HOJA DE METRADOS

PROYECTO: HITOS DE CONCRETO ARMADO


HOJA PROVINCIA

DEPART: FECHA

DISTRITO REVISADO POR

ITEM DENOMINACION UNIDAD VECES LARGO ANCHO ALTO PARCIAL SUB-TOTAL


01.00 POSTES DE CONCRETO
01.01 MOVIMIENTOS DE TIERRAS
01.01.02 EXCAVACIONES
01.01.02.01 EXCAVACIONES MANUAL EN TERRENO NORMAL M3 0.19

DADO 1 1.00 0.40 0.40 0.60 0.10

DADO 2 1.00 0.40 0.40 0.60 0.10

01.01.02.02 REFINI Y NIVELACION M2 1.92

DADO 1 1.00 PERI= 1.60 0.60 0.96

DADO 2 1.00 PERI= 1.60 0.60 0.96

02.02 OBRAS DE CONCRETO SIMPLE

02.02.01 SOLADOS E=4" M2 0.32

DADO 1 1.00 1.60 0.10 0.16

DADO 2 1.00 1.60 0.10 0.16

02.02.02 DADOS DE CONCRETO FC=140 KG/M2 M3 0.16

DADO 1 1.00 0.40 0.40 0.50 0.08

DADO 2 1.00 0.40 0.40 0.50 0.08

02.03 OBRAS DE CONCRETO ARMADO


02.03.02 POSTES DE CONCRETO FC=175 KG/M2
02.03.02.01 ENCOFRADO Y DESENCOFRADO POSTES M2 1.68

POSTE 1 1.00 0.60 1.40 0.84

POSTE 2 1.00 0.60 1.40 0.84

02.03.02.02 ACERO EN POSTES KG 5.38


Nª PAÑOS LONGITUD NªVECES L TOTAL KG/M TOTAL(KG)
metrado de acero
POSTE 1 1.00 1.40 4.00 5.60 0.56 3.14

POSTE 2 1.00 0.50 8.00 4.00 0.56 2.24

02.03.02.03 CONCRETO EN POSTES M3 0.05

POSTE 1 1.00 0.15 0.15 1.00 0.02

POSTE 2 1.00 0.15 0.15 1.00 0.02

03.02 REVOQUES Y REVESTIMIENTO


03.02.04 TARRAJEO EN COLUMNAS M2 1.20

POSTE 1 1.00 0.60 1.00 0.60

POSTE 2 1.00 0.60 1.00 0.60

03.09 PINTURA
03.09.05 PINTURA EN COLUMNAS M2 1.20

De tarrajeo 1.00 area= 1.20 1.20

03.10 VARIOS, LIMPIEZA Y JARDINERIA


03.10.04 ROTULADO 15 X 15 CM UND 5.00
5.00 5.00
HOJA DE METRADOS
PROYECTO: HITOS DE CONCRETO ARMADO
HOJA PROVINCIA

DEPART: FECHA

DISTRITO REVISADO POR

ITEM DENOMINACION UNIDAD VECES LARGO ANCHO ALTO PARCIAL SUB-TOTAL


01.00 POSTES DE CONCRETO
01.01 MOVIMIENTOS DE TIERRAS
01.01.02 EXCAVACIONES
01.01.02.01 EXCAVACIONES MANUAL EN TERRENO NORMAL M3 0.58

DADO 1 6.00 0.40 0.40 0.60 0.58

01.01.02.02 REFINI Y NIVELACION M2 5.76

DADO 1 6.00 PERI= 1.60 0.60 5.76

01.02 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADOS E=4" M2 0.96

DADO 1 6.00 1.60 0.10 0.96

02.02.02 DADOS DE CONCRETO FC=140 KG/M2 M3 0.58

DADO 1 6.00 0.40 0.40 0.60 0.58

01.03 REVOQUES Y REVESTIMIENTO

03.02.04 POSTES PREFABRICADOS UND 6.00

POSTE 1 6.00 6.00

01.04 REVOQUES Y REVESTIMIENTO


03.02.04 TARRAJEO EN POSTES M2 0.60

POSTE 1 1.00 0.60 1.00 0.60

01.05 PINTURA
03.09.05 PINTURA EN COLUMNAS M2 0.60

De tarrajeo 1.00 area= 0.60 0.60

01.06 VARIOS, LIMPIEZA Y JARDINERIA


03.10.04 ROTULADO 15 X 15 CM UND 6.00
6.00 6.00
INSUMOS PARA 1 HITO
METRADO
SOLADOS E=4"
Cemento Portland Tipo I bls. 0.27 0.16 0.0432
Hormigón m3 0.09 0.16 0.0144

CIMIENTO DE CONCRETO FC=140 KG/M2


Cemento Portland Tipo I bls. 8.43 0.08 0.6744
Hormigón m3 1.09 0.08 0.0872

CONCRETO PARA POSTES FC=210 KG/M2


Cemento Portland tipo I bls. 9.73 0.04 0.3892
Hormigón m3 1.06 0.04 0.0424

ACERO PARA POSTES


Fierro Corrugado 3/8 VAR 1 2 2
Fierro Corrugado 1/4 VAR 1 3 3

3/8 5.54 0.61555556 2


1/4 7.68 0.85333333 3
PARA 6 HITOS PRECIO TOTAL

0.2592 18.01
0.0864 18.27

4.0464 18.01
0.5232 38.29

2.3352 18.81
0.2544 38.29

12 2.52
18 2.93

CEMENTO 6.6408
HORMIGON 0.864
ACERO 3/8 5
ACERO 1/4 6
MANO DE OBRA
METRADO
SOLADOS E=4"
OPERARIO HH 0.2 0.16 0.032

CIMIENTO DE CONCRETO FC=140 KG/M2


OPERARIO HH 0.64 0.08 0.0512

CONCRETO PARA POSTES FC=210 KG/M2


Cemento Portland tipo I HH 1.6 0.04 0.064

ACERO PARA POSTES


Fierro Corrugado POSTSE 2 2 4

3/8 5.54 1.84666667 2


1/4 7.68 2.56 3
PARA 6 HITOS PRECIO TOTAL

0.192 7.5 1.44

0.3072 7.5 2.304

0.384 7.5 2.88

24 2.52

CEMENTO 0.8832
HORMIGON #REF!
ACERO 3/8 12
ACERO 1/4 18