Sei sulla pagina 1di 26

CE Congestion Analysis

RAJASTHAN CIRCLE

Prepared By:
Yash Sinha ,
UMTS TEAM Rajasthan Circle
Date : 29/09/2012
Major Issue observed :

The increasing UL Traffic for the R99 and HSPA Services has impacted the NQI , since the UL CE cong.
was pegged and contributed towards the low access rate. Details of Jaipur and Ajmer RNC is as below.
The below BAR chart indicates the Success Rate for RRC, HSDPA, HSUPA and R99:

100 99.80247311

99.5
99
98.49047026 98.55745252
98.5
98
97.5929836
97.5
97
96.5
96 Ajmer RNC , 30.8.2012 DBH Hour
1

RRC Success Rate HSDPA Success Rate HSUPA Success Rate PS R99 Success Rate

100
99.54172105

99

98
97.45444232
96.99882477
97
96.22048558
96

95

94
Jaipur RNC , 30.8.2012 DBH Hour
1

RRC Success Rate HSDPA Success Rate HSUPA Success Rate PS R99 Success Rate
Now we dig up the major cause for the RAB Failure in PS Mode , and found that the RAB Failure
was mainly due to UL CE cong.

Details of RAB Failure in Ajmer RNC :

Details of RAB Failure in Jaipur RNC :

0
638

268 1602
0

VS.RAB.FailEstabPS.TNL VS.RAB.FailEstabPS.ULCE.Cong
VS.RAB.FailEstabPS.ULIUBBand.Cong VS.RAB.FailEstabPS.ULPower.Cong
VS.RAB.FailEstabPS.UuNoReply
Below is the list of sites which were having PS RAB , RRC cong. The Card relocation and addition
was done for the sites indicated in green color which reduced the overall CE Cong. in Jaipur RNC.

KPI Snap shot for the sites under CE cong. :


Major Breakthrough achieved for the congestion removal :

1. CE Hardware addition.
2. LDR Parameter change.
3. User BIT Rate reduction.
4. Parameter optimization for Power and Code Cong. removal.
5. Physical Optimization activity performed on the cells.

The details of each breakthrough and impact observed after the changes is covered as
below :
1.1.1 CE HARDWARE ADDITION:

CE hardware addition performed on top 10 priority sites of which 5 cards were taken from switched off
sites (Near to school) , 4 card from spares and 1 from non operational site(SMS Hospital). The sample of
PRE and POST KPI observed after the CE Card addition is as below.

KPI OF Kumbhamarg before CE card addition:


Post KPI of Kumbhamarg Site after the CE card addition: the below graph indicates that
the major improvement has been observed after the CE Card addition on the sites having high
CE Cong. ratio on RRC and RAB. It is due to the High CE requirement for HSUPA and R99
Services.
1.1.2 LDR Parameter Changes :

LDR Parameter changes performed in the Jaipur and Ajmer RNC dated 26th Sept 2012 , after which the
Ajmer RNC success rate increased by approx 10 % and Jaipur RNC increased by 1.2 %

HSDPA , HSUPA , R99 Access Success Rate since 27th Aug 2012.

HSDPA + HSUPA + R99 Access Success Rate


100.00

95.00

90.00 89.44 89.37


88.21 88.65
87.3287.76
85.00 85.72 85.69
84.56 83.7184.1084.39
82.2782.27 82.73
81.08 81.59 81.47 81.46
80.80
80.00 79.95
78.38
76.72 77.08
75.00 75.86
73.21
72.44 72.47
72.0571.39 71.03
70.00

65.00 66.05

60.00
24-Aug 29-Aug 3-Sep 8-Sep 13-Sep 18-Sep 23-Sep 28-Sep 3-Oct

RC-G-AJMR-RNC-01-HU RC-G-JIPR-RNC-01-HU

PAYLOAD TREND FOR AJMER RNC FOR DBH HOUR


Payload in Mb
6000
5000
4000
3000
2000
1000
0

HSUPA Payload(MB) PS R99UL Payload(MB)


Site wise analysis where the LDR parameters were changed in the Ajmer RNC :

It can be clearly seen as per the above graph that the VS.RAB.FAILESTABPS.UL.CE.CONG. counter value
has been decreased significantly after the changes implemented on 26th Sept 2012 , these sites were
contributing the 80 to 90 % of CE cong at the RNC level.
1.1.3 User BIT Rate reduction:

2. Parameter impact details

The below graph indicates the Average no. of Radio bearers hourly in the UL direction for Background
and Interactive class before the Parameter changes.

2500
VS.RB.PS.Bkg.UL.32
2000
VS.RB.PS.Bkg.UL.64
1500
VS.RB.PS.Int.UL.32
1000
VS.RB.PS.Int.UL.64
500

0
09/12/2012 03:00

09/12/2012 20:00
09/12/2012 00:00
09/12/2012 01:00
09/12/2012 02:00

09/12/2012 04:00
09/12/2012 05:00
09/12/2012 06:00
09/12/2012 07:00
09/12/2012 08:00
09/12/2012 09:00
09/12/2012 10:00
09/12/2012 11:00
09/12/2012 12:00
09/12/2012 13:00
09/12/2012 14:00
09/12/2012 15:00
09/12/2012 16:00
09/12/2012 17:00
09/12/2012 18:00
09/12/2012 19:00

09/12/2012 21:00
09/12/2012 22:00
09/12/2012 23:00
The below graph indicates the Average no. of Radio bearers hourly in the UL direction for Background
and Interactive class After the Parameter changes.

2000
1800 VS.RB.PS.Bkg.UL.32
1600
1400 VS.RB.PS.Bkg.UL.64
1200
1000 VS.RB.PS.Int.UL.32
800 VS.RB.PS.Int.UL.64
600
400
200
0

The changes at the RNC for the parameter UlBeTraffInitBitrate setted to D32 was done at 16:00 Hrs.
After the changes we can clearly see that the 64 RB has reduced on both Bkg , Interactive and 32 RB has
take the initial call attempts from 64 RB.

The Below graph indicates the Payload (MB) and R99 Throughput (bps) , It can be clearly seen from the
below graph that the PS 128 UL Payload increases as the Busy Hour approaches since the data download
and the CE bit rate reduction is functional.

5000 40
4500 PS128
35
4000 R99UL
30 Payload(MB)
3500
3000 25
2500 20 PS384
2000 R99UL
15
Payload(MB)
1500
10
1000
500 5
PS64 R99UL
0 0 Payload(MB)
09/13/2012 02:00

09/13/2012 14:00
09/13/2012 01:00

09/13/2012 03:00
09/13/2012 04:00
09/13/2012 05:00
09/13/2012 06:00
09/13/2012 07:00
09/13/2012 08:00
09/13/2012 09:00
09/13/2012 10:00
09/13/2012 11:00
09/13/2012 12:00
09/13/2012 13:00

09/13/2012 15:00
09/13/2012 16:00
09/13/2012 17:00
09/13/2012 18:00
09/13/2012 19:00
09/13/2012 20:00
09/13/2012 21:00
09/13/2012 22:00
09/13/2012 23:00
VS.PS.Throu
ghput.UL64.
bps

The below chart indicates the LDR BE Rate reduction and the UL R99 Payload.

300 10000
9000 VS.LC
250 8000
7000 C.LDR.
200 UL.BE
6000
150 5000 RateD
4000 own
100 3000
50 2000
1000 PS
0 0 R99UL
Paylo
ad(M
B)
Hourly details of PS RB : The below graph will indicate the PS RB Details at diff. hours on 13 th Sept
2012.

The below bar chart indicated the Average RB Users on the diff. SF.

1. Bar Chart Indicating the RB @ 13/09/2012, 16:00 Hrs

2000
1800 VS.RB.PS.Bkg.UL.1
1600 28
1400 VS.RB.PS.Bkg.UL.1
1200 44
1000 VS.RB.PS.Bkg.UL.1
800 6
600 VS.RB.PS.Bkg.UL.2
400 56
200 VS.RB.PS.Bkg.UL.3
0 2
VS.RB.PS.Bkg.UL.3
84
VS.RB.PS.Bkg.UL.6
4
VS.RB.PS.Bkg.UL.8

The above chart indicates the high UL 64 RB as Initialbit rate was UL64.

2. Bar Chart Indicating the RB @ 13/09/2012 , 19:00 Hrs

1200
VS.RB.PS.Bkg.UL.128
1000
VS.RB.PS.Bkg.UL.144
800

600 VS.RB.PS.Bkg.UL.16

400 VS.RB.PS.Bkg.UL.256

200
VS.RB.PS.Bkg.UL.32
0
VS.RB.PS.Bkg.UL.384

VS.RB.PS.Bkg.UL.64

VS.RB.PS.Bkg.UL.8

The above chart indicates the high UL 32 RB as Initialbit rate after implementation.
3. Bar Chart Indicating the RB @ 13/09/2012 , 23:00 Hrs

1200
1000
VS.RB.PS.Bkg.UL.128
800
VS.RB.PS.Bkg.UL.144
600
VS.RB.PS.Bkg.UL.16
400
VS.RB.PS.Bkg.UL.256
200 VS.RB.PS.Bkg.UL.32
0 VS.RB.PS.Bkg.UL.384
VS.RB.PS.Bkg.UL.64
VS.RB.PS.Bkg.UL.8

The above chart indicates the high UL 32 and UL 64 RB at DBH Hour, after implementation.
3. Congestion analysis on the RNC level:

The below chart indicate the impact of Parameter changes on the RNC Level.

1. RNC WISE RRC and RAB Cong. Analysis on 13th Sept 2012 :

4500
VS.RRC.Rej.ULCE.Cong
4000
3500
3000
2500 VS.RAB.FailEstabCS.UL
CE.Cong
2000
1500
1000 VS.RAB.FailEstabPS.UL
500 CE.Cong
0

The PS RAB Cong. Due to UL CE was 4253 @ 22:00 Hrs and 2332 @ 23:00 Hrs (DBH)

If we compare the DBH hour data of 13th and previous days we find a reduction of around 3K .
10000
12000
14000

0
2000
4000
6000
8000
09/11/2012 00:00
09/11/2012 02:00
09/11/2012 04:00
09/11/2012 06:00
09/11/2012 08:00
09/11/2012 10:00
09/11/2012 12:00
09/11/2012 14:00
09/11/2012 16:00
09/11/2012 18:00
09/11/2012 20:00
09/11/2012 22:00
09/12/2012 00:00
09/12/2012 02:00
09/12/2012 04:00
09/12/2012 06:00
09/12/2012 08:00
09/12/2012 10:00
09/12/2012 12:00
09/12/2012 14:00
2. RNC WISE RRC and RAB Cong. Analysis on 12th and 11th Sept 2012 :

09/12/2012 16:00
09/12/2012 18:00
09/12/2012 20:00
09/12/2012 22:00
g

LCE.Cong
LCE.Cong
VS.RRC.Rej.ULCE.Con

VS.RAB.FailEstabPS.U
VS.RAB.FailEstabCS.U
3. Radio Bearer analysis on the Site level:

The below details will focus on the PS UL CE cong. analysis on the site level.

1. RB wise details @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.

30
25
20
15 VS.RB.PS.Bkg.UL.32
10 VS.RB.PS.Bkg.UL.64
5 VS.RB.PS.Int.UL.32
0 VS.RB.PS.Int.UL.64

2. RB wise details @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

30
25
20
15 VS.RB.PS.Bkg.UL.32
10 VS.RB.PS.Bkg.UL.64
5 VS.RB.PS.Int.UL.32
0 VS.RB.PS.Int.UL.64
50

0
100
150
200
250
300
09/12/2012 00:00
09/12/2012 01:00
09/12/2012 02:00
09/12/2012 03:00
09/12/2012 04:00
09/12/2012 05:00
09/12/2012 06:00
09/12/2012 07:00
09/12/2012 08:00
09/12/2012 09:00
09/12/2012 10:00
09/12/2012 11:00
09/12/2012 12:00
09/12/2012 13:00
09/12/2012 14:00
09/12/2012 15:00
09/12/2012 16:00
09/12/2012 17:00
09/12/2012 18:00
4. UL CE Cong. analysis on the Site Ghatgate(win5):

09/12/2012 19:00
09/12/2012 20:00
09/12/2012 21:00
09/12/2012 22:00
09/12/2012 23:00
1. UL CE Cong. @ 12th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

2. UL CE Cong. @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
ng
ng
CE.Cong

PS R99UL
Payload(MB)
abPS.ULCE.Co
abCS.ULCE.Co
VS.RRC.Rej.UL

VS.RAB.FailEst
VS.RAB.FailEst
200 300 VS.RRC.Rej
180 .ULCE.Con
160 250 g
140 VS.RAB.Fai
200
120 lEstabCS.U
100 150 LCE.Cong
80 VS.RAB.Fai
60 100 lEstabPS.U
LCE.Cong
40 50 PS R99UL
20
Payload(M
0 0
B)

3. UL CE Cong. @ 12th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.

14
12
10 J Congestion
8 Analysis -RRC
6 Congestion Ratio

4
2
0
09/12/2012…

09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…

09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…
09/12/2012…

09/12/2012…

J Congestion
Analysis - PS RAB
Congestion Ratio

4. UL CE Cong. @ 13th Sept 2012 of site GHATGATE(WIN5) having high Cong. in UL.
8
J
7 Congestio
6 n Analysis
5 -RRC
4 Congestio
n Ratio
3
2
1 J
Congestio
0
n Analysis
- PS RAB
Congestio
n Ratio

5. UL CE Cong. analysis on the Site SITAPURA :

1. UL CE Cong. @ 12th Sept 2012 of site SITAPURA having high Cong. in UL.

5000 120 VS.RRC.Rej.ULCE.Cong


4500
4000 100 VS.RAB.FailEstabCS.ULCE.Cong
3500 80
3000 VS.RAB.FailEstabPS.ULCE.Cong
2500 60
2000 PS R99UL Payload(MB)
1500 40
1000 20
500
0 0

2. UL CE Cong. @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.
0
1500
2000
2500
3000
3500

500
1000
09/13/2012 00:00
09/13/2012 02:00
09/13/2012 04:00
09/13/2012 06:00
09/13/2012 08:00
09/13/2012 10:00
09/13/2012 12:00
09/13/2012 14:00
09/13/2012 16:00
09/13/2012 18:00
09/13/2012 20:00
09/13/2012 22:00
09/14/2012 00:00
09/14/2012 02:00
09/14/2012 04:00
09/14/2012 06:00
09/14/2012 08:00
09/14/2012 10:00
0
20
60
80

40
100
120
140

3. UL CE Cong. @ 12th Sept 2012 of site SITAPURA having high Cong. in UL.
VS.RRC.Rej.ULCE.Cong

PS R99UL Payload(MB)
VS.RAB.FailEstabPS.ULCE.Cong
VS.RAB.FailEstabCS.ULCE.Cong
80
70
60 J Congestion
Analysis -RRC
50 Congestion
40 Ratio
30
20
10
0

08:00
00:00
01:00
02:00
03:00
04:00
05:00
06:00
07:00

09:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
J Congestion
Analysis - PS
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
09/12/2012
RAB Congestion
Ratio

4. UL CE Cong. @ 13th Sept 2012 of site SITAPURA having high Cong. in UL.

60
J
50
Congestion
40 Analysis -
RRC
30 Congestion
Ratio
20

10 J
0 Congestion
Analysis -
PS RAB
Congestion
Ratio

6. DT ANALYSIS on the site after parameter changes :

Details Of R99 Upload during the DT , 200 MB File was being UP Loaded on the Sendspace Server.
1.1.4 Parameter optimization for Power and Code Cong. removal :

After the addition of CE card it has been observed that the Power and code cong. tends to rise sharply
on the sites, so to counter that we alter the below parameters.
Thank You