precaution during estimation under the guidance of SH. AJII SINGH (SR.
LECT.) They told us many important points during the project. We got the
= 19.48m
SUB.CKT. NO:-6
From DB to SB17 = 1.5 (along the H.R.)
= 112.36m
= 290m + 135m
= 525m
GALVANISED STEEL:-
= 15m
= 16.5m
MATERRIAL TABLE
TOTAL 25253/-
COST