Wind Power Take

Take-off
off in the SARI/Energy Region

Project Procurement Methods and


Project Development Options

Soren Krohn, ADB Consultant


Colombo, 23 September 2010
Roadmap (»to do« List) for Governments 1
Good wind resource near grid & road,
road high cost/risk of alternatives?

Already demonstration project, interested investors?


NO YES
Demo EPC plant IPP/BOO plant (built by developer)

Competition on kWh price Fixed kWh price

Preassigned
g site IPP/BOO developer
p finds site
(requires dispersed resources)
Denmark Denmark offsh Denmark onsh
E
Egypt
t E
Egypt
t E
Egypt
t Egypt
Germany Germany
Mexico Mexico Mexico
Ontario Ontario
Québec Québec
Syria Syria
Thailand Thailand
Yemen Yemen
Roadmap (»to do« List) for Governments 2
Good wind resource near grid & road,
road high cost/risk of alternatives?

Already demonstration project, interested investors?


NO YES
Demo EPC plant IPP/BOO plant (built by developer)

Competition on kWh price Fixed kWh price

Preassigned
g site IPP/BOO developer
p finds site
(requires dispersed resources)
Do transmission grid study for site

Do preliminary env/soc impact study Secure land lease option

Prequalify developers (tech/econ) Apply [pay?]

Public land or get land lease option Do transmission grid study for site

Ensure automatic permits/licenses Env/soc impact study by developer


Roadmap (»to do« List) for Governments 3
Preassigned site IPP/BOO developer finds site
EPC IPP/BOO (requires dispersed resources)
Do transmission grid study for site

Do preliminary env/soc impact study Secure land lease option

P
Prequalify
lif developers
d l (tech/econ)
(t h/ ) A l [[pay?]
Apply ?]

Public land or get land lease option Do transmission grid study for site

Ensure automatic permits/licenses Env/soc impact study by developers

Wind Wind measurement by developers…


measurement …jointly …individually

All local wind measurements also need regional long-term wind data!

Energy Energy assesment by developers


assessment
Roadmap (»to do« List) for Governments 4
--------- EPC --------- ----------------------------------- IPP/BOO ------------------------------------
------ Competitively tendered price ------ ----- Fixed price ----
--------------- Preassigned site --------------- ------------ Developers find site -----------
Do wind
D i d Wi d measurementt b
Wind by d
developers…
l
measurement …jointly …individually

All local wind measurements also need regional long-term wind data!

Do energy Energy assesment by developers


assessment
Hire consultants to draft RFP for PPA Std. PPA & grid
Do feasibility connection
study Issue RFP for wind elecricity purchase rules exist?!

Hire owners'
consultant Feasibility study by developers

Tender for EPC Bids for kWh price by developers Fixed kWh price
contractor
Roadmap (»to do« List) for Governments 5
--------- EPC --------- ----------------------------------- IPP/BOO ------------------------------------
------ Competitively tendered price ------ ----- Fixed price ----
--------------- Preassigned site --------------- ------------ Developers find site -----------

Hire owners'
consultant Feasibility study by developers

Tender for EPC Bids for kWh price by developers Fixed kWh price
contractor

Verify wind resource (energy) assessment

For safety & performance: Verify compliance with IEC 61400, latest edition

Verify compliance with existing grid code for wind turbines & wind farms

Issue other permits automatically Get permits

Sign Power Purchase Agreement for 20 years = IEC certification


Th k You
Thank Y

Contact details

Soren Krohn
Wind Energy Consultant, Washington DC
Phone +1
+1-202-468-2902
202 468 2902
Email sk@skpower.net