Sei sulla pagina 1di 7

S/R 1 6

PRODUCCION
MINERAL 18551.2468913 W
DESMONTE 111307.481348 RPM
RESIST C MINERAL 45000 45 CFM
RESIST C DESMONTE 32000 32 COSTO
FACT CARGA MIN 1.17 1.17 DISPONIBILIDAD
FACT CARGA DESM 0.42 0.42 UTILIZACION
DENSIDAD MINERAL 2.64 2.64
DENSIDAD DESMONTE 1.95 1.95 RANGO DE PENETRACION
BURDEN MIN 5.7 5.7 MINERAL
ESPACIAM MIN 6.5 6.5 DESMONTE
BURDEN DESM 8.5 8.5
ESPACIAM DESM 7.8 7.8 RANGO DE PENETRACION PROMEDIO
ALTURA DE BANCO 15 49.2125984252 PROMEDIO
SD 1 3.280839895
TACO DESM 6 19.6850393701 TIEMPO PRODUCTIVO AL DIA
TACO MIN 4 13.1233595801
DIAMETRO TAL 11 11
TURNOS / DIA 2 2 RANGO DE PENETRACION NETOS AL DIA
HORAS / DIA 24 24
DIAS/MES 30
CALCULO DEL MEC
1.28
36.25
32376.2247561914 MIN PARA BU 49RIII
75159.0931840157 DES CALCULO DE CARGA LINEAL

CALCULO DE PRODUCCION DE 4 PERFORADORAS 23.92


PROD ACTUAL PROD. PROP
430141.271760828 560000 CALCULO DE EXPLOSIVO POR TALADRO
PROD. ADICIONAL DESM MIN ALTURA BANCO
129858.728239172 111307.481 18551.2468913 49.21
MINERAL
DESMONTE

CALCULOS DE TONELADAS POR TALADRO


MINERAL
DESMONTE

CALCULO DE TONELADAS POR DIA


MINERAL
DESMONTE
CALCULO DE PERFORADORAS ADICIONALES
MINERAL
DESMONTE

PERFORADORAS
MINERAL
DESMONTE

UTILIZANDO METROS PERFORADOS


BU 49RIII
120A ADICIONALE
TOTAL
CALCULAR EL O&O
barrenos costo 8798 perf pies /dia
barrenos vida 85000 perf m/dia
estabilizador costo 6868 COSTO PERFORADORAS
estabilizador vida 115000
consumo electrico 320 C1 C. INT SEGURO E I
costo electrico 0.29 Cd C. DEPRECIACION
horas/operativas 5580 C1 + Cd
vida equipo 12 COSTO DE OPERACION
costo de mano de obra 15 costo de reparacio
horas / dia 22.8 cost de energia
cost lubricantes
cost barrenos
cost estabilizad
cost mano de ob
COST OPERA
COST AD + OP

CALCULO DE PERFORACION
BROCA A BROCA B BROCA C
TIPO DE BROCA RB-53 RB-60 RB-67G
COSTO DE BROC 3435.48 3620.65 3759.54
PIES PERFORADOS/BROCA 12349.08 11850.15 11719.25
BORCA A
COSTO DE BROCA 3435.48 3435.48 3435.48
METROS PERFORADOS 3763.99958 3763.999584 3763.99958
RANGO DE PENETRACION 32.0215189 33.9907918677 31.5785421
COSTO DE AD + OP 318.98 314.47 310.86
BROCA B
COSTO DE BROCA 3620.65 3620.65 3620.65
METROS PERFORADOS 3611.92572 3611.92572 3611.92572
RANGO DE PENETRACION 32.0215189 33.9907918677 31.5785421
COSTO DE AD + OP 318.98 314.47 310.86
BROCA C
COSTO DE BROCA 3759.54 3759.54 3759.54
METROS PERFORADOS 3572.0274 3572.0274 3572.0274
RANGO DE PENETRACION 32.0215189 33.9907918677 31.5785421
COSTO DE AD + OP 318.98 314.47 310.86

CALCULO DE BROCAS
PERF 2 PERF3
PERFORADORAS 4 2.21
PIES PERFORADOS/DIA 1979.49524924 1838.02034
VIDA BROCA 12349.08 12349.08
DIAS/MES 30 30

# BROCAS 19.24 9.87

20 10 total

CALCULAR LA CANTIDAD DE NITRATO Y EMULSION

metros perforados / mes 109545.174


metros perf / taladro 16
taladros / mes 6846.5734

taladros desmonte 5868.49149


taladros mineral 978.081914

kg / metro 78.4788544
met carga/ tal desm 10
met carga/ tal miner 12
kg explos desmon 4605524.89
kg explos mineral 921104.977
emulsion NA
desmonte 2302762.44 2302762.44
mineral 460552.489 460552.489

CALCULA REL FACTOR DE POTENCIA

TONELADAS DE MINERAL AL MES 2400000


TONELADAS DE DESMONTE AL MES 14400000
KG EXPLO DESMONTE 4605524.88726
KG EXPLO MINERAL 921104.977452

FACTOR DE POTENCIA MIN 0.3837937406


FACTOR DE POTENCIA DESM 0.3198281172

CALCULAR LA CANTIDAD DE OPERADORES

SISTEMA 4X3
OPERADORES 3.5
PERFORADORAS 7
PERFORSTAS 24.5 25

CALCULAR CAUDAL NETO SUMINISTRADO

FAC. C. TEMP 0.581 PERF 1 PERF 2 PERF 3


FACT ALT 0.46 CFM 2800 2600 2400
CORREGIDO 3821.27358 3548.32546 3275.377350766
PERF 1 PERF 2 PERF 3 PERF 4
298000 310000 300000
98 100 96
2800 2600 2400
6078198 5942588 5845876
88% 86% 84%
87% 86% 88%

O DE PENETRACION
84.62 89.82 83.45
108.46 115.13 106.96

O DE PENETRACION PROMEDIO
105.0574766852 111.518346 103.604141

O PRODUCTIVO AL DIA
18.3744 17.7504 17.7408

O DE PENETRACION NETOS AL DIA


1930.3680996042 1979.49525 1838.02034

LO DEL MEC
0.001 1000000 0.02831685

LO DE CARGA LINEAL
0.7853981634 121 0.00694444

LO DE EXPLOSIVO POR TALADRO


SD TACO MINER TACO DESMON
3.28 13.12 19.69
941.7462523514
784.7885436262

LOS DE TONELADAS POR TALADRO


804.9113267961
1868.544151491

LO DE TONELADAS POR DIA


31572.7110125885 32376.2248 30062.2897
73293.7934220805 75159.0932 69787.4583
LO DE PERFORADORAS ADICIONALES
0.59 0.57 0.62
1.52 1.48 1.59
2.11 2.05 2.21

0.62
1.59

ANDO METROS PERFORADOS m/mes


4 1979.49525 72402.0182
2.21 1838.02034 37143.1562
109545.174

1930.3680996042 1979.49525 1838.02034


588.3761967594 603.350152 560.2286
O PERFORADORAS
6078198 5942588 5845876
70.8 69.2 68.1
90.77 88.75 87.30
161.58 157.97 155.40
O DE OPERACION
36.31 35.50 34.92
92.8 92.8 92.8
9.08 8.87 8.73
2.6710700614 2.7390478 2.54328753
1.5411776199 1.58040002 1.46744852
15 15 15
157.3990308355 156.493611 155.462737
318.98 314.47 310.86

10.8740213201 10.1642154 10.7568692

10.9637161188 10.2539102 10.846564


11.0137954353 10.3039895 10.8966433

30