Sei sulla pagina 1di 2

Job Procedure No:GAIL-MECON-NRP-CGR-KKBMPL-JP-15

Project :HDD & Associated works for Chandragiri


River for KKBMPL, Phase-II
OWNER : M/s GAIL (INDIA) LIMITED
PMC : M/S MECON LIMITED
CONTRACTOR : NRP PROJECTS PVT. LTD.

SAFETY INDUCTION FORMAT


Project Name: KKBMPL PROJECTS, PHASE-1 DATE:
Contractor Name:
Sr.
Name Designation Age Signature
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Points Discussed (Tick out): -

Importance of PPE’s. Housekeeping


Emergency Assembly Point Driving
General Method of accident prevention. Precaution in Excavation
Precaution while working at height Precaution in Electrical
Emergency Response Location of First-Aid
Material Handling General HSE Rule and Regulation
Important Numbers Operation of Fire Extinguisher
Overview of Project Hazards at Project sites
HSE Policy Prohibited of Drugs & Alcohols

Signature
HSE Engineer
Job Procedure No:GAIL-MECON-NRP-CGR-KKBMPL-JP-15

Project :HDD & Associated works for Chandragiri


River for KKBMPL, Phase-II
OWNER : M/s GAIL (INDIA) LIMITED
PMC : M/S MECON LIMITED
CONTRACTOR : NRP PROJECTS PVT. LTD.

SAFETY INDUCTION FORMAT


Project Name: KKBMPL PROJECTS, PHASE-1 DATE:
Contractor Name:

Potrebbero piacerti anche