Sei sulla pagina 1di 9

DATOS

prod-mineral 73947.00 RANGO DE PENETR


ley de mineral 0.71
SC MIN (PA - PSI) 290784261.19 42163.7179 MINERAL
FACTOR DE CARGA 1.62 DESMONTE
MALLA DE PERF 6.00
6.50 RANGO DE PENETRA
TACO MIN 13.12
prod- desmonte 169179.00 RP PROMEDIO
SC DESM (PA - PSI) 238753159.24 34619.21
FACTOR DE CARGA 0.52 PERFORACIO
MALLA DE PERF 9.00
10.00 pies/dia
TACO DESMONTE 16.04
ALTURA DE BANCO 46.21 MEC gr/cm3 - kg/f
SOBRE PERFORAC 4.92
DATOS ADICIONALES 33.98
DIAMETRO (PLG) 12.25 9.00
STRIPING RATIO 0.44 OJO DENSIDAD LINEAL KG/PIE
GUARDIA 10.2
27.81

NUMERO DE PERFORADORAS

ALT BANCO
46.21

EXPLOSIVO EN TALA
MINERAL
DESMONTE

TONELAJE DISPARADO POR


MINERAL
DESMONTE

TONELAJE DIARIO T
MINERAL
DESMONTE
SUMA

PERFORADORAS

7 GRUPOS 3 PERFOS 11 PERFORISTAS


CALCULAR EL COSTO DE PERFORACION
BROCA A BROCA B RP PERFORADORA

TIPO RB-60 RB-67G 88.993833077


COSTO BROCA 3435.48 3759.54 88.993833077
TOTAL PIES PERF 12349.08 11719.25
COSTO TOTAL PERF/HORA 34.95 37.25

DOLARES/PIE 0.67 0.74

CALCULAR CANTIDAD DE BROCAS

PERFORADORAS 3
PIES PERFORADOS DIA
1815.4741947718
VIDA BROCAELEGIDA
12349.08
DIAS MES 30
# DE BROCAS 13.23

perfo pie/dia
BARRENOS - PRECIO 8798 perfo m/dia
BARRENOS - VIDA 85000 PRECIO
ESTABILIZADOR - PRECIO 6868 COSTO INT. SEGURO E IMPUESTO
ESTABILIZADOR -VIDA 115000 COSTO DE DEPRECIACION
consumo electrico 320 C1 + CD
CONSUMO ELECTRICO COSTO 0.29 COSTO DE OPERACION
HORAS OPERADAS /AÑO 5580 C reparaciones
VIDA EQUIPO 12 Cenergia
horas efectivas en dia 20.4 C lubricant
mano de obra 15 C barreno
C estabilizador
C mano de obra
total C opera
costo de adqui + operacion

costo de broca
total de metros perforados
rango de penetracion
costo de adqui + opera
costo de perforacion
SELECCION DE MARTILLO requiere 5 plg
ALTURA 4500
FACTOR DE CORRECCION 0.581
ALTURA DE BANCO 15 CAUDAL NETO SUMINSTR Qn(CFM)
CAUDAL NETO SUM COMPQi(CFM)
CAUDAL PERDIDO Qp(CFM)
FACTO DE CORREC. ALTURFa
FACTO DE CORREC. TEMP Ft
RANGO DE PENETRACION FT/HORA
PERF 1 PERF 2 PERF 3 PERF 4
80.07150371 84.99577506 81.43143611
92.45492315 98.14075529 94.02517523

RANGO DE PENETRACION PROMEDIO


PERF 1 PERF 2 PERF 3 PERF 4
83.8379323 88.99383308 85.26183363

PERFORACION POR DIA


PERF 1 PERF 2 PERF 3 PERF 4
1710.293819 1815.474195 1739.341406

DENSI EXPLO 1PIE


1.2 0.001 1000000 0.028316847

DAD LINEAL KG/PIE DIAMETRO


33.98 0.785398163 150.06 0.006944444

RO DE PERFORADORAS

SOBRE PERF TACO DESM TACO MIN


4.92 16.04 13.12

EXPLOSIVO EN TALADRO KG/TALADRO


1057.12
975.91

TONELAJE DISPARADO POR TALADRO TM/TALADRO


652.5421293
1876.746978

TONELAJE DIARIO TONELADAS / DIA


21827.47448 23169.82978 22198.19176
62777.0146 66637.70212 63843.21784
84604.48909 89807.5319 86041.4096

2.87368 2.70719 2.82569


TIEMPO DE
PERFORACION
ES
138.763323 A
131.686091 B

PER1 PERF2 PERF 3 PERF4


1710.293819 1815.474195 1739.341406
521.297556 553.3565346 530.1512605
6478198 5942588 5286147
75.46287993 69.22369534 61.57698118
96.74728196 88.74832736 78.94484767
172.2101619 157.9720227 140.5218289

38.69891278 35.49933094 31.57793907


92.8 92.8 92.8
9.67 8.87 7.89
2.644968799 2.807630214 2.689890882
1.526117483 1.619971304 1.552037024
15 15 15
160.3447273 156.6017652 151.5143517
332.5548891 314.5737879 292.0361806

3435.48 3435.48 3435.48


3763.999584 3763.999584 3755.355
25.55380176 27.12532032 25.98780689
332.5548891 314.5737879 292.0361806
13.92663111 12.509774 12.1522524
5 7 5
1 2 3
529 1200 750
721.9477577 1637.688675 1023.555422
192.9477577 437.6886754 273.5554221
0.46 0.46 0.46
0.581 0.581 0.581
PERFORADORAS
ESPECIFICACIONES PERF 1 PERF 2 PERF 3 PERF 4
Peso de maquina perforando (LIBRAS) 298000 310000 330000
RPM 98 100 90
COSTO 6478198 5942588 5286147

Potrebbero piacerti anche