Sei sulla pagina 1di 1

Part Fab QC Comp Fab Comp Fab SQ-UP Date Visual Dim.

ual Dim. PT Date MT Date PMI Date RT/Date BHN/Date UT/Date PWHT/Date Hydro/Date
Date Date QC Date Date USE MATERIAL MARKED FOR THIS JOB
ITEM QTY.
BPC FURNISHED MATERIAL

"T"

"S" "T" "P"


ISOLATION STRIP
WHEN CARBON STEEL CLAMP ARE USED
ON STAINLESS STEEL PIPES, IT IS
2T ("T" < 10°) NECESSARY TO PUT IN THE CONTACT

"M"

"M"
3T ("T" < 12°) ZONE A THIN PLATE ACCORDING TO
SPECIFICATION REQUIREMENTS
BANDA DE AISLAMIENTO
CUANDO EL ÁRBOL DE ACERO AL
CARBONO SE UTILIZA EN TUBOS DE
SEE DETAIL ACERO INOXIDABLE, ES NECESARIO

"H"

"H"
PONER EN LA ZONA DE CONTACTO UNA
PLACA DELGADA DE ACUERDO CON LOS
" REQUISITOS DE ESPECIFICACIÓN
FLAT "R
BAR P xT

"Ø" PIPE

"H"

"H"
BOLT
C OF MACHINE BOLT NUT
L
(TYP)

"M"

"M"
"A"
"Ø" HOLE EXAMPLE: 2 "CASE PIPE

CL02 - ØPIPE - MAT CLASS


SCALE 1_2 UNITS
SUPPORT
ITEM DESCRIPTION QTY DETAIL
ELEMENT TYPE
(1) STRIP 2 FLAT BAR PxT A4

(2) BOLT 3 SEE TABLE "1" A6

(3) NUT 3 SEE TABLE "1" A7

(4) ISOLAT. STRIP 1 PLATE SEE NOTE (2)

Potrebbero piacerti anche