Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Production
Electrical
16.07.2019
Maintaines
Stores
Stores
Description
Production
Electrical
19.07.2019
Maintaines
Stores
Description
1. Upto 19.30 Hrs we complete 2 batches due to sludge 3.5 ton charged for Hcl batch.
2. Dryer plant started at 12.30 Hrs -- we feed 15.5 % PAC only so outlet is 625kgs /Hr not 700kgs.
3. Al % in dryer plant is 30 and outlet is 117 c.
4.PAC 3 tank cleaning work completed.
5.Filter cloth is washed with MDc - Futher observation is going on.
6.west cost dispatched 16.2 % material by using Hcl with sludge batch.
7.sattur and west cost dispatch carried out.
8.Civil work carried out in New filter press area.
9.Dryer plant all lines are cleaned for plant start-up.
10.coal crushing working on as per requirement - upto now old coal is using 325kgs/Hr.
01. Plant regular maintenance work carried out.
02. Sludge godown pulverized motor shifted to another place so disconnect the connection,laying the cable and reconnect
03. Dryer and HAG plant all motors amps checked work done narmal running.
04. 11KV/440V transformer can't operate Auto tap changer now manually operating so checky and inform to supplies and f
05. New mccb panel commissioning and installation place today desided in existing mccb panel room so that work was pro
06. Liquid plant Screw convayar starter panel was can't operate so checked that push button switch was jamed so serviced.
1. Powder plant 5KL FRP tank water leak checked ok handover to production, bottom support MS fabrication work under
2. Reactor – 4 manual side damaged portion welded with MS 8mm plate welded – waiting for Belzona to make putty.
3. Powder plant scrubber pump spider changed.
4. Reactor – 2 to Reactor – 3 Material charging HDPE line modification work MS angle support work and HDPE line f
completed. Further work to be continue tomorrow.
5. Reactor – 3 Hydraulic pressure increased 5.8 kg/cm2.
6. Reactor – 3 material spillage all cleaned.
7. Reactor –5 Hydraulic pressure increased 5.5 kg/cm2.
8. Screw conveyor non drive end side bearing changed.