Sei sulla pagina 1di 1

Emmanuel SJB Industrial Compound, Manila South Rd,

SIEGEN
United Siegen Philippines Corp.
San Isidro, City of Cabuyao, Laguna, Philippines 4025

Tel. (049) 559-3044


Mobile (Smart): 0943-707-8687
Mobile (Globe): 0917-160-2544

siegenphils@gmail.com
uspc@siegenphilippines.com
Attention:
www.siegenphilippines.com
Mr. Jasper Balatero
RUCKS KUNSULT CONSTRUCTION SERVICE INC.

QUOTATION / PROPOSAL
jas.bals.jb@gmail.com

Subject: Fabrication of 10,000 Liters Aboveground Storage Tank (AST)


Total Due: Date: Delivery/Pick up Date Reference No.
₱ 190,400.00 June 17, 2019 TBD USPC-2019-0761

QTY ITEM DESCRIPTION UNIT PRICE TOTAL


1 Supply of labor, materials and Technicnal Supervision for the ₱ 170,000.00 ₱ 170,000.00
design and fabrication of 10,000 Liters Above Ground Storage Tank (AST)

Specification
• 7ft x 10ft length
• 5mm High Grade MS Plate
• Shell and Flat Heads
• With sealed bolted Standard manhole (600mm I.D)
• All stub-out (Inlet,discharge,purge,breather)
• Leak tested/Pressure Test 5 PSI
• Machine Precision Rolling
• Access Ladder
• Saddle Stand
• 6011 welding root-pass & 7018 Welding Capping
• Hose type sigth gauge
• 2 coats Epoxy primer (exterior)
• 2 coats Gray Finish (exterior)

Delivery:
not yet included in the price.
Lead Time:
20 working days and 7 days preparation prior to the commencement of the project

Sub Total (VAT Ex.) ₱ 170,000.00


12% VAT ₱ 20,400.00
Total (Vat In.) ₱ 190,400.00
Note: Please read the terms and conditions carefully.

Payment Terms
50% DOWN PAYMENT (NON-REFUNDABLE) Jeanalyn Banaga Camille Reonal
30% PROGRESS BILLING VP Admin Sales Support
20% PRIOR TO PICK UP/DELIVERY OF THE TANK Approved By Prepared By
12% VAT INCLUSIVE

For Check Payments, please indicate:


UNITED SIEGEN PHILIPPINES CORP. By affixing my signature, I accept and conform with all the
Thank you for the opportunity to serve you. foregoing items/details in this Quotation/Proposal.

Terms & Conditions:


1) This Quotation is Valid only for Thirty (30) Working days, otherwise, subject
for revision.
2) Jobs not picked up Five (10) Working days after completion will be subject ________________________ _________________
to additional One (1)% of the Total Price per day for warehousing cost. Mr. Jasper Balatero Date
3) Other appurtenances not mentioned above are excluded.

Potrebbero piacerti anche