1. INTRODUCTION
The purpose of this document is to specify the extent of inspection and testing
for INSTRUMENTATION CALIBRATION in EARLY PRODUCTION FACILITY.
This document also provides the type of inspection and tests, applicable
procedure document, and inspection point involvement by CONTRACTOR and
COMPANY
2. SCOPE
This document is applicable to:
3. REFERENCE
4. ATTACHMENTS
b) Inspection Forms
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
ITP Table
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
Test Involvement
Code Activity Description Test Frequency Reference Document Acceptance Verifying Document
No Criteria CONTRACTOR OMV
According to
Project Project
Method statement /
prior to start of the Specification/Standards/Typi Specification/Sta YS2-P10159-013 –E&I-PRC-
1 Procedure preparation cal Installation details/ IFC 005
P R
activity ndards/ Typical
layout drawings Installation
details
IEC-60529
Project
Prior to start of IEC 60079
2 Material Receiving Inspection Specification/Standards/ P R
the activity Data sheets PART1
IEC-60529
Verify against data sheet and Prior to start of Project PART 7
3 Specification/Standards QCP-405 P R
Material test certificate the activity IEC 60068-2
IEC-60529
Verify all the project Prior to start of Project IEC 60079 QCP-405
4 Specification/Standards
P R
document the activity PART1
IEC 60079
Before installation Project PART 7 QCP-405
5 Instrument calibration Specification/Standards P w
to the field IEC 60068-2
CONTRACTOR: INTRACS P – Perform (100% Surveillance) W – Witness : Notification required (RIT) Presence not mandatory
COMPANY: OMV R – Review H – Hold Point: Notification required (RIT) Presence mandatory.
RIT- Request For Inspection C S –Check Sheet
& Testing T S - Test Sheet
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
Inspection Forms
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
Calibration Check:
APPLY OUTPUT READING
INPUT RISING FALLING
%SPAN IDEAL ACTUAL ERROR% % SPAN IDEAL ACTUAL ERROR%
Manufacturers 0 100
Quoted
Accuracy 25 75
50 50
75 25
100 0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
4
5
6
TESTED LABEL AFFIXED DATA SHEET ATTACHED
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 A
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
0 100
25 75
50 50
75 25
100 0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
TESTED LABEL AFFIXED DATA SHEET ATTACHED
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 B
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
TYPE ADJ.RANGE/CALIB.RANGE
Calibration Check:
OUTPUT READING
APPLY INPUT
RISING FALLING
%SPAN IDEAL ACTUAL ERROR% % SPAN IDEAL ACTUAL ERROR%
Manufacturers 0 100
Quoted
Accuracy 25 75
50 50
75 25
100 0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
4
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 C
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
TYPE ADJ.RANGE/CALIB.RANGE
Calibration Check:
OUTPUT READING
APPLY INPUT
RISING FALLING
%SPAN IDEAL ACTUAL ERROR% % SPAN IDEAL ACTUAL ERROR%
Manufacturers 0 100
Quoted
Accuracy 25 75
50 50
75 25
100 0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
REMARKS:
CONTRACTOR
BY
COMPANY
DIFFERENTIAL PRESSURE
Item Description Test Code No.
TRANSMITTER
Item Location/Area
ITP No.
Instrument Tag No
Sub-system No.
Sub-System Description Form No.
Reference Drawings
INSTRUMENT DATA
MANUFACTURER/MODEL DATA SHEET NO.
SERIAL NO. MOUNTING
Calibration Check:
OUTPUT READING
APPLY INPUT
RISING FALLING
%SPAN IDEAL ACTUAL ERROR% % SPAN IDEAL ACTUAL ERROR%
Manufacturers
Quoted
0 100
25 75
Accuracy
50 50
75 25
100 0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
4
5
TESTED LABEL AFFIXED DATA SHEET ATTACHED
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 E
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
TYPE SCALE
INDICATOR TYPE ELECTRICAL CONNECTION
Calibration Check:
TEST RESULTS
OUTPUT READING
APPLY INPUT
RISING FALLING
75 25
100 0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 F
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
TEST RESULTS
OUTPUT
INPUT% INPUT UP SCALE DOWN SCALE
READING ERROR READING ERROR
25
50
75
100
TEST INSTRUMENT DETAILS
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 G
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
CONTRACTOR
COMPANY
FORM NO. : QCP-405 H
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 I
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 J
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
CONTRACTOR
D BY
COMPANY
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 L
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
REMARKS:
CONTRACTOR
COMPANY
FORM NO. : QCP-405 M
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
REMARKS:
CONTRACTOR
COMPANY
FORM NO. : QCP-405 N
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
REMARKS:
CONTRACTOR
COMPANY
FORM NO. : QCP-405 O
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
Reference Drawings
INSTRUMENT DATA
TYPE LINE NUMBER
SERVICE
TEST DETAILS ( VALVE SIGNAL RANGE)
AIR FAILURE OPENS CLOSES STAY PUT
TEST RESULT
LEAKAGE TEST
REMARKS:
CONTRACTOR
ACCEPTED
BY
COMPANY
TEST RESULT
SIGNAL INDICATED VALVE POSITION ACTUAL VALVE POSITION TIME
MIN MAX OPEN CLOSE CLOSE OPEN
MIN MAX CLOSE OPEN OPEN CLOSE
CALIBRATION POINTS
SIGNAL INCREASE VALVE POSITION RESULT SIGNAL DECREASE VALVE POSITION RESULT
OPEN / CLOSED OPEN / CLOSED
75% / 25% 75% / 25%
50% 50%
25% / 75% 25% / 75%
CLOSED / OPEN CLOSED / OPEN
AUXILARY EQUIPMENT MOUNTED WITH VALVE
SOLENOID VALVE TEST SHEET ATTACHED
CONTRACTOR
COMPANY
ADJ.RANGE-SET PRESSURE
TEST RESULT
CLOSING TIME(SEC) OPENING TIME (SEC)
1
2
3
TESTED LABEL AFFIXED DATA SHEET ATTACHED
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 R
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
25
50
75
100
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 S
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
TEST RESULTS:
UNIT SPECIFIED VALUE TEST RESULT REMARKS
COLD SPRING SET PRESSURE
RESET PRESSURE
SEAT LEAK RATE(ANSI B147.1[API 527])
TEST INSTRUMENT DETAILS
TYPE: MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
TESTED LABEL AFFIXED DATA SHEET ATTACHED
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 T
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
MANUFACTURER
DATA SHEET NUMBER
WELL MATERIAL
FLANGE MATERIAL
EXTENSION LENGTH
EXTENSION MATERIAL
EXTENSION CONNECTION
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 U
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
SPECIFIED THICKNESS
ACTUAL DATA
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 V
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 W
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
INSTRUMENTATION CALIBRATION
TYPE MANUFACTURER
TEST RESULTS
% TEMPERATURE PRESSURE
0 INPUT OUTPUT ERROR INPUT OUTPUT ERROR
25
50
75
100
75
50
25
0
TEST INSTRUMENT DETAILS
TYPE MODEL / SERIAL NUMBER CALIBRATION DUE DATE
1
2
3
REMARKS:
CONTRACTOR
BY
COMPANY
FORM NO. : QCP-405 X
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
1. INTRODUCTION
The purpose of this document is to specify the extent of inspection and testing
for Medium & Low Voltage Motor in Early Production Facility (EPF3). This
document also provides the type of inspection and tests, applicable procedure
document, and inspection point involvement by CONTRACTOR and
COMPANY
2. SCOPE
This document is applicable to:
To define the manner in which Medium & Low Voltage Motor will be inspected and
tested on construction projects as per the project specifications.
3. REFERENCE
♦ IEC 60034 Rotating electrical machines
♦ IEC 60072 Dimensions & output series for rotating
electrical machines
♦ IEC 60079 Electrical apparatus for explosive gas
atmospheres
♦ IEC 60085 Electrical insulation –thermal evaluation
Designation
♦ IEC 60529 Degrees of protection provided by
enclosure (IP code)
♦ IEC 62262 Degrees of protection provided by
enclosures for electrical equipment
against external mechanical impacts
(IK code)
♦ ISO 281 Rolling bearings – Dynamic load ratings
& rating life
♦ ISO 2954 Mechanical vibration of rotating &
reciprocating machinery-requirements for
instruments for measuring vibration
severity
♦ ISO 8821 Mechanical vibration –balancing- shaft &
fitment key convention
4. ATTACHMENTS
b) Inspection Forms
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
ITP Table
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
Test Involvement
Reference
Code Activity Description Test Frequency Acceptance Verifying Document
Document
No Criteria CONTRACTOR OMV
Method statement / Procedure Prior to start of the HAR-YE-S2-018-E- IEC 60034 YS2-P10159-013 –E&I-
1 ADM-44 P R
preparation activity PRC-001
Prior to start of the HAR-YE-S2-018-E- IEC 6226
2 Material Receiving Inspection ADM-44 P R
activity
HAR-YE-S2-018-E- IEC 60079 QCP-307E
3 Motor installation After Installation ADM-44 P W
CONTRACTOR: INTRACS P – Perform (100% Surveillance) W – Witness : Notification required (RIT) Presence not mandatory
COMPANY: OMV
R – Review H – Hold Point: Notification required (RIT) Presence mandatory.
RIT- Request For Inspection C S –Check Sheet
& Testing T S - Test Sheet
TBI- To Be Issued
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
Inspection Forms
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
Item Description HIGH, MEDIUM & LOW VOLTAGE MOTOR Test Code No.
Tag no
Item Location/Area ITP No.
Subsystem No.
Sub-System Description Form No.
Reference Drawings
TEST INSTRUMENT USED
No. TYPE SERIAL NUMBER CALIBRATION DUE DATE
1
2
INSULATION RESISTANCE OF WINDINGS
Minimum acceptable insulation values should be 150 megohms
Motor winding shall be tested by 1000V Megohmmeter for medium voltage motor
Motor winding shall be tested by 500V Megohmmeter for low voltage motor
SL No Winding Measured Value
1 U-V
2 U-W
3 V-W
4 U-EARTH
5 V-EARTH
6 W-EARTH
WINDING RESISTANCE
SL No. Winding Measured Value
1 U-V
2 U-W
3 V-W
REMARKS :
CONTRACTOR
BY
COMPANY
Item Description HIGH, MEDIUM & LOW VOLTAGE MOTOR Test Code No.
Tag no
Item Location/Area ITP No.
Subsystem No.
Sub-System Description Form No.
Reference Drawings
TEST INSTRUMENT USED
No. TYPE SERIAL NUMBER CALIBRATION DUE DATE
1
2
POLARIZATION INDEX TEST FOR MEDIUM VOLTAGE MOTOR
Polarization Index should be minimum 2.5
Sl. No. Windings Insulation resistance in 1 minutes Insulation resistance in Measured Polarization
10 minutes Index
1 U – EARTH
2 V – EARTH
3 W - EARTH
Remarks:
CONTRACTOR
BY
COMPANY
Item Description HIGH, MEDIUM & LOW VOLTAGE MOTOR Test Code No.
Tag no
Item Location/Area ITP No.
Subsystem No.
Sub-System Description Form No.
Reference Drawings
TEST INSTRUMENT USED
No. TYPE SERIAL NUMBER CALIBRATION DUE DATE
1
2
CHECK THE CONNECTION OF THE MOTOR
STAR CONNECTION DELTA CONNECTION
U1 U2 U1 U2
V1 V2 V1 V2
W1 W2 W1 W2
W2 U2 V2 W2 U2 V2
U1 V1 W1 W1 U1 V1
R Y B R Y B
CONTRACTOR
BY
COMPANY
FORM NO.: QCP-307C
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
Item Description HIGH, MEDIUM & LOW VOLTAGE MOTOR Test Code No.
Tag no
Item Location/Area ITP No.
Subsystem No.
Sub-System Description Form No.
Reference Drawings
TEST INSTRUMENT USED
No. TYPE SERIAL NUMBER CALIBRATION DUE DATE
1
2
INSULATION RESISTANCE OF SPACE HEATER
Minimum acceptable insulation value should be 10 megohms
Motor heater should be tested by 500V megohmmeter
Sl. No. Winding Measured Value
Remarks:
CONTRACTOR
BY
COMPANY
FORM NO.: QCP-307D
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE MOTOR
CONTRACTOR
by
COMPANY
1. INTRODUCTION
The purpose of this document is to specify the extent of inspection and testing
for Medium & Low Voltage Switchgear in Early Production Facility. This
document also provides the type of inspection and tests, applicable procedure
document, and inspection point involvement by CONTRACTOR and COMPANY
2. SCOPE
This document is applicable to:
To define the manner in which Medium & Low Voltage Switchgear will be inspected
and tested on construction projects as per the project specifications.
3. REFERENCE
♦ HAR-YE-S2-018-E-ADM-44 Medium & Low Voltage Switchgear
♦ IEC-60050-441 International Electro-technical Vocabulary.
Switchgear, control gear & fuses
♦ IEC-60071 Insulation co-ordination
♦ IEC-60099 Surge arresters
♦ IEC-60255 Electrical Relays
♦ IEC-60079 Electrical Apparatus for explosive gas
atmosphere
4. ATTACHMENTS
b) Inspection Forms
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE SWITCHGEAR
ITP Table
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE SWITCHGEAR
Test Involvement
Reference Verifying
Code Activity Description Test Frequency Acceptance
Document Document
No Criteria CONTRACTOR OMV
Method statement / Procedure HAR-YE-S2-
Prior to start of the erection 018-E-ADM-44 HAR-YE-S2-018- YS2-P10159-013
1 preparation P R
activity E-ADM-44 –E&I-PRC-001
HAR-YE-S2- IEC-60076
2 Material Receiving Inspection Prior to start the activity 018-E-ADM-44 P R
CONTRACTOR: INTRACS P – Perform (100% Surveillance) W – Witness : Notification required (RIT) Presence not mandatory
COMPANY: OMV
R – Review H – Hold Point: Notification required (RIT) Presence mandatory.
RIT- Request For Inspection C S –Check Sheet
& Testing T S - Test Sheet
TBI- To Be Issued
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE SWITCHGEAR
Inspection Forms
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE SWITCHGEAR
19 Check power cable are properly fitted & armour & screens earthing is correct
CONTRACTOR
by
COMPANY
FORM NO. : QCP-304 A
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE SWITCHGEAR
Remarks:
CONTRACTOR
d by
COMPANY
FORM NO. : QCP-304 B
OMV YEMEN
EARLY PRODUCTION FACILITY PROJECT
INSPECTION AND TEST PLAN
MEDIUM & LOW VOLTAGE SWITCHGEAR
Space
Control Signaling
Heater
Test VOLT. MINI REQUI. Wiring Wiring
Circuit
INSULATION RESISTANCE – M-OHM
CONTINUITY INSULATION
VT Prim/secondary -
IDENTIFICATION
Primary Secondary Secondary/primary - Earth
Earth
V1a- V2a- V1b- V2b- V3b-
U1 U2 U3 V1a V2a V3a V1b V2b V3b U1-E U2E U3-E V3a-E
E E E E E
CONTRACTOR
COMPANY