Location ROCK SLOPE

Coordinate
Date/ Time
Number of Slope
Strike
Dip
Rock Type

Dip
Tinggi Lereng Strike
BD Dip (°) Direction Analisis Runtuhan Lereng
(N°E)
(N°E)
Total Slope
X α= β= sin (α-β) H.I 1
Height
2 Plane topling
3
4 Wegde circular
5
6
Sin α = sin β = 7
8
Hitungan : 9
10
11
12
13
14
15
16
17
18
19

Trend : RMR :
20 Plunge :
PENENTUAN ROCK QUALITY DESIGNATION (RQD)
SLOPE / TUNNEL
Location :
Date/ Time :
Rock Type :

Spasi kekar RQD (%)


No ∑ Jv / 1m2
(mm) = 115 - 3,3 (Jv)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
FAKULTAS TEKNOLOGI MINERAL
INSTITUT TEKNOLOGI MEDAN

TEROWONGAN SIBAGANDING
KABUPATEN TOBA SAMOSIR PROVINSI SUMATERA UTARA

SLOPE, FACE GEOLOGICAL & G.O.B RECORD


Location Excavation method
Date/Time Support type
Station Tunnel direction
Rock Description
Rock Type :

Remark

Rock Mass Classification (RMR)


A Zone B Zone C Zone
Parameter
Estimation Rating Estimation Rating Estimation Rating

Strenght of intac rock material (Point load index) from UCS

RQD (%) approx.

Spacing of discontinuities

Discontinuity length (persistance)

Separation (aperture)

Roughness
Discontinuity
Infilling (gauge)

Weathering

Total Rating

Ground Water

Strike Perpendicular to tunnel axis


(Adjusment for
joint
orientation) Paralel to tunnel axis

Total Rock Mass Rating (RMR)

Meaning of Rock Class

Geological Overbreak Assesment(*)

Item Description Favourable Unfavourable Remark

Joint Direction

Fracture zone

Ground water

Laminated joint

Joint condition

Rock Mass Condition

(*) actual volume of geological overbreak is measured and confirmed by survey (attached)
Recommendation:

Mengetahui, Diperiksa Oleh: Diajukan Oleh: