME B36.10M.
Actual Design Pressures and required pipe wall thickness intended to be used to be calculated and
confirmed by piping designer or engineer.
7 Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness. Thread sealant shall be used on all tubing NPT connections.
9. PWHT is required for welded piping wherever weld size or pipe thickness is greater than 19mm
except for socket-welds or seal welds
10. Piping for Glycol, Amine, and Hot Oil Service, shall be welded
13. Bore for BW fittings and flanges to match connected pipe schedule.
16. For Orifice Flanges larger than 324 mm, use standard flanges and install pressure taps on pipe
utilizing appropriate branch connections
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing. Applicable
only for pressure tests conducted below 38 C, and is subject to reduction based on limitations of any
valves, controls, equipment, and/or vessels connected to the piping system during hydrotest.
18. Maximum Hydro-test Pressure is the minimum pressure threshold for hydro test at 38 C or less (Ref
ASME B31.3 Para 345.4.2)
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and dope
is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are not
considered pipe nipples.
22. No threaded branch connections may be permanently attached to piping.
23. All SW joints to be welded both inside and outside
30. Piping shall be in accordance with Pembina Specifications.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head
118
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
27 - 48 NPT / SW S/80
119
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
(M45C)
60 – 610 RFWN
Fittings ASME B16.11 27 – 48 NPT / SW 3000 CL ASTM A-350-LF2 CL1 10, 13, 20
Threadolets
MSS SP-97
& 27 – 48 NPT / SW 3000 CL ASTM A-350-LF2 CL1 10, 13, 20
Sockolets
Spectacle
ASME B16.48 27– 324 RF 150 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RF 150 CL ASTM A516 GR. 70N 3, 19
& Spacer
316 SS Flexible
RF 150 CL Graphite Spiral
27 - 559 Wound c/w 316SS 19
Gaskets Inner ring and CS
ASME B16.20 outer ring.
610 RF 150 CL
120
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 20 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
4. Joint inspection shall be increased to 100% in cyclic or vibratory service.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping.
13. Bore match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing below 38
C, and may be lower based on limitations of any valves, controls, equipment, and/or vessels
connected to the piping system during hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 1.0,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
121
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
27 – 48 NPT / SW S/80
Flanges 27 – 48 RFSW
Grade 359 Cat II
CSA Z245.12 PN 50 4, 5, 13, 19
(M45C)
60 – 610 RFWN
122
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Threadolets
MSS SP-97 ASTM A-350-LF2
& 27 – 48 NPT / SW 3000 CL 10, 13, 20
CL1
Sockolets
316 SS Flexible
Graphite Spiral
RF 300 CL Wound c/w 316SS 19
ASME B16.20 Inner ring and CS
Gaskets outer ring.
27 – 406
123
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 50 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
4. Joint inspection shall be increased to 100% in cyclic or vibratory service.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping.
13. Bore match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing below 38
C, and may be lower based on limitations of any valves, controls, equipment, and/or vessels
connected to the piping system during hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 1.0,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
124
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
27 - 48 NPT / SW S/80
323.9 –
BW 9.53 mm min
457.2
508.8 –
BW 12.7 mm min
609.6
125
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RFSW
Grade 359 Cat II 4, 5, 13,
CSA Z245.12 PN 100 19
(M45C)
60 – 762 RFWN
Threadolets 3000 CL
& 27 – 48 NPT / SW
MSS SP-97 (Run ≤ 356)
Sockolets ASTM A-350-LF2 CL 10, 13,
1 20
6000 CL
27 - 48 NPT / SW
(Run ≥ 406)
Spectacle
ASME B16.48 27– 324 RF 600 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 762 RF 600 CL ASTM A516 GR. 70N 3, 19
& Spacer
126
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 100 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
4. Joint inspection shall be increased to 100% in cyclic or vibratory service.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping.
13. Bore match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing below 38
C, and may be lower based on limitations of any valves, controls, equipment, and/or vessels
connected to the piping system during hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 1.0,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
127
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
128
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
27 – 48 NPT / SW S/80
129
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RTJSW
Grade 359 Cat II
CSA Z245.12 PN 150 5, 13, 19
(M45C)
60 - 610 RTJWN
Fittings ASME B16.11 27 – 48 NPT / SW 6000 CL ASTM A-350-LF2 CL1 10, 13, 20
Nipples ASME B36.10M 27 - 48 NPT / SW S/160 ASTM A-333-Gr6 Smls 10, 20, 21
Threadolets
MSS SP-97 6000 CL
& 27 – 48 NPT / SW ASTM A-350-LF2-CL1 10, 13, 20
Sockolets
Spectacle
ASME B16.48 27– 324 RTJ 600 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 600 CL ASTM A516 GR. 70N 3, 19
& Spacer
130
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
1/4” PE 0.035”
Tubing
ASTM A269 3/8” PE 0.049” Annealed 316SS Smls 7
1/2” PE 0.065”
316SS w/ 316SS
Tubing Per Tubing Compression 7, 20
Ferrules
Fittings
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 150 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping.
13. Bore match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing below 38
C, and may be lower based on limitations of any valves, controls, equipment, and/or vessels
connected to the piping system during hydrotest.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 1.0,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
131
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 - 48 SW S/160
132
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RTJSW
Grade 359 Cat II
CSA Z245.12 PN 250 5, 13, 19
(M45C)
60 - 610 RTJWN
133
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Spectacle
ASME B16.48 27– 324 RTJ 1500 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 1500 CL ASTM A516 GR. 70N 3, 19
& Spacer
1/2” PE 0.065”
316 SS w/ 316SS
Tubing Per Tubing Compression 7,20
Ferrules
Fittings
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 250 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping.
13. Bore match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing below 38
C, and may be lower based on limitations of any valves, controls, equipment, and/or vessels
connected to the piping system during hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
134
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 1.0,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
135
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 – 48 SW S/160
136
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
508.0 -
BW 52.37 mm min
609.6
Flanges 27 – 48 RTJSW
Grade 359 Cat II
CSA Z245.12 PN 420 5, 13, 19
(M45C)
60 - 610 RTJWN
Spectacle
ASME B16.48 27– 324 RTJ 2500 CL ASTM A516 GR. 70N 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 2500 CL ASTM A516 GR. 70N 19
& Spacer
137
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Tubing 3/8” PE
ASTM A269 0.083” 316SS Smls 7
1/2” PE
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 420 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping.
13. Bore match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing below 38
C, and may be lower based on limitations of any valves, controls, equipment, and/or vessels
connected to the piping system during hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length. Pipe sections longer than 150mm are
not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 1.0,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
138
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 - 33 SW S/80
48 SW S/80
139
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RFSW
Gr 359 Cat II (M45C)
CSA Z245.12 PN 20 5, 13, 19
SS
60 - 610 RFWN
Spectacle
ASME B16.48 27– 324 RF 150 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RF 150 CL ASTM A516 GR. 70N 3, 19
& Spacer
316SS/ Flexible
RF 150 CL Graphite Spiral
Wound c/w 316 SS 19
Gaskets 27 – 559 Inner & CS Outer
ASME B16.20 Ring
610 RF 150 CL
140
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 20 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
13. Bore to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
33. The SMYS of any pipe, flange, or fitting shall not be greater than 485 MPa.
34. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22
35. All carbon steel components shall meet the requirements of NACE MR0175-ISO 15156-2 for SSC
Region 3.
36. Any stainless steel components shall meet the requirements of NACE MR0175-ISO 15156-3.
37. Carbon steel pipe, flanges, and butt-weld fittings shall meet the sour service material property and
composition requirements of CSA Z245.1 for pipe, CSA Z245.12 for flanges, and CSA Z245.11 for
BW fittings.
38. Any CSA Z245 components shall be marked for sour service in accordance with the applicable
CSA Z245 standard. All other components shall be stamped, marked, labeled, or tagged for sour
service in accordance with NACE MR0175-ISO 15156.
39. Pressure retaining components shall be supplied with MTR’s.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 0.9,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
141
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
142
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 - 33 SW S/80
48 SW/BW S/80
143
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
RFWN 27 – 48 RFSW
Gr 359 Cat II (M45C) 2, 5,
CSA Z245.12 PN 50 13,19
SS
60 - 610 RFWN
Nipples
ASME B36.10 27 - 48 SW S/160 ASTM A-333-Gr6 Smls 21
Spectacle
ASME B16.48 27– 324 RF 300 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RF 300 CL ASTM A516 GR. 70N 3, 19
& Spacer
144
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 50 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
13. Bore to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
33. The SMYS of any pipe, flange, or fitting shall not be greater than 485 MPa.
34. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22
35. All carbon steel components shall meet the requirements of NACE MR0175-ISO 15156-2 for SSC
Region 3.
36. Any stainless steel components shall meet the requirements of NACE MR0175-ISO 15156-3.
145
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
37. Carbon steel pipe, flanges, and butt-weld fittings shall meet the sour service material property and
composition requirements of CSA Z245.1 for pipe, CSA Z245.12 for flanges, and CSA Z245.11 for
BW fittings.
38. Any CSA Z245 components shall be marked for sour service in accordance with the applicable
CSA Z245 standard. All other components shall be stamped, marked, labeled, or tagged for sour
service in accordance with NACE MR0175-ISO 15156.
39. Pressure retaining components shall be supplied with MTR’s.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 0.9,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
146
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 - 33 SW S/80
48 SW / BW S/80
Pipe CSA Z245.1 88.9 BW 5.49 mm min Gr 359 Cat II (M45C) SS 40, 41
147
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RFSW
CSA Z245.12 PN 100 Gr 359 Cat II (M45C) SS 5, 13,19
60 – 610 RFWN
Sockolets 3000 CL
Spectacle
ASME B16.48 27– 324 RF 600 CL ASTM A516 GR. 70N 5, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RF 600 CL ASTM A516 GR. 70N 5, 19
& Spacer
148
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Tubing Compres
Per Tubing 316SS w/ 316SS Ferrules 7, 20
Fittings sion
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 100 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
13. Bore to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
33. The SMYS of any pipe, flange, or fitting shall not be greater than 485 MPa.
34. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22
35. All carbon steel components shall meet the requirements of NACE MR0175-ISO 15156-2 for SSC
Region 3.
36. Any stainless steel components shall meet the requirements of NACE MR0175-ISO 15156-3.
37. Carbon steel pipe, flanges, and butt-weld fittings shall meet the sour service material property and
composition requirements of CSA Z245.1 for pipe, CSA Z245.12 for flanges, and CSA Z245.11 for
BW fittings.
149
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
38. Any CSA Z245 components shall be marked for sour service in accordance with the applicable
CSA Z245 standard. All other components shall be stamped, marked, labeled, or tagged for sour
service in accordance with NACE MR0175-ISO 15156.
39. Pressure retaining components shall be supplied with MTR’s.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 0.9,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
150
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 - 33 SW S/80
48 SW / BW S/80
151
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RTJSW
Gr 359 Cat II (M45C)
CSA Z245.12 PN 150 5, 13,19
SS
60 - 610 RTJWN
Spectacle
ASME B16.48 27– 324 RTJ 900 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 900 CL ASTM A516 GR. 70N 3, 19
& Spacer
152
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 150 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
13. Bore to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
153
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
33. The SMYS of any pipe, flange, or fitting shall not be greater than 485 MPa.
34. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22
35. All carbon steel components shall meet the requirements of NACE MR0175-ISO 15156-2 for SSC
Region 3.
36. Any stainless steel components shall meet the requirements of NACE MR0175-ISO 15156-3.
37. Carbon steel pipe, flanges, and butt-weld fittings shall meet the sour service material property and
composition requirements of CSA Z245.1 for pipe, CSA Z245.12 for flanges, and CSA Z245.11 for
BW fittings.
38. Any CSA Z245 components shall be marked for sour service in accordance with the applicable
CSA Z245 standard. All other components shall be stamped, marked, labeled, or tagged for sour
service in accordance with NACE MR0175-ISO 15156.
39. Pressure retaining components shall be supplied with MTR’s.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 0.9,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
154
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
Recorded Hydrotest
(Note 32)
27 - 33 SW S/160
48 SW / BW S/160
155
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Flanges 27 – 48 RTJSW
CSA Z245.12 PN 250 Gr 359 Cat II (M45C) SS 5, 13, 19
60 – 610 RTJWN
Blind Flanges CSA Z245.12 27 – 610 RTJ PN 250 Gr 359 Cat II (M45C) SS 5, 19
Nipples
ASME B36.10M 27 - 48 SW S/XXH ASTM A-333-Gr6 Smls 21
Swages
ASTM A-350-LF2 CL1 or
MSS SP-95 SW Match Pipe
27 – 48 ASTM A-333-Gr6 Smls
Spectacle
ASME B16.48 27– 324 RTJ 1500 CL ASTM A516 GR. 70N 3, 19
Blind
156
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Paddle Blind
ASME B16.48 356 – 610 RTJ 1500 CL ASTM A516 GR. 70N 3, 19
& Spacer
3/8” PE 0.049” 7
1/2” PE 0.065”
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 250 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
13. Bore to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
157
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
33. The SMYS of any pipe, flange, or fitting shall not be greater than 485 MPa.
34. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22
35. All carbon steel components shall meet the requirements of NACE MR0175-ISO 15156-2 for SSC
Region 3.
36. Any stainless steel components shall meet the requirements of NACE MR0175-ISO 15156-3.
37. Carbon steel pipe, flanges, and butt-weld fittings shall meet the sour service material property and
composition requirements of CSA Z245.1 for pipe, CSA Z245.12 for flanges, and CSA Z245.11 for
BW fittings.
38. Any CSA Z245 components shall be marked for sour service in accordance with the applicable
CSA Z245 standard. All other components shall be stamped, marked, labeled, or tagged for sour
service in accordance with NACE MR0175-ISO 15156.
39. Pressure retaining components shall be supplied with MTR’s.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 0.9,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.
158
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Material Service Rating Class CA (mm) Temperature (C) Design Code Specification
27 – 33 SW S/160
48 SW / BW S/XXH
219.1 –
BW Calculate mm min
609.4
Flanges 27 – 48 RTJSW
Gr 359 Cat II (M45C)
CSA Z245.12 PN 420 5, 13,19
SS
60 – 610 RTJWN
159
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Spectacle
ASME B16.48 27– 324 RTJ 2500 CL ASTM A516 GR. 70N 3, 19
Blind
Paddle Blind
ASME B16.48 356 – 610 RTJ 2500 CL ASTM A516 GR. 70N 3, 19
& Spacer
Tubing 3/8” PE
ASTM A269 0.083” 316SS Smls 7
1/2” PE
160
Engineering Standards and Specifications
Uncontrolled once printed. See Pembina's intranet portal for the latest version.
Integrity & Technical Services Version 15, August 16, 2013
ESS 3.42 Facility Piping Specifications
Notes:
1. Piping shall be in accordance with Pembina Specifications and CSA Z662.
3. ASME B16.48 blinds must be certified to CSA Z245.12 PN 420 pressure ratings, otherwise design
and test pressures shall be limited as per ASME B16.5 flange ratings.
5. SMYS for BW fitting and flanges shall be equal to or greater than the SMYS of the pipe to which
they are attached.
7. Compression Fittings to be Swagelok. Ferrule and fitting hardness to be greater than tubing
hardness.
10. Refer to CSA Z662 for restrictions on threaded piping. Threaded piping is permitted only if H2S
content is less than 1% and H2S partial pressure is less than 35 kPa at operating pressure.
Threaded branch connections are permitted only if H2S partial pressure is less than 700 kPa at
operating pressure, and only for instrumentation, sampling, chemical injection, or maintenance
vents and drains.
13. Bore to match connected pipe schedule.
17. Maximum Hydro-test Pressure is the maximum upper limit for test pressure during testing.
Applicable only for pressure tests conducted below 38 C, and is subject to reduction based on
limitations of any valves, controls, equipment, and/or vessels connected to the piping system during
hydrotest.
19. Greasing or doping of flange seating surfaces is prohibited.
20. Thread sealant shall be used on all NPT connections. Combination use of pipe thread tape and
dope is prohibited.
21. Pipe nipples shall be between 50mm and 150mm in length, and shall be minimum S/XXH in cyclic
or vibrating service. Pipe sections longer than 150mm are not considered pipe nipples.
31. Threaded plugs 33mm and smaller to be heavy hex head. Hub flange plugs and 48 mm plugs to be
solid round head.
32. Strength and leak hydrotest to be conducted with water or water with anti-freeze chemical. Test
durations to be as noted below. Visual Leak Check to be conducted after Strength Test and before
reducing hydrotest pressure below the Minimum Leak Test Pressure. Tests shall be chart recorded.
33. The SMYS of any pipe, flange, or fitting shall not be greater than 485 MPa.
34. The hardness of any pipe, flange, fitting, and tubing or tubing fitting shall not exceed HRC 22
35. All carbon steel components shall meet the requirements of NACE MR0175-ISO 15156-2 for SSC
Region 3.
36. Any stainless steel components shall meet the requirements of NACE MR0175-ISO 15156-3.
37. Carbon steel pipe, flanges, and butt-weld fittings shall meet the sour service material property and
composition requirements of CSA Z245.1 for pipe, CSA Z245.12 for flanges, and CSA Z245.11 for
BW fittings.
38. Any CSA Z245 components shall be marked for sour service in accordance with the applicable
CSA Z245 standard. All other components shall be stamped, marked, labeled, or tagged for sour
service in accordance with NACE MR0175-ISO 15156.
39. Pressure retaining components shall be supplied with MTR’s.
40. Wall thickness was based on SMYS of Gr. 359, design factor of 0.8, location factor of 0.9,
temperature factor of 1.0, joint factor of 1.0 and location class 1.Wall thickness applies to risers and
pig assemblies only.
41. Engineer to confirm wall thickness is adequate based on design conditions, location factor, pipe
grade and regulatory bodies.