vity Activi
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
No. ties
Cleari
ng the
area
by
remov
ing
1
weeds
and
unwa
nted
plants
2
Keepi
123
ng the
proce
ss
area
plain
Applyi
ng
ceme
nt and
buildin
g
3
blocks
in
constr
ucting
the
plant.
4
Final
stage
124
of
plant
constr
uction
Install
ation
5 of
equip
ment
Install
ation
of
Electri
6. cal
conne
ction
and
supply
125
Start
of
7.
Opera
tion
vity Activi
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
No. ties
Cleari
ng the
area
by
1
remov
ing
weeds
and
126
unwa
nted
plants
Keepi
ng the
2 proce
ss
area
plain
Applyi
ng
ceme
nt and
buildin
3
g
blocks
in
constr
ucting
the
127
plant.
Final
stage
of
plant
constr
4
uction
Install
ation
5
of
equip
ment
Install
ation
6. of
Electri
128
conne
ction
and
supply
Start
of
7.
Opera
tion
vity Activi
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
No. ties
Cleari
ng the
1
area
by
129
remov
ing
weeds
and
unwa
nted
plants
Keepi
ng the
2 proce
ss
area
plain
Applyi
ng
ceme
3
nt and
buildin
blocks
130
in
constr
ucting
the
plant.
Final
stage
of
4
plant
constr
uction
Install
ation
5
of
equip
ment
Install
6. ation
of
131
Electri
conne
ction
and
supply
Start
of
7.
Opera
tion
vity Activi
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
No. ties
Cleari
1
ng the
132
area
by
remov
ing
weeds
and
unwa
nted
plants
Keepi
ng the
proce
2
ss
area
plain
Applyi
ng
3 ceme
nt and
buildin
133
blocks
in
constr
ucting
the
plant.
Final
stage
of
plant
constr
4
uction
Install
ation
5
of
equip
ment
134
Install
ation
of
Electri
6. c
conne
ction
and
supply
Start
of
7.
Opera
tion
135
vity Activi
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
No. ties
Cleari
ng the
area
by
remov
ing
1
weeds
and
unwa
nted
plants
Keepi
ng the
2 proce
ss
area
plain
3
Applyi
136
ng
ceme
nt and
buildin
blocks
in
constr
ucting
the
plant.
Final
stage
of
plant
constr
4
uction
137
Install
ation
5
of
equip
ment
Install
ation
of
Electri
6. c
conne
ction
and
supply
Start
of
7.
Opera
tion
138
Paraffin Wax Manufacturing Plant Work Schedule
vity Activi
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
No. ties
Cleari
ng the
area
by
remov
ing
1
weeds
and
unwa
nted
plants
Keepi
2
ng the
proce
139
ss
area
plain
Applyi
ng
ceme
nt and
buildin
g
3
blocks
in
constr
ucting
the
plant.
Final
stage
of
4
plant
constr
uction
140
Install
ation
5
of
equip
ment
Install
ation
of
Electri
6. c
conne
ction
and
supply
Start
of
7.
Opera
tion
141
III. Quality Assurance and Control
Products made from crude oil are vastly used in our daily living and plays
an important role to give the community its daily necessities. In order to do so, in
Quality Assurance and control program has no other goal than to return
(PD1686), Clean Air Act (Ra 8749), Clean Water Act (RA 9275), Ecological Solid
Waste Management Act (RA 9003) and Toxic, Hazardous and Nuclear Waste
Act (RA 6969), the consumers (include the residential area), are assured that no
Quality Assurance
142
whose sole function is to manage and improve the process. The Quality Manager
is responsible for development of the facility quality manual which defines roles
Quality Control
confirm that laboratory analyses are reliable, and verify that the reported results
are suitable to support decisions, and measure and document of any uncertainty
Assurance Plan while each laboratory should have a written Quality Control Plan.
procedures, process and product specification and planned details for process
assessment. The Quality Control plan should detail the process for generating
1. Certificate of Analysis
3. Batch Description
4. Shipment Information
143
A. Commissioning and Dry-run Stage
B. Operation Stage
V. Risk Management
Action Plan
PLANT LAYOUT
144
Isometric view of the location site
145
146
CHAPTER VIII
Summary of Findings
follows:
1. The proposed Oil Refinery plant will be located at Sumira, Camarines Sur in
Bicol Region. It is expected that the demand for diesel, gasoline, LPG and other
petroleum by-products such as naphtha, kerosene and related jet aircraft fuels,
147
fuel oils, lubricating oil, paraffin wax, asphalt and tar, petroleum coke, sulfur,
olefins, plastics, will continue to keep up with the country’s growing polymer
industry.
Conclusions
mentioned above.
target customers and target location is important since these will be used as
148
2. Technical aspects such as mass balance and energy balance and equipment
cost and specifications, are needed to evaluate the plant overall efficiency since
investment, operating expenditure, payback period and rate of return are needed
generated during construction and operation of the plant and the mitigation
measures needed to minimize the impact of the waste generated by the Oil
Refinery plant.
5. Design, which uses a 1:1 ratio of ethylene and benzene as feedstock, shows
that its process is highly efficient, economically viable and has low impact in
the environment. This design option will have the highest potential among the
Recommendations
1. The Oil Refinery plant should always consider a strategic target location to
maximize its resources. Easier access to raw materials and target customers
should always be preferred to lessen costs. The plant should also meet the
149
2. The equipment should be set to function with optimal efficiency since it will
150