Sei sulla pagina 1di 2

Architectural Graphic Skills V

Week Week Dates Tuesday Exercise Deliverables

Introducton to the Working drawings / standard AutoCAD Plan for the residence 200
Week 01 06 AUG - 10 AUG 2018 7-Aug Practces sq.yards.

Demonstratng the working drawings from professional


Week 02 13 AUG - 17 AUG 2018 14-Aug architects Sheet No. 01 :- Site Plan
Proper Format/Setting out Plans/Site Plan

All floor plans,


Week 03 20 AUG - 24 AUG 2018 21-Aug Grid marking, Grid dimensions, Introducton to marking Class Progress/ discussion
Columns , Footng Plan and Beam layout Plan

All floor plans incorporatng the levels, dimensions, door Sheet No. 02 :- Floor Plans
Week 04 27 AUG - 31 AUG 2018 28-Aug window Schedule/legend

Week 05 03 SEP - 07 SEP 2018 4-Sep Class Progress/ discussion


Designing Elevaton, Levels in elevatons, Assigning
materials to the elevatons.
Week 06 10 SEP - 14 SEP 2018 11-Sep Sheet No. 03 :- Elevations

Week 07 17 SEP - 21 SEP 2018 18-Sep Class Progress/ discussion


Detailing Sectons, Levels in sectons, dimensioning,
Representaton of the materials shown in secton.
Week 08 24 SEP - 28 SEP 2018 25-Sep Sheet No. 04 :- Sections

Week 09 01 OCT - 05 OCT 2018 2-Oct Gandhi Jayant


Week 10 08 OCT - 12 OCT 2018 9-Oct Constructon Module by Mr. Mohit Verma/ Mid term Assessment

Basics of Toilet planning, Drafting toilet plans,Internal


Wall Elevatons
Week 11 15 OCT - 19 OCT 2018 16-Oct OR Class Progress/ discussion
Basics of Kitchen planning, working triangle rule, Drafting
kitchen plans, Internal Wall elevatons.

Drawing sectons, detailing slopes, floor drains, floor


traps, fixture locatons, tling plan, and tle drops, etc.
OR
Week 12 22 OCT - 26 OCT 2018 23-Oct Drawing sectons, detailing slopes, hob and hood Class Progress/ discussion
locaton, sink locaton, floor traps, fixture locatons, tling
plan, dado marking and layout and tle drops, slab
heights, overhead cabinets heights etc.

29 OCT - Sheet No. 05 :- Toilet Details/Kitchen


Week 13 30-Oct Class discussion with individual students
02 NOV 2018 Details

Week 14 05 NOV - 09 NOV 2018 6-Nov Diwali Break

Week 15 12 NOV - 16 NOV 2018 13-Nov Class Progress/ discussion


Selecton of one individual detail like wall secton etc. and
working in detail on it (preferable scale 1:5)
Week 16 19 NOV - 23 NOV 2018 20-Nov Sheet No. 06 :- Details

Week 17 26 NOV - 30 NOV 2018 27-Nov FINAL PORTFOLIO SUBMISSION

Potrebbero piacerti anche